Paul Industries is a US process equipment contractor for Iceland that engineers, fabricates, tests and commissions heat exchangers, cooling water and closed-loop systems, water treatment and purified water plants, compressed air and fume handling packages, refrigeration and process skids, and process piping for aluminium smelters, geothermal power and district heating plants, data centers, fish processors and pharmaceutical plants in Iceland. Each system is designed for the 400/230 V, 50 Hz Icelandic grid, built and documented to the European rules Iceland applies as an EEA member, shipped to Reykjavik, and then either installed and started up by Paul or erected under Paul’s supervision. From its headquarters at 256 Shore Drive, Kilmarnock, Virginia, Paul Industries takes on Icelandic projects; the company was formerly based in northern New Jersey, then Pennsylvania.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
Pressure plant oversight Administration of Occupational Safety and Health (AOSH)
Supply 400/230 V, 50 Hz
Power mix About 70% hydro, 30% geothermal
VAT 24 percent standard rate
Reviewed November 2026

What a US process equipment contractor for Iceland delivers to Icelandic plants

A US process equipment contractor for Iceland carries a system from process duty to running plant across the North Atlantic: engineering to European and ASME practice, fabrication and factory testing in the United States, packing for a cold, wet voyage, and installation and start-up at an Icelandic site. Paul Industries supplies plate and shell and tube heat exchangers, closed-loop cooling systems, industrial water treatment, dust and fume collection, pump and dosing skids, and the stainless, duplex and carbon steel piping that connects them.

Icelandic owners select one of three routes. Equipment supply with Paul supervising installation fits a plant with its own maintenance and construction teams. Design-build adds the plant room, tie-ins, controls and the inspection file. Turnkey delivery places the whole job, from design basis to commissioning records, under one Paul contract priced in US dollars. Iceland is listed under Northern Europe on Paul’s international projects page.

Drawings for Icelandic plants use SI units and documents are written in English, with operating instructions and nameplates translated into Icelandic where the owner or AOSH asks for them. Tag numbers follow the plant’s own system so the equipment drops straight into its maintenance records.

Iceland’s process economy: aluminium, geothermal energy, data centers, fish and medicines

Iceland’s process plants run on cheap renewable power and cold seawater, and five groups buy most of the country’s industrial process equipment: aluminium smelters, geothermal power and district heating utilities, data centers, fish processors and a small pharmaceutical sector. The table summarizes each group with market facts; the plants named describe the Icelandic market.

Icelandic process sectors and the equipment they buy
SectorLocationMarket factSystems Paul supplies
Aluminium smeltingReydarfjordur, Straumsvik near Hafnarfjordur, GrundartangiThree smelters with national capacity of about 850,000 to 900,000 tonnes a yearCooling water systems, compressed air, fume treatment support systems, heat exchangers, pump skids
Geothermal power and heatHengill area east of Reykjavik, the northeastHellisheidi is rated at 303 MW of electricity and 200 MW of thermal outputPlate exchangers, condensate and cooling water treatment, brine and hot water piping
Data centersReykjanesbaer near Keflavik, Akureyri, Blonduos, ReykjavikOperators cite renewable grid power and free-air cooling for most of the yearLiquid cooling loops, coolant distribution, heat recovery exchangers, water treatment
Fish processingCoastal towns around the countryFresh, frozen, salted and fishmeal production for exportAmmonia refrigeration, seawater and process water treatment, CIP, steam and hot water systems
MedicinesReykjavikA 13,000 m2 biosimilar plant opened in 2016 in the University of Iceland science parkPurified water, WFI, clean steam, bioprocess utilities

Aluminum smelter Iceland capacity and what smelters buy

The Iceland aluminum industry rests on three smelters. Fjardaal at Reydarfjordur in the east is the largest aluminum smelter Iceland has, with capacity of about 350,000 tonnes a year; the ISAL smelter at Straumsvik, south of Hafnarfjordur, has about 207,000 tonnes; and Nordural at Grundartangi, north of Reykjavik, produced 260,155 tonnes of aluminium and alloys in 2025 while drawing about a quarter of all electricity generated in Iceland. Smelters run potlines, carbon plants and casthouses around the clock, and every hour of lost cooling or compressed air costs metal.

