Paul Industries is a US process equipment contractor for Nigeria that engineers, fabricates, tests and commissions pressure vessels, shell and tube heat exchangers, boiler and steam systems, water treatment and purified water plants, chemical injection and pump skids, and process piping for refineries, gas and fertilizer plants, food and beverage factories and drug manufacturers in Nigeria. Each system is built for the 400/230 V, 50 Hz Nigerian supply and documented for registration under the Factories (Boiler and Pressure Vessel) Regulations and, for medicines, NAFDAC inspection, then shipped to the Lagos ports, where Paul installs and commissions it or supervises its installation. The company’s headquarters is at 256 Shore Drive in Kilmarnock, Virginia; Paul Industries was formerly based in northern New Jersey, then Pennsylvania.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
Boiler and vessel rule Factories (Boiler and Pressure Vessel) Regulations 2018
Supply 400/230 V, 50 Hz
Medicines regulator NAFDAC, WHO Maturity Level 3
Seaports Apapa, Tin Can Island, Lekki Deep Sea Port
VAT 7.5 percent (Nigeria Tax Act 2025)
Reviewed November 2026

Which systems does a US process equipment contractor for Nigeria ship to Nigerian sites?

A US process equipment contractor for Nigeria takes responsibility for a system from the first process calculation to the day it runs at a Nigerian plant: design to the code the Director of Factories accepts, fabrication and testing in the United States, export packing, the Atlantic crossing, and installation, start-up and handover at site. Paul Industries supplies ASME pressure vessels and separators, heat exchangers to TEMA, chemical injection and transfer skids, industrial water treatment and purified water systems, and the alloy, carbon steel and stainless process piping that ties them in.

Nigerian owners choose among three routes. Supply-only with Paul supervising the installation fits an owner whose engineering, procurement and construction contract already covers site works. Design-build adds the plant room, interconnecting piping, controls and the registration file. Turnkey delivery puts the full system, from design basis to commissioning records, under a single Paul contract priced in US dollars. Nigeria sits in the Africa list on Paul’s international projects page.

Documents for Nigerian plants are written in English with SI units on drawings and data sheets, and US customary values shown alongside where an ASME form calls for them. Tag numbers, line numbers and equipment numbers follow the owner’s numbering scheme from the first P&ID, so the registration file, the maintenance system and the as-built drawings all use the same identifiers.

Where are Nigeria’s refining, gas, fertilizer, food and medicine plants?

Nigeria’s largest process plants are concentrated around Lagos and the Niger Delta, with food, beverage and medicine factories spread across Lagos, the southwest and the northern cities. The table lists the main clusters and the systems Paul builds for them; the plants named are market facts about Nigeria.

Nigerian process clusters and the equipment they buy
ClusterRegionMarket factEquipment Paul supplies
Refining and petrochemicalsLekki Free Zone, LagosDangote’s 650,000 barrel per day single-train refinery reported full design capacity in February 2026Pressure vessels, exchangers, chemical injection skids, utility water and cooling packages
FertilizerLekki Free Zone, LagosA urea complex of about 3 million tonnes a year stands beside the refineryBoiler feed and condensate systems, cooling water treatment, process piping
Liquefied natural gasBonny Island, Rivers StateSix trains rated at 22 million tonnes a year, with a seventh train targeted for start-up by the end of 2027Separators, knock-out drums, glycol and amine skids, water treatment
Food and beverageLagos, Ogun, Oyo, Enugu, KadunaBrewing alone runs plants at Lagos, Ibadan, Ota, Ijebu-Ode, Ama in Enugu State and KadunaCIP, pasteurizer and glycol skids, steam systems, water treatment
MedicinesLagos and the southwestNAFDAC counts 190 pharmaceutical manufacturing companies, up from 174Purified water, WFI, clean steam and process skids

The Dangote refinery in Nigeria and the Lekki industrial zone

The Dangote refinery in Nigeria is a 650,000 barrel per day single-train crude refinery in the Lekki Free Zone on the Lekki peninsula east of Lagos, with a urea fertilizer complex of about 3 million tonnes a year next to it. Dangote refinery capacity reached its full design rate in early 2026, according to the company’s February statement, and the group has announced further expansion plans for both the refinery and urea output. The Dangote refinery location, in Ibeju-Lekki close to the Lekki Deep Sea Port, has drawn logistics, chemical and utility investment to the zone.

