Paul Industries is a US process equipment contractor for Kuwait that designs and fabricates skids, pressure vessels, heat exchangers and water treatment systems in the United States for the 50 Hz, 240/415 V Kuwaiti supply, then installs and commissions them at plants in Ahmadi, Shuaiba, Shuwaikh and Subhan or supervises their installation. Each system ships with the data book a KPC subsidiary, a drug plant or a utility asks for. From its headquarters at 256 Shore Drive in Kilmarnock, Virginia, the company takes work in all 50 states and at plants abroad; it was formerly based in northern New Jersey, then Pennsylvania.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
Power 50 Hz, 240/415 V
Refineries Mina Al-Ahmadi, Mina Abdullah, Al-Zour
Container ports Shuwaikh and Shuaiba
Import charges 5% GCC duty, no VAT in force
Time zone UTC+3 all year
Reviewed November 2026

Scope of a US process equipment contractor for Kuwait, from design to service

A US process equipment contractor for Kuwait delivers engineered equipment that meets an oil sector purchase specification, a Gulf electrical supply and a long sea voyage in one package. Paul Industries takes a Kuwaiti order from the process design through fabrication, the factory acceptance test, export packing, site work and service. The range covers pump and chemical injection skids, pressure vessels, separators and knock-out drums, heat exchangers, industrial water treatment trains and process piping, combined where the scope calls for it into turnkey process systems.

Kuwaiti buyers pick from three delivery routes. Supply with installation supervision fits an operator that already has a construction contract running on site. Design-build adds layout, tie-ins, controls and integration with the plant’s distributed control system. Complete installation puts setting, piping, cabling, start-up and commissioning under Paul’s contract through handover. Neighboring markets are covered on the Saudi Arabia page and the Qatar page, and the international projects page lists every country where Paul takes work.

Major industries in Kuwait and where the process plants sit

The major industries in Kuwait are crude production and refining, petrochemicals, power and water, food and a small pharmaceutical sector, and almost all of the process plants sit along the coast south of Kuwait City. Kuwait Petroleum Corporation’s subsidiaries own the oil chain from the fields to the refineries, while dairy, juice and drug manufacturers cluster in the Subhan and Shuwaikh industrial areas. The table maps the industries in Kuwait to the zones where equipment lands.

Kuwaiti industrial zones and the process equipment they use
ZoneIndustryTypical Paul scope
Mina Al-Ahmadi and Mina AbdullahRefining under KNPCSeparators, exchangers, chemical injection skids, cooling water treatment
Al-ZourRefining at the Al-Zour complexDosing skids, condensate polishing, pressure vessels, utility piping
Shuaiba Industrial AreaPetrochemicals, port and utilitiesProcess vessels, heat transfer packages, effluent treatment
Burgan and the northern and western fieldsCrude production under Kuwait Oil CompanyProduced water treatment, injection skids, metering and test separators
Subhan and ShuwaikhPharmaceuticals, dairy, juice and foodPurified water, CIP skids, clean steam, process cooling
Az-Zour North and DohaPower and seawater desalinationChemical dosing, pretreatment, pumping and cooling packages

How many refineries in Kuwait, and what does each one buy?

Kuwait has three refineries, all now run by Kuwait National Petroleum Company: Mina Al-Ahmadi, Mina Abdullah and Al-Zour, which KNPC took over when it integrated the former KIPIC. The Kuwait refinery list is short, but the throughput is large. Mina Al-Ahmadi and Mina Abdullah together reached about 798,600 barrels a day in 2025, Al-Zour reached about 615,000, and KNPC put its combined Kuwait refining capacity at roughly 1.41 million barrels a day in June 2026. Units at both older refineries were cleared that year to run above their original design rates, which means new pumps, exchangers, relief paths and injection points.

A Kuwait refinery buys equipment in two rhythms: steady replacement during maintenance turnarounds, and step changes when a unit is debottlenecked. Kuwait oil refineries also need the water side of the plant, from boiler feed treatment to cooling tower chemistry and effluent systems. Upstream, Kuwait Oil Company has set a production capacity target of 4 million barrels a day by 2035, and the produced water, injection and separation equipment behind that target is described on the oil and gas industry page.

