Paul Industries carries out data center commissioning in Utah for the mechanical systems of a data hall: flushing and pressure testing, equipment startup, functional tests through integrated systems testing, and the records Utah’s energy code expects at turnover. A Utah plant has to prove itself in two very different seasons, under an energy code that took a new edition on July 1, 2026, and often while the site grows in phases as power arrives. Paul Industries plans the tests with the owner’s commissioning team, runs the mechanical work and delivers documented results.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
Energy code 2024 IECC with Utah amendments, from July 1, 2026
Code commissioning Required above 10,000 sq ft or 960,000 Btu/h (C408.2)
Air permit trigger 5 tons a year of a criteria pollutant (Utah DAQ)
Freezing days 112 a year in Salt Lake City, so freeze sequences get tested
Reviewed November 2026

What does data center commissioning in Utah cover?

Data center commissioning in Utah covers the work that proves a data hall’s cooling, power and controls perform as designed before servers depend on them, from factory witness tests through cleaning, filling, startup, functional performance tests and full integrated testing under simulated load. For the mechanical side that means chillers, dry coolers and towers, pumps, coolant distribution units, air handlers, piping, glycol loops, freeze protection and the building automation that sequences all of it.

The general method, from Level 1 through Level 5, is set out on the data center commissioning page. In Utah, three conditions change the program: the 2024 energy code and its commissioning section, a climate that requires the plant to be tested in winter and summer modes, and air permit limits that shape how long emergency generators may run during load testing. Each is covered below.

Utah’s 2024 energy code and the commissioning requirement

Utah’s 2024 energy code requires commissioning of mechanical systems in most data center buildings, because Utah Code 15A-2-103 adopts the 2024 International Energy Conservation Code with state amendments for work governed by the code from July 1, 2026. Section C408.2 requires that, before the final mechanical and plumbing inspections, the registered design professional or approved agency provide evidence of mechanical systems commissioning and completion. The construction documents must state the commissioning requirements, and copies of the documentation go to the owner and are available to the code official on request.

The section exempts buildings under 10,000 square feet of gross conditioned floor area whose combined heating, cooling and service water heating capacity is under 960,000 Btu per hour. Almost every data hall exceeds the capacity limit on cooling alone, so the requirement applies to them. A written commissioning plan, developed by a registered design professional or approved agency, describes the activities in each phase, the people involved, the functions to be tested and the conditions under which each test runs.

Through Section C403.1.2, that energy code also makes data center systems meet ASHRAE 90.4, whose Sections 6 and 8 cap mechanical load component values and electrical losses. Commissioning is where those design numbers meet measured performance: economizer changeover points, chiller part-load operation, pump and fan speeds and the setpoints that make the design efficient all get verified in the field.

Data center commissioning levels with the Utah checks at each one

Data center commissioning levels run from factory testing at Level 1 to integrated systems testing at Level 5, and a Utah project adds specific checks at each level for freeze protection, altitude and seasonal operation. The table below lists the mechanical focus at each level and what a Utah site adds.

Commissioning levels on a Utah data center mechanical scope
LevelMechanical focusUtah additionRecord produced
Level 1: factory witnessChiller, coolant distribution unit and pump skid performance at the factoryRatings confirmed at site altitude, not sea levelFactory test reports with altitude correction
Level 2: delivery and installationReceipt inspection, setting, piping and wiringGlycol, heat trace and freeze devices installed as drawnInstallation checklists and photos
Level 3: startupFlushing, fill, pressure tests, equipment startupFill water quality checked against seasonal hardnessFlushing logs, test certificates, startup reports
Level 4: functional testsEach system through its sequences and failure modesWinter and summer modes, economizer changeover, freeze alarmsFunctional test scripts with results
Level 5: integrated testingWhole facility under simulated load with utility failureGenerator run hours planned within the air permitIntegrated test report and issues log closeout

The data center commissioning process on a Utah build

The data center commissioning process on a Utah build starts during design, when the commissioning plan and the test scripts are written around the climate, and ends after the first year of operation, when seasonal tests deferred at turnover are completed. Commissioning data centers in a state with long cold winters and short hot summers means the plant almost never meets both design extremes during the construction window, so some tests have to be scheduled for the season that brings them.

