Paul Industries engineers and builds data center liquid cooling in Michigan, from coolant distribution units and rack manifolds to the warm-water facility loops and dry coolers that carry the heat outdoors. Michigan air is cold enough that a liquid loop running at 32 degrees Celsius or warmer can shed its heat without compressors for more than nine hours in ten, so the state suits dense GPU racks well. Paul Industries supplies, builds and services these systems for Michigan owners with the work run from 256 Shore Drive in Kilmarnock, Virginia, the company’s headquarters.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
W32 dry cooling Detroit at or below 77 F in 90.9% of hours (ASOS, 2021 to 2025)
W40 dry cooling Above 90 F only about 17 hours a year at Detroit
Freeze exposure Coldest hour minus 15 F at Sault Ste. Marie; minus 9.9 F at Grand Rapids
Heating season 6,067 to 9,218 heating degree days, Detroit to Marquette (NOAA)
Reviewed November 2026

Why does data center liquid cooling in Michigan run so well on warm water?

Data center liquid cooling in Michigan runs well on warm water because the outdoor air sits well below typical liquid loop temperatures for nearly the whole year, letting dry coolers do the work that chillers do in hotter states. A server cold plate can accept facility water far warmer than a chilled water coil, and every degree of supply temperature the racks accept adds hours when outside air alone can cool the loop.

The national guide to cold plates, rear-door exchangers and coolant distribution units sits on the data center liquid cooling page. The material here applies those systems to Michigan: the weather record behind warm-water design, freeze protection, Michigan water as a fill source, heat reuse against a long heating season, and the codes that govern the piping.

Data center liquid cooling temperature classes against Michigan weather

ASHRAE’s liquid cooling guidelines group facility water supply into classes named for their maximum temperature in Celsius: W17, W27, W32, W40, W45 and W+ above 45. The class a rack vendor supports decides how much of a Michigan year a dry cooler can hold the loop at setpoint, so it is the first data center liquid cooling temperature decision to make.

The table below assumes a dry cooler and heat exchanger together need about 12 degrees Fahrenheit between outdoor air and the water they produce, and reads the hourly airport record for 2021 through 2025.

Share of hours a dry cooler alone holds each ASHRAE facility water class, Michigan airports 2021 to 2025
StationW17 (62.6 F supply): air at or below 50 FW32 (89.6 F supply): air at or below 77 FW40 (104 F supply): hours per year above 90 FHottest hour recorded
Detroit Metro46.9%90.9%1796 F
Grand Rapids49.8%91.8%1395 F
Lansing49.4%91.5%1498 F
Traverse City52.2%93.3%2395 F
Sault Ste. Marie58.4%97.2%090 F

The pattern is clear. A W17 loop, which suits older or mixed equipment, needs trim cooling for about half the year. A W32 loop needs help for only a few hundred hours, mostly summer afternoons. A W40 loop is beyond the reach of Michigan air for just a dozen or two hours a year, and a W45 loop sat above every hour recorded at all five airports, including the 98-degree peak at Lansing. For a new Michigan hall, specifying racks that accept W32 or warmer water usually removes chillers from the liquid side altogether, leaving a small trim plant or a tie to the building’s chilled water for the hottest days.

Data center liquid cooling vs air cooling for Michigan owners

The data center liquid cooling vs air cooling comparison in Michigan is narrower than in the South, because air-cooled halls here already get thousands of economizer hours. Liquid cooling wins in Michigan for a different reason: racks above roughly 40 to 50 kilowatts cannot be cooled by air at any outdoor temperature without very high airflow, and the liquid loop then runs almost entirely on dry coolers. Many Michigan owners end up with both, keeping air handlers for storage, networking and the residual heat from liquid-cooled racks, and running a warm-water loop for the dense rows.