Pharmaceutical companies in Kuwait and the drug control rules

Pharmaceutical companies in Kuwait form a compact sector, and an established example of in-country production is Kuwait Saudi Pharmaceutical Industries Company, a Mezzan Holding subsidiary in the Subhan industrial area whose lines include large-volume parenterals, oral solids, oral liquids and semi-solids. In a localization agreement with Abbott, the company took on manufacture of 26 Abbott products in Kuwait, with technology transfer and GMP knowledge sharing involving the Ministry of Health. The pharmaceutical industry in Kuwait answers to Kuwait Drug and Food Control, part of the Ministry of Health, which registers medicines, inspects for GMP and is aligning its GMP rules with ICH guidelines.

For pharmaceutical manufacturing companies in Kuwait, that regime means purified water loops, water for injection, clean steam and CIP systems that are qualified and documented before product is made. Paul builds those systems with sanitary welding records, surface finish data, passivation records and executed IQ and OQ protocols, as described on the pharmaceutical industry page and the high purity water systems page.

Food industries in Kuwait: dairy, juice and packaged foods

Food industries in Kuwait are anchored by dairy and beverage plants such as the Kuwaiti Danish Dairy Company, which opened its first plant in Shuwaikh in 1962 and its Subhan factory in 1982, and today makes milk, yogurt, ice cream and fruit juices. Plants of that kind run pasteurizers, aseptic and hot-fill lines, CIP and glycol or chilled water systems around the clock in summer ambient heat. Paul designs those support systems for 50 Hz power and hot climate duty, with the sanitary detail covered on the dairy processing page.

Kuwait desalination projects and the water every plant treats

Kuwait desalination projects pair power generation with seawater treatment in large integrated plants on the coast. The Az-Zour North 1 plant combines 1,500 MW of power with 486,000 cubic meters a day of seawater desalination, and its planned Phase 2 and 3 expansion, awarded to an ACWA Power and Gulf Investment Corporation consortium on a 25-year build, operate and transfer basis, targets about 2,700 MW and around 120 million imperial gallons a day. A reverse osmosis program at Doha adds roughly 50 million imperial gallons a day per phase. Desalinated water still needs softening, polishing or demineralization before it feeds a boiler, a cooling loop or a purified water system, and Paul sizes that treatment from the site’s own water analysis.

Which Kuwaiti rules and owner standards govern imported equipment?

Imported process equipment in Kuwait is governed first by the owner’s engineering standards, then by the Public Authority for Industry’s conformity scheme for regulated products, the electricity ministry’s codes, Kuwait Fire Force approval for fire safety items and, in drug plants, Kuwait Drug and Food Control. Paul lists every one of them against every line item in the scope review, so the data sheets, materials and test points are settled before fabrication begins.

Rules and documents that shape equipment bound for Kuwait
Rule or documentAuthorityEffect on the equipment
Engineering standards and purchase specificationsKNPC, KOC and other KPC subsidiariesDesign code and edition, materials, vessel supports, inspection and test plan
Kuwait Conformity Assurance Scheme (KUCAS)Public Authority for IndustryConformity certificate for regulated products before final customs clearance
GSO standardsGCC Standardization Organization, applied by Kuwait where no Kuwaiti standard existsProduct requirements and test methods
Electrical and energy codesMinistry of Electricity, Water and Renewable Energy240/415 V 50 Hz design, protection, energy conservation requirements
Fire equipment approvalKuwait Fire ForceApproval of detection and suppression products on test reports from accredited laboratories
GMP and product registrationKuwait Drug and Food Control, Ministry of HealthQualified utilities and equipment in drug plants
Ministerial Resolution No. 3 of 2026Public Authority for ManpowerNo outdoor work from 11:00 to 16:00 between 1 June and 31 August

KNPC and KOC standards on pressure vessels and exchangers

Kuwait’s oil companies write their technical requirements into numbered engineering standards and purchase specifications. KNPC’s Standard Specification 40A5, for example, sets structural requirements for horizontal vessels and heat exchangers, and Kuwaiti fabricators approved by KPC and its subsidiaries work to ASME Section VIII Division 1 and Division 2 for pressure vessels. A typical order names the design code and edition on the data sheet, adds company rules on materials, nozzle loads, coatings and inspection, and attaches an inspection and test plan with hold points for the client’s inspector. Paul designs and fabricates to that set, builds every hold point into its quality plan, and closes each one in the data book before the crate is nailed shut.