Refineries, fertilizer plants and the businesses that grow around them run on the same classes of equipment: pressure vessels, heat exchangers, chemical dosing skids, cooling water and boiler feed treatment, and miles of process piping. Paul builds this equipment to ASME Section VIII, TEMA and ASME B31.3 for owners and contractors in the zone, as described on Paul’s oil and gas and chemical manufacturing pages.

Pharmaceutical companies in Nigeria and NAFDAC GMP

Pharmaceutical companies in Nigeria register products with, and are inspected by, the National Agency for Food and Drug Administration and Control, which the World Health Organization rates at Maturity Level 3 for the regulation of medicines and imported vaccines. NAFDAC figures put the number of domestic pharmaceutical manufacturers at 190, up from 174, and the agency reports the split between imported and Nigerian-made medicines moving from 70 to 30 in 2019 to roughly even in 2025. More production inside Nigeria means more tablet, liquid and sterile plants, each with water and steam systems that NAFDAC GMP inspectors examine.

A NAFDAC GMP inspection looks at how the plant designs, qualifies, operates and monitors its water, steam and process equipment, in line with the NAFDAC GMP guidelines. Paul supplies purified water generation and distribution, WFI stills, clean steam generators and process skids in electropolished 316L stainless steel to ASME BPE, with design and functional specifications, material and weld records, passivation reports and executed IQ and OQ protocols, so the plant’s quality team holds a complete record for the inspection. Paul’s pharmaceutical systems page sets out the same scope for plants in other countries.

How are boilers and pressure vessels registered under Nigeria’s 2018 regulations?

Nigeria’s Factories (Boiler and Pressure Vessel) Regulations, 2018, made under the Factories Act and in force since 18 December 2018, require boilers and pressure vessels used in Nigerian workplaces to be built to codes and standards adopted by the Director of Factories and registered with the Director, who assigns each one a registration number. The application is filed after manufacture or before installation, and the design must be reviewed by an Authorized Inspector before approval. Small air receivers of 60 litres or less are among the vessels exempt from registration.

What the 2018 regulations ask for and what Paul delivers
RequirementWhat the regulations sayWhat Paul delivers
Drawings and calculationsSubmitted in duplicate with the registration applicationTwo printed sets of design drawings and calculations, plus electronic files
Design conditionsDesign pressure and temperature, arrangement and dimensions of all partsDesign data sheet and general arrangement for each vessel
MaterialsMaterial details and specifications as the adopted code requiresMill test reports traced to each pressure part
Manufacture and weldingProposed manufacture, welded joint configuration and quality control plan; welding procedures qualified by testWeld maps, procedure and welder qualification records, inspection and test plan
Code referenceThe section and paragraph of the code used for constructionASME Section I or VIII clause references on the data report
Test evidenceA report of physical tests establishing the maximum allowable working pressureHydrostatic test certificate and relief valve set pressure records
In-service inspectionBoilers at least every 12 months, pressure vessels at least every 26 months, unfired vessels extendable to five yearsInspection openings, nozzle schedules and a maintenance plan for the inspector

The regulations also require non-destructive testing to be carried out by persons holding certification and registered with the Institute of Non-Destructive Testing, Nigeria, and require written quality control and welding procedures reviewed by an Authorized Inspector before work proceeds. Paul builds every vessel’s file so the Nigerian owner and the Authorized Inspector see design, materials, welding, examination and test evidence in the order the registration form asks for it, and Paul attends the inspection at site during commissioning. Paul’s hydrostatic testing work supplies the test certificates in that file.

Nigeria voltage and frequency: designing skids for 400/230 V at 50 Hz

Nigeria voltage for low-voltage supply is 400 V three phase and 230 V single phase at 50 Hz, the national specification the Ministry of Power set out, with medium-voltage networks at 11 kV and 33 kV. The ministry stated that installations and equipment that depart from the 400/230 V low-voltage specification receive no approval, so the voltage on a skid’s nameplate matters as much as its pressure rating.

