Paul Industries provides tank fabrication in Kansas, designing, building, delivering and installing carbon steel and stainless storage tanks, process tanks and field erected tanks for refineries, food and pet food plants, packing plants, animal health makers, utilities and fuel users. Kansas regulates petroleum and hazardous substance tanks through the Kansas Department of Health and Environment under the Kansas Storage Tank Act, and the act’s exceptions for process tanks, refinery tanks, agricultural material tanks and small aboveground tanks decide which new tanks need a KDHE operating permit. Paul Industries builds the tank to its standard and gives the owner the construction data the state’s registration asks for.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
Tank law Kansas Storage Tank Act, K.S.A. 65-34,101 and following
Agency Kansas Department of Health and Environment (KDHE)
Aboveground More than 90% of volume above ground; under 660 gallons excepted
Registration $10 per aboveground tank each year, due before December 31
Excepted Flow-through process tanks and refinery aboveground tanks
Reviewed November 2026

What does tank fabrication in Kansas involve?

Tank fabrication in Kansas involves sizing and designing the tank, building it to the right standard, testing it, delivering or erecting it on site, and connecting it to the plant, with the state’s storage tank rules checked before the order is placed. Paul Industries builds welded steel storage tanks to API 650, low pressure tanks to API 620, shop-built aboveground fuel tanks to UL 142, water storage tanks to AWWA D100, and sanitary process tanks to ASME BPE practice, in carbon steel, stainless steel and duplex grades.

Buyers choose the route that suits the project: a tank supplied alone for the plant to set, a design-build package in which Paul Industries designs and fabricates the tank with its foundation design, ladders, platforms, vents and nozzles, or complete installation covering foundations, setting or erection, piping, insulation, heat tracing, testing and startup. Atmospheric tanks that gain pressure duty cross into pressure vessel territory, covered on the pressure vessel fabrication in Kansas page.

Which tanks does the Kansas Storage Tank Act cover?

The Kansas Storage Tank Act covers stationary tanks that hold regulated substances, meaning petroleum and the hazardous substances listed under the federal Superfund law, other than hazardous waste managed under the federal hazardous waste rules. A storage tank under the act includes the tank, its associated piping and ancillary equipment, and its containment system, so piping and containment details belong in the tank design from the start.

The act splits tanks by how much of their volume sits below ground. An aboveground storage tank has more than 90 percent of its volume, piping included, above the surface, and a tank in a basement, cellar, mine working or tunnel that sits on or above the floor is also treated as aboveground. An underground storage tank has 10 percent or more of its volume, piping included, below ground. That split matters for design, because long buried piping runs can turn a mostly aboveground system into an underground one.

Above ground storage tank regulations: Kansas permits, fees and exceptions

Above ground storage tank regulations in Kansas start with K.S.A. 65-34,103, which lists the tanks the act does not reach, and those exceptions cover a large share of the tanks that industrial plants buy. A new tank outside every exception needs registration and a KDHE operating permit before it holds product.

Tanks excepted from the Kansas Storage Tank Act (K.S.A. 65-34,103)
Excepted tankWhere Kansas plants see itRules that still apply
Flow-through process tanksMix, reaction, wash and surge tanks inside a production processDesign standard, fire code, plant process safety program
Aboveground tanks at a petroleum refining facilityCrude, intermediate and product tanks inside refinery fencesAPI 650 and API 653 practice, federal spill prevention rules, the refinery’s own program
Aboveground tanks of agricultural materials regulated by the Kansas Department of AgricultureFertilizer and agricultural chemical storageKansas Department of Agriculture requirements
Aboveground tanks under 660 gallonsSmall day tanks, lube oil and maintenance tanksFire code and federal spill rules where totals reach their thresholds
Farm or residential motor fuel tanks of 1,100 gallons or less for noncommercial useFarm fuel tanksFire code and safe siting
Storm water and wastewater collection systems, impoundments, pits and lagoonsPacking plant and food plant wastewater systemsKDHE water permits and the plant’s discharge permit
Oil and gas production tanks and gathering equipmentLease tanks in oil and gas fieldsOil and gas regulations
Pipeline facilities and pipeline terminalsPipeline-supplied bulk terminalsPipeline safety rules
Electrical equipment with built-in tanksTransformers and switchgearUtility and electrical codes

Fertilizer tanks, Kansas law hands to the Kansas Department of Agriculture rather than KDHE when they hold agricultural materials that department regulates, which matters in a state that ranks first in wheat and sorghum production. Tanks that store diesel, gasoline, solvents, caustic or other listed substances at plants, fleets, hospitals and data centers are the ones that usually need KDHE registration.