KUCAS and the Kuwait import requirements for regulated products

KUCAS, the Kuwait Conformity Assurance Scheme run by the Public Authority for Industry, makes a certificate of conformity a precondition for final customs clearance of regulated products. The Standards and Industrial Services Affairs body at the authority issues national standards and conformity certificates, and where no Kuwaiti standard covers a product, Gulf standards from the GCC Standardization Organization apply. Most engineered process skids fall outside the regulated product lists, but electrical accessories, lighting, sockets and some building products on a skid can fall within them, so the Kuwait import requirements for each component are checked at the bill of materials stage and the supporting test reports go with the shipment.

Language, units and the data book Kuwaiti owners expect

Drug registrations with Kuwait Drug and Food Control call for Arabic labelling on the medicine itself, and equipment documentation follows the owner’s own template. Paul prepares drawings, data sheets and manuals in English with metric units, adds dual units where that template asks for them, and supplies Arabic nameplates or warning labels wherever the specification or the operator calls for them. The data book follows the owner’s index: purchase order and specification references, design calculations, approved drawings, material certificates traced to heat numbers, welding procedures and welder qualifications, NDT and PMI results, pressure test charts, coating records, the FAT report and the punch list closure. Owners that run an electronic document system receive the same set as indexed files in the format their document controllers specify.

Fire safety items and the Kuwait Fire Force

Fire detection, alarm and suppression products installed in Kuwait go through Kuwait Fire Force approval, which relies on test reports and product certification from laboratories accredited to its Fire Service Directorate. A process skid usually carries few such items: gas and flame detectors, a suppression system in an analyzer shelter, or a fire water connection. Paul selects those components from product lines that already hold the approval and records them on the drawings the owner submits with its fire protection design.

Summer working hours on Kuwaiti sites

Kuwait bans outdoor work between 11:00 and 16:00 from 1 June to 31 August under the Public Authority for Manpower’s Ministerial Resolution No. 3 of 2026, with exemptions for emergency maintenance and vital facilities. Paul schedules lifts, setting and outdoor hot work for early mornings and the cooler months, and keeps terminations, loop checks and panel work for the shaded or indoor hours.

What is the voltage in Kuwait, and how is a skid wired for it?

Kuwait’s electrical supply is 50 Hz with a nominal 240 V single phase and 415 V three phase, so the Kuwait voltage 3 phase figure for motors, heaters and drives is 415 V. Buyers looking up the Kuwait voltage and frequency for a US-built package are really asking how far a 60 Hz, 480 V design has to change, and the answer reaches the motor windings, the control transformers, the heaters and every pump and fan curve. Kuwait electrical standards follow IEC practice, with the Ministry of Electricity, Water and Renewable Energy setting connection and energy conservation rules, so Paul builds control panels to IEC 60204-1 or the owner’s panel specification.

Frequency is the larger change. A 60 Hz motor runs at about five sixths of its rated speed on 50 Hz, and by the affinity laws a centrifugal pump’s flow drops in step with speed while its head drops with the square of speed. Paul selects pumps, fans, compressors and agitators on 50 Hz performance data, or puts them on variable frequency drives configured for the Kuwaiti supply, and proves the duty point during the factory acceptance test.

Electrical and climate design basis for a Kuwaiti skid
ItemKuwaitTypical US designHow Paul builds it
Frequency50 Hz60 Hz50 Hz motor and pump selections, or drives set for the supply
Three-phase voltage415 V480 VWindings, heaters and transformers rated for 415 V
Single-phase voltage240 V120 VPanel lighting, receptacles and instrument power at 240 V
Wiring practiceIEC components and cable markingsNEC and UL listingsIEC 60204-1 panels, IEC terminals and cable color codes
Ambient designLong, extreme summer heatTemperate ambientMotor and drive derating, panel air conditioning, sunshields
Dust and saltDesert dust storms and coastal humidity at Shuaiba and AhmadiIndoor or mild exposureSealed enclosures, filtered panel cooling, coating systems for chlorides

Shipping to Kuwait from USA ports

Shipping to Kuwait from USA ports ends at one of two container gateways run by the Kuwait Ports Authority: Shuwaikh, on Kuwait Bay beside Kuwait City, and Shuaiba, on the southern coast next to the refining and petrochemical belt. Most US East Coast sailings to Kuwait transship at a hub, and published forwarder estimates run from about 25 to 32 days from the East Coast to Shuwaikh, while one listed Baltimore service takes about 45 days. Paul fixes the shipping envelope during design, books the sailing early, and plans the factory acceptance test backward from the cargo cutoff.