A typical sequence runs as follows. During design, the team reviews sequences of operation for freeze protection and economizer changeover. At Level 2 and Level 3 the installation is checked and the systems are cleaned and started. Functional tests at Level 4 drive each system through its modes, using false loading or simulated outdoor conditions where the real weather is not available. Integrated testing at Level 5 then removes utility power, fails equipment and proves the plant holds the hall within its limits. The seasonal tests that the weather prevented at turnover are scheduled for the first winter or summer of operation.

Why Utah plants need a winter test and a summer test

Utah cooling plants need testing in both winter and summer because Salt Lake City averages 112 days a year with a freezing low and about 62 days at 90 degrees or above, and the plant runs completely different sequences in each. In winter, dry coolers and economizers carry the load, glycol and heat trace protect the outdoor equipment, and the controls must keep coils from freezing at low load. In summer, chillers, adiabatic stages or towers take over and the plant runs near its peak capacity.

A plant handed over in October may never have rejected full load on a hot afternoon, and one handed over in June may never have seen a single freezing night. Both gaps are risks. Paul Industries writes seasonal test scripts that list exactly what must be observed in each season, captures trend data from the building automation system during the first cold snap and first heat wave, and closes the open items in the issues log when the data proves the sequences work.

Seasonal tests for a Utah data center cooling plant
SeasonTestPass condition
WinterDry cooler operation at low outdoor temperature and low loadLeaving fluid held above the low limit with no coil freeze alarm
WinterHeat trace and basin heater circuitsEach circuit energizes at its setpoint and alarms on failure
WinterAir-side economizer low-limit protectionDampers modulate and the low-limit trips before coil temperature falls too far
ShoulderEconomizer to mechanical changeoverSmooth transfer with no hall temperature excursion
SummerFull-load heat rejection on a hot afternoonSupply temperature held with the designed redundancy available
SummerAdiabatic stage enable and drainSpray enables at setpoint and the system drains and dries on schedule

Generator and load bank testing under Utah air rules

Generator and load bank testing on a Utah data center has to fit the site’s air permit, because the emergency generators that integrated testing relies on are emission units regulated by the Utah Division of Air Quality. Utah DAQ requires a New Source Review Approval Order when a source’s emissions of a criteria pollutant reach five tons per year or more, or when hazardous air pollutant emissions exceed 500 pounds a year for a single pollutant or 2,000 pounds combined. A data center with a large generator fleet usually exceeds those thresholds and operates under permit conditions that limit run hours.

Much of the Wasatch Front also sits in an ozone nonattainment area. EPA designated the Northern Wasatch Front, covering Salt Lake and Davis counties and parts of Weber and Tooele counties, as nonattainment under the 2015 ozone standard in 2018, and the area was later reclassified to Moderate. Owners there plan generator testing carefully against their permit limits. The commissioning schedule therefore counts the generator hours each test consumes, combines tests where possible and uses resistive load banks on the mechanical systems so that cooling performance can be proven without extra engine hours. Engine ratings also fall with altitude, so generator capacity at the 4,231-foot elevation of the Salt Lake City airport is confirmed before the load steps are written.

Flushing, pressure testing and fill on Wasatch Front water

Flushing, pressure testing and fill on Wasatch Front water need attention to water quality because city supplies change through the year. According to Salt Lake City Public Utilities, over 60 percent of the city’s supply begins in Wasatch canyon streams and that summer flow is supplemented by deep wells with harder water. Water used for flushing and fill in July can carry more minerals than the same tap delivered in April.

For the chilled water and condenser loops, flushing removes construction debris through temporary strainers and bypasses around chillers, coils and heat exchangers, followed by chemical cleaning and passivation where the specification calls for them. For technology cooling loops that serve liquid-cooled racks, fill water is treated or purified to the server maker’s limits before it touches a cold plate. Pressure tests follow the governing piping code, with documented test pressure, hold time and witness. Paul Industries runs these steps and records them, using the practices on the hydrostatic testing page.

Liquid cooling loops in the Utah commissioning program

Liquid cooling loops add their own steps to a Utah commissioning program, because the coolant that reaches a cold plate has to be cleaner, better degassed and more tightly controlled than ordinary chilled water. Each technology cooling loop is flushed with the coolant distribution unit and rack manifolds bypassed, filled with coolant mixed to the server maker’s specification, and circulated through air separators until dissolved air readings settle. At Salt Lake City elevation the lower atmospheric pressure releases air more readily at high points, so venting and degassing take longer than at sea level.