A skid built for the US 480 V, 60 Hz grid turns its pumps about 17 percent slower on 50 Hz, losing roughly a sixth of its flow and about 30 percent of its head, so Paul selects every pump, fan and compressor at its 50 Hz curve, fits IEC motors rated for 400 V, and builds control panels to IEC 60204-1 with 230 V or 24 V DC control circuits. A Nigeria voltage converter suits a phone charger; a process skid is engineered for the Nigerian supply from the first data sheet. Many Nigerian plants generate their own power with gas engines or diesel sets, so Paul adds ride-through, phase-loss protection and restart sequencing for transfers between grid and captive generation.

Electrical installations in Nigeria are inspected, tested and given certification by the Nigerian Electricity Management Services Agency under the Electricity Act 2023 and the Nigerian Electricity Supply and Installation Standards Regulations, and an installation is energized after it passes. Paul supplies the single-line diagrams, cable schedules, protection settings, and insulation and earth test results for each panel and motor circuit, ready for that inspection.

SONCAP certificate, Form M and Nigerian customs

Imports into Nigeria pass through three checks: the Form M declaration opened through an authorized dealer bank, the Pre-Arrival Assessment Report the Nigeria Customs Service generates from it, and, for regulated products, a SONCAP certificate from the Standards Organisation of Nigeria. A Form M for plant and machinery stays valid for 365 days, and clearance now runs through the customs B’Odogwu platform.

A SONCAP certificate covers each shipment of regulated products and is issued after a product certificate, both through SON’s accredited bodies. Machinery and raw materials imported by bona fide manufacturers are handled through SON import permits rather than the full programme, and SON’s own guidance names industrial machinery among the categories its import permit covers. Paul confirms the route with the Nigerian buyer at order, then supplies the pro forma invoice for the Form M, the test reports and technical files the conformity body reviews, and a final commercial invoice and packing list that match the Form M line by line.

Documents and charges for process equipment entering Nigeria
ItemWho prepares or paysDetail
Pro forma invoicePaul IndustriesAccompanies the buyer’s Form M application at its bank
Form M and PAARImporter, bank and Nigeria Customs ServiceForm M valid 365 days for plant and machinery; PAAR generated by customs
SONCAP or import permitImporter, with Paul’s technical filePer shipment for regulated products; permit route for manufacturers’ machinery
Import dutyImporter, or Paul under DDPSet by tariff classification of each item
Value added taxImporter, or Paul under DDP7.5 percent under the Nigeria Tax Act 2025
Shipping documentsPaul IndustriesCommercial invoice, packing list, bill of lading, certificate of origin, insurance certificate

The Nigeria VAT rate stayed at 7.5 percent when the Nigeria Tax Act 2025 replaced the old Value Added Tax Act on 1 January 2026, and the new Act widened input VAT recovery to fixed assets used for taxable supplies, which matters to a manufacturer buying a new process line.

Lekki Deep Sea Port, Apapa and Tin Can Island Port: shipping from the US East Coast

Lekki Deep Sea Port, Apapa and Tin Can Island Port are the three Lagos gateways for process equipment shipped from the United States, and the choice among them follows the plant’s location and the carrier’s service. The Lekki Deep Sea Port location is on the Lekki peninsula in Ibeju-Lekki, Lagos State, beside the free zone that holds the refinery and fertilizer complex; the port started full commercial operation in April 2023, its container terminal is rated at about 1.2 million containers a year on three berths along a quay of nearly 1.2 km, and it opened with a 14 m draft. Apapa port and Tin Can Island Port sit inside Lagos harbour and serve the industrial areas of mainland Lagos and Ogun.

Freight-route listings show the quickest service from New York to Tin Can Island at about 18 to 19 days, while transshipped services into Apapa take far longer, so Paul books the sailing to match the plant’s schedule. For Lekki Deep Sea Port, Lagos, the terminal operator cites clearance of 5 to 10 days. Skids ship in 40-foot high cube containers, with a usable inside height of about 2.69 m and width of about 2.35 m, or on flat racks when a module is wider or taller. Crates use ISPM 15 heat-treated timber with the treatment mark, vapor barrier wrap and desiccant, and open stainless ends are capped and purged.

Inland moves to plants in Ogun, the north or the Niger Delta need route surveys for heavy loads, so Paul sizes modules and lifting frames for the road leg as well as the sea leg. For Lekki Deep Sea Port, Nigeria’s first operating deep sea port, sites in the free zone sit a short haul from the quay.