Kansas aboveground storage tank registration and the operating permit

Kansas aboveground storage tank registration under K.A.R. 28-44-29 requires the owner to register each regulated tank with KDHE, giving the owner’s name and contact details, the facility location, tank status, age and capacity, storage tank construction details and the substance stored. The owner pays a nonrefundable registration fee of $10 per tank each year before December 31, a $50 penalty applies to each tank whose fee is late, and no regulated substance may be placed in the tank until a valid operating permit is displayed at the facility where the public can see it.

The KDHE above ground storage tank operating permit is therefore a startup gate as well as a paperwork item. Paul Industries supplies the construction details the registration form asks for, including standard, capacity, materials, wall type and containment, along with the nameplate data, and plans the first fill for after the permit is posted.

Kansas underground storage tank regulations for new systems

Kansas underground storage tank regulations require an application to KDHE before a new underground tank is installed or an existing system is modified, under Article 44 of the department’s regulations, adopt the federal design and installation rules in 40 CFR 280.20 to 280.22 with Kansas changes, and require verification of each installation or modification within 30 days of completion. Under the federal rules Kansas adopts, tanks and piping installed or replaced after April 11, 2016 must be secondarily contained and use interstitial monitoring.

Kansas adds its own controls on who signs for the work. A KDHE underground storage tank installation must carry an installation certification from an installer holding a KDHE license, and the manufacturer’s installation checklist and the installation certification go to KDHE with the registration notice. K.A.R. 28-44-20 through 28-44-22 set licensing for underground tank contractors, installers and removers, and testers. Paul Industries supplies double-wall tanks built to the standard the system design calls for, and coordinates the KDHE application, installation certification and 30-day verification so the system can be registered and permitted on schedule.

Tanks the Kansas act leaves to other rules

Tanks the Kansas act leaves to other rules still need careful design, because the excepted categories include big, demanding tanks. Refinery tanks, process tanks and agricultural tanks each answer to a different authority, and the fire code applies to flammable and combustible liquids whatever their KDHE status.

Aboveground tanks at the state’s three refineries, at McPherson, El Dorado and Coffeyville, are excepted from the act, so API 650 for new construction, API 653 for inspection and repair, federal spill prevention rules and the refinery’s own program govern them. API 650 tanks, Kansas refineries included, are usually field erected, with shell courses, floating or fixed roofs, seals and bottoms built on site to the refinery’s specifications. Flow-through process tanks in food, pet food and chemical plants are excepted too, which places their design on the plant’s own engineering standards and its process safety program. The State Fire Marshal’s regulations on flammable and combustible liquids, K.A.R. 22-7, and NFPA 30 practice cover siting, venting, spacing and containment for tanks holding those liquids.

Containment, overfill protection and venting on regulated Kansas tanks

Containment, overfill protection and venting on a regulated Kansas tank are designed with the tank, because they are what the registration form, the fire code and the federal rules check. Aboveground tanks are contained either by a double wall with interstitial monitoring or by a dike or remote impoundment that holds the full contents of the biggest container inside it plus a weather allowance, and the choice drives the footprint, the foundation and the cost.

Overfill protection combines a level gauge readable at the fill point, a high-level alarm and, where the fill is pumped, an automatic shutoff or a valve the delivery driver can see and close. Normal venting is sized for the maximum fill and withdrawal rates and for thermal breathing, and emergency venting is sized for fire exposure so the shell cannot rupture. Underground systems add spill buckets and overfill devices at the fill pipe, secondary containment for tanks and piping installed since April 11, 2016, and under-dispenser containment for new dispenser systems. Paul Industries fits these items in the shop where possible, so the tank arrives with its containment, gauging and vents already tested.

