Paul Industries provides validation and commissioning in California for biotech, pharmaceutical and medical device plants, commissioning and qualifying process equipment, clean utilities, cleanrooms and building systems from South San Francisco and the Bay Area to Vacaville, Los Angeles, Orange County and San Diego. California sites answer to three sets of rules at once: FDA’s GMP regulations, the state Department of Public Health’s manufacturing license, and Title 24 building commissioning that the building department checks before occupancy. Paul Industries plans one program that produces the evidence all three expect.
Request a quote or call 201-450-8280
What does validation and commissioning in California cover?
Validation and commissioning in California covers the engineering tests that prove a new or changed system was built and works as designed, the GMP qualification (IQ, OQ and PQ) that proves it is fit for regulated production, and the state energy code commissioning that new nonresidential buildings of 10,000 square feet or more must complete. On a life science project those three overlap, and the same air handler, water loop or control sequence is tested for each.
Paul Industries designs, builds, commissions and qualifies the systems it delivers, and qualifies vendor-built and existing systems as a standalone scope. Programs run as a standalone qualification scope, as part of a design-build package in which Paul Industries also supplies and installs the equipment, or with complete installation from design through qualified status. Typical California scopes include purified water and WFI, clean steam, CIP and SIP skids, bioreactor and buffer utilities, autoclaves and washers, cleanroom HVAC and pressure cascades, cold rooms and freezers, compressed gases, and the building automation and monitoring systems around them. The general method is set out on the validation and commissioning page; the sections below cover what California adds.
California’s drug and device manufacturing license and the qualification file
California’s drug and device manufacturing license is issued by the Department of Public Health’s Food and Drug Branch under Health and Safety Code section 111615, and every firm that manufactures drugs or medical devices in the state needs one, in addition to its FDA registration. Biologics makers count as drug manufacturers when the finished product is for therapeutic use, and diagnostic and analyte-specific reagent makers count as device manufacturers.
Two features of the California drug manufacturing license matter for qualification planning. First, the license reaches into clinical development: drugs and devices made for human clinical trials must come from a facility holding the state license, whether the trial runs in California, elsewhere in the United States or abroad, while bench work with no human use stays outside it. A South San Francisco or San Diego company moving from research into its first clinical lots therefore needs a qualified, inspection-ready suite earlier than many founders expect. Second, the state applies a choice set by AB 1277 in 2013: a site that shows certain federal or audit evidence receives its license without a state pre-license inspection, and any other site is inspected first.
| Evidence the site provides | Typical site | What it means for the qualification program |
|---|---|---|
| FDA biologics license (PHS Act section 351) | Commercial biologics plant | Licensing rests on the federal approval; qualification is held to FDA’s inspection standard |
| FDA establishment registration plus a federal inspection in the past two years | Operating drug or device plant | The recent FDA inspection carries the license; qualified status is kept current for the next one |
| Audits to ISO 13485, ISO 15378, ISO 9000 or 21 CFR 210, 211 or 820 | Device makers and component suppliers | Audit findings on equipment and process validation feed directly into the license file |
| Approved IND or IDE | Clinical-stage biotech or device company | Clinical suite, utilities and equipment qualified before first clinical manufacture |
| None of the above | New site or new owner | CDPH inspects before licensing; apply at least 90 days before the site expects to be ready |
Whichever route applies, the license is in hand before product is distributed. Paul Industries sequences commissioning and qualification so that the equipment, utilities and environmental controls in a new suite are qualified and their records assembled by the date the owner sets for inspection readiness.
California Title 24 commissioning requirements for lab and plant buildings
California Title 24 commissioning requirements come from the 2025 Energy Code, Section 120.8, effective January 1, 2026, which reaches every new nonresidential building except healthcare facilities once its conditioned area hits 10,000 square feet. Those buildings complete owner’s project requirements, a basis of design, a design review, commissioning measures written into the construction documents, a commissioning plan finished before the building permit is issued, functional performance testing, a systems manual with operator training, and a commissioning report to the owner.
