Paul Industries is a US process equipment contractor for Romania that engineers and fabricates pressure vessels, purified water and WFI systems, clean steam, CIP skids, process tanks, refinery pump skids and cooling packages serving Romania’s drug, vehicle, refining and food producers, designed to the EU Pressure Equipment Directive and documented for ISCIR operating authorization at 400 V and 50 Hz. Each system sails to the port of Constanta, moves inland by road or rail, and Paul installs, starts up and commissions it at the plant or supervises the installation. Paul Industries has its headquarters at 256 Shore Drive in Kilmarnock, Virginia; the company was formerly based in northern New Jersey and later in Pennsylvania.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
Pressure equipment law PED via HG 123/2015; ISCIR operating authorization under Law 64/2008
Power 230/400 V, 50 Hz
Medicines regulator NAMMDR (ANMDMR), PIC/S since 1995
Main port Constanta, on the Black Sea
VAT 21 percent standard rate since 1 August 2025
Reviewed November 2026

The scope of a US process equipment contractor for Romania

The scope of a US process equipment contractor for Romania runs from process design and fabrication in the United States through export, site installation, ISCIR operating authorization support and qualification, with every document in a form a Romanian inspector and a corporate quality unit both accept. For Romanian plants, Paul Industries builds pressure vessel fabrication packages, pump skids, heat exchangers, high-purity water systems for WFI and purified water, clean steam systems and CIP and SIP systems.

Romanian buyers choose among three delivery routes. Equipment supply with supervision delivers tested modules and Paul’s direction of the setting, tie-in and start-up work. Design-build adds layouts, utility connections and controls around the equipment. Turnkey delivery covers the complete system, from requirements to executed qualification, under one contract and one schedule. Romania appears among the Central and Eastern European countries on Paul’s international projects page.

Pharmaceutical companies in Romania and their manufacturing sites

Pharmaceutical companies in Romania produce antibiotics, generics and branded medicines at plants in Bucharest, Iasi, Cluj-Napoca and Targu Mures. These names describe the market and what its plants buy; none of them is presented as a Paul project.

Antibiotice runs its plant in Iasi and plans a research center and critical medicines plant of about 75 million euros, with works scheduled from summer 2026. Zentiva manufactures at two Bucharest sites, Zentiva SA and Labormed Pharma. Terapia, Sun Pharma’s Romanian subsidiary, manufactures in Cluj-Napoca, and Gedeon Richter Romania has produced medicines in Targu Mures since it bought the Armedica plant in 1998.

Romanian industrial regions and the systems Paul Industries supplies
RegionPlants named as market factsProcess needsSystems from Paul Industries
Bucharest and IlfovZentiva and Labormed Pharma sitesPurified water, formulation, cleaning, HVAC chilled waterWater systems, mixing vessels, CIP skids, chillers
Moldavia (Iasi)Antibiotice plant and planned critical medicines plantFermentation and sterile utilities, WFI, clean steamWFI loops, clean steam generators, fermentation support vessels
Transylvania (Cluj-Napoca, Targu Mures)Terapia, Gedeon Richter RomaniaOral solid dose utilities, purified water, process coolingPurified water, glycol systems, compressed air piping
Muntenia and Oltenia (Mioveni, Craiova, Brazi)Dacia Mioveni, Ford Otosan Craiova, Petrobrazi refineryPaint shop water, machining coolant, refinery turnaround equipmentFiltration skids, tanks, pressure vessels, exchanger bundles
Dobrogea (Constanta, Navodari)Petromidia refinery, port industryHydrocarbon processing, tank farms, cooling waterPressure vessels, pump skids, alloy spools, cooling systems

Antibiotics, sterile products and the pharmaceutical industry in Romania

The pharmaceutical industry in Romania includes antibiotic production, which pairs fermentation and downstream purification with sterile filling, and that combination asks for large WFI capacity, clean steam for sterilizing fermenters and lines, and validated CIP across many circuits. Paul designs WFI generation and storage, distribution loops held hot or sanitized on schedule, and clean steam generators sized for peak sterilization demand, all to ASME BPE with documented welds and surfaces, as described on its sterile injectables page.

