Paul Industries provides boiler repair in Arkansas for food plants, rice mills, paper and chemical sites, steel mills, hospitals and campuses, repairing firetube, watertube, cast iron and hot water boilers and their controls, burners, feedwater and steam systems. Every repair is planned around the Arkansas boiler rules in 20 CAR Part 880, so the work, the paperwork and the inspector’s acceptance line up before the unit goes back on line. Paul Industries is headquartered at 256 Shore Drive, Kilmarnock, Virginia, and takes work across Arkansas and in all 50 states.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
State program Boiler Inspection Section, Arkansas Department of Labor and Licensing
High-pressure steam Internal and external inspection every year (20 CAR 880-603)
Low-pressure steam External yearly, internal every three years
Codes adopted ASME 2025, NBIC 2025, CSD-1 2024 (20 CAR 880-701)
Reviewed November 2026

The Arkansas boiler law and Arkansas boiler code behind every repair

Boiler repair in Arkansas is governed by the state boiler and pressure vessel law, Arkansas Code 20-23-101 and the sections that follow it, and by the Boiler Inspection Section Rules codified at 20 CAR Part 880. The program dates to Act 428 of 1917, which authorized a State Boiler Inspector, and the office long known as the Arkansas boiler inspection division now operates as the Boiler Inspection Section of the Arkansas Department of Labor and Licensing. A Chief Boiler Inspector runs it day to day.

The reach of the Arkansas boiler law is wider than many owners expect. The legislature gave the Section authority over the manufacture, repair, installation, operation and inspection of steam boilers, hot water heating and supply boilers, pressure piping, unfired pressure vessels and anhydrous ammonia containers, along with licensing of the people who sell, install, repair, operate and inspect them. A repair therefore touches more than the pressure parts: the steam header, the blowdown line and the deaerator in the same room can each carry their own state requirement.

The Arkansas boiler code is built from national standards adopted by reference. Section 880-701 adopts the ASME Boiler and Pressure Vessel Code, 2025 edition, including Section I for power boilers, Section IV for heating boilers, Section V for examination and Section IX for welding qualification, together with ASME B31.1 for power piping, ASME CSD-1 (2024 edition) for controls and safety devices, and the National Board Inspection Code (2025 edition), Part RB for in-service inspection and Part RC for repairs and alterations. Where a state statute or rule differs from the ASME text, the rules say the state provision controls.

How often are boilers inspected in Arkansas?

Arkansas inspection intervals depend on the equipment type, and Section 880-603 sets them out plainly. High-pressure steam boilers are inspected internally and externally once each year. Low-pressure steam boilers get an external inspection every year and an internal inspection once every three years where the design allows it. Hot water heating boilers get a yearly external inspection and an internal one when the inspector calls for it. Unfired pressure vessels are inspected every two years.

Arkansas inspection schedule by equipment type (20 CAR 880-603 and 880-604)
EquipmentExternal inspectionInternal inspectionNote for planning repairs
High-pressure steam boilerEvery yearEvery yearAn extension of up to six months is possible for good cause, with a $25 fee
Low-pressure steam boilerEvery yearEvery three yearsInternal only as far as the construction permits
Hot water heating boilerEvery yearWhen the inspector requires itUnder 200,000 Btu/hr exempt, except in schools, daycare centers, hospitals and nursing homes
Unfired pressure vesselEvery two yearsEvery two years where conditions permitDeaerators, blowdown tanks and air receivers often fall here
Any of the aboveMore often if the inspector questions the boiler or its controlsFindings can shorten the next interval

The extension rule matters to production plants. An extension is granted by the Chief Inspector for good cause, cannot exceed six months, and restarts the annual clock from the day after the inspection, so it moves the next outage as well as this one. Paul Industries plans repairs so the open-boiler work and the internal inspection share the same shutdown, which keeps the annual inspection and the repair from costing two separate outages.

What does a boiler inspection consist of?