Buildings under 10,000 square feet still complete the design review and write the commissioning measures into the construction documents. Hospitals and other healthcare facilities follow Title 24 Part 1, Chapter 7, overseen by the state’s health facilities agency. On top of Part 6, CALGreen (Title 24 Part 11) Section 5.410.2 requires its own commissioning of new buildings of 10,000 square feet and over, and Section 5.410.4 requires testing and adjusting for smaller buildings and for new systems added in alterations. Mechanical acceptance tests under Section 120.5 are performed by a technician holding an acceptance test technician credential, whose identification number appears on the certificate of acceptance; that rule has applied to nonresidential permit applications submitted since October 1, 2021.
So when is commissioning required on a California life science job? For a new building of 10,000 square feet or more, always under the energy code and CALGreen; for a tenant improvement or new system, through acceptance tests and testing and adjusting; and for any GMP system, whenever the quality unit’s change control says so, regardless of building size.
| Item | Title 24 and CALGreen commissioning | GMP commissioning and qualification |
|---|---|---|
| Purpose | Energy and building performance as designed | Fitness for regulated production and product protection |
| Trigger | New nonresidential building, 10,000 sq ft or more; acceptance tests on new systems | Any system with product or patient impact, new or changed |
| Reviewer | Building department, through compliance certificates | Owner’s quality unit; FDA and CDPH at inspection |
| Requirements document | Owner’s project requirements and basis of design | User requirements and design specifications, with risk assessment |
| Testing | Functional performance tests against the code’s acceptance tests | Commissioning tests, then IQ, OQ and PQ against approved acceptance criteria |
| Records | Commissioning plan, test reports, systems manual, commissioning report | Approved protocols, executed data, deviations, summary reports under good documentation practice |
| After turnover | Operator training and documented sequences | Change control, periodic review and requalification |
Running one test for two purposes
A Title 24 functional performance test of an air handler’s economizer, fan and control sequences produces data a GMP operational qualification also needs, provided the test was written with acceptance criteria the quality unit approved, executed under good documentation practice, and run with calibrated instruments. ASTM E2500 and the ISPE commissioning and qualification guide allow that leverage. Paul Industries writes the commissioning plan and the qualification plan together, marks which tests serve both, and keeps the energy code forms and the GMP protocols in step, so each air handler in a California lab building is tested once for both reviewers.
Biotech companies in San Diego and what their plants ask to have qualified
Biotech companies in San Diego concentrate around Torrey Pines Mesa, Sorrento Valley and the North County corridor toward Carlsbad and Oceanside, and their manufacturing needs run from clinical cell and gene therapy suites to commercial biologics, diagnostics and device lines. California as a whole counts more than 406,000 people directly employed in life sciences and 143,572 in life science manufacturing, according to Biocom California’s 2026 economic impact report.
For a San Diego company the qualification scope usually starts with the clinical suite the state license requires: cleanroom HVAC and its pressure cascade, biosafety cabinets and isolators, incubators and freezers with monitoring, purified water or WFI, and the computerized systems that record it all. As products move toward commercial supply, the scope grows into larger single-use and stainless bioreactor trains, CIP and SIP, clean steam and process utilities. Paul Industries builds and qualifies those systems, and the purified water side is described on high-purity water systems in California.
Biotech companies in South San Francisco, CA and the Bay Area
Biotech companies in South San Francisco, CA make up the oldest life science cluster in the state; the city traces its title as the birthplace of biotechnology to Genentech’s founding there in 1976 and counts over 250 biotech companies in about 12 million square feet of biotech space, with another 3.5 million under construction. Many of those buildings combine research labs, pilot plants and clinical manufacturing under one roof.
For biotech companies, Bay Area growth follows that pattern: a research building that adds a GMP suite, a pilot plant that scales to clinical lots, a campus that adds a manufacturing floor. Each step adds qualification scope inside an occupied building, so Paul Industries stages commissioning and qualification around active labs, isolates the GMP area’s air and utilities first, and writes the change control records that keep qualified systems in their state while construction continues next door. Cleanroom construction is covered on cleanrooms in California, and clean-in-place systems on CIP and SIP systems in California.