Winter, wind and heat tracing for Kansas tanks

Kansas tanks set outdoors face freezing winters, hot summers and strong winds, so heat tracing, insulation, venting and wind design are part of the fabrication scope rather than afterthoughts. Water, caustic, fats and many process liquids thicken or freeze in cold weather, and diesel can gel, so outdoor tanks holding them get electric or steam tracing with insulation and a weatherproof jacket, along with heated level instruments and drains.

Tall, lightly loaded tanks are checked against the standard’s wind provisions, with wind girders on open-top and large-diameter shells and anchorage on tanks that could overturn when nearly empty. Hot summer sun raises vapor pressure in fuel and solvent tanks, which affects vent sizing and coating color. Paul Industries designs the tracing and insulation with the tank, mounts the supports and clips in the shop, and tests the tracing circuits during installation.

Coatings, linings and materials for Kansas service

Coatings, linings and materials for a Kansas tank are chosen from the stored product, its temperature and the cleaning it will see, and they often decide service life more than wall thickness does. Carbon steel with an epoxy or phenolic lining suits many fuels, water and mild chemicals at modest cost, while stainless steel avoids lining maintenance where product purity, frequent washdown or chlorides make linings a weak point.

Exterior systems are selected for ultraviolet exposure, temperature swings and, near packing and chemical plants, splash from cleaning chemicals. Bottoms resting on soil get cathodic protection or a liner and leak detection beneath them, and insulated outdoor equipment gets coatings rated for corrosion under insulation. Water storage for drinking water follows AWWA standards with linings listed to NSF/ANSI 61 for potable use. Paul Industries specifies surface preparation, film thickness and cure, applies and inspects the coating, and records holiday testing and thickness readings in the turnover file, so the owner has a baseline for the first inspection.

Inspecting and repairing tanks already in Kansas service

Inspecting and repairing tanks already in Kansas service follows API 653 for field-erected API 650 tanks and industry practice for shop-built tanks, with intervals set by the measured corrosion rate and the tank’s history. Owners carry out routine visual checks of shells, foundations, containment and gauges, while periodic external and internal inspections measure shell and bottom thickness, check welds and nozzles, and look for settlement.

Common repairs include bottom replacement or a new bottom over the old one, shell plate inserts, nozzle replacement, roof and seal repairs on floating roof tanks, coating and lining renewal, and foundation releveling. Each repair is planned with a hydrostatic test or an engineering evaluation in place of one where the standard allows, and the records are kept with the tank file the owner holds for KDHE and the insurer. Paul Industries cleans, inspects, repairs, recoats, tests and returns tanks to service, or replaces them when repair no longer makes economic sense.

Shop-built or field erected tanks for Kansas sites?

Shop-built or field erected construction for a Kansas tank depends mainly on diameter, because a tank that fits on a truck can be built and tested in a controlled shop, while larger tanks have to be erected where they will stand. Field erected tanks, Kansas sites included, also bring weather into the schedule, since wind, cold and rain slow welding and coating on open ground.

Shop-built and field erected tanks compared for Kansas projects
FactorShop-built tankField erected tank
SizeLimited by road shipping dimensions and weightPractically unlimited diameter and height
Typical standardsUL 142, API 650 shop-built, ASME BPE process tanksAPI 650, API 620, AWWA D100
Quality controlIndoor welding, polishing and testingWeather protection, site inspection and testing
Schedule driverShop slot and delivery dateFoundation readiness, weather and crane time
Site disruptionShort: set, anchor and connectLonger: laydown, erection, testing and coating on site
Typical Kansas usesFuel tanks, process tanks, chemical and water tanksRefinery and terminal storage, large water storage, bulk liquid storage

Foundations for either route are designed for the full liquid load, the soil conditions, and wind and seismic loads under the governing standard. Paul Industries designs the anchorage, ring wall or slab with the tank so the two match, and schedules shop or field hydrostatic testing to suit the site’s water supply and disposal.