Smelters buy cooling water and closed-loop systems for rectifiers, casting pits and compressors, compressed air plants and dryers, heat exchangers, pumps and dosing skids, and alloy piping. Paul designs these packages for 400 V and 50 Hz, for the low ambient temperatures and wind of an Icelandic fjord site, and for maintenance without stopping a potline, with duty and standby trains and isolation for each.

Iceland geothermal power plant systems and district heating

An Iceland geothermal power plant uses steam and hot brine from deep wells to drive turbines and, in the Reykjavik area, to heat fresh water for district heating. Geothermal electricity production in Iceland supplies about 30 percent of the country’s power, with hydro supplying the rest, and the Hellisheidi geothermal power plant in the Hengill area, run by ON Power, a subsidiary of Reykjavik Energy, has been rated at 303 MW of electricity and 200 MW of heat since its expansions, with a further 100 MW district heating expansion under construction.

Geothermal fluids carry dissolved silica, hydrogen sulfide and carbon dioxide, so equipment that touches them is chosen for scaling and corrosion. Paul builds plate and shell and tube exchangers that transfer heat from geothermal fluid to clean district heating water, condensate and cooling tower water treatment, pump packages and pressure vessels, with materials selected from the fluid chemistry. Paul’s power generation page covers the same balance-of-plant work for other plants.

District heating exchangers and pump stations

District heating in the capital area moves geothermal heat through two kinds of water: geothermal fluid or heated fresh water from the power plant, and the network water that reaches buildings. Exchanger stations, booster pump stations and storage tanks sit between them, and each must keep running through the coldest weeks, when demand peaks. Paul builds exchanger stations with parallel plate packs so one pack opens for cleaning while the others carry the load, variable speed pump skids with duty and standby pumps, deaeration and dosing where the network water needs it, and controls that hold supply temperature as outdoor temperature falls. Every station is tested on the US floor with water before it ships, and pipe connections are prepared so the site tie-in fits a planned outage window.

Iceland data centers: cooling and heat recovery equipment

Iceland data centers rely on renewable grid power and cool outdoor air, and operators state that free-air cooling serves most of the year, with campuses near Keflavik in Reykjanesbaer, at Akureyri in the north, at Blonduos and in Reykjavik. High-density computing racks now push heat loads past what air alone removes, so Icelandic sites add liquid cooling and heat recovery.

Paul builds data center liquid cooling loops, coolant distribution skids, plate exchangers that hand rack heat to a dry cooler or a district heating network, and treated water systems for those loops. Paul’s data center page sets out the mechanical scope, and each Icelandic package is wired for 400 V and 50 Hz and protected for winter freeze conditions in its outdoor sections.

Heat from computing halls is a resource in Iceland as well as a load, because district heating networks and greenhouses can take warm water year round. Paul designs heat recovery exchangers and controls that raise return water temperature where a heat user sits close to the hall, and that hand the heat to dry coolers whenever the user needs less.

Refrigeration and water for fish processing plants

Fish processing plants along Iceland’s coast freeze, chill and store catch for export and turn by-products into fishmeal and oil, so refrigeration, clean water and hygiene systems decide both product quality and running cost. Paul builds ammonia refrigeration packages with plate freezers, blast freezer coils and cold store evaporators, seawater intake filtration and treatment, process water disinfection, CIP for filleting and packing lines, and hot water and steam systems for cleaning and for fishmeal cookers and dryers. Equipment for these plants uses stainless steel and coated surfaces that stand up to brine, washdown and salt air, and controls sit in sealed enclosures rated for daily hosing.

Iceland pharmaceutical companies and EEA GMP

Iceland pharmaceutical companies follow EU Good Manufacturing Practice, because Iceland is in the European Economic Area and any maker of medicines for the EU and EEA market must comply with EU GMP wherever it is located. The Icelandic Medicines Agency licenses manufacturing sites; it granted a manufacturing licence in 2018 to the biosimilar plant in Reykjavik’s university science park, a 13,000 m2 facility that a US FDA inspection closed in 2026 with a Voluntary Action Indicated classification.