Direct-to-chip cooling in a Michigan hall, from cold plate to dry cooler

Data center liquid cooling direct to chip works by pumping coolant through cold plates mounted on processors and accelerators, collecting it in rack manifolds, and returning it to a coolant distribution unit that transfers the heat to the facility water loop. The facility loop then carries the heat to dry coolers, cooling towers, or the building’s chilled water plant.

The coolant distribution unit is the boundary between two water systems with different jobs. On the rack side, the technology cooling loop holds a small volume of very clean, treated water or a glycol mixture, filtered fine enough to protect the narrow channels in the cold plates. On the building side, the facility loop holds a larger volume and, in Michigan, often carries glycol so its outdoor coils survive winter. Choosing the right data center liquid cooling CDU comes down to capacity, approach temperature, pump redundancy, filtration, controls and whether the unit sits in the row or in a mechanical gallery.

Liquid cooling components in a Michigan installation and what each must handle
ComponentRoleMichigan-specific concern
Cold plates and rack manifoldsCollect heat at the chip and distribute coolant within the rackSupplied with the servers; connections sized to the CDU flow and pressure drop
Coolant distribution unit (CDU)Pumps the technology loop, transfers heat to facility water, filters and controls supply temperatureFacility side may carry glycol for winter; heat exchanger approach selected for the warm-water class
Technology cooling loopClosed loop from CDU to racksFilled with treated or deionized water or a specified glycol, never raw municipal water
Facility water loopCarries heat from CDUs to heat rejectionGlycol strength set for the coldest hour, as low as minus 15 F in the Upper Peninsula record
Dry coolers or fluid coolersReject heat to outdoor airSnow clearance at air inlets; stands above drift height; low-ambient fan control
Trim chiller or tie to chilled waterCovers the hottest hours for lower water classesNeeded for a few hundred hours at W32, close to none at W40
Leak detection and drip containmentFinds and contains coolant releases at manifolds and under CDUsTied into the building management system with alarms and isolation valves

Is data center water cooling closed loop?

Data center liquid cooling at the rack is a closed loop: the technology cooling loop between the coolant distribution unit and the cold plates is sealed, holds a fixed volume of treated coolant and loses almost nothing in normal operation. Whether the whole system consumes water depends on the heat rejection outside. A loop that rejects heat through dry coolers, as most Michigan warm-water designs can, uses essentially no water for cooling, while a loop that rejects heat through an open cooling tower evaporates water on the hottest days.

That distinction matters in Michigan, where public attention to Great Lakes water is high and where the state’s enterprise data center tax exemption requires municipal water service for the facilities it covers. A warm-water liquid design rejecting heat through dry coolers gives an owner a simple answer: the server cooling loop is sealed, and the outdoor equipment does not evaporate water.

Edge and modular liquid-cooled enclosures across northern Michigan

Edge and modular liquid-cooled enclosures in northern Michigan face the harshest version of the state’s winter, because a small enclosure has little thermal mass and often sits outdoors or in an unheated building. Traverse City recorded a 470-hour unbroken run at or below freezing between 2021 and 2025, and Sault Ste. Marie a 762-hour run, so a module that loses power in January can freeze its rack loop before power returns.

Paul Industries designs these enclosures with glycol on every loop that leaves conditioned space, heat tracing on exposed pipe and valves, insulated and heated CDU compartments, and controls that keep minimum flow and minimum temperature through a power transfer. Where the module feeds heat into a host building, such as a hospital, university or industrial plant, the reuse connection runs through an isolating plate exchanger so the host’s heating water and the module’s coolant never mix.