Functional tests then prove the coolant distribution unit’s controls: supply temperature held against changing heat load, pump changeover on failure, filter differential alarms, leak detection that isolates the right zone and a dew point guard that keeps supply water above the room dew point. Heat load comes from rack-mounted load banks or from the first production servers under the operator’s supervision. The fill chemistry is sampled and recorded as the baseline for later coolant testing, and the results join the rest of the mechanical record set.

Controls and building automation: the part of commissioning that fails most quietly

Controls and building automation decide whether a commissioned Utah plant actually runs the way the tests showed, because sequences drift as setpoints are adjusted, sensors age and software is updated. Commissioning therefore checks more than equipment. Sensor calibration is verified against reference instruments, outdoor air temperature and humidity sensors are shielded and located away from exhaust plumes and snow drifts, and every alarm is traced from the field device to the operator’s screen.

Trend logs set up at turnover are the owner’s best tool afterward. Paul Industries configures trends for supply and return temperatures, flows, valve and damper positions, economizer mode and freeze protection status, then reviews them with the operator after the first cold snap and the first heat wave. Drift found in that review is corrected before it costs energy or puts a coil at risk.

Utah’s shoulder seasons deserve their own trend review. Spring and autumn days can swing from below freezing at dawn to the 70s by afternoon, so the plant may change modes several times in a day. Trends from those days show whether changeover deadbands are wide enough, whether valves and dampers settle or hunt, and whether freeze protection releases promptly once the air warms.

Phased Utah data center construction and recommissioning each phase

Phased Utah data center construction means commissioning is repeated for each new hall or plant module while earlier phases stay live. Large campuses often receive power in steps, and a 2025 statute, Utah Code 54-26, covers service requests that reach at least 100 megawatts inside five years. Each phase brings new chillers, coolant distribution units or dry coolers that connect to operating headers.

Recommissioning a live plant is more careful work than commissioning an empty one. Tie-ins follow a method of procedure approved by the operator, new equipment is tested in isolation before it joins the plant, and integrated tests are run so that the operating halls never lose redundancy. The sequences in the building automation system are retested after every change, because a new module can alter staging and changeover points for the whole plant. Paul Industries keeps a single issues log and record set across phases, so the owner ends with one history of the plant rather than several.

Data center commissioning plan and schedule for a Utah project

A data center commissioning plan and schedule for a Utah project tie every test to a construction milestone, a season and a power availability date. The data center commissioning schedule usually runs in parallel with the last third of construction, with Level 3 startup beginning as soon as permanent power and water reach each system, and Level 4 and Level 5 testing consuming the final weeks before the owner’s ready-for-service date.

The plan names who performs each test, who witnesses it and what record results. The data center commissioning agent writes and directs the scripts on behalf of the owner. Paul Industries prepares and starts the mechanical systems, runs them through the scripts, fixes any deficiency and records the results. The plan also lists deferred seasonal tests and the date range for each.

A data center commissioning checklist for Utah mechanical systems

The data center commissioning checklist below covers the mechanical items that most often hold up turnover on a Utah project. Each item has a responsible party and a record attached.

Mechanical commissioning checklist for a Utah data hall
ItemWhat is verifiedRecord
Piping cleanlinessFlush velocity reached, strainers clean, water clearFlushing log with strainer inspections
Pressure testsTest pressure and hold time per the piping codeSigned test certificates by system
Glycol concentrationMix matched to the site’s design lowRefractometer readings by loop
Freeze protectionHeat trace, basin heaters, low-limit devices operateFunctional test sheets
Equipment ratingsCapacity confirmed at site elevationStartup reports with measured flows and temperatures
Sequences of operationStaging, changeover, failure response and alarmsFunctional test scripts and trend data
Water treatmentChemistry baseline and controller setpointsWater analysis at turnover
Operations documentsManuals, labels, maintenance actionsTurnover binder or electronic record set

Documentation and turnover for the owner and the building official

Documentation and turnover on a Utah data center follow both the owner’s requirements and the energy code, which in Section C408 calls for operations and maintenance information, a commissioning report and documentation the code official can request. The O and M documents include manufacturers’ information, programming and data points, narratives describing how systems are intended to operate, and labels stating required regular maintenance on the equipment.

Paul Industries delivers the mechanical records as an organized set: test certificates, flushing and fill logs, startup reports, functional test results, the closed issues log, as-built drawings, valve tags and the maintenance schedule. Those records also support warranty claims on chillers, coolant distribution units and dry coolers, which manufacturers often tie to documented startup. City and county building departments then complete their final inspections against the code with the evidence in hand.