Biologics and sterile manufacturers depend on water for injection, clean steam and process utilities qualified under EU GMP Annex 1 and Annex 15. Paul supplies purified water and WFI systems, clean steam generators and bioprocess skids in electropolished 316L to ASME BPE, with design specifications, material and weld records and executed IQ and OQ protocols, as described on Paul’s biotech page.

How AOSH regulates boilers and pressure equipment in Iceland

Iceland’s Administration of Occupational Safety and Health, AOSH or Vinnueftirlitid, registers and inspects boilers and pressure equipment used in food plants, hospitals, breweries, dry cleaners and other workplaces. New boilers installed in Iceland must bear the CE marking and be manufactured to harmonized standards, the installer notifies AOSH, and AOSH inspects the installation before the equipment goes into use. Registered equipment is then inspected each year or every three years depending on its registration category, and a major inspection follows any major repair.

Icelandic requirements for pressure and electrical equipment and the Paul deliverable
ItemRequirement in IcelandWhat Paul delivers
Pressure equipment placed on the marketPressure Equipment Directive 2014/68/EU across the EEA, with CE marking and conformity assessment by categoryDesign to the essential safety requirements, technical file, materials and test records for the conformity route the category sets
New boilerCE marking, harmonized standards, installer notification to AOSH, inspection before first useBoiler documentation set, operating instructions and installation records ready for AOSH
Boiler and vessel in serviceRegistration and periodic AOSH inspection, yearly or every three years by category; trained supervisor presentInspection access, maintenance plan and operator training records
Electrical installationAct 146/1996 and Regulation 678/2009, overseen by the Housing and Construction AuthorityPanels to IEC 60204-1, wiring diagrams, test results and protective device settings
MachineryEEA machinery rules and CE marking for machines placed on the marketRisk assessment, technical file and instructions for the skid

US-built pressure equipment headed for Iceland is designed from the start to meet the essential safety requirements of the Pressure Equipment Directive, with ASME calculations cross-checked against the harmonized standard where the conformity route calls for it, materials chosen with European certification, and a technical file assembled for the conformity assessment the equipment’s category requires. Paul delivers each vessel and boiler built and documented to those requirements, and the Icelandic owner receives the full file for AOSH registration.

AOSH expects each boiler to have a supervisor with adequate training who attends its inspections. Paul trains the plant’s boiler supervisor and operators during commissioning on start-up and shutdown, water treatment and blowdown, safety valve and low-water cut-off tests, and the records AOSH reviews, and it leaves a written training record with the handover file.

Iceland voltage, frequency and electrical design

Iceland voltage on low-voltage industrial circuits is 400 V between phases and 230 V phase to neutral, at a frequency of 50 Hz, and Iceland electricity comes almost entirely from hydro and geothermal stations. Large consumers such as smelters take high-voltage supply and transform it on site, while process skids and utility plants run at 400 V.

A pump designed for a 60 Hz US supply turns about 17 percent slower on 50 Hz, so Paul sizes rotating equipment on its 50 Hz curves, specifies IEC-frame motors wound for 400 V, and assembles panels to IEC 60204-1 whose control circuits run at 230 V AC or 24 V DC. An Iceland voltage adapter or an Iceland voltage converter answers a visitor’s charging question; for a plant, Paul engineers the equipment for the Icelandic supply from the first data sheet. Panels carry heaters and thermostats where they sit in unheated buildings, and outdoor equipment is rated for freezing temperatures and wind-driven rain.

Port of Reykjavik and shipping to Iceland from US East Coast ports

The Port of Reykjavik, at the Sundahofn container terminal, is the main entry point for process equipment shipped to Iceland, with container, ro/ro and refrigerated cargo handling, and direct North Atlantic services link it with US East Coast ports. Freight-route listings put shipping to Iceland from US ports such as Norfolk at roughly 9 to 24 days depending on the service and routing, and sailings from Reykjavik back to Baltimore or New York at about a week.

Skids ship in 40-foot high cube containers, about 2.35 m wide and 2.69 m high inside, or on flat racks when a module is wider or taller. For smelters in the east, cargo continues by coastal sailing or road from Reykjavik, so Paul sizes modules and lifting frames for that onward leg and for winter road conditions. Crates use ISPM 15 heat-treated timber with the treatment mark, wrapped against salt spray, with desiccant for a cold, humid voyage.