An Arkansas internal boiler inspection is a hands-on examination of the opened, cooled and cleaned pressure parts, and the owner prepares the unit before the inspector arrives. Section 880-705 lists the preparation: cool it down, blank off connections to adjacent units where needed, drain the water, remove the manhole and handhole plates, open the low-water cutout, pull the water column plugs and remove grate bars from internally fired units. The fire side is cleaned of soot and ash, and scale and mud are removed from the water side.

The inspector can go further. If conditions found at the inspection warrant it, brickwork, lagging, jacketing or covering can be ordered removed, and a part can be drilled to establish thickness. Where the tensile strength of the material is unknown, the rule tells the inspector to take it as 55,000 psi at temperatures up to 650 F, which can lower the calculated allowable pressure on an old riveted or undocumented boiler.

Paul Industries handles that preparation as part of the repair scope: cooldown and lockout, draining, plate removal and new gaskets, fireside and waterside cleaning, refractory and casing removal where the inspector asks for it, and thickness testing. The repair then follows in the same outage, so findings are fixed while the unit is already open.

Which boilers sit outside the Arkansas boiler regulations?

The Arkansas boiler regulations list specific exemptions from installation permits and inspection in Section 880-604, and knowing them avoids both missed inspections and unnecessary ones. Hot water heating boilers below 200,000 Btu per hour of input are exempt, except in schools, daycare centers, hospitals and nursing homes, where they are inspected every year. Units in private residences and in apartment buildings of eight apartments or less are exempt, as is equipment subject to US Department of Transportation inspection.

Two exemptions are worth reading closely at industrial sites. Boilers and pressure vessels used in the production, transmission or storage of oil, natural gas or casinghead gas are exempt, which the rule labels refineries. Coil-type steam generators without an accumulator drum are exempt, and coil-type hot water boilers are exempt when they meet a list of limits: no drum or steam space, tubing no larger than 1 inch outside diameter, water capacity no more than six gallons and water no hotter than 350 F, among others. An exempt unit still gets repaired to the ASME and National Board standard, because the exemption covers permits and inspection only.

How Arkansas approves a welded or major boiler repair

Major repairs and all welding repairs on Arkansas pressure equipment need approval from the Boiler Inspection Section, and Section 880-706 lays out how that approval works. The Section, directly or through an authorized inspector, is notified of a contemplated major repair before work starts. The inspector’s authorization is obtained before the repair begins, and the same inspector performs the final acceptance inspection. No welding of any kind is done on that equipment until permission is granted.

The rule also fixes how the welding is documented. Repair firms keep a written quality control program covering every planned and systematic action that assures the work meets the adopted codes. Welders and welding operators are qualified to ASME Section IX, and a firm that makes weld repairs submits its Welding Procedure Specification and Procedure Qualification Record to the Section. The original construction code governs the repair, and another code is used only with the concurrence of the inspector and the Section. Welded repairs follow the National Board Inspection Code, and a welded repair is made under the National Board R program with the inspector consulted throughout.

Common boiler repairs and what the Arkansas rules attach to each
RepairState requirementWhat the owner receives
Tube replacement or retubing a firetube boilerThe Section is notified so the shell interior is inspected while the tubes are outTube material records, expansion or weld records, inspector acceptance
Patch on a shell, furnace or drumThe Section or an authorized inspector is consulted before work starts so the patch design does not reduce the allowed pressurePatch drawing, weld procedure, examination results, repair report
Weld repair of cracks or wastagePrior approval, Section IX welders, submitted WPS and PQR, inspector authorization and final acceptanceNational Board repair form, NDE records, hydrostatic test record where required
Lap seam crack on a riveted longitudinal jointThe shell or drum is permanently discontinued for use under pressureReplacement plan and budget
Rerate to a higher pressure or temperaturePrior approval of the Chief Inspector and the original code editionCalculations, test records, revised nameplate data
Controls, burner and gas train workASME CSD-1 (2024 edition) as adoptedSafety device test record and settings

Two rules shape older equipment in particular. A typical lap seam crack along a riveted longitudinal joint permanently ends that shell’s service under pressure, so an inspection finding of that kind turns a repair into a replacement. And watertube boilers with tubes secured to cast iron or malleable iron headers, or with cast iron mud drums, are limited to 160 psi maximum allowable working pressure regardless of their original rating.

