Paul Industries designs, fabricates, installs and tests process piping in Alaska for oil and gas producers, terminals and refineries, mines, seafood processors, utilities and hospitals, building ASME B31.3 spools and skids that install inside a short season and keep running at forty below. Alaska plant piping answers to ASME codes, to the Department of Environmental Conservation’s facility oil piping rule at regulated oil sites, and to the State Fire Marshal’s building code with its own appendix for oil and gas buildings. Paul Industries handles all of it under one contract, from line sizing to the turnover package.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
Facility oil piping B31.3, B31.4 or B31.8 and an API 570 program (18 AAC 75.080)
Buried oil piping All welded above 1 inch, coated and cathodically protected
Oil and gas buildings Appendix LL of the state building code
Plumbing code 2018 UPC, DOLWD jurisdiction in communities of 2,500 or more
Reviewed November 2026

What process piping in Alaska is built to

Process piping in Alaska is built to ASME B31.3 for process and chemical lines, ASME B31.1 for steam and power piping, and ASME B31.4 or B31.8 for liquid and gas lines that leave the plant fence, with ASME Section IX qualifying the welding on all of them. The state adds its own layer in three places: ADEC’s oil pollution rules for facility oil piping and production flow lines, the 2021 International Building, Mechanical and Fire Codes adopted by the State Fire Marshal in 13 AAC 50, and the 2018 Uniform Plumbing Code that the Department of Labor and Workforce Development enforces for plumbing, gas and fuel piping.

Alaska piping also has to live with conditions most codes treat as edge cases: outdoor air below minus 40 in the Interior and on the North Slope, a summer to winter swing that moves long runs by inches, frost-susceptible and thawing ground under supports, and salt air and seawater at coastal plants. Paul Industries designs for those conditions at the drawing stage, so the field crew sets supports, heat tracing and insulation that are already on the isometrics.

Facility oil piping under 18 AAC 75.080

Facility oil piping under 18 AAC 75.080 covers all oil piping at oil terminals, crude oil transmission pipelines, and exploration and production facilities that need an approved contingency plan. Piping placed in service after December 30, 2008 must be designed and built to ASME B31.3, B31.4 or B31.8, or an equivalent ADEC approves, and all of it is maintained and inspected under a program built on API 570.

Facility oil piping requirements in 18 AAC 75.080 and how they shape a design
RequirementRuleDesign and construction response
Design codeB31.3, B31.4 or B31.8 for piping in service after December 30, 2008Code chosen per line on the line list, with design basis on each isometric
Buried piping jointsAll welded, with no clamped, threaded or similar connections above 1 inch nominalWelded buried runs, flanges and valves brought above grade or into vaults
Buried piping corrosionProtective coating plus cathodic protection, unless an approved corrosion-resistant material is usedFactory coating, field joint coating, test stations and CP design by a corrosion expert
Cathodic protectionConsistent with NACE RP0169, designed by a corrosion expert and installed under one’s supervisionCP drawings and commissioning survey in the turnover package
Exposed buried segmentsExamined for coating damage and corrosion per API 570 section 9.2.6Excavation plans that include the examination and repair method
Older buried piping without CPElectrically inspected by a corrosion expert at least every three years, never more than 39 months apartReplacement or retrofit CP where active corrosion is found
Aboveground supportsConsistent with ASME B31.3 paragraph 321Support design checked for thermal movement, snow, ice and seismic loads
Inspection programAPI 570 or an approved equivalentCircuit drawings, thickness monitoring locations and baseline readings at turnover

Production flow lines get their own section, 18 AAC 75.047, which points to B31.4 or B31.8 and requires a corrosion monitoring and control program. The line between a plant’s B31.3 piping and a pipeline code is set by the owner’s design basis and the regulator, and Paul Industries marks it on the drawings so inspection and repair later follow the right code.

Hydrocarbon process buildings and modules under Appendix LL

Hydrocarbon process buildings and modules in Alaska are designed under Appendix LL of the state building code, a set of provisions the State Fire Marshal adopts in 13 AAC 50 for buildings directly connected with the transport or processing of oil and gas. Appendix LL works with the 2021 IBC, IMC, IFC and IFGC for factory, hazardous, storage and utility occupancies, and it covers attached control rooms, generator enclosures, warehouses and similar spaces.