Iceland is in the European Economic Area but outside the EU customs union, so goods from the United States clear Icelandic customs with duty set by tariff line and import VAT paid at clearance. The Iceland VAT rate is 24 percent for most goods, with a reduced 11 percent rate for items such as food and accommodation, and a VAT-registered business normally recovers import VAT on equipment used in taxable activity.

Moving a US-built system to an Icelandic site
StepResponsibilityDetail for Iceland
Export packingPaul IndustriesISPM 15 crates, salt spray wrap, desiccant, capped and purged stainless ends
Ocean legPaul, or the buyer under FCA or FOBNorth Atlantic sailing from a US East Coast port to Sundahofn, Reykjavik
Customs entryImporter, or Paul under DDPDuty by tariff line; import VAT at 24 percent at clearance
Onward legPer IncotermRoad or coastal sailing to sites in the east, north or west
Site arrivalPaul IndustriesReceipt inspection against the packing list, then installation or supervision

How does an Icelandic project with Paul Industries run?

An Icelandic project with Paul Industries runs in nine stages, and the EEA conformity file for pressure equipment and machinery is built alongside the design so the AOSH inspection before first use proceeds on schedule.

Stages of a process equipment project for a plant in Iceland
StageWork by Paul IndustriesWhat the Icelandic plant receives
1. Design basisProcess duty, 400/230 V supply, winter design temperatures, wind and seismic data, water or geothermal fluid chemistryAgreed design basis in English
2. EngineeringMechanical, process and electrical design at 50 Hz, PED category reviewP&IDs, calculations and data sheets
3. Conformity fileTechnical file for pressure equipment and machinery, materials plan, weld proceduresDocuments for CE marking and AOSH registration
4. US fabricationWelding, examination, pickling and passivation, panel assemblyMill certificates, weld logs, examination reports
5. Witnessed factory testHydrostatic or pneumatic test and function checks, with the buyer present or watching a live streamFAT record signed by both parties
6. ExportISPM 15 crating, booking to the Port of Reykjavik, export filingsCommercial invoice, packing list, bill of lading
7. InstallationPaul installs and connects the system, or supervises that workInstallation records and redlined drawings
8. Start-upCommissioning, AOSH inspection before use, IQ and OQ for GMP systemsCommissioning sheets, inspection records, executed protocols
9. Handover and serviceTraining, spares, maintenance and inspection planManuals and as-built dossier, Icelandic translations on request

Iceland is seismically active, so Paul includes the site’s seismic design values in the basis and anchors skids, tanks and piping supports to them. Winter work is planned around short daylight and storms, with modules finished and tested in the United States so site hours go to connection and start-up.

Spare parts follow the same logic. A commissioning kit of gaskets, seals, filter elements, fuses and instrument spares ships in the main consignment, and the proposal lists a priced two-year spares set, including plate exchanger gaskets and pump seals that wear fastest in geothermal and seawater service, so the plant holds what it needs before the first planned stop.

Who builds process systems for plants in Iceland?

Paul Industries builds process systems for plants in Iceland: cooling water, compressed air and heat exchanger packages for aluminium smelters at Reydarfjordur, Straumsvik and Grundartangi; geothermal heat exchangers, water treatment and pump skids for power and district heating plants in the Hengill area and the northeast; liquid cooling and heat recovery systems for data centers around Keflavik and Akureyri; ammonia refrigeration, CIP and water treatment for fish processors; and WFI and clean steam systems for pharmaceutical plants in Reykjavik. Every system is engineered for 400/230 V at 50 Hz, built and documented to the EEA rules that apply to it, and put into service by Paul as a full installation or erected under Paul’s supervision. Paul also publishes pages for Norway and Finland.

What drives the cost of a process system delivered to Iceland?

Seven cost drivers on top of the equipment set the delivered price of a process system for an Icelandic plant, and Paul shows each as its own line in a US dollar proposal.