Romanian pharmaceutical companies making sterile products follow Annex 1 of EU GMP as revised, applicable from 25 August 2023, and their contamination control strategy covers each water, steam and gas system. Pharmaceutical manufacturing companies in Romania making tablets and capsules lean instead on purified water, compressed air and dehumidified HVAC, and Paul sizes those utilities to the production plan the plant gives.

GMP inspection by NAMMDR

NAMMDR, the National Agency for Medicines and Medical Devices of Romania (ANMDMR in Romanian), inspects manufacturing sites against EU GMP and has been a PIC/S participating authority since November 1995, after joining the original Pharmaceutical Inspection Convention in 1982. Paul prepares design, installation and operational qualification protocols in the plant’s own document system, in English with Romanian versions where the quality unit requests them, so an inspector follows the evidence from the requirements to the data.

Water systems carry the longest qualification tail. Performance qualification for a WFI or purified water system typically runs in phases over about a year, starting with intensive daily sampling at every point of use and stepping down once the results prove stable, so the date sampling begins decides when the plant releases product made with that water. Paul flushes, passivates and sanitizes each loop before sampling starts and stays with the Romanian quality unit through the first phase to close any excursion with a documented cause.

What are the main industries in Romania for process equipment?

The main industries in Romania for process equipment are pharmaceuticals, vehicle manufacturing, oil refining and food processing, and each buys vessels, skids, piping and utilities on a different rhythm. Asked what major manufacturers have plants in Romania, the short answer runs from Dacia and Ford to OMV Petrom and Rompetrol, alongside the medicine makers named above.

Car manufacturing companies in Romania

Car manufacturing companies in Romania center on two assembly plants: Dacia at Mioveni, which builds the Duster and the Bigster, and Ford Otosan at Craiova, which builds the Puma, the electric Puma Gen-E and the Transit and Tourneo Courier and completed its millionth Puma on 20 May 2026. Both plants run paint shop pretreatment, electrocoat, machining coolant, parts washing and large chilled water and compressed air networks, and Paul supplies process cooling systems, filtration skids, tanks and piping for them.

Refineries in Romania and their equipment demand

Refineries in Romania buy pressure vessels, heat exchanger bundles, pump skids, alloy piping and storage equipment for turnarounds, upgrades and environmental projects. OMV Petrom runs the Petrobrazi refinery at Brazi in Prahova county, and Rompetrol Rafinare runs Petromidia at Navodari on the Black Sea coast, the largest of the oil refineries in Romania. Paul fabricates refinery equipment to EN 13445 or ASME Section VIII as the owner’s specification requires, with PED conformity documents and records for ISCIR, as its oil and gas page describes.

Romanian refineries schedule their heavy work around planned shutdowns, so Paul plans fabrication, factory testing and the Constanta sailing backward from the turnaround start, and ships exchanger bundles and vessels with their test packs and lifting drawings.

Food manufacturing companies in Romania

Food manufacturing companies in Romania number about 14,000, with meat processing, milling and baking, and dairy as the largest segments, and the dairy sector is led by foreign-owned groups, including Albalact, FrieslandCampina and Danone. Dairies run milk reception, pasteurization, fermentation tanks for yogurt and cheese, and multi-circuit CIP, and meat plants run brine injection, cooking, chilling and refrigeration. Paul builds sanitary tanks, plate heat exchanger packages, CIP skids and glycol or ammonia refrigeration for those plants, covered on its dairy processing page.

Manufacturing companies in Romania in every sector above share the same request: equipment that arrives complete, tested and documented, so the site phase is short. The manufacturing industry in Romania has absorbed large investments in vehicles, medicines and energy, and Paul delivers modules built for that pace.

ISCIR, Romania’s pressure equipment authority, and the rules for a US vessel

ISCIR, Romania’s State Inspection for the Control of Boilers, Pressure Vessels and Lifting Installations, is the market surveillance authority for pressure equipment under HG 123/2015, the government decision that transposes the Pressure Equipment Directive 2014/68/EU, and it also authorizes pressure installations to operate under Law 64/2008. A US-built vessel therefore meets the PED when it is placed on the Romanian market and the national operating rules once it is installed.