Heat reuse uses for Michigan liquid cooling and the loop temperature each needs
ReuseTypical water temperature neededFit with a liquid loopMichigan season of use
Ventilation and makeup air preheatLow; any water warmer than outdoor airDirect from W32 to W45 return waterOctober through April in most of the Lower Peninsula, longer in the north
Snow melt at docks, walkways and rampsLow to moderateDirect from W40 or W45 return water through a glycol slab loopSnow season, longest in the snow belts and the Upper Peninsula
Low-temperature radiant or fan coil heatingModerateDirect from W45 return water, or a heat pump on cooler loopsFull heating season
Domestic hot water preheatModeratePreheat directly, finish with a heater or heat pumpAll year
District steam networksFar above any liquid loopOnly with high-lift heat pumps; usually not economicNot applicable without a large lift

Freeze protection for Michigan liquid cooling loops

Freeze protection for Michigan liquid cooling loops starts with keeping glycol where it is needed and out of where it is not. Any loop with coils outdoors has to survive the coldest hour at the site, which in 2021 through 2025 reached minus 3 degrees at Detroit, minus 9.9 at Grand Rapids and minus 15 at Sault Ste. Marie, and has to survive unbroken freezing runs that lasted 397 to 762 hours across the five airports.

Paul Industries usually places the glycol on the outdoor facility loop and keeps the technology cooling loop on treated water, with a plate heat exchanger or the CDU itself as the break between them. That keeps glycol’s lower heat capacity and higher viscosity away from the cold plates, where every degree of approach counts. The facility loop’s glycol strength is set from the site’s coldest expected hour and the difference between freeze protection, where the fluid stays pumpable, and burst protection, where it only avoids pipe damage. Paul Industries designs for freeze protection on any loop that must run through a cold snap, because a data hall cannot wait for a thaw.

Power interruptions are the case to design for. If the CDUs and facility pumps ride through a utility outage on generator power, the loops keep moving and stay warm from the IT load itself. If an outage stops circulation in January, outdoor coils and exposed piping cool quickly, so the controls open drain valves or start freeze protection sequences on loss of flow, and the generator transfer sequence brings facility pumps back before dry cooler fans. Paul Industries writes those sequences into the controls narrative and tests them at commissioning, because a sequence that works on paper and fails on a cold night is a costly kind of design error in a Michigan hall.

Winter also brings the opposite risk: overcooling. On a minus 10 night a dry cooler at full fan speed can drive facility water well below the CDU’s minimum supply temperature, so low-ambient controls stage fans down, bypass coils or mix return water to hold setpoint, and the controls alarm on low temperature as firmly as on high.

Michigan water, coolant chemistry and data center cooling water quality

Data center cooling water quality for a liquid loop is set by the fill water and the coolant package, and Michigan’s municipal supplies give very different starting points. The Great Lakes Water Authority system serving Detroit averaged 128 milligrams per liter of dissolved solids and about 2 milligrams per liter of silica in 2023, while Lansing’s softened groundwater from the Saginaw Aquifer carried 84 to 110 parts per million of sodium.

Neither is suitable as-is for a technology cooling loop. Paul Industries fills technology loops with deionized or reverse osmosis water, adds the inhibitor and biocide package the cold plate manufacturer specifies, and records the fill chemistry as the baseline for later sampling. Where a site has a purified water system, the fill connection comes from it; where it does not, a portable deionization rig serves the fill and top-ups. For larger campuses that want permanent purified water for fill and makeup, the Michigan approach is on the ultrapure water systems in Michigan page.

Choosing the data center liquid cooling coolant

The data center liquid cooling coolant for the technology loop is either inhibited water or a propylene glycol mixture, and the choice follows the server vendor’s specification and the loop’s exposure to cold. Inhibited water carries heat best and suits loops that never leave the heated building, which is the usual Michigan arrangement when glycol stays on the outdoor side. A glycol mixture on the technology loop suits rear-door heat exchangers near exterior walls, modular data halls and edge enclosures where a power loss in January could freeze the rack loop.

Heat reuse against a Michigan heating season

Heat reuse from liquid-cooled racks is more attractive in Michigan than in most states, because the heating season is long: NOAA normals put Detroit at about 6,067 heating degree days a year, Grand Rapids at 6,408, Traverse City at 7,104 and Marquette at 9,218. A W40 or W45 loop returns water warm enough to preheat ventilation air, domestic hot water or a low-temperature heating loop directly, and a heat pump can lift it further for buildings that need hotter water.