How a project for a Nigerian plant runs with Paul Industries

A project for a Nigerian plant runs with Paul Industries in nine stages, and the registration file for every boiler and pressure vessel is assembled alongside the design so the Authorized Inspector reviews it before fabrication starts.

Project stages for process equipment delivered to Nigeria
StagePaul Industries’ workRecord kept by the Nigerian plant
1. Design basisProcess duty, 400/230 V supply, captive power, ambient and water data, code basisSigned design basis in English
2. EngineeringProcess, mechanical and electrical design to ASME, TEMA and IEC at 50 HzP&IDs, calculations, data sheets
3. Registration fileDrawings and calculations in duplicate, materials, weld plan and code referencesFile for Authorized Inspector review and Director of Factories registration
4. Import paperworkPro forma invoice, technical file for SONCAP or permitForm M and conformity documents
5. FabricationWelding, NDE, heat treatment, passivation and panel build in the United StatesMill certificates, weld maps, NDE reports
6. Factory acceptanceHydrostatic and functional tests, witnessed in person or by live videoSigned FAT report
7. Export and voyageISPM 15 crating, booking to Lekki, Apapa or Tin Can IslandShipping document set matching the Form M
8. Installation and start-upPaul installs and commissions, or supervises installation, and supports the NEMSA and pressure equipment inspectionsCommissioning sheets, inspection reports, IQ and OQ for GMP systems
9. Handover and serviceTraining, spares, maintenance plan, service visitsAs-built dossier and spares list

Witnessing the factory acceptance test from Lagos

Nigerian buyers witness the factory acceptance test either in person at the US fabrication floor or through a live video session with cameras on gauges, instruments and the control screen. Paul sends the test procedure for approval two weeks ahead, runs the hydrostatic test, functional checks, alarm and interlock tests and, for water systems, a conductivity and flow run, and records every reading on signed sheets the buyer keeps. Punch items found during the test are closed and photographed before crating, so the equipment that reaches Lagos is the equipment the buyer approved.

Operating spares for a Nigerian plant are listed and priced in the same proposal as the equipment: mechanical seals, gasket sets, filter cartridges, membranes, sensors and relief valve spares for two years of running. A commissioning kit ships inside the main consignment, packed and labelled by system, so start-up keeps moving without waiting on a part still at sea.

Coastal Lagos and the Niger Delta are hot and humid year round, with salt-laden air near the sea, so Paul specifies coating systems, stainless or coated fasteners, panel enclosures with cooling and condensation control, and motors with tropical protection for those sites.

Who builds process systems for plants in Nigeria?

Paul Industries builds process systems for plants in Nigeria: pressure vessels, heat exchangers and chemical injection skids for refineries and petrochemical plants in the Lekki Free Zone; separators, glycol and amine skids and water treatment for gas plants around Bonny Island and the Niger Delta; boiler feed and cooling water systems for fertilizer production; CIP, pasteurizer and glycol skids for food and beverage plants in Lagos, Ogun, Ibadan and Kaduna; and purified water, WFI and clean steam systems for drug makers. Each system is engineered for 400/230 V at 50 Hz, documented for registration under the 2018 regulations and, for medicines, NAFDAC inspection, and set to work by Paul, either as a full installation and commissioning or with Paul supervising the installation. Paul also publishes country pages for Saudi Arabia and Qatar.

What drives the cost of process equipment delivered to Nigeria?

Seven cost drivers beyond the equipment price set what a Nigerian plant pays for a delivered process system, and Paul lists each as a separate line in a US dollar proposal.

  • Electrical design. 50 Hz equipment selection, IEC motors and drives for 400 V, and generator transfer logic.
  • Registration documents. Duplicate drawings and calculations, weld and NDE records, and test reports for the Director of Factories file.
  • Materials and coatings. Alloy and stainless grades for sour or chloride service and coating systems for coastal humidity.
  • Conformity and import paperwork. Technical files for SONCAP or SON permits and Form M support.
  • Freight. Direct or transshipped sailings, flat racks for oversize modules, and port handling at Lekki, Apapa or Tin Can Island.
  • Duty and VAT. Import duty by tariff line and 7.5 percent VAT, carried by the party the Incoterm names.
  • Installation scope. Paul installing and commissioning the whole system, priced side by side with Paul supervising the installation.