Law 64/2008 sets three steps for a pressure installation. The installation is notified before it is set up, the owner or user obtains an operating authorization from ISCIR before start-up, and technical checks in use follow at intervals, carried out by ISCIR for the equipment listed in Annex 3 of the law and by ISCIR-authorized persons for the equipment in Annex 2. ISCIR technical prescriptions, such as PT C 4 for stable metallic pressure vessels, set the detail of those checks, and ISCIR is reissuing several prescriptions in 2025 editions.

From the US shop to ISCIR operating authorization: the requirements and the records Paul Industries supplies
StepRuleRecords from Paul Industries
Placing on the marketPED 2014/68/EU through HG 123/2015Hazard category, conformity module, technical file, CE marking, declaration of conformity
Romanian instructionsHG 123/2015 for manufacturer, importer and distributorInstructions and safety information in Romanian
Before installationLaw 64/2008 installation noticeLayout, foundation loads, connection and relief data
Before operationISCIR operating authorization under Law 64/2008Test certificates, material records, relief valve settings, operating manual
In usePeriodic technical checks under Law 64/2008 and ISCIR prescriptions such as PT C 4Inspection access drawings and a maintenance plan matched to the check intervals
Machinery and electricalDirective 2006/42/EC, then Regulation 2023/1230 from 20 January 2027; LVD, EMC, Normativ I 7-2011Risk assessment, EN 60204-1 panels, test records

Design codes and the move to the Machinery Regulation

Romanian owners specify vessels to EN 13445 for its presumption of conformity under the PED, or to ASME Section VIII when a corporate standard asks for it, in which case the design file shows how European material data and test pressures meet each essential safety requirement. Skids with pumps and agitators placed on the market from 20 January 2027 fall under the EU Machinery Regulation 2023/1230 in place of the Machinery Directive, and Paul prepares the risk assessment and declaration under whichever rule applies on the shipping date.

Seismic design for the Vrancea zone

Seismic design in Romania follows the P100-1/2013 code, because the Vrancea zone at the bend of the Carpathians produces intermediate-depth earthquakes some 60 to 200 kilometers deep, including the magnitude 7.4 event of 4 March 1977 that struck Bucharest. A revised P 100-1/2025 has been notified to the EU in draft. Tall tanks, vessel skirts, skid frames and pipe racks need anchorage and bracing designed to the site’s seismic parameters, so Paul designs those elements to the loads the owner’s structural engineer sets and supplies anchor reactions for the foundation design.

Romania voltage and frequency for process skids

Romania voltage and frequency follow the European standard of 400 V three phase and 230 V single phase, 50 Hz, with sockets of Types C and F, while Transelectrica operates the national transmission grid. For a buyer asking what voltage does Romania use on a skid, the answer is Romania 3 phase voltage of 400 V for motors and heaters and 230 V for control and lighting circuits, against 480 V and 120 V at 60 Hz in US plants.

Romania power voltage at 50 Hz changes pump and fan selection: a motor on 50 Hz runs about 17 percent slower than on 60 Hz, which lowers centrifugal pump head by roughly 30 percent, so Paul picks impeller diameters and motor frames for the 50 Hz duty point. Electrical installations in Romanian buildings follow Normativ I 7-2011, and Paul supplies IEC-rated components with CE marking, EN 60204-1 panels, single-line diagrams and test records with Romanian labels.

Shipping through the port of Constanta, Romania

Shipping through the port of Constanta, Romania, takes roughly three weeks from New York, with forwarder schedules showing about 20 to 23 days port to port. The port of Constanta is the largest port on the Black Sea and the seventh busiest port in the EU, and the Danube to Black Sea Canal links it to the Danube waterway, which opens a barge option for heavy items bound for Danube-side plants.

Shipping to Romania from USA ports is planned around module size. A 40-foot high cube container measures roughly 12.0 by 2.35 by 2.69 meters inside, so Paul lays out skids to fit those dimensions where the process allows, and ships larger vessels and exchanger bundles on flat racks or as breakbulk with a road permit and route survey for the leg to Brazi, Mioveni, Craiova or Iasi. Crating uses ISPM 15 heat-treated wood, and centers of gravity and lifting points are marked on every module.