Small structures get practical treatment. A wellhead shelter, pigging enclosure, meter building or shut-down valve enclosure can be classed as a Group U occupancy when it is under 1,000 square feet, holds only meters, valves or pipe work, is not normally occupied more than once in 12 hours, has two exits if it exceeds 300 square feet, and is remote and dedicated as the appendix defines those words. Remote means no other occupied building unrelated to oil and gas sits within one-half mile of a flare or emergency blowdown exhaust. Because piped modules are usually built off site, the state’s amended IBC also requires their plans to carry the seal of a design professional registered in Alaska and to pass plan review before the module is set on its foundation. Paul Industries designs the piping, frame and enclosure of a module as one package for that review.

Where do Alaska plumbing rules stop and plant piping start?

Alaska plumbing rules stop at the systems the 2018 Uniform Plumbing Code governs: domestic water, drainage, venting, and fuel gas and fuel piping in buildings, inspected by the DOLWD Mechanical Inspection Section in communities of 2,500 people or more, and by the Municipality of Anchorage inside its limits under an agreement with the state. Plant piping that carries product, chemicals, process water, steam, refrigerant or compressed gases is designed to the ASME B31 codes and reviewed through the owner’s engineering, the Fire Marshal’s plan review and, at regulated oil sites, ADEC.

The boundary matters for who signs what. Under AS 08.40, a mechanical administrator is the person responsible for installing or modifying mechanical piping and systems subject to the Uniform Plumbing and Mechanical Codes, or for certifying that the work complies, and Alaska requires anyone who bids or works as a contractor to hold a certificate of registration under AS 08.18. Paul Industries marks each line on the line list with its governing code, so the inspection, testing and sign-off for every system is clear before work starts.

Which process piping requirements apply to each Alaska service?

Process piping requirements for each Alaska service start with the fluid, pressure and temperature, then add the coldest metal temperature the line will see and the way it will be drained, traced or protected. The table below shows the combinations Paul Industries builds most often.

Piping services, codes and process piping materials at Alaska facilities
ServiceCodeTypical materialsAlaska design notes
Crude, products and fuelB31.3 in the plant; B31.4 beyond itCarbon steel, impact tested where coldWelded buried runs, CP, API 570 circuits
Fuel gas and produced gasB31.3 or B31.8Carbon or low-temperature carbon steelHydrate and liquid dropout at low points, traced drains
Steam and condensateB31.1 (boiler external piping) and B31.3Carbon steelDrip legs and traps protected from freezing, expansion loops
Glycol heating and heat recoveryB31.3 or B31.9 in buildingsCarbon steel or stainlessGlycol concentration for site minimum, air separation, expansion
Ammonia refrigerationB31.5 and ASHRAE 15Carbon steel, low-temperature gradesMachinery room and relief discharge rules at seafood plants
Seawater and brineB31.3Super duplex, 6Mo stainless, HDPE, lined steelChloride pitting, galvanic isolation, layup drainage
Mine slurry, tailings and reagentsB31.3, or B31.4 for slurry pipelinesHDPE, rubber-lined or hardened steel, stainless for reagentsWear, drain-down to avoid freezing, heat tracing on reagent lines
Process and potable waterB31.3 or UPCStainless, ductile iron, HDPEInsulated, traced or circulated lines, freeze-safe valves
Compressed air and nitrogenB31.3Carbon or stainless steelDry air to avoid ice in drops, drains that stay above freezing

Piping that has to survive minus 40 and a summer thaw

Piping that has to survive minus 40 and a summer thaw is designed for cold-temperature toughness, for large thermal movement and for supports that stay put on moving ground. Fairbanks averages minus 8.3 degrees Fahrenheit in January and 62.9 in July under the 1991 to 2020 NOAA normals, and an outdoor line that runs hot in service and sits cold during an outage sees a much wider range than either average. B31.3’s low-temperature toughness rules decide whether pipe, fittings, flanges and bolting need impact testing, and Paul Industries applies them to the lowest metal temperature in operation, shutdown or depressurization.

Movement comes next. A long carbon steel run grows and shrinks with every swing, so loops, offsets, guides and anchors are laid out with a stress analysis instead of left to field judgment, and nozzle loads on pumps, vessels and exchangers are checked against their limits. Supports on frost-susceptible or thawing ground use adjustable shoes, piles or sleepers chosen with the site’s geotechnical data. Heat tracing and insulation are sized to the site’s design minimum and wind, with sealed jacketing and drains at every low point. More on tracing systems is on the heat tracing page.