Can boilers be repaired after a failed Arkansas inspection?

Equipment found unsafe at an Arkansas inspection can be repaired and returned to service, provided the repair restores a safe working condition and the paperwork reaches the Section. An authorized inspector can shut down equipment considered unsafe, and an unsafe unit is stamped XXOOOXX, a mark only an authorized inspector may remove. When an inspector withholds or withdraws a certificate, the reasons go to the Section in a report, and the certificate is reissued only after a repair or inspection report shows the unit has been made safe.

Paul Industries works from the inspector’s written findings. Typical Arkansas findings include waterside scale and oxygen pitting in feedwater-starved boilers, leaking tube ends, cracked tube sheet ligaments, refractory failure, wasted firetubes at the rear tube sheet, inoperative low-water cutoffs and safety valves that will not reseat. Paul Industries repairs each item, documents it on the forms the rules require and schedules the reinspection so the certificate can be restored. An operating certificate is not renewed while there is an unpaid administrative fine or an uncorrected violation, so closing every item matters as much as the major one.

Controls, burners and safety devices under CSD-1 (2024)

Controls and safety devices on automatically fired Arkansas boilers are held to ASME CSD-1, 2024 edition, which the state adopted by reference in Section 880-701. The gas train and boiler controls comply with CSD-1, boiler disconnects follow the National Electrical Code as adopted by the Board of Electrical Examiners, and every steam boiler carries an audible alarm working with its other operating controls unless a boiler operator is in constant attendance.

Larger units add a second standard. Boilers with a fuel input of 12.5 million Btu per hour (3.6 MW) or more follow NFPA 85 for design, installation, operation, maintenance and testing, alongside the ASME and National Board requirements. For a burner retrofit, a low-NOx conversion or a burner management system replacement on a unit of that size, the purge, ignition, flame safeguard and fuel safety shutoff logic are checked against both documents before first fire.

Paul Industries repairs and replaces flame safeguards, low-water cutoffs, pressure and temperature limits, fuel valves, proving switches and combustion controls, and tests each safety device after the work with recorded trip points. For boilers installed after October 1, 1999, the rules also recommend an 8-inch reinforced block wall, six feet high, separating the unit from employees and the public; where a replacement project changes the room layout, that wall is part of the design conversation.

Operator attendance and the Arkansas boiler license

Arkansas ties boiler operation to operator attendance, and Section 880-707 sets the attendance level by boiler type and controls. Power boilers in use are attended by an operator holding an Arkansas boiler license issued by the Boiler Inspection Section, and a fired unit is considered in use whether or not steam is being drawn. Steam boilers of 50 horsepower and over, and steam boilers in hospitals, hotels, schools, theaters and office buildings, are under regular attendance.

Attendance levels in the Arkansas rules (20 CAR 880-707)
Boiler and controlsAttendance levelEffect on a repair or control upgrade
Manual high-pressure steam boilerConstant attendanceControl upgrades to CSD-1 change the staffing requirement
High-pressure steam boiler meeting CSD-1 with alarms and safety devicesRegular attendanceAlarm and safety device tests after any control repair
High-pressure boiler with remote alarms for low water, high pressure, high water and loss of boilerPeriodic attendance, with the Chief Inspector’s prior approvalRemote monitoring needs a written request describing the system
Low-pressure steam, hot water heating and supply boilersReadings every two hours, extendable to fourCSD-1 controls, alarms and safety devices kept in service

The attendance rules make control repairs an operating cost question as much as a safety one. A plant that upgrades a manual unit to CSD-1 controls with remote alarms can apply to move from constant to periodic attendance, which changes how the boiler house is staffed. Plants also track each operator’s Arkansas boiler license renewal date next to the boiler’s certificate date, since the rules require an operator holding a current license whenever a power boiler is in use, including the days a repaired unit is fired for testing. The Arkansas boiler operator license is issued by the same Section that inspects the equipment.