Inland routes from Constanta to Romanian plant regions
DestinationInland mode from ConstantaPlanning point
Navodari and Constanta industrial zoneShort road moveCrane plan at the quay and the plant
Bucharest, Brazi and MioveniRoad or railWide-load permit and bridge survey for oversize vessels
Craiova and Danube-side sitesRoad, rail or barge through the Danube to Black Sea CanalBarge loading and unloading points for heavy items
Iasi, Cluj-Napoca and Targu MuresRoad or rail across the Carpathian approachesModule height and weight for mountain routes

Documents, units and drawings for a Romanian file

Documents for a Romanian file use metric units, European symbols on piping and instrument diagrams, and Romanian for every item the law addresses to the operator: instructions, safety information, nameplate text and warning labels. Engineering calculations, weld records and test reports are issued in English, with Romanian summaries where ISCIR or the plant’s safety officer asks for them. Paul assembles the file in a numbered register so the importer, the ISCIR inspector and the plant’s quality unit each find their section without searching, and the same register becomes the as-built record at handover.

Shutdown windows and site work at Romanian plants

Site work at Romanian plants usually happens inside a planned shutdown, whether that is a refinery turnaround at Brazi or Navodari, a summer stop at a vehicle plant, or a GMP campaign break at a pharmaceutical site. Paul splits each system into modules that arrive pre-piped, pre-wired and pressure-tested, so the site phase is limited to setting, tie-ins, loop checks and start-up. Tie-in points, isolation lists and the order of work are agreed with the plant before the equipment sails, and the commissioning team runs its checks against the factory test record to close out quickly.

Customs entry and the Romania VAT rate change of 2025

Customs entry for US equipment follows the EU Common Customs Tariff, with each item classified under the Combined Nomenclature and duty charged on the customs value, filed by an importer holding an EORI number. The Romania standard VAT rate rose from 19 to 21 percent on 1 August 2025 under Law 141/2025, and the same law merged the 5 and 9 percent reduced rates into a single 11 percent rate. That Romania VAT rate change still sets the Romania VAT rate 2026 figure of 21 percent on imported equipment, charged on the duty-paid value and recovered by VAT-registered plants.

How a Romanian project with Paul Industries is run

Paul Industries runs a Romanian project in nine steps, with the PED categories, the ISCIR documentation list, the 50 Hz equipment basis and the qualification strategy fixed in the first two. The table lists each step and what the plant receives.

Steps of a process equipment project for a plant in Romania
StepPaul Industries activityDeliverable to the Romanian plant
1. ScopeUser requirements, PED categories, ISCIR list, 230/400 V supply, seismic dataCode basis and document register
2. EngineeringProcess, mechanical, seismic and electrical design to EN 13445 or ASME VIII, ASME BPE, EN 60204-1Drawings and calculations for approval, design qualification report
3. US fabricationWelding, examination, passivation and panel assemblyMaterial traceability, weld records, examination reports
4. Factory testingPressure tests, functional and alarm tests witnessed by the ownerSigned FAT record
5. Conformity fileTechnical file, CE marking, declaration, Romanian instructionsPackage for the importer and ISCIR
6. ShipmentCrating, sailing to Constanta, inland move, customs dataBill of lading, invoice, packing list
7. InstallationSetting, connection and wiring by Paul or under its supervisionInstallation records and marked-up drawings
8. Authorization and qualificationRecords for the ISCIR operating authorization, commissioning, IQ, OQ, PQ supportExecuted protocols, start-up report
9. HandoverTraining, spare parts, inspection and maintenance planRomanian and English manuals, as-built file

After handover Paul keeps the systems in shape with preventive maintenance, periodic requalification, spares and repairs, timed to the technical checks that Law 64/2008 requires during operation.

Who builds process systems for plants in Romania?

Paul Industries builds process systems for plants in Romania: WFI, clean steam and purified water for pharmaceutical plants in Bucharest, Iasi, Cluj-Napoca and Targu Mures, cooling, coolant and water treatment packages for vehicle plants in Mioveni and Craiova, pressure vessels, exchangers and pump skids for refineries at Brazi and Navodari, and sanitary tanks and CIP for dairies and food plants. Each system is engineered for 400 V at 50 Hz, documented to the PED, EU GMP and the ISCIR operating rules in Romanian and English, and installed and commissioned by Paul or under its supervision, under one contract. The Poland page covers another Central European market with its own national inspection body.

What drives the delivered cost of a Romanian project?