Further northeast, the large-scale biologics site in Vacaville, which Lonza bought from Roche in 2024, holds about 330,000 liters of bioreactor capacity in 12,000- and 25,000-liter reactors and has an upgrade program under way. Sites of that scale bring stainless bioreactor, media and buffer, CIP, SIP and WFI qualification measured in hundreds of systems rather than dozens.
Pharmaceutical companies in California, from clinical lots to commercial supply
Pharmaceutical companies in California range from single-suite clinical manufacturers to contract development and manufacturing organizations and commercial plants, and the state license’s reach into clinical manufacturing means more of them qualify equipment early. Pharma companies in Southern California, from Los Angeles and Orange County to the Inland Empire and San Diego, add oral solid dose, sterile fill-finish and packaging lines to the biologics mix of the north.
The qualification approach scales with the phase. A clinical site needs qualified utilities and equipment with protocols proportionate to the risk; a commercial site adds process validation, cleaning validation, and the lifecycle program of periodic review and requalification. Paul Industries scopes each California program to the phase the product is in and the license route the site has chosen, so early sites avoid over-documentation and commercial sites close every gap before an inspection.
Medical device companies: California licensing and equipment qualification
Medical device companies in California hold the same CDPH manufacturing license as drug makers, and since February 2, 2026 their federal quality system rules sit in FDA’s Quality Management System Regulation, which incorporates ISO 13485:2016 into 21 CFR Part 820. For equipment, that means installation and operational qualification of process equipment and validation of processes whose output cannot be fully verified afterward, such as sealing, molding, bonding, cleaning and sterilization.
Orange County, including Irvine, and the San Diego and Bay Area device clusters run many of these lines in controlled environments, alongside utilities such as purified water and compressed gases. Paul Industries installs and qualifies the clean rooms, utilities and process equipment for device lines, and writes protocols around the critical process parameters the device maker’s risk files identify.
Power shutoffs, wildfire smoke and earthquakes in a California requalification plan
Power shutoffs, wildfire smoke and earthquakes belong in a California site’s requalification plan because each can push a qualified system outside its validated state without any change to the equipment. Utilities use Public Safety Power Shutoffs to de-energize lines during dangerous fire weather, a practice San Diego Gas and Electric began in 2013 and Pacific Gas and Electric and Southern California Edison adopted in 2018.
| Event | What it disturbs | Evidence before the area returns to use |
|---|---|---|
| Public Safety Power Shutoff or grid outage | HVAC pressure cascades, cold storage, water loop temperature and flow, monitoring data | Generator and transfer logs, pressure and particle recovery, product temperature excursion review, water loop sampling |
| Wildfire smoke | Outdoor air quality, prefilter and HEPA loading, room particle counts | Filter differential pressure trends, particle counts against classification limits, filter change records |
| Earthquake | Equipment anchorage, piping supports, cleanroom ceiling grids and seals | Walkdown of anchorage and supports, leak checks of HEPA seals, pressure decay or integrity tests on affected lines |
| Extreme heat | Chiller and cooling capacity, warehouse temperatures | Mapping data for the hot season, alarm history, deviation assessment |
Paul Industries writes those triggers and checks into the requalification plan at turnover, so the quality unit has a pre-approved route to release after an event instead of an open investigation. Seismic anchorage and bracing are installed to the 2025 California Building Code, and the installation qualification records the as-built anchorage against the approved drawings.
How Paul Industries runs a California C&Q program
A California C&Q program from Paul Industries starts at design, because the Title 24 design review, the GMP design qualification and the state license schedule all depend on decisions made before construction. The program then moves through factory and site acceptance, commissioning, qualification and turnover with one plan and one document system.