Replacing a boiler: the Arkansas boiler permit and first inspection

A replacement boiler in Arkansas needs permission from the Boiler Inspection Section before it is installed, and the Arkansas boiler permit application carries the manufacturer’s data report for the new unit. Installation permits are required by Arkansas Code 20-23-307, a permit is obtained for each boiler, and the rules extend the same requirement to a used boiler that is moved and reinstalled. Installers, sellers and repairers of boilers must hold a license from the Section.

Before the boiler operates, a state boiler inspector or an authorized insurance inspector inspects it and the certificate of inspection is issued under Arkansas Code 20-23-301. The certificate for a power or heating boiler is posted in the boiler room where the operator can read it. At the first inspection the boiler receives a state number preceded by the letters AR, at least a quarter inch high and kept clear of lagging, covering and paint, and a complete data report goes in with the first internal inspection report.

Second-hand boilers bring an extra step. When a used boiler comes into Arkansas from another state, the factor of safety is determined at its inspection and a complete report with all construction data goes to the Section for approval. Paul Industries assembles that package before shipment, so the reinstallation is not held at the inspection stage. Boilers below 50 horsepower that were hydrostatically tested at the manufacturer, and whose external piping was not shipped with them, are spared the additional hydrostatic test; the separately made boiler external piping is tested to ASME B31.1.

Where Arkansas boilers carry the heaviest duty

Arkansas boilers do most of their hardest work in food processing, rice milling, forest products, chemicals and steel, which together shape what fails and when it can be repaired. The Arkansas Economic Development Commission reports that seven of the top ten food and beverage companies in the world have manufacturing facilities in the state, including Tyson Foods, headquartered in Springdale, and that Arkansas has 14.5 million acres of farmland producing rice, grains, chickens and catfish.

Food and poultry plants use steam for cooking, scalding, pasteurizing, sanitation and hot water, and their boilers cycle hard between production and cleanup shifts. That duty produces thermal fatigue at tube ends, condensate return contamination and feedwater problems that show up as waterside deposits at the annual internal. Rice country in eastern Arkansas, where the USDA counts the Arkansas Grand Prairie and the Mississippi Delta among the four regions that grow almost the entire US rice crop and where Riceland Foods is based in Stuttgart, runs process steam and drying heat on a harvest calendar that leaves little room for a winter surprise.

Forest products and chemicals put larger boilers to work. The commission counts more than a dozen paper and packaging companies in the state and almost 19 million acres of timberland, and south Arkansas hosts chemical production at sites such as LSB Industries in El Dorado and Albemarle’s bromine plants in Magnolia. Northeast Arkansas adds steel: the commission describes Mississippi County as the largest steel producing county in the nation. Process steam at those sites often feeds turbines, reboilers and heat exchangers through ASME B31.1 piping, and the repair plan has to account for every connected user before a unit comes off line.

Boiler repair in Little Rock, Northwest Arkansas and the Delta

Boiler repair in Little Rock and the rest of the state follows the same Arkansas rules, but the equipment mix and the outage windows differ by region. Paul Industries plans each job around the plant’s production and inspection calendar.

Arkansas regions and the boiler work they generate
RegionTypical boiler ownersRepairs Paul Industries plans for
Little Rock, North Little Rock and ConwayHospitals, state and university buildings, office towers, manufacturersHeating boiler retubes, low-water cutoff and control repairs, annual internal preparation
Fayetteville, Springdale, Rogers and BentonvillePoultry and further-processing plants, food manufacturers, campusesFiretube repairs, feedwater and condensate fixes, burner and CSD-1 upgrades
Fort Smith and the River ValleyFood plants and manufacturersProcess steam boiler overhauls and burner retrofits
Jonesboro, Blytheville and Mississippi CountySteel mills, food plants, grain and rice processingWatertube repairs, steam header and blowdown work, reinspection after findings
Stuttgart, Pine Bluff and the DeltaRice mills, grain dryers, paper and chemical plantsHarvest-season readiness overhauls, refractory and tube repairs
El Dorado, Magnolia and TexarkanaChemical and bromine plants, manufacturers and institutionsLarge watertube and package boiler repairs, NFPA 85 burner management work

The same paperwork follows the equipment in every region: approval before welding, the inspector’s acceptance, the National Board repair form and the state number kept visible. Paul Industries keeps those records in the equipment file so the next annual inspection starts from a complete history.