Stainless process tanks for Kansas food, pet food and animal health plants

Stainless process tanks for Kansas food, pet food and animal health plants are built for cleanability as much as for strength, with sanitary finishes, sloped bottoms, cleaning sprays, sanitary nozzles and welds that drain. Food manufacturing makes up 21 percent of Kansas manufacturing, according to the state’s commerce department, and pet food makers in the Kansas City Animal Health Corridor account for 61 percent of the pet food sold in the United States, so process tanks, Kansas buyers order cover everything from batching and holding to cleaning solutions.

Process tanks Kansas plants order, by industry
IndustryTypical tanksFabrication details that matter
Pet food and food processingFat and oil tanks, slurry and batching tanks, CIP tanksHeated jackets, agitator supports, sanitary finish, insulation
Animal healthMedia, buffer, product holding and purified water tanksPolished interiors, drainability, passivation and weld records for validation
Beef processingHot water, sanitation chemical, rendering and wastewater pretreatment tanksCorrosion resistance to chlorides and cleaning chemicals, heavy wall where abrasion occurs
Flour milling and grainLiquid additive, enrichment and water tanksFood contact surfaces, placement away from dust zones
Battery and chemical manufacturingSolvent, electrolyte and process water tanksMaterial compatibility, nitrogen blanketing, vapor control
Utilities and water treatmentWater storage, chemical feed and neutralization tanksAWWA or API standard, coatings, chemical-resistant linings

Stainless steel tank fabrication for those plants starts with the grade, usually 304L or 316L, and a finish specification tied to the product. Paul Industries builds custom stainless steel tanks with jackets, agitators, load cells and level instruments fitted and tested before delivery, and passivates and documents them for the plant’s quality records. The sanitary piping that connects them is covered on the process piping in Kansas page.

Tank fabrication across Kansas

Tank fabrication across Kansas follows the industries in each region, and Paul Industries delivers and installs tanks in every one of them and in all 50 states.

Tank fabrication, Wichita, Hutchinson and McPherson

Aerospace plants, refineries, grain handlers, food plants and utilities in south central Kansas order fuel and chemical tanks, process water tanks and field erected storage. Custom steel tank fabrication, Kansas refinery and terminal work included, often means replacing an older tank on an existing foundation, so Paul Industries surveys the foundation and the old tank’s connections before the new design is fixed.

Tank fabrication, Kansas City, Johnson County and Topeka

Animal health, pet food, food and battery plants and the hospitals, campuses and data centers of the Kansas City area and Topeka order stainless process tanks, generator fuel tanks, water tanks and chemical tanks. Generator fuel tanks of 660 gallons or more holding diesel usually need KDHE registration and an operating permit, and Paul Industries sizes and supplies them with the containment the fire code requires.

Western Kansas

Packing plants, feed yards, dairies, ethanol plants and grain handlers in Garden City, Dodge City, Liberal and the surrounding counties order hot water, chemical, wastewater pretreatment and fuel tanks. Wastewater collection tanks and lagoons are excepted from the Kansas Storage Tank Act, while fuel and chemical storage at the same plants usually is not.

What does tank fabrication in Kansas cost?

Tank fabrication in Kansas costs what the volume, material, standard, finish and installation scope require, so a price is built from the data sheet. Diameter and height set plate quantity, stainless and duplex grades raise material cost, sanitary finishes and jackets add labor, and field erection adds foundations, crane time and weather allowances. Double-wall construction, containment, insulation, heat tracing, platforms and coatings are each priced as scope items.

The state’s charges are small next to the tank itself: KDHE’s aboveground registration fee is $10 per tank each year, with a $50 penalty per tank when it is late. A budget range comes from a preliminary data sheet, and Paul Industries fixes the price once the standard, materials, accessories and site conditions are settled.

Who fabricates tanks in Kansas?