  • EEA conformity work. PED category review, technical files, European material certification and machinery documentation.
  • 50 Hz and 400 V design. Reselected rotating equipment, IEC motors, drives and panels.
  • Climate and seismic design. Freeze protection, heated enclosures, wind loads and seismic anchorage.
  • Materials. Duplex, titanium or other alloys for geothermal fluid and seawater, electropolished 316L for medicines.
  • Freight. North Atlantic sailings to Reykjavik and any onward coastal or road leg to the east or north.
  • Import VAT and duty. 24 percent VAT and tariff duty, carried by the party the Incoterm names.
  • Site route. Paul installing and commissioning the system compared with Paul supervising the installation.

Paul Industries for Icelandic smelters, geothermal plants, data centers and process plants

Paul Industries engineers, fabricates and tests heat exchangers, cooling and water systems, refrigeration and process skids in the United States for plants across Iceland, ships them to Reykjavik, and installs and commissions them or supervises their installation, with EEA conformity, electrical and GMP records in English. Send the process duty, site, supply data and target start-up, and Paul answers with a US dollar price, a conformity and document plan, and fabrication and sailing dates. Request a quote for an Icelandic plant.

Standards referenced: Pressure Equipment Directive 2014/68/EU (EEA) · Act No. 146/1996 on the safety of electrical installations (Iceland) · Regulation No. 678/2009 on electrical installations (Iceland) · EU GMP Guide (EudraLex Volume 4) · ASME Boiler and Pressure Vessel Code Section VIII · ASME B31.3 · ASME BPE · IEC 60204-1 · Incoterms 2020 · ISPM 15

Frequently asked questions

Which Iceland voltage should a US-built skid be wired for?

A skid for an Icelandic plant is wired for a 400 V three-phase supply at 50 Hz, with 230 V available phase to neutral. Paul specifies IEC motors and drives for 400 V, feeds the controls from a control transformer or a 24 V DC power supply, and adds panel heaters where the skid sits in an unheated hall. Wiring diagrams and test results ship with the panel for the plant’s electrical records.

How much import VAT does Iceland charge on industrial equipment?

Iceland charges VAT at the standard rate of 24 percent on imported machinery, collected when the goods clear customs, together with any duty due on the tariff line. A VAT-registered company normally recovers that import VAT as input tax when the equipment serves taxable business. Under DDP terms Paul includes duty and VAT in its US dollar price; under CIF or DAP the Icelandic importer pays them at clearance.

Do boilers installed in Iceland need CE marking?

New boilers installed in Iceland must bear CE marking and be built to harmonized standards, and the installer notifies AOSH, which inspects the boiler before it goes into service. Pressure equipment falls under the EEA Pressure Equipment Directive, with the conformity route set by the equipment’s category. Paul designs and documents each boiler and vessel to meet those requirements and delivers the technical file with it.

How often does AOSH inspect pressure equipment in Iceland?

AOSH inspects registered boilers and pressure equipment either every year or every three years, depending on the registration category the equipment falls in, and it carries out a major inspection after any major repair. The plant’s trained boiler supervisor attends each inspection. Paul supplies the maintenance and inspection plan, access points and records that make each AOSH visit straightforward.

Who supplies cooling systems to aluminium smelters in east Iceland?

Paul Industries supplies closed-loop cooling water systems, heat exchangers, compressed air plants and pump skids to aluminium smelters, including the Reydarfjordur smelter region in east Iceland. Packages are designed with duty and standby trains so maintenance proceeds with the potline running, built for 400 V and 50 Hz and for fjord weather, and installed and commissioned by Paul or under Paul’s supervision.

What heat exchangers suit geothermal water at plants near Reykjavik?

Geothermal water near Reykjavik carries silica, hydrogen sulfide and dissolved gases, so plants separate it from clean district heating water through plate or shell and tube heat exchangers in titanium, duplex or other alloys chosen from the fluid analysis, with gasket and plate pack designs that tolerate scaling and cleaning. Paul sizes, builds and tests these exchangers and their pump skids for geothermal service.

Are there data centers in Iceland that buy liquid cooling equipment?

Data centers operate near Keflavik in Reykjanesbaer, at Akureyri, at Blonduos and in Reykjavik, and their high-density computing halls add liquid cooling to the free-air cooling Iceland’s climate allows. Paul builds coolant distribution skids, rack cooling loops, heat recovery exchangers and water treatment for these sites, wired for 400 V at 50 Hz with freeze protection for outdoor equipment.

What transit time should an Icelandic plant plan for from the US East Coast?