The constraint is the customer, not the heat. Michigan’s established district systems, such as the downtown Grand Rapids network that has delivered steam since 1897 to 112 buildings through about seven miles of pipe, run at steam temperatures far above what a liquid loop returns. Practical reuse in Michigan therefore starts inside the campus, with office space, warehouse heating, snow melt for loading docks and walkways, and makeup air preheat for the data halls themselves. Paul Industries sizes reuse loops so the data hall’s cooling never depends on the heat customer: the dry coolers always carry the full load if the reuse side shuts down.

Piping, codes and testing for Michigan liquid cooling

Liquid cooling piping in Michigan is permitted and inspected under the 2021 Michigan Mechanical Code, in effect since March 12, 2024, and its hydronic chapter, carried over from the International Mechanical Code, sets the hydrostatic test at 1.5 times maximum design pressure with a 100 psi minimum. Facility water mains typically follow ASME B31.9, the building services piping code, and stainless technology loops to the owner’s specification, often drawing on ASME B31.3 practice for cleanliness and weld quality.

Paul Industries installs the mains, branches and manifold connections, pressure tests each section, flushes the loops through temporary strainers until the flush water runs clean, and only then connects the CDUs and racks. Overhead routing above the racks is common in new Michigan halls, with drip trays and leak detection under every joint above equipment; under-floor routing suits retrofits of raised-floor halls. Data center liquid cooling leak response is designed in from the start: isolation valves at each row, leak detection cable at manifolds and under CDUs, and alarms that tell operators which zone to isolate.

Adding liquid cooling to an operating Michigan hall

Adding liquid cooling to an operating Michigan hall usually means tapping the existing chilled water plant or adding a dedicated warm-water loop with its own dry coolers on the roof or yard. Tapping chilled water is quicker but ties the dense racks to compressor cooling all year; a dedicated warm-water loop costs more upfront but runs on Michigan air for most hours.

Paul Industries surveys the hall first: chilled water capacity and temperature, pipe routes from the plant to the target rows, structural capacity for overhead mains and outdoor equipment, power for CDUs, and the outages the operator can allow. Hot taps and line stops let new branches connect to live mains without draining the plant, and work is phased row by row so the existing white space keeps running. The air side changes too, because air handlers that served the old rows now see lower sensible loads and need control adjustments.

How is data center liquid cooling cost built up in Michigan?

Data center liquid cooling cost in Michigan depends on the number and capacity of coolant distribution units, the length and material of facility water piping, the heat rejection route, the condition of the existing hall, and the controls and leak detection scope. Paul Industries prices each project from that scope, starting with a budget figure drawn from similar Michigan and Midwest work while the design is still being settled.

Operating savings follow from Michigan electricity prices. At the 2026 commercial average of 15.80 cents per kilowatt-hour (EIA, through August), every 250 kilowatts of chiller and fan power a warm-water loop removes saves about $346,020 a year when it runs around the clock; at the industrial average of 9.29 cents, about $203,451. Data center liquid cooling maintenance adds modest recurring costs: coolant sampling and top-up, filter changes, pump and valve checks, and calibration of leak detection and temperature sensors. Paul Industries offers supply-only CDU and piping packages, design-build loops, and complete installations through startup.

Who builds and services data center liquid cooling in Michigan?

Paul Industries builds and services data center liquid cooling in Michigan for colocation operators, enterprises, universities and industrial owners, covering coolant distribution units, technology and facility loops, dry coolers and trim cooling, glycol systems, leak detection, controls integration, flushing, testing and startup. For loops that tie into a larger plant, the Michigan plant design approach is on the data center cooling in Michigan page, and campus-scale mechanical work is on the data center mechanical contractor in Michigan page.