Paul Industries for refineries, gas plants, food factories and drug makers in Nigeria

Paul Industries designs, fabricates and tests pressure vessels, heat exchangers, water and steam systems and process skids in the United States for plants across Nigeria, ships them to Lekki, Apapa or Tin Can Island, and installs and commissions them or supervises their installation, with registration, electrical and GMP records in English. Send the process duty, plant location, supply arrangement and target start-up, and the reply from Paul gives a price in US dollars, the registration documents planned for each vessel, and build and sailing dates. Nigerian buyers start through the quote request page.

Standards referenced: Factories (Boiler and Pressure Vessel) Regulations, 2018 (S.I. No. 35 of 2018) · Factories Act, Cap. F1 LFN 2004 · Nigerian Electricity Supply and Installation Standards (NESIS) Regulations 2015 · Electricity Act 2023 · NAFDAC Good Manufacturing Practice guidelines · SONCAP (Standards Organisation of Nigeria Conformity Assessment Programme) · ASME Boiler and Pressure Vessel Code Section I and Section VIII · ASME B31.3 · TEMA · ASME BPE · Incoterms 2020 · ISPM 15

Frequently asked questions

Where is Dangote refinery located, and what does it mean for equipment suppliers?

The Dangote refinery is located in the Lekki Free Zone at Ibeju-Lekki, on the Lekki peninsula east of Lagos, next to a urea fertilizer complex and close to the Lekki Deep Sea Port. Dangote refinery Lekki operations reached the full 650,000 barrel per day design rate in early 2026. Refineries and the plants around them buy vessels, exchangers, skids and piping, which Paul builds to ASME and TEMA and ships to Lagos.

Which Nigeria VAT rate applies when imported machinery clears customs?

Nigeria charges VAT at 7.5 percent on imported equipment, a rate the Nigeria Tax Act 2025 kept when it replaced the Value Added Tax Act on 1 January 2026. Import duty depends on the tariff classification of each item. Under CIF or DAP terms the Nigerian importer pays duty and VAT at clearance; under DDP Paul includes them in the US dollar price.

What goes into a Director of Factories registration application?

The owner applies to the Director of Factories after manufacture or before installation, with drawings, calculations and specifications in duplicate, design pressure and temperature, material details, welding and quality control information, the code section used and a report of physical tests. An Authorized Inspector reviews the design, and the Director assigns a registration number. Paul supplies that complete file with the boiler.

How often are pressure vessels inspected in Nigeria?

Under regulation 12 of the Factories (Boiler and Pressure Vessel) Regulations, 2018, an Authorized Inspector inspects boilers and refrigeration plants at least once every 12 months and pressure vessels, including steam receivers, separators and air receivers, at least once every 26 months. For an unfired vessel the inspector may extend the interval up to five years based on service and risk. Paul builds vessels with the access the inspector needs.

What does a NAFDAC GMP inspection look at in a water system?

A NAFDAC GMP inspection of a pharmaceutical water system looks at the design and qualification records, sanitization method and frequency, microbial and chemical monitoring results, deviations and change control. Paul supplies purified water and WFI systems with design specifications, material and weld records, passivation reports and executed IQ and OQ protocols, so the plant enters the inspection with complete documentation for the equipment.

What Nigeria voltage should a US control panel be built for?

A control panel for a Nigerian plant is built for a 400 V three-phase, 50 Hz supply with 230 V single phase available, the national low-voltage specification. Paul fits IEC motor starters and drives rated for 400 V, a control transformer or 24 V DC supply, phase-loss and under-voltage protection, and documentation for the NEMSA inspection that precedes energization.

Does Paul Industries supply equipment to gas plants around Bonny Island and Port Harcourt?

Paul Industries supplies separators, knock-out drums, glycol and amine regeneration skids, chemical injection packages, heat exchangers and water treatment systems for gas processing in the Niger Delta, including the Bonny Island and Port Harcourt areas. Equipment is designed to ASME Section VIII, TEMA and ASME B31.3, documented for Nigerian registration, and installed and commissioned by Paul or under Paul’s supervision.

Is a SONCAP certificate needed for a process skid shipped to Lagos?

A SONCAP certificate is needed for each shipment of products SON regulates, issued after a product certificate through an accredited conformity body. Machinery imported by a bona fide manufacturer for its own production is handled through an SON import permit, and SON names industrial machinery among the categories that permit covers. Paul confirms the route with the buyer at order and supplies the technical file either route needs.