Published route data for sailings out of Norfolk and other US East Coast terminals shows roughly 9 to 24 days to Reykjavik, depending on whether the service runs direct or transships, and direct sailings from Reykjavik back to Baltimore or New York take about a week. Customs clearance and any onward leg to the east or north of Iceland come on top. Paul books the sailing to suit the site’s start-up date.

Which regulator licenses pharmaceutical plants in Iceland?

The Icelandic Medicines Agency licenses medicine manufacturing sites in Iceland, and because Iceland is in the EEA, manufacturers follow EU Good Manufacturing Practice, including Annex 1 for sterile products. Paul supplies WFI, purified water and clean steam systems with design specifications, weld and passivation records and executed IQ and OQ protocols for the plant’s GMP file.

Does Paul Industries install equipment at the Grundartangi industrial area?

Paul Industries installs and commissions equipment at plants in the Grundartangi industrial area north of Reykjavik, or supervises the installation, according to the contract. Plants there buy cooling water systems, compressed air, heat exchangers and pump skids, which Paul engineers for 400 V and 50 Hz, ships through Reykjavik and documents for AOSH and the EEA rules.

What does a fish processing plant in Iceland buy from a US equipment builder?

A fish processing plant in Iceland buys ammonia refrigeration for freezing and cold storage, seawater and process water treatment, CIP systems for filleting and packing lines, hot water and steam systems, and, for fishmeal production, steam supply and heat recovery for cookers and dryers. Paul builds these packages in stainless and coated steel for a wet, salty environment and wires them for 400 V and 50 Hz.

How does Iceland's seismic activity affect skid and tank design?

Iceland is seismically active, so tanks, skids, vessels and pipe supports are anchored for the site’s seismic design values, and tall equipment is checked for overturning. Paul includes the seismic data in the design basis, designs anchor bolts and base frames to it, and adds flexible connections where piping crosses between structures that move differently.

Which delivery term do Icelandic buyers pick for US-built equipment?

Icelandic plants with an established forwarder often buy FCA or FOB a US port, or CIF Reykjavik, and clear customs themselves. Buyers who want delivery to the site choose DAP, and DDP adds duty and VAT to Paul’s scope. Each option is priced in US dollars under the Incoterms 2020 rules, with freight and insurance itemized.

How is equipment protected for a North Atlantic crossing?

Paul packs equipment for the North Atlantic in ISPM 15 heat-treated timber crates with vapor barrier wrap and desiccant, caps and nitrogen purges open stainless connections, and ships panels and instruments in sealed cases. Crates carry lifting and center of gravity marks, and loose items are listed by system so nothing goes missing between Reykjavik and the site.

What documents come with a US-built pressure vessel for an Icelandic plant?

A US-built pressure vessel for an Icelandic plant comes with its design calculations, drawings, material certificates, weld procedure and welder records, NDE and pressure test reports, nameplate data, the technical file for its Pressure Equipment Directive category, and operating and maintenance instructions. Paul delivers the set in English, with Icelandic translations of operating instructions on request.

In what currency does Paul Industries quote Icelandic work?

Paul Industries quotes Icelandic work in US dollars. The proposal breaks out equipment, engineering, EEA conformity files, ocean freight and cover, and installation or supervision, each on its own line for the Incoterm the buyer names. A request with the duty, site, electrical data, winter design temperature and planned start-up gets a defined scope with build and sailing dates in return.

Who keeps equipment running after start-up at plants in Akureyri and the north?

Paul Industries keeps the equipment it delivers to plants in Akureyri, the north and across Iceland running after start-up, with spare parts, filter, resin and membrane changes, exchanger cleaning and gasket replacement, relief valve testing, preventive maintenance and repairs, plus support for each AOSH inspection. The service plan is agreed at handover and the as-built file is updated after every visit.

What is the Hellisheidi geothermal power plant?

The Hellisheidi geothermal power plant in the Hengill area east of Reykjavik is operated by ON Power, a subsidiary of Reykjavik Energy. It was commissioned in 2006 and is rated at 303 MW of electricity and 200 MW of thermal output for district heating, with a further heating expansion under way. Plants like it buy exchangers, pumps and water treatment of the kind Paul builds.