In design, Paul Industries develops user requirements and the energy code’s owner’s project requirements together, runs the system risk assessment, and identifies critical aspects that qualification will test. During construction, vendor factory acceptance tests are witnessed and their data reused where the quality unit accepts it, installation is verified against drawings, and Cal/OSHA permit inspections for new boilers and air receivers are scheduled into startup. Commissioning covers Title 24 functional performance tests and GMP engineering tests; qualification then executes IQ, OQ and PQ protocols, closes deviations and issues summary reports. Turnover delivers the systems manual, training records, qualified status and the requalification plan. Where process piping is part of the scope, welding and passivation records come from industrial welding services in California and passivation services in California, so the installation qualification has a complete chain of evidence.
Cal/OSHA permits to operate in a California turnover file
Cal/OSHA permits to operate belong in a California turnover file because the state’s Pressure Vessel Unit requires a permit, issued after inspection, for power boilers above 15 psig, air tanks larger than 1.5 cubic feet and LP-gas tanks over 125 gallons. A clean steam generator fed by a plant boiler, a compressed air receiver serving a cleanroom or a jacketed vessel heated by plant steam all sit inside that system of permits and inspections.
Boilers are inspected internally and externally each year under Title 8 section 770, while air tank permits run up to three years for portable tanks and five years for others under section 461. Paul Industries schedules the permit inspection for new boilers and receivers into startup, records the nameplate, National Board number and permit in the installation qualification, and lists permit renewal dates in the maintenance plan, so the quality unit can show that pressure equipment in qualified systems is operating legally as well as correctly.
Qualifying monitoring, control and data systems at California plants
Monitoring, control and data systems at California plants are qualified like any other GMP system, with the added expectation of 21 CFR Part 11 controls on electronic records and signatures. Building management systems, environmental monitoring systems, PLC-controlled skids and the historian that stores their data each need a defined scope, configuration records and tests of the functions that touch product quality.
A typical program verifies user accounts and access levels, audit trail capture of changes, time synchronization, alarm setpoints and delays, data backup and restore, and the report that a quality reviewer actually signs. Where a California research building runs one building management system for labs and GMP suites alike, Paul Industries separates the GMP points into a qualified partition, so routine changes on the research side stay outside the change control that governs the qualified area. Control system programming itself is part of the same contract where the owner wants it.
What does validation and commissioning cost in California?
The cost of validation and commissioning in California depends on the number and complexity of systems, the GMP classification and product risk of each, whether the building also needs Title 24 commissioning, how much vendor and commissioning data the quality unit accepts, the state of the existing documentation, and how many rounds of protocol review the owner’s procedures require. A clinical suite with a dozen systems and a commercial biologics plant with hundreds sit at very different points on that scale.
Integrating the energy code tests with GMP commissioning and leveraging factory data are the most effective controllable savings, because they remove duplicate testing. Documentation standards matter almost as much: a site whose SOPs call for a separate protocol, report and review cycle for every small system pays for paperwork that a risk-based approach would group, and a site with incomplete installation records for existing equipment pays for walkdowns and drawing updates before any protocol can be executed. Agreeing the protocol templates, approval routing and deviation process at the start keeps those costs predictable, and Paul Industries sets them out in the validation plan before the first protocol is drafted. Paul Industries prices each program from a system list with a protocol count per system, gives a budget range from comparable scope at the start, and fixes the price once the system list and documentation standards are agreed.
Who handles validation and commissioning in California?
Paul Industries handles validation and commissioning in California for biotech, pharmaceutical and device plants in South San Francisco, the wider Bay Area, Vacaville and Solano County, Sacramento, Los Angeles, Orange County, the Inland Empire and San Diego. From its headquarters at 256 Shore Drive in Kilmarnock, Virginia (the company was formerly based in northern New Jersey, then Pennsylvania), Paul Industries brings the same qualification program to California plants that it runs in all 50 states.
Owners with sites on both coasts get the same protocol formats, documentation practice and turnover packages at each. The Virginia program, in the headquarters state, is described on validation and commissioning in Virginia, and phased biologics campuses on validation and commissioning in North Carolina. Seismic and permit context for the rest of the coast is on West Coast process contracting.