Turnover testing of these loops is described on the data center commissioning in Michigan page, and the chilled water plants many retrofits tap into are serviced as shown on the Michigan chiller repair page. Paul Industries carries the same work in its home state, set out on the Virginia data center liquid cooling page, and in New York, on the New York liquid cooling page. Immersion tanks are covered on the immersion cooling page, and the regional view on the Midwest page. Statewide services are listed on the Michigan page.

Liquid cooling loops from Paul Industries for Michigan halls

Paul Industries builds liquid cooling loops for Michigan halls in Detroit, Southfield, Ann Arbor, Lansing, Grand Rapids, the Great Lakes Bay region and northern Michigan, matched to the racks the owner is buying and to the site’s weather and water. The work runs from survey and design through supply, installation, flushing, pressure testing, startup and service. To begin, send the rack models and densities, the target water class, the hall drawings and the existing plant data, then request a quote.

Standards referenced: ASHRAE TC 9.9 Liquid Cooling Guidelines (W17 to W45 facility water classes) · 2021 Michigan Mechanical Code · 2021 Michigan Building Code · ASME B31.9 · ASME B31.3 · NFPA 75

Frequently asked questions

Who installs data center liquid cooling in Ann Arbor, Saline and Washtenaw County?

Paul Industries installs data center liquid cooling across Washtenaw County, including Ann Arbor and Saline, covering CDUs, rack manifolds, facility water loops and dry coolers. Southeast Michigan has the warmest summers in the state, yet Detroit Metro air stayed at or below 77 degrees in about 91 percent of the hours logged from 2021 through 2025, so a W32 loop there needs trim cooling for a few hundred hours a year at most.

What do liquid-cooled halls in Kent and Ottawa counties need for winter?

Yes. Paul Industries builds liquid cooling for halls in Grand Rapids, Kent and Ottawa counties and the rest of West Michigan. Grand Rapids reached minus 9.9 degrees in the 2021 to 2025 record and sits in the Lake Michigan snow belt, so outdoor dry coolers there get glycol sized for the coldest hour, stands above drift height and inlets kept clear of snow.

Which ASHRAE water class should a new Michigan hall specify?

A new Michigan hall gets the most from W32 or warmer facility water. At W32 a dry cooler holds the loop without compressors for about 91 to 97 percent of hours across the five airports studied, and at W40 the exceptions shrink to a dozen or two hours a year. The class is limited by what the server vendor supports, so Paul Industries confirms it before sizing the loop.

Are dense GPU racks liquid cooled in Michigan?

Dense GPU racks are liquid cooled wherever they are installed, including Michigan, because racks above roughly 40 to 50 kilowatts cannot be held at safe temperatures with air alone. Michigan’s advantage is what happens outside the hall: its cold air lets warm-water loops reject that heat through dry coolers for most of the year, so dense racks add less compressor energy here than in hotter states.

How cold does the glycol need to be rated for in Michigan?

The glycol on an outdoor facility loop is rated from the site’s coldest expected hour, with margin. The 2021 to 2025 record reached minus 3 degrees at Detroit, minus 8 at Lansing, minus 9.9 at Grand Rapids and minus 15 at Sault Ste. Marie, and longer records reach colder still. Loops that must keep pumping through a cold snap need freeze protection, not just burst protection, and Paul Industries designs to that standard.

Can Michigan tap water be used to fill a liquid cooling loop?

Michigan tap water is the source, but it is purified before it goes into a technology cooling loop. Great Lakes municipal water is low in dissolved solids, and Lansing’s softened groundwater is higher in sodium; either way, deionized or reverse osmosis water with the vendor’s inhibitor package is used for fill and top-up, and the fill chemistry is recorded as the baseline for later sampling.

What does a data center liquid cooling CDU do?