How long does shipping take from the US East Coast to Lagos?

Freight-route data shows the quickest container service from New York to Tin Can Island in Lagos at about 18 to 19 days, while transshipped services, including some into Apapa, are listed at up to about nine weeks. Clearance adds time at the Nigerian end, and the Lekki terminal operator cites 5 to 10 days there. Paul picks the sailing that fits the plant’s start-up date.

Who builds purified water systems for drug manufacturers in Lagos?

Paul Industries builds purified water, WFI and clean steam systems for drug manufacturers in Lagos and across southwest Nigeria, in electropolished 316L stainless steel to ASME BPE with orbital welds and documented slope. Each system ships with its specifications, material and weld records and IQ and OQ protocols for the NAFDAC GMP file, and Paul installs and commissions it or supervises the installation.

What is the Lekki Deep Sea Port, and where is it?

Lekki Deep Sea Port is a deep-water port on the Lekki peninsula in Ibeju-Lekki, Lagos State, which began full commercial operation in April 2023. Its container terminal handles about 1.2 million containers a year across three berths with a 14 m draft. The port sits beside the Lekki Free Zone, which shortens the road leg for equipment bound for refinery, fertilizer and chemical plants there.

Does Paul Industries install equipment at breweries and food plants in Kaduna and Ogun?

Paul Industries installs and commissions equipment at breweries and food plants in Kaduna, Ogun and other Nigerian states, or supervises the installation, depending on the contract. Breweries, bottlers, dairies and flour mills buy CIP systems, pasteurizers, glycol chillers, steam and condensate systems and water treatment, which Paul builds for 400 V, 50 Hz and ships with full records.

Which Incoterm works best for a first order from a Nigerian plant?

Nigerian buyers who clear through their own agent often choose CIF Lagos or CFR, keeping clearance, duty and the inland leg in-country under their control. Buyers who want delivery to the site gate choose DAP, and DDP places duty and VAT in Paul’s scope. Paul quotes every option in US dollars under Incoterms 2020 and aligns the commercial invoice with the Form M.

What documents should match the Form M for a machinery import?

The commercial invoice, packing list and bill of lading for a machinery import should match the Form M and the pro forma invoice behind it in description, quantity, value, origin and HS classification. Paul issues the pro forma invoice for the Form M application, then prepares the final shipping documents and the certificate of origin from the same item list, so customs sees one consistent set.

How does Paul Industries handle captive power at Nigerian plants?

Many Nigerian plants run on gas engines or diesel generators for part or all of the day, which brings voltage dips and transfers between sources. Paul designs panels with drive ride-through, phase-loss and under-voltage protection, and restart sequencing that brings pumps, heaters and compressors back in a safe order after a transfer, so a process skid recovers without manual resets.

What equipment does a fertilizer plant at Lekki buy from abroad?

A urea and ammonia fertilizer plant at Lekki buys boiler feed water treatment, deaerators, condensate polishing, cooling water treatment and chemical dosing, along with heat exchangers, pressure vessels and alloy process piping. Paul builds these to ASME Section VIII, TEMA and ASME B31.3, documents them for Nigerian registration and supplies them for installation by Paul or under Paul’s supervision.

Are Nigerian orders priced in naira or US dollars?

Paul Industries prices Nigerian orders in US dollars, with equipment, engineering, registration documents, freight, insurance and site work as separate lines under the chosen Incoterm. Send the process duty, site location, supply arrangement including any captive generation, water analysis and the planned start-up month, and Paul answers with a defined scope, delivery dates and the payment schedule.

Which after-sales work follows equipment delivered to a Nigerian site?

After start-up Paul Industries supplies spare parts, filter, resin and membrane changes, relief valve testing, preventive maintenance and repairs for the equipment it delivers to Nigerian plants, and supports the periodic Authorized Inspector inspections of boilers and pressure vessels. A written service plan comes with the handover dossier, and the dossier is updated after each visit.

Planning process equipment for a plant in Nigeria?

Send Paul Industries the process duty, the plant location, the power arrangement and the target start-up, and the reply sets out the registration file, the sailing to Lagos and an estimate priced in US dollars. Call 201-450-8280 or request a quote.