Who maintains boilers between Arkansas inspections?

Between inspections, the owner is responsible for keeping the unit in safe working condition, and most Arkansas plants put that maintenance under a service contract. Paul Industries maintains boilers on a schedule built around the state inspection interval: monthly checks of low-water cutoffs, limits and combustion, quarterly burner tuning and safety valve checks, annual waterside and fireside cleaning timed to the internal inspection, and chemical treatment review with the plant’s water program.

That rhythm catches the problems inspectors write up. Scale found early is cleaned before it overheats tubes, a sticking float chamber is repaired before it fails a test, and a weeping tube end is rerolled before it becomes a weld repair needing Section approval. Related plant work, from boiler water treatment to steam trap surveys, keeps the unit from carrying problems that start elsewhere in the steam system.

What does boiler repair in Arkansas cost?

The cost of boiler repair in Arkansas is set by the boiler type and pressure class, the extent of the damage found once the unit is opened, whether welding and state approval are involved, and how much of the work has to happen inside a fixed outage. A control or low-water cutoff repair is a small job; a retube, a furnace patch or a refractory rebuild is a planned project; and a lap seam crack or a failed rerate turns the discussion to replacement.

The state fees are small next to the work. The rules set a $25 fee for an inspection extension, $100 per boiler for a special inspection requested by the owner, and a $15 operating certificate fee per unit. The larger costs sit in labor, materials, refractory, examination, temporary steam during a long outage and production time. How much is boiler maintenance under a contract depends on the number and size of boilers, visit frequency and the inspection preparation included; Paul Industries quotes it per boiler with the scope listed visit by visit. For a repair, Paul Industries gives a budget range from comparable scope once it has the make, model, pressure, fuel, age and the inspector’s findings, then a firm price after the unit is opened and examined. Boiler inspection cost on the owner’s side is mostly preparation and downtime, which is why combining it with the repair outage pays.

Who repairs boilers in Arkansas?

Paul Industries repairs boilers in Arkansas, covering high-pressure and low-pressure steam boilers, hot water heating boilers, firetube and watertube designs and the controls, burners, feedwater systems and piping that serve them. Paul Industries prepares the boiler for the state inspection, makes the repairs the inspector calls for, handles the notifications and approvals the Arkansas rules require for welded and major repairs, and documents the work on the National Board forms so the certificate is restored.

Plant owners choose between three routes. Supply-only covers replacement tubes, burners, controls and parts matched to the boiler. Design-build covers a boiler replacement with its permit package, stack, feedwater and controls. Complete installation covers removal of the old unit, setting and piping the new one, first-fire, safety device testing and the inspection that leads to the certificate. Paul Industries also handles the vessels, piping and welding around the boiler: see pressure vessel fabrication in Arkansas, process piping in Arkansas, industrial welding services in Arkansas and validation and commissioning in Arkansas, plus chiller repair in Arkansas for the cooling side of the plant.

Paul Industries is an East Coast contractor, formerly based in northern New Jersey and then Pennsylvania, now headquartered in Kilmarnock, Virginia, where boiler repair in Virginia is its home-state work. Owners comparing state programs can read how boiler repair in Tennessee runs under a different board and inspection schedule. The national boiler repair page covers the repair methods themselves, and the Southeast page covers the wider region.