Paul Industries fabricates tanks in Kansas for refineries, food, pet food and animal health plants, packing plants, battery and chemical plants, utilities and fuel users, building steel tank fabrication, Kansas projects included, to API 650, API 620, UL 142, AWWA D100 and sanitary practice. From its headquarters at 256 Shore Drive in Kilmarnock, Virginia, the East Coast contractor, formerly based in northern New Jersey and later Pennsylvania, takes tank work across Kansas, throughout the 50 states and abroad.

For comparison, see tank fabrication in Virginia, the headquarters state, along with the Texas and Illinois tank pages; the Midwest page sets the Kansas tank rules beside those of neighboring states. Tank projects in Kansas often include welding at Kansas plants, boiler and hot water systems and qualification of process tanks. Cleaning and inspection of tanks already in service are covered under industrial tank cleaning.

Tanks from Paul Industries for Kansas plants

Paul Industries designs, fabricates, delivers, erects, installs, tests, repairs and replaces storage and process tanks for Kansas plants, with the construction data for KDHE registration ready when the tank arrives. Send the volume or dimensions, the stored product, design temperature and pressure or vacuum, the standard, materials and finish, nozzles and accessories, and the site location, then call 201-450-8280 or request a quote. General guidance on tank types and standards sits on the national tank fabrication page, and the Kansas overview lists other process work in the state.

Standards referenced: Kansas Storage Tank Act (K.S.A. 65-34,101 and following) · K.A.R. 28-44 (KDHE storage tank regulations) · 40 CFR Part 280 · K.A.R. 22-7 (Flammable and Combustible Liquids) · API 650 · API 620 · API 653 · UL 142 · AWWA D100 · ASME BPE · NFPA 30

Frequently asked questions

Who builds storage and process tanks in Wichita and south central Kansas?

Paul Industries builds storage and process tanks for aerospace plants, refineries, food plants, grain handlers and utilities in Wichita, Hutchinson, McPherson, El Dorado, Newton and Salina. Shop-built tanks are delivered tested and ready to set, and larger tanks are field erected on foundations designed with them. Send the volume, product and standard, and Paul Industries prices the tank and its installation.

Does Paul Industries fabricate tanks for Kansas City, Olathe and Lenexa plants?

Paul Industries fabricates stainless process tanks, chemical tanks, water tanks and generator fuel tanks for animal health, pet food, food and battery plants, hospitals, campuses and data centers in Kansas City, Kansas, Olathe, Lenexa, Overland Park, De Soto, Lawrence and Topeka. Sanitary tanks are built and documented for validation, and regulated fuel tanks are supplied with the construction data KDHE registration needs.

Who builds tanks for packing plants in Garden City, Dodge City and Liberal?

Paul Industries builds hot water, sanitation chemical, rendering, wastewater pretreatment and fuel tanks for beef packing plants, feed yards, dairies and ethanol plants in Garden City, Dodge City, Liberal and across western Kansas. Materials are chosen for chlorides and cleaning chemicals, and tanks are delivered or erected around the plant’s production schedule.

What is the Kansas Storage Tank Act?

The Kansas Storage Tank Act, K.S.A. 65-34,101 and following, is the state law under which the Kansas Department of Health and Environment regulates underground and aboveground tanks holding petroleum and listed hazardous substances. It defines aboveground and underground tanks, sets registration and permit requirements through K.A.R. 28-44, and lists exceptions such as flow-through process tanks, refinery aboveground tanks and tanks under 660 gallons.

Do aboveground storage tanks need to be registered in Kansas?

Aboveground storage tanks holding regulated substances need to be registered with KDHE in Kansas unless an exception applies, such as tanks under 660 gallons, flow-through process tanks, refinery aboveground tanks or agricultural material tanks under the Kansas Department of Agriculture. Registered tanks pay $10 each a year before December 31 and need a posted operating permit before product goes in. Paul Industries supplies the construction details for registration.

Can a new Kansas fuel tank be filled before the operating permit arrives?