The delivered cost of a Romanian project depends on the equipment and five further items, each priced as its own US dollar line in Paul’s proposal: 50 Hz engineering, conformity and ISCIR documents, freight, customs and VAT, and the site route. Shipping to Romania from USA cost depends on module size and count, the sailing chosen, and whether the inland leg needs flat racks, escorts or a barge.

  • 50 Hz and seismic engineering. IEC motors and drives, EN 60204-1 panels, and anchorage designed to P100-1/2013.
  • Conformity and authorization documents. PED category work, Romanian translations, the ISCIR record set and GMP protocols.
  • Freight. Ocean freight to Constanta, flat racks, crane plans and the inland road, rail or barge leg.
  • Customs and VAT. Duty by heading under the chosen Incoterm, and the VAT rate in Romania of 21 percent on the value after duty.
  • Site work. Installation by Paul inside the running plant, or Paul’s supervision of setting and hook-up.

Under Incoterms 2020, FCA at a US port leaves the ocean and import legs to the buyer, CIF Constanta adds freight and insurance to the port, and DAP at the plant gives Paul the full route with duty and VAT left with the importer.

Paul Industries for Romanian pharmaceutical, automotive and refinery plants

For plants across Romania, Paul Industries engineers, builds and factory-tests vessels to the PED, WFI and steam systems, process skids, cooling and piping, ships them through the port of Constanta, and installs and commissions them or supervises the installation, with conformity, ISCIR, electrical and qualification records in Romanian and English. Share the process requirements, plant address, electrical supply and planned start-up, and Paul’s proposal sets out the route, the schedule and a US dollar price. Request a quote for your plant in Romania.

Standards referenced: Pressure Equipment Directive 2014/68/EU · HG 123/2015 · Law 64/2008 on the safe operation of pressure installations · ISCIR technical prescriptions (PT), including PT C 4 · Machinery Directive 2006/42/EC and Machinery Regulation (EU) 2023/1230 · Low Voltage Directive 2014/35/EU · EMC Directive 2014/30/EU · Normativ I 7-2011 · P100-1/2013 seismic design code · EN 60204-1 · EN 13445 · EU GMP, Annex 1 and Annex 15 · PIC/S GMP Guide · European Pharmacopoeia · ASME Boiler and Pressure Vessel Code Section VIII · ASME BPE · Incoterms 2020 · ISPM 15

Frequently asked questions

How much import VAT does a Romanian plant pay on a US skid?

A Romanian plant pays 21 percent import VAT on a US skid, the standard rate since 1 August 2025, calculated on the customs value with duty added, and a VAT-registered plant reclaims it through its periodic returns. Paul Industries quotes in US dollars and splits equipment, freight and services into distinct invoice lines so the plant’s accountants book each one correctly.

Does a US vessel need ISCIR authorization before it runs in Romania?

A pressure installation in Romania runs only after the owner or user obtains an operating authorization from ISCIR under Law 64/2008, which follows an installation notice and precedes periodic technical checks in use. Paul Industries supplies the test certificates, material records, relief valve data and Romanian manuals that the authorization file draws on.

Must pressure equipment instructions be in Romanian?

Pressure equipment placed on the Romanian market carries its instructions and safety information in Romanian under HG 123/2015, an obligation that runs through the manufacturer, the importer and the distributor. Paul Industries delivers Romanian instructions, safety information and nameplate data with the equipment, plus English engineering documents for corporate reviewers.

What voltage does Romania use for industrial motors and panels?

Romanian plants use 400 V three phase and 230 V single phase at 50 Hz, compared with 480 V and 120 V at 60 Hz in US plants. Paul Industries selects 50 Hz motors and impellers, builds EN 60204-1 panels with IEC components and CE marking, and documents the installation to Normativ I 7-2011 practice.

Which water and steam systems does an antibiotic plant in Iasi order from Paul Industries?

An antibiotic plant in Iasi orders WFI generation and hot distribution loops, clean steam generators sized for fermenter and line sterilization, purified water pretreatment and CIP skids from Paul Industries. The systems follow the European Pharmacopoeia, Annex 1 and ASME BPE, arrive through Constanta with Romanian documents and a 50 Hz design, and Paul commissions them or supervises installation.