Boiler service and repair from Paul Industries in Arkansas

Paul Industries repairs, overhauls, maintains, supplies and replaces boilers for Arkansas plants, hospitals, campuses and commercial buildings, from the Ozarks to the Delta, with the state approvals and National Board records built into each job. Send the boiler make, model, National Board and AR state numbers, pressure and fuel, the latest inspection report and any findings, and Paul Industries scopes the repair and the outage. Call 201-450-8280 or request a quote. The Arkansas page lists the other process, piping and water work Paul Industries delivers across the state.

Standards referenced: Arkansas Code 20-23-101 et seq. (boiler and pressure vessel law) · 20 CAR Part 880, Boiler Inspection Section Rules · ASME Boiler and Pressure Vessel Code, 2025 edition, Sections I, IV and IX · ASME B31.1 Power Piping · ASME CSD-1, 2024 edition · National Board Inspection Code, 2025 edition, Parts RB and RC · NFPA 85 Boiler and Combustion Systems Hazards Code

Frequently asked questions

Who handles boiler repair in Little Rock and central Arkansas?

Paul Industries handles boiler repair in Little Rock, North Little Rock, Conway and the rest of central Arkansas for hospitals, state and university buildings, office towers and manufacturers. Most central Arkansas boilers are heating boilers or low-pressure steam units, so annual external inspections, three-year internals and control repairs drive the work. Send the boiler data and the latest inspection report, and Paul Industries scopes the repair around the inspection date.

Does Paul Industries repair process boilers at poultry and food plants in Springdale, Rogers and Fort Smith?

Paul Industries repairs process boilers at poultry, further-processing and food plants across Northwest Arkansas and the River Valley, including Springdale, Rogers, Bentonville and Fort Smith. These boilers cycle between production and sanitation loads, so tube end leaks, feedwater faults and condensate contamination are common findings. Repairs are scheduled into planned outages so steam for cooking and sanitation returns before the next production shift.

Which steel mill and Delta boilers in Blytheville, Jonesboro and Pine Bluff does Paul Industries work on?

Paul Industries works on watertube and package boilers, steam headers, blowdown systems and feedwater equipment at steel mills, grain and rice processors, paper plants and chemical sites in Blytheville, Jonesboro, Pine Bluff and across the Delta. Each repair goes through the Arkansas approval steps for welded work, and the inspector’s acceptance is scheduled before the boiler returns to service.

What triggers an Arkansas boiler inspection after a repair?

A welded repair, a major repair or a repair made after a certificate was withheld leads to an inspection before the boiler returns to service. The inspector who authorized the repair performs the final acceptance inspection, and where a certificate was withdrawn, the Section reissues it only after a repair or inspection report shows the boiler is safe. Paul Industries books that acceptance inspection as part of the repair schedule.

Is a hydrostatic test always required after a boiler repair in Arkansas?

A hydrostatic test follows most welded pressure-part repairs, under the National Board Inspection Code and the inspector’s direction, and the Arkansas rules cap the test pressure on boilers at 90 percent of yield strength. Test pressure is taken from the data report or nameplate. Mechanical repairs such as control replacements are proven by function testing instead. Paul Industries records the test pressure, hold time and result for the repair file.

What records should an Arkansas plant keep for each boiler?

Keep the manufacturer’s data report, the National Board number and AR state number, every certificate of inspection, each inspection report and the inspector’s findings, repair forms with welding procedure and welder records, safety valve and control test records and the water treatment log. The rules require a complete data report with the first internal inspection, and inspectors ask for repair history. Paul Industries returns each repair package in that format.

How do the Arkansas boiler rules treat a boiler moved in from another state?

A used boiler moved into Arkansas needs permission from the Boiler Inspection Section before it is installed, an installation permit, and an inspection before it operates. The factor of safety is determined at that inspection, and a complete report with all construction data goes to the Section for approval. A boiler without the ASME symbol or National Board stamping is accepted only as a State Special approved by the Chief Inspector.

What happens after a boiler accident at an Arkansas plant?

The owner or user and any authorized inspector notify the Boiler Inspection Section of any explosion or accident involving a boiler or unfired pressure vessel. No part of the equipment is disturbed or moved until the Chief Inspector grants authority to do so. After release, Paul Industries assesses the damage, recommends repair or replacement, and carries out the approved work with the documentation the Section requires.