How much does data center commissioning cost in Utah?

The cost of data center commissioning in Utah depends on the number of systems and pieces of equipment, the commissioning levels in scope, the number of phases, the seasonal tests that must be repeated and the generator and load bank strategy. Flushing and pressure testing scale with pipe length and loop count. Functional and integrated testing scale with the number of sequences, failure scenarios and the hours of supervised testing the owner requires.

Utah-specific items are the second season of testing, freeze protection checks, altitude confirmation of equipment ratings and the planning time needed to fit generator tests within permit limits. Paul Industries prices the mechanical commissioning scope with the installation or as a separate package, gives a budget range from comparable scope once the system list is known, and firms the price when the commissioning plan is issued.

Owners weigh that cost against what commissioning prevents. A coil that freezes in the first January, a dry cooler bank that cannot carry the July peak at altitude, or an economizer that hunts between modes all cost more to fix after servers are live than during testing, and each one surfaces only when the test script asks the plant to do something it has not done before. A well-run Utah program finds those problems on paper or on simulated load, not on production equipment.

Who performs data center commissioning in Utah?

Paul Industries performs the mechanical work of data center commissioning in Utah: flushing, chemical cleaning, pressure testing, fill and degassing, startup, functional testing and participation in integrated systems tests, with the records to match. Its headquarters is at 256 Shore Drive, Kilmarnock, Virginia, and the company, once based in northern New Jersey and later in Pennsylvania, takes commissioning work across Utah and in all 50 states.

The Utah program follows the same test discipline Paul Industries uses for data center commissioning in Virginia, its home state, and on data center commissioning in Texas projects, adapted to freezing nights, altitude and Utah’s code. The systems being tested are described on the data center cooling in Utah and data center liquid cooling in Utah pages, and the installation scope on the data center mechanical contractor in Utah page. For regulated life sciences plants, the comparable program is validation and commissioning in Utah.

Paul Industries data center commissioning services in Utah

Paul Industries data center commissioning services in Utah cover new halls, phased expansions, liquid cooling additions and recommissioning of existing plants in Salt Lake City, West Jordan, Lehi, Eagle Mountain, Ogden, Tooele and St. George. Utah data center construction teams can bring Paul Industries in with the mechanical installation or for commissioning alone, and the same team carries the plant into service with chiller repair in Utah and maintenance after turnover. The wider region is on the Southwest page and the state overview on the Utah page. Send the system list, the commissioning plan or specification and the schedule, and request a quote.

Standards referenced: 2024 International Energy Conservation Code with Utah amendments (Section C408) · ASHRAE 90.4 · ASHRAE Guideline 0 · 2024 International Mechanical Code · ASME B31.9 · ASME B31.3 · Utah Administrative Code R307-401 (air permits)

Frequently asked questions

How to commission a data center in Utah's climate?

Commission it in stages from factory tests through integrated testing, and plan for two seasons. Utah plants run economizer and freeze protection sequences for much of the year and peak chiller or adiabatic sequences in summer, so tests that the weather does not allow at turnover are scheduled for the first winter or summer of operation. Trend data from the building automation system closes those items.

Does Utah's energy code require commissioning for a data center?

For nearly every data center, yes. The 2024 International Energy Conservation Code, adopted in Utah with amendments from July 1, 2026, requires mechanical systems commissioning under Section C408.2 unless the building is under 10,000 square feet and its heating, cooling and service water heating capacity totals under 960,000 Btu per hour. Data hall cooling alone exceeds that capacity.

What does the data center commissioning agent check against Utah's code?

The agent verifies that the commissioning plan, functional tests and records meet Section C408 and that the systems perform as the design intends, including the economizer and efficiency features that the ASHRAE 90.4 route depends on. Paul Industries runs the mechanical systems through the agent’s scripts, corrects deficiencies and provides the records the agent compiles into the report.

Who commissions data center cooling in Salt Lake City and West Jordan?

Paul Industries flushes, pressure tests, starts and functionally tests data center cooling plants in Salt Lake City, West Jordan and across the valley, working to the owner’s commissioning plan. Work covers new halls and expansions in operating buildings. Call 201-450-8280 or request a quote with the system list and schedule.

Who handles commissioning for data halls in Lehi and Eagle Mountain?