Which systems do pharmaceutical plants in Cluj-Napoca and Targu Mures buy?

Pharmaceutical plants in Cluj-Napoca and Targu Mures that make oral solid doses buy purified water systems, compressed air and nitrogen piping, process cooling and HVAC chilled water, along with mixing and holding vessels. Paul Industries builds those utilities for 400 V at 50 Hz and delivers installation and operational qualification protocols with them.

What equipment do the vehicle plants in Mioveni and Craiova need?

The Dacia plant in Mioveni and the Ford Otosan plant in Craiova run paint shop pretreatment, electrocoat, machining coolant, parts washing, chilled water and compressed air networks. Paul Industries supplies filtration and coolant skids, process tanks, chilled water systems and piping for those plants, built and tested in the United States and installed during planned shutdowns.

Who fabricates pressure vessels for the refineries at Brazi and Navodari?

Paul Industries builds exchanger bundles, pressure vessels, alloy spools and pump skids for the Petrobrazi refinery at Brazi and the Petromidia refinery at Navodari, designed to EN 13445 or ASME Section VIII as the owner specifies. Each item ships with PED conformity documents, test records and the records ISCIR reviews for operating authorization.

How long does shipping from New York to Constanta take?

Forwarder schedules put New York to Constanta at about 20 to 23 days port to port, depending on the carrier and transshipment. Customs entry and the inland leg by road, rail or Danube barge follow. Paul Industries books the sailing so the equipment reaches the plant ahead of its installation or turnaround window.

How are skids anchored against Vrancea earthquakes in Bucharest?

Plants in Bucharest and across the area affected by the Vrancea zone design equipment anchorage to the P100-1/2013 seismic code, using the site’s design ground acceleration and soil data. Paul Industries designs skid frames, tank anchorage and pipe supports to the seismic loads the owner’s structural engineer sets and supplies anchor reactions for the foundations.

Is an ASME-coded vessel acceptable under the PED in Romania?

Romanian plants accept ASME Section VIII vessels when the PED conformity route documents how each essential safety requirement is met, including material properties, test pressure and the item’s hazard category. Paul Industries prepares that technical file and applies CE marking where the category requires it, or designs to EN 13445 when the owner prefers the harmonized standard.

How often are pressure vessels checked once they run in Romania?

Pressure vessels in Romania receive periodic technical checks in use under Law 64/2008, carried out by ISCIR for equipment in Annex 3 of the law and by ISCIR-authorized persons for equipment in Annex 2, with detail set by ISCIR prescriptions such as PT C 4. Paul Industries designs inspection access into each vessel and supplies a maintenance plan matched to those checks.

How does NAMMDR review qualification records for Romanian plants?

NAMMDR inspects Romanian plants against EU GMP and the PIC/S guide and looks for a complete, controlled chain of qualification evidence from requirements to performance data. Paul Industries writes design, installation and operational qualification protocols in the plant’s document system, in English with Romanian versions where requested, and executes them on site.

Which dairy and food equipment ships from the US to Romanian plants?

Romanian dairies and food plants order sanitary storage and fermentation tanks, plate heat exchanger and holding tube packages, multi-circuit CIP skids and glycol or ammonia refrigeration from Paul Industries. Hygienic orbital welds, self-draining layouts, a 400 V, 50 Hz electrical design and Romanian documents for the food safety and ISCIR files come with each package.

Can Romanian engineers attend the factory acceptance test?

Romanian engineers and quality staff join Paul Industries’ factory acceptance tests in the United States in person or by live video. The test covers pressure tests, functional runs, alarm and interlock checks and a document review, and the signed record joins the qualification package before the equipment sails for Constanta.

What does a Romanian plant send to receive a firm price?

A Romanian plant receives a firm price after sending the user requirements, the PED categories or process data, the site address and supply details, the seismic parameters, the qualification scope and the start-up date. Paul Industries replies with a proposal in US dollars that lists equipment, documents, freight, duty assumptions and site work separately.

What service follows a system installed in Romania?

Paul Industries keeps Romanian systems running with planned maintenance, periodic requalification, rouge removal and repassivation of stainless steel, spare parts and repairs. Visits are timed to the periodic technical checks that Law 64/2008 sets, and each one adds its findings to the equipment file Paul delivered at start-up.