For buyers asking how to ship from US to Kuwait with an oversized skid, the answer usually involves flat racks or breakbulk space for anything beyond a 40-foot high cube, a heavy-lift survey at the discharge port and a road permit for the trip to Ahmadi or Al-Zour. Paul designs lifting lugs and spreader points into the base frame, marks centers of gravity on every crate, packs to ISPM 15 and prepares the commercial invoice and packing list with an HS code on every line.

Kuwait customs duty, import duties and taxes

Kuwait customs duty on most industrial goods is 5 percent of the CIF value under the Single Customs Tariff that applies the GCC common external tariff, paid in Kuwaiti dinars, with exemptions for a list of foodstuffs, medical and pharmaceutical items. The Kuwait customs tariff classification on each line therefore matters: a Kuwait customs duty calculator or Kuwait import duty calculator returns a usable figure only once the HS code and the customs value under the chosen Incoterm are fixed. On Kuwait import duties and taxes more broadly, Kuwait has no VAT in force, and its 2026 to 2030 fiscal plan leaves VAT out, so the Kuwait import duty is the main charge at the border.

Under Incoterms 2020, a Kuwaiti operator with its own freight forwarder usually takes delivery FCA at a US port, an owner that wants freight and risk carried to the plant gate chooses DAP, and DDP folds clearance and duty into a single delivered price. Paul quotes in US dollars on whichever term the buyer chooses.

Project sequence for a Kuwaiti order

Paul Industries runs a Kuwaiti order through nine steps, and the first two lock the owner standards, the 415 V 50 Hz design basis, the shipping envelope and the summer installation window. The table shows what each step produces for the Kuwaiti owner.

Steps in a process equipment order for a plant in Kuwait
StepWorkRecord for the Kuwaiti owner
1. Scope and code reviewProcess duty, KPC or plant standards, KUCAS items, fire safety items, HS codesCompliance matrix per line item
2. EngineeringP&IDs, 3D layout, 415/240 V electrical design, heat and dust ratings, crate envelopeData sheets and drawings for client review
3. Fabrication in the United StatesWelding, assembly, wiring, instrumentation, material traceabilityMill certificates, weld maps, NDT and PMI reports
4. Factory acceptance testHydrostatic and functional tests, control logic, witnessed in person or by videoSigned FAT report and punch list closure
5. Export packing and shippingPreservation, crating, export filing, booking to Shuwaikh or ShuaibaInvoice and packing list with HS codes, crate drawings
6. Installation or supervisionSetting, anchoring, piping and cable tie-ins under the site permit systemInstallation records and redlines
7. Start-upFlushing, rotation checks, first fluid, tuningStart-up report and setpoint list
8. Commissioning and qualificationSite acceptance test, IQ and OQ in drug plants through validation and commissioningExecuted protocols
9. Handover and serviceTraining, spares, service plan around turnaroundsManuals, as-builts and turnover dossier

Kuwait keeps Arabia Standard Time, UTC+3, with no daylight saving, so a Kuwaiti engineer’s afternoon lines up with an East Coast morning for video-witnessed tests and design reviews. Spare seals, gaskets, filter elements and rotating parts are stocked at the plant in quantities sized for a sea resupply, and Paul keeps drawings, logic and test records on file for diagnosis and for service visits timed to each turnaround.

Who builds process systems for plants in Kuwait?

Paul Industries builds process systems for plants in Kuwait, from a single chemical injection skid or separator to complete water treatment, heat transfer and turnkey process packages, and carries them through factory testing, export, installation, start-up and commissioning. Paul works to the KNPC or KOC specification or the plant’s own standard, wires for the 240/415 V 50 Hz supply, prepares the conformity and fire safety records each item needs, and stays with the equipment through handover and service. Refineries in Ahmadi and Al-Zour, producers in the northern and western fields, and drug and food plants in Subhan and Shuwaikh deal with one contractor and one set of records.

What sets the delivered cost of equipment for a Kuwaiti plant?