Qualifying California systems with Paul Industries
Paul Industries commissions and qualifies process equipment, clean utilities, cleanrooms and building systems for California life science plants, and designs and builds the systems themselves where the owner wants one contract from design through qualified status. Call 201-450-8280 or request a quote with the system list and the date the site must be inspection-ready. Statewide energy, seismic and cleanroom guidance for owners is collected on the California page.
Standards referenced: 21 CFR Parts 210 and 211 · 21 CFR Part 820 (QMSR, ISO 13485:2016) · 21 CFR Part 11 · ASTM E2500 · ISPE Baseline Guide Volume 5, Commissioning and Qualification · ISO 14644 · California Health and Safety Code 111615 and 111635 · 2025 California Energy Code (Title 24 Part 6) Section 120.8 · 2025 CALGreen (Title 24 Part 11) Section 5.410 · 2025 California Building Code · Cal/OSHA Title 8 Boiler and Unfired Pressure Vessel Safety Orders
Frequently asked questions
Who qualifies equipment and utilities for biotech companies in San Diego, CA?
Paul Industries commissions and qualifies cleanroom HVAC, purified water and WFI, clean steam, bioreactor utilities, isolators, cold storage and monitoring systems for biotech companies in San Diego, CA, from Torrey Pines and Sorrento Valley to Carlsbad and Oceanside. Clinical suites are qualified to the schedule the CDPH license application sets, and commercial sites add process and cleaning validation.
Does Paul Industries commission and qualify systems in South San Francisco and the wider Bay Area?
Yes. Paul Industries commissions and qualifies systems in South San Francisco, Hayward, Fremont, Emeryville, Alameda and across the Bay Area, often inside buildings that combine research labs and GMP suites. GMP air and utilities are isolated and qualified first, change control protects qualified systems while other floors are still under construction, and Title 24 commissioning is run alongside so each test serves both reviewers.
Who handles qualification at large-scale biologics sites in Vacaville and Solano County?
Paul Industries handles commissioning and qualification of bioreactor trains, media and buffer preparation, CIP and SIP, WFI and clean steam at large-scale biologics sites in Vacaville and Solano County. Programs at that scale run on a system list of hundreds of items, with risk assessments that set the depth of each protocol and a schedule tied to the plant’s shutdowns.
Does Paul Industries qualify production lines for medical device companies in Irvine, California and Orange County?
Yes. Paul Industries qualifies cleanrooms, utilities and process equipment such as sealers, molding and bonding equipment, washers and sterilization support systems for medical device companies in Irvine, California and across Orange County. Protocols follow the device maker’s risk files and the QMSR, which has incorporated ISO 13485:2016 into FDA’s device rules since February 2, 2026.
How many biotech companies in South San Francisco are there today?
The City of South San Francisco counts over 250 biotech companies, occupying about 12 million square feet of biotech space, with roughly 3.5 million more under construction. The city traces its biotech identity to Genentech’s founding there in 1976. Many buildings mix research and clinical manufacturing, which is why qualification work there so often happens inside occupied labs.
Does a California clinical trial manufacturing site need a state license?
Yes. The CDPH Food and Drug Branch requires drugs and devices made for human clinical trials to be manufactured in a facility holding the state manufacturing license, wherever the trial takes place. Non-clinical bench and internal testing with no human use falls outside the requirement. The application goes in at least 90 days before the site expects to be ready for inspection, so qualification is planned to that date.
When can CDPH license a California plant without a pre-license inspection?
Under Health and Safety Code section 111635 as amended in 2013, CDPH licenses without a pre-license inspection when the site shows an FDA biologics license, an FDA registration with a federal inspection in the past two years, compliance with audits to ISO 13485, ISO 9000, ISO 15378 or 21 CFR 210, 211 or 820, or an approved IND or IDE. Without that evidence, the department inspects first.
Which California buildings fall under the Title 24 commissioning rule?
Any new nonresidential building outside the healthcare category whose conditioned area reaches 10,000 square feet goes through the full Section 120.8 process: owner’s project requirements, basis of design, design review, commissioning plan, functional testing, systems manual, training and a commissioning report. Smaller buildings complete the design review and write commissioning measures into the construction documents. Healthcare buildings follow Title 24 Part 1, Chapter 7.