A coolant distribution unit pumps coolant to the racks, transfers heat from that loop to the facility water through a heat exchanger, filters the coolant, and controls its supply temperature and pressure. In Michigan designs the CDU or a separate plate exchanger also acts as the break between a glycol facility loop and a treated water technology loop, so glycol stays outdoors and the cold plates keep the full heat transfer of treated water.

How is a liquid cooling leak handled in a data hall?

Leaks are handled by design: drip trays under joints above equipment, leak detection cable at manifolds and under CDUs, isolation valves at each row and alarms in the building management system that name the zone. Technology loops hold small volumes and run at modest pressure, so a well-designed system limits any release to one row. Paul Industries tests every joint hydrostatically before coolant is introduced.

Does liquid cooling in Michigan use water from the Great Lakes?

The rack loop is sealed and uses only its fill volume of treated water. Any further water use comes from the heat rejection choice outdoors: dry coolers consume none for cooling, while open cooling towers evaporate water on hot days. In Michigan, warm-water liquid loops can run on dry coolers for nearly every hour, which keeps a liquid-cooled hall’s water draw close to zero.

Can the heat from liquid-cooled racks warm Michigan buildings?

Yes. Warm-water loops at W40 or W45 return water hot enough to preheat ventilation air, warm offices and warehouses, melt snow at loading docks or feed a heat pump. Michigan’s long heating season, about 6,000 to 9,000 heating degree days depending on the city, gives that heat a use for much of the year. Paul Industries designs reuse so the hall’s cooling never depends on the heat customer.

What pressure test applies to liquid cooling piping in Michigan?

Hydronic piping under the 2021 Michigan Mechanical Code is hydrostatically tested to 1.5 times maximum design pressure, with 100 psi as the minimum, following the International Mechanical Code chapter Michigan adopts. Paul Industries tests each section before insulation and ceilings close, flushes the loop through temporary strainers, and records test pressures, durations and results for the turnover package.

What sets the schedule for adding liquid rows to a live Michigan hall?

A retrofit’s length depends on the number of rows, the pipe routes, equipment lead times for CDUs and dry coolers, and the outage windows the operator allows. Paul Industries phases the work row by row, uses hot taps and line stops to connect to live mains, and prefabricates pipe spools off site so installation inside the white space is short and controlled.

What maintenance does a Michigan liquid cooling system need?

Routine maintenance covers coolant sampling for inhibitor level, pH, conductivity and microbial growth, filter changes on the technology loop, pump and valve inspections, leak detection testing, sensor calibration and, before each winter, a glycol strength check on the outdoor loop. Dry coolers need coil cleaning in spring and snow-ready access in winter. Paul Industries provides these as scheduled service.

Is immersion cooling an option in Michigan?

Immersion cooling works in Michigan and benefits from the same cold air: tank heat exchangers return warm water that dry coolers can cool for nearly the whole year. Immersion suits high-density deployments where the owner accepts tank-based server handling. Paul Industries installs the facility water side, the heat rejection and the tank connections for immersion projects as well as cold plate systems.

Do large Michigan utility contracts affect liquid cooling design?

They affect phasing. Consumers Energy’s large-load terms for loads of 100 megawatts or more allow a ramp-up of up to five years, and campuses under contracts like DTE’s Saline Township agreement fill in stages. Facility water mains, headers and pipe racks are sized for the final load, while CDUs and dry coolers are added as each hall’s racks arrive.

How much does it cost to add liquid cooling to a Michigan data hall?

The cost depends on CDU count and capacity, piping length and material, heat rejection, controls, leak detection and how much work happens around live equipment. Paul Industries starts with a budget figure from similar projects and confirms a firm price after the survey. On the operating side, removing 250 kilowatts of chiller and fan power saves about $346,020 a year at Michigan’s 2026 commercial electricity average.

Bringing dense racks into a Michigan hall?

Send the rack models and densities, the water class they accept, hall drawings and existing plant data. Call 201-450-8280 or request a quote.