The delivered cost of process equipment for a Kuwaiti plant depends on five things beyond the equipment price: the sea route and its transshipments, preservation and crating, owner documentation, customs duty under the chosen Incoterm, and the installation route and season. Paul prices each one as its own line so the owner can compare options.

  • Route. Transshipment through a hub, flat racks for oversized frames and heavy-lift handling at Shuwaikh or Shuaiba each add freight cost.
  • Preservation. Long voyages in Gulf heat call for vapor barrier bags, desiccant, nitrogen blankets on vessels and crates designed for desert storage before installation.
  • Owner documentation. KPC specifications add inspection hold points, material testing and data book content.
  • Duty. The 5 percent GCC duty sits with the buyer under FCA or DAP and inside Paul’s price under DDP.
  • Installation. Summer hour limits, permit systems and the choice between supervision and complete installation set the field cost.

Paul Industries and process plants in Kuwait

Paul Industries engineers, fabricates, tests and ships process equipment to Kuwait, then installs, starts up and commissions it or supervises the installation, with the KPC, KUCAS and drug control records gathered in one turnover file. Send the process duty, the site, the governing specification and the target start date, and Paul will lay out the scope, the schedule and a price in US dollars. Request a quote to begin a Kuwait project.

Standards referenced: KNPC and KPC subsidiary engineering standards (Standard Specification series) · Kuwait Conformity Assurance Scheme (KUCAS), Public Authority for Industry · GSO (GCC Standardization Organization) standards · Ministry of Electricity, Water and Renewable Energy codes · Kuwait Fire Force equipment approval · Kuwait Drug and Food Control GMP requirements · Public Authority for Manpower Ministerial Resolution No. 3 of 2026 (summer work hours) · GCC Common Customs Tariff · ASME Boiler and Pressure Vessel Code Section VIII · ASME B31.3 · IEC 60204-1 · Incoterms 2020 · ISPM 15

Frequently asked questions

Which pharmaceutical companies in Kuwait manufacture medicines in the country?

Kuwait Saudi Pharmaceutical Industries Company, a Mezzan Holding subsidiary in the Subhan industrial area, makes medicines in Kuwait on lines for large-volume parenterals, oral solids, oral liquids and semi-solids. It also manufactures 26 Abbott products under a localization agreement. Paul Industries builds the purified water, WFI, clean steam and CIP systems plants like this qualify, and delivers the IQ and OQ protocols with them.

What is the voltage in Kuwait for three-phase motors on a process skid?

Kuwait supplies 415 V three phase and 240 V single phase at 50 Hz. Motors, heaters and control transformers on a skid are rated for 415 V, and panel lighting and instrument power for 240 V. Paul Industries designs the electrical package to that basis before fabrication and builds the panels to IEC 60204-1 or the owner’s specification.

Will a 60 Hz US pump meet its duty point on the Kuwaiti supply?

A pump selected on a 60 Hz curve turns about one sixth slower at 50 Hz, so its flow falls in proportion and its head with the square of speed, and it misses the duty point. The remedy is a pump and motor chosen on 50 Hz data or a drive configured for the site. Paul Industries makes that selection in design and confirms the duty at the factory acceptance test.

How many refineries in Kuwait does KNPC operate, and at what capacity?

KNPC operates three: Mina Al-Ahmadi, Mina Abdullah and Al-Zour. The two older refineries together reached about 798,600 barrels a day in 2025 and Al-Zour about 615,000, for combined capacity near 1.41 million barrels a day. Paul Industries builds separators, exchangers, injection skids and water treatment systems for refineries of that size and documents them to KNPC specifications.

Does Paul Industries install equipment at refineries in Ahmadi and Al-Zour?

Paul Industries installs, starts up and commissions equipment at refineries in Ahmadi and Al-Zour, or supervises the installation, as the contract sets. Field work follows the refinery’s permit to work system and summer hour rules, and the start-up and commissioning records join the fabrication records in the turnover file.

What sea transit should a Kuwaiti buyer plan from the US East Coast?

Forwarder estimates run about 25 to 32 days from East Coast ports to Shuwaikh, and one listed Baltimore service takes about 45 days, because most sailings transship at a hub. Paul Industries confirms the current routing at booking, sets the factory acceptance test date from the cargo cutoff, and builds the transit time into the project schedule from the first program.

Which Kuwaiti port suits a skid bound for the Shuaiba Industrial Area?