Can Title 24 functional performance tests count toward an operational qualification?
They can, when the test is written with acceptance criteria the quality unit approves, executed under good documentation practice with calibrated instruments, and reviewed as GMP data. ASTM E2500 and the ISPE commissioning guide support that leverage. Paul Industries marks the shared tests in a combined plan so the energy code forms and the GMP protocols draw on the same executed data.
Who performs mechanical acceptance tests on a California project?
Title 24 Part 6 Section 120.5 acceptance tests on nonresidential mechanical systems are performed by a technician holding an acceptance test technician credential under Part 1 Section 10-103.2, with the technician’s identification number on the certificate of acceptance. The requirement has applied to permit applications submitted since October 1, 2021, and the building department checks the certificates before final inspection.
Does CALGreen add its own commissioning requirement?
Yes. CALGreen, Title 24 Part 11, requires commissioning of new nonresidential buildings of 10,000 square feet and over under Section 5.410.2, starting with the owner’s project requirements, and testing and adjusting of systems in smaller buildings and of new systems in additions and alterations under Section 5.410.4. Unconditioned warehouses are exempt. The Part 6 energy code commissioning is in addition to it.
How should a qualified cleanroom be checked after a public safety power shutoff?
Review the generator and transfer logs, confirm the HVAC restored its pressure cascade and that particle counts returned within limits for the room class, review any temperature excursions in cold storage and incubators, and sample water loops that lost circulation. Paul Industries writes those steps into the requalification plan at turnover so the quality unit releases rooms on a pre-approved basis after an outage.
Does wildfire smoke affect a qualified cleanroom in California?
Wildfire smoke loads prefilters and final filters quickly and raises outdoor particle concentrations, so filter differential pressures climb and room counts deserve closer watching during smoke events. Trending filter pressures, increasing particle monitoring frequency and changing prefilters as they load keep rooms within their classification. Afterward, filter changes are recorded and any excursions assessed before the room returns to routine monitoring.
Are pharma companies in Southern California held to different validation rules than Bay Area sites?
The rules are the same statewide: FDA’s GMP regulations, the CDPH manufacturing license and the Title 24 energy code. What differs is the building department reviewing the commissioning certificates, the utility serving the site, and the mix of products, with more oral solid dose and fill-finish in the south. Paul Industries applies one program format and adjusts the details for each jurisdiction.
Does seismic anchorage belong in an installation qualification?
Yes. California equipment is anchored and braced to the 2025 California Building Code, and the installation qualification verifies the as-built installation against the approved drawings, which include anchorage and bracing details. Recording anchorage in the IQ also gives the site a baseline for the post-earthquake walkdown in its requalification plan, so damage is easier to judge against the approved condition.
How much does validation and commissioning cost for a California biotech project?
Cost follows the system count, product risk, protocol depth, how much vendor and commissioning data can be leveraged, and whether the building also needs Title 24 commissioning. Combining the energy code tests with GMP commissioning removes duplicate testing and cuts the protocol count. Paul Industries gives a budget range from comparable scope, then a fixed price from an agreed system list and documentation standard.
How long does a California clinical suite take to commission and qualify?
The duration depends on the number of systems, the readiness of vendor documentation, the speed of protocol review and approval, and how many deviations arise. The CDPH application, filed at least 90 days before inspection readiness, sets the outside date. Paul Industries builds the qualification schedule backward from that date, with commissioning finished early enough to leave time for IQ, OQ and PQ and their reports.
Which documents help Paul Industries scope a California qualification job?
Send the system list or drawings, the product and its phase, the CDPH license route the site expects to use, the building’s Title 24 status, existing protocols and SOPs for validation, vendor documentation already received, and the target inspection or production date. Paul Industries uses that to propose a protocol count per system, a schedule and a budget range.
Qualifying systems at a California life science site?
Send the system list, the product phase and license route, the building’s Title 24 status and your inspection readiness date. Call 201-450-8280 or request a quote.