K.A.R. 28-44-29 says no regulated substance may be placed in an aboveground storage tank unless a valid operating permit is displayed at the facility and visible to the public, so a new regulated tank waits for its permit before the first delivery. Paul Industries builds that step into the startup plan, completing installation and testing early enough for the registration and permit to be in place.

Is a tank in a Kansas basement treated as an underground tank?

A tank in a basement, cellar, mine working, drift, shaft or tunnel is treated as an aboveground storage tank in Kansas when it sits on or above the floor, even though it is below grade. A tank counts as underground when 10 percent or more of its volume, piping included, is below the ground surface. Paul Industries designs piping routes with that line in mind.

Are flow-through process tanks regulated by KDHE?

Flow-through process tanks are excepted from the Kansas Storage Tank Act, so mix, reaction, wash and surge tanks that form part of a production process do not need KDHE registration as storage tanks. They still need sound design, fire code compliance for flammable contents and coverage in the plant’s process safety program. Paul Industries designs them to the plant’s engineering standards and documents them fully.

What does a new underground tank installation in Kansas require?

A new underground tank installation in Kansas requires a KDHE application before work starts, a system meeting 40 CFR 280.20 as Kansas adopts it, secondary containment with interstitial monitoring for tanks and piping installed after April 11, 2016, certification by an installer holding a KDHE license, and verification to KDHE within 30 days of completion. Paul Industries supplies the tanks and coordinates the filings.

Who regulates fertilizer and agricultural chemical tanks in Kansas?

Aboveground tanks holding agricultural materials that the Kansas Department of Agriculture regulates are excepted from the Kansas Storage Tank Act, so that department’s requirements govern them rather than KDHE’s tank rules. Paul Industries builds agricultural liquid tanks to the standard and containment the owner’s permit requires, in carbon steel, stainless or coated construction.

Do refinery tanks in Kansas need KDHE registration?

Aboveground storage tanks located at a petroleum refining facility are excepted from the Kansas Storage Tank Act, so they are governed by API 650 and API 653 practice, federal spill prevention rules and each refinery’s program instead of KDHE tank registration. Paul Industries erects, repairs and replaces refinery tanks to those standards and the refinery’s specifications.

What standard should a Kansas diesel generator tank meet?

A shop-built diesel generator tank in Kansas is usually built to UL 142, often as a double-wall or dike tank, and placed to the fire code’s spacing and venting rules. Tanks of 660 gallons or more that hold diesel need KDHE registration and an operating permit. Paul Industries sizes the tank for the required runtime and supplies it with containment, gauging and overfill protection.

Can an existing tank be moved and reused at another Kansas site?

An existing tank can be moved and reused in Kansas when its condition and construction standard support the new service, which means an inspection to API 653 or the original standard, thickness readings, repairs where needed and a new test before use. A regulated tank at its new location is registered there. Paul Industries inspects, repairs, moves and resets relocated tanks.

Which stainless finish does a Kansas food or pet food tank need?

A Kansas food or pet food tank needs a product contact finish smooth enough to clean reliably, with 304L or 316L stainless chosen for the product and cleaning chemicals, and welds ground and blended where they touch product. Exterior finishes are chosen for washdown. Paul Industries agrees the finish specification at quotation and records roughness readings before delivery.

How long does it take to build a tank for a Kansas plant?

Build time for a Kansas tank depends on size, material availability, standard, finish and whether the tank is shop-built or field erected. Small carbon steel tanks are quickest; large field erected tanks depend on foundation readiness, weather and crane time as much as on fabrication. Paul Industries gives a schedule with the quote and orders plate as soon as drawings are approved.

What should a Kansas plant send when ordering a tank?

Paul Industries needs the stored product, working volume or dimensions, design temperature and any pressure or vacuum, the standard, material and finish, single or double wall, nozzles and accessories such as ladders, platforms, agitators and instruments, insulation and heat tracing, and the site location with any access limits. For a replacement, add the old tank’s nameplate and drawings.

Planning a new, replacement or relocated tank in Kansas?

Send the product, volume, standard, materials, accessories and site location, and for a replacement the old tank’s nameplate and drawings. Call 201-450-8280 or request a quote.