Shuaiba port sits beside the industrial area and the southern refining belt, so cargo for Shuaiba, Ahmadi or Al-Zour often discharges there, while Shuwaikh port serves Kuwait City and the Subhan and Shuwaikh industrial areas. Paul Industries chooses the discharge port with the forwarder and sizes crates for the road leg to the plant.

How is Kuwait customs duty calculated on an imported process skid?

Kuwait charges 5 percent of the CIF value on most industrial goods under the GCC common external tariff, paid in Kuwaiti dinars. The figure depends on the HS classification of each item and the customs value under the Incoterm. Paul Industries lists HS codes on the invoice and, under DDP terms, includes the duty in its delivered price.

Is VAT charged on equipment imported into Kuwait?

Kuwait has no VAT in force. It signed the GCC VAT framework, but its 2026 to 2030 fiscal plan leaves VAT out, so imports carry customs duty without VAT. Paul Industries rechecks the tax position whenever it prices a DDP order, so the delivered figure matches the rules on the shipping date.

What does a KUCAS certificate cover, and does a process skid need one?

KUCAS, the Public Authority for Industry’s conformity scheme, requires a certificate of conformity for regulated products before final customs clearance. Engineered process equipment sits mostly outside those lists, while electrical accessories and some building products on a skid can fall inside them. Paul Industries checks each component at the bill of materials stage and ships the supporting test reports.

Which pressure vessel code do KNPC and KOC orders specify?

The purchase order and data sheet name it, and Kuwaiti oil sector fabrication commonly works to ASME Section VIII Division 1 or Division 2 alongside the company’s own standards, such as KNPC Standard Specification 40A5 for horizontal vessel and exchanger supports. Paul Industries designs to the named code and edition and records every client hold point in the data book.

Does Paul Industries build water treatment for plants fed by Kuwait desalination projects?

Paul Industries builds softening, reverse osmosis, demineralization, chemical dosing and purified water systems for Kuwaiti plants that draw desalinated water from projects such as Az-Zour North. Each system is sized on the site water analysis, and materials are chosen for the chloride levels the piping and exchangers will see.

Can outdoor installation work continue at Kuwaiti plants in July?

From June through August, Kuwaiti rules keep crews out of open areas from 11 in the morning until 4 in the afternoon, and emergency maintenance at vital facilities is exempt. Paul Industries plans lifts and outdoor hot work for early mornings and cooler months, and moves panel terminations and loop checks into the midday hours.

Does Paul Industries build dairy and juice processing systems for plants in Subhan?

Paul Industries builds CIP skids, pasteurizer support systems, glycol and chilled water systems, process cooling and sanitary piping for dairy and juice plants in Subhan and Shuwaikh. The systems are designed for 50 Hz power and summer ambient heat, with sanitary welding and documentation that suit food safety audits.

What documents ship with a skid sent to a plant in Kuwait City?

The commercial invoice and packing list with HS codes, the bill of lading, the export filing and crate markings move with the cargo. The technical file holds drawings, data sheets, material certificates, weld and NDT records, the FAT report, manuals and spare parts lists. Paul Industries assembles the file during fabrication so it is complete before the crates close.

Do fire detectors on a skid need Kuwait Fire Force approval?

Fire detection, alarm and suppression products installed in Kuwait need Kuwait Fire Force approval, which rests on test reports from laboratories accredited to its Fire Service Directorate. Paul Industries selects gas and flame detectors and suppression components from approved product lines and marks them on the drawings the owner submits.

Which Incoterm works best for a Kuwaiti refinery buying from the United States?

Refineries with a contracted forwarder usually buy FCA at a US port and handle freight and clearance themselves. DAP suits an owner that wants Paul to carry freight and risk to the plant gate, and DDP puts duty and clearance inside one price. Paul Industries quotes in US dollars on whichever Incoterm the buyer chooses.

What does Paul Industries need to price a Kuwait project?

Send the process duty and flow sheet, the site and plant, the governing KPC or plant specification, utility data including voltage and water analysis, the target start-up date and the preferred Incoterm. Paul Industries returns a priced scope in US dollars with the route, schedule and installation option, then firms it once the design basis is agreed.

Planning process equipment for a plant in Kuwait?

Send the process duty, the plant location and the governing KNPC, KOC or plant specification, and Paul Industries will set out the scope, the shipping route and a price. Call 201-450-8280 or request a quote.