Paul Industries carries out mechanical commissioning for data halls in Lehi, Eagle Mountain and the rest of northern Utah County, including phased campuses that add plant modules as power arrives. Each phase is tested in isolation and then integrated with the operating plant, with the issues log and records kept as one set across phases.

Can freeze protection be commissioned during a summer handover?

Partly. Heat trace circuits, basin heaters and low-limit devices can be tested by simulating cold conditions at the sensor, and glycol concentration can be measured at any time. The true test, the plant holding its fluid temperatures on a real January night at low load, needs real cold weather, so it is listed as a deferred seasonal test and closed with trend data in the first winter.

How do Utah air permits affect integrated systems testing?

Generators are emission units, and Utah DAQ requires an Approval Order when a source reaches five tons a year of a criteria pollutant. Permits for large generator fleets usually limit run hours, and much of the Wasatch Front is in an ozone nonattainment area. The commissioning team counts generator hours per test, combines tests and uses load banks for mechanical systems to keep engine time within the permit.

What water should be used to flush and fill a Utah data center loop?

Flushing can use city water with temporary strainers, but fill water for closed loops should be treated to the specification, and technology cooling loops need water purified to the server maker’s limits. Salt Lake area supplies get harder in summer when deep wells supplement canyon streams, so water analysis at fill sets the baseline for the treatment program.

Does altitude change commissioning results in Utah?

It changes the expected numbers. Fans, air-cooled condensers and dry coolers move less air mass at about 4,231 feet than at sea level, and engine generators lose rating with altitude. Functional tests compare measured performance with altitude-corrected selections, not with sea-level catalog values, so the plant is judged against what it should deliver at the site.

How long does data center commissioning take on a Utah project?

Commissioning activity spans most of the construction period, from design review to the final integrated test, and seasonal tests can extend into the first year of operation. The intense testing phase is usually the last several weeks before ready-for-service. Phased campuses repeat the cycle for each phase. Paul Industries builds its startup and testing work into the owner’s master schedule from the start.

What records does a Utah building official ask for at a data center final inspection?

Section C408 calls for evidence of mechanical commissioning and completion before the final mechanical and plumbing inspections, and documentation made available to the code official on request. That typically includes the commissioning plan, functional test results, the preliminary or final commissioning report and the operations and maintenance information delivered to the owner.

Can an operating Utah data hall be recommissioned after adding liquid cooling?

Yes. New coolant distribution units and branches are flushed, pressure tested, filled and degassed in isolation, then connected to the facility water loop under a method of procedure. The plant sequences are retested because the added load changes staging and changeover. Paul Industries plans each step around the operator’s change windows.

What does mechanical commissioning cost on a Utah data center?

Cost follows the number of systems and tests, the levels in scope, phasing, seasonal retests and the generator strategy. Flushing and pressure testing scale with pipe length; functional and integrated testing scale with sequences and supervised hours. Paul Industries offers a budget range from comparable scope and a firm price once the commissioning plan is issued.

What is checked at Level 3 startup on a Utah chiller plant?

Level 3 confirms that each piece of equipment is clean, filled, rotating the right way and operating within its limits: flows, temperatures, pressures, vibration, oil and refrigerant conditions on chillers and safeties on every device. In Utah the startup also confirms glycol concentration, heat trace operation and altitude-corrected capacities before functional testing begins.

How are economizer changeovers tested in a Utah data center?

The test drives the plant from full economizer through partial to full mechanical cooling and back, either on real weather in spring or autumn or with simulated outdoor values at the controller. The pass condition is a smooth transfer with no hall temperature excursion and no hunting between modes. Utah’s long shoulder seasons make this sequence one of the most used, so it gets extra attention.

Does Paul Industries keep testing after a Utah data center opens?

Paul Industries completes the deferred seasonal tests, reviews trend data with the operator during the first year and maintains the plant afterward under a service program, so later changes are tested to the same standard. Records from commissioning become the baseline for maintenance, warranty claims and future expansions.

Which Utah data center systems need a deferred test after turnover?

Systems whose design condition depends on the weather usually do: dry cooler and economizer capacity on the hottest days, adiabatic stages, tower freeze protection and the low-load winter sequences. They are listed in the commissioning plan as deferred seasonal tests with target date ranges, and the results are added to the commissioning report when the season arrives and trend data confirms performance.

Getting a Utah data hall ready for service?

Send the system list, the commissioning plan or specification and the construction schedule. Call 201-450-8280 or request a quote.