Do the Arkansas boiler rules cover the steam piping attached to the boiler?

The rules cover pressure piping through Subpart 12 of Part 880, with ASME B31.1 as the adopted code for power and auxiliary piping at industrial and institutional plants, and boiler external piping is tested to B31.1. Fabrication or installation of pressure piping requires a license endorsement from the Section and a permit for each installation. Paul Industries plans boiler and piping repairs together so both satisfy the state requirements.

How long should a boiler repair outage be planned for?

Outage length depends on cooldown time, the size of the repair, refractory curing, inspection scheduling and the hydrostatic test. A control repair fits in a shift, while a retube or furnace repair on a large firetube boiler is a planned multi-day project with the inspector booked in advance. Paul Industries sets the outage plan before shutdown, with parts and tubes staged so the boiler is opened only once.

Why do Arkansas boilers develop waterside scale and pitting?

Hard makeup water, poor deaeration, condensate contamination and inconsistent blowdown are the usual causes, and food plants return condensate that can carry product or cleaning chemicals. Scale insulates tubes and leads to overheating, while dissolved oxygen causes pitting near the feedwater inlet. Paul Industries repairs the damage, then reviews pretreatment, deaerator performance and blowdown so the next internal inspection is clean.

Can a manual boiler be upgraded so it needs less operator attendance?

A manual high-pressure steam boiler needs constant attendance under the Arkansas rules. Upgrading its controls to ASME CSD-1, with alarms and safety devices at the unit, supports regular attendance, and adding remote alarms for low water, high pressure, high water and loss of boiler supports periodic attendance with the Chief Inspector’s prior approval. Paul Industries designs and installs the control upgrade and prepares the written request the rules call for.

What does NFPA 85 add for large Arkansas boilers?

Boilers with a fuel input of 12.5 million Btu per hour or 3.6 MW and above follow NFPA 85 for design, installation, operation, maintenance and testing, in addition to the ASME code and National Board requirements adopted in Arkansas. That covers purge, ignition sequences, flame safeguards and fuel safety shutoff. Paul Industries checks burner management repairs and replacements against NFPA 85 and records the function tests.

How are deaerators and blowdown tanks handled in an Arkansas boiler room?

Deaerators, blowdown tanks and similar vessels are unfired pressure vessels in most installations, inspected every two years under the Arkansas rules where conditions permit, and repaired under the same approval and National Board requirements as the boiler. Their condition affects boiler health directly: a failing deaerator lets oxygen into the feedwater. Paul Industries inspects and repairs them in the same outage as the boiler.

Is it better to repair or replace an aging Arkansas boiler?

Repair makes sense when the pressure parts are sound and the problem is tubes, refractory, controls or a localized defect. Replacement wins when the shell has a lap seam crack, the boiler cannot hold its allowed pressure, parts are no longer supported, or fuel and maintenance costs outweigh the price of a new unit. Paul Industries prices both paths side by side so the owner decides on numbers.

Can an Arkansas plant put its whole boiler house under one service agreement?

Paul Industries writes service agreements for Arkansas plants and buildings that cover scheduled control and safety device checks, combustion tuning, safety valve checks, inspection preparation, waterside and fireside cleaning and water treatment review. Contracts are written per boiler, with each visit’s scope listed, and can include the deaerator, feedwater pumps, steam traps and condensate system so the whole boiler house is covered under one agreement.

What should be sent to get a boiler repair quote for an Arkansas site?

Send the boiler make, model and serial number, the National Board and AR state numbers, design pressure, fuel and firing rate, the age of the unit, the latest certificate and inspection report with any findings, and photographs of the problem area. Add the outage window and any steam users that must stay supplied. Paul Industries returns a scope, a budget range and an outage plan.

Have an Arkansas boiler finding to fix?

Send the boiler data, the AR state number and the latest inspection report. Call 201-450-8280 or request a quote.