Oil, refinery and pipeline-connected piping

Oil, refinery and pipeline-connected piping in Alaska runs from production pads on the North Slope to the Kenai Peninsula refinery and the two Petro Star refineries, at North Pole and at Valdez. The Trans Alaska Pipeline System runs 800 miles from Pump Station 1 at Prudhoe Bay to Valdez, crossing three mountain ranges and three major earthquake faults by Alyeska’s own description, and has moved some 18 billion barrels since 1977. Pump stations, terminal manifolds, tank farms and fuel distribution all rely on plant piping at their ends.

For these owners Paul Industries fabricates and installs B31.3 piping for process units, manifolds, metering and relief systems, flare and drain headers, steam and condensate, and utility systems, with welded buried runs and CP where 18 AAC 75.080 applies. Tie-ins to live systems are planned with isolation, purging and hot work permits under the owner’s procedures, and grouped into the fewest outages. Vessels and tanks at the same sites are covered on the pressure vessel fabrication in Alaska and tank fabrication in Alaska pages.

Mine, mill and water treatment piping

Mine, mill and water treatment piping in Alaska serves hard-rock operations such as Teck’s Red Dog, which the company describes as one of the world’s largest zinc mines, about 170 kilometers north of the Arctic Circle near Kotzebue, and Hecla’s Greens Creek in Southeast. Mills run slurry and tailings lines, reagent and flotation circuits, process water reclaim and the water treatment plants that clean contact water before release.

Slurry lines are built for wear, with HDPE, rubber-lined or hardened steel pipe and long-radius bends, and they are laid out to drain on shutdown so solids and water do not freeze in place. Reagent systems use stainless or lined pipe with secondary containment where the chemical demands it. Paul Industries prefabricates these systems as spools and skids and tests them before they ship, which keeps field work to setting and connecting.

Seafood plant, utility and building systems

Seafood plant, utility and building systems round out Alaska process piping work: refrigerated seawater and brine circuits, ammonia refrigeration for plate and blast freezers, cooker steam, CIP and washdown at coastal plants, and steam, glycol and water systems at hospitals, campuses and power plants in Anchorage, Fairbanks and Juneau. Seafood plant piping in particular is designed around a season and a long layup, and the details are set out on the seafood plant process piping in Alaska page.

Boiler plant piping, from feedwater and blowdown to condensate return, is built to B31.1 for the boiler external piping and repaired along with the boilers described on the boiler repair in Alaska page. Utility loops in hospitals and laboratories are built for continuous operation, with isolation valves placed so a section can be replaced without shutting down the building.

Heat recovery piping deserves a mention of its own in Alaska, where every unit of fuel arrives by pipeline, tanker, barge or truck. Jacket water from generator engines, condenser heat from refrigeration plants and flue gas from boilers are routinely piped through plate exchangers into glycol loops that warm buildings, process water or fuel tanks. Paul Industries sizes those loops, selects exchangers and pumps, and lays out the controls so the recovered heat is used first and the boilers make up only the difference, with bypasses that keep engines and compressors protected when the heat demand drops in summer.

Process piping fabrication in spools and skids

Process piping fabrication in spools and skids is how most Alaska piping arrives, because welding in a heated fabrication bay is faster, cleaner and easier to inspect than welding outdoors in October. Paul Industries cuts, fits, welds, examines and pressure tests spools to the isometrics, labels each one with its line number and spool mark, caps and preserves the ends, and packs them for the barge or road route they will take. Field welds are planned at locations that allow fit-up tolerance and good access.

Process piping and welding go together on every job. Welders work to procedures qualified under ASME Section IX, the examination extent follows the code and the owner’s specification, and every weld is traceable to its welder, procedure and examination record. Code welding across the state is described on the industrial welding services in Alaska page and shop work on the pipe fabrication page. The pipe fittings Anchorage and Fairbanks projects need, from flanges and valves to supports and bolting, are bought to the same material specification and shipped with the spools, so the field crew receives a complete kit for each line.

Public work, prevailing wage and safety on Alaska piping jobs

Public work on Alaska piping jobs follows AS 36.05.010, which requires contractors on public construction contracts to pay at least the prevailing wage for the region, using the determination the Department of Labor and Workforce Development issued at least 10 days before bids were due. Public construction, as AS 36.95.010 defines it, is work under contract for the state, a political subdivision or a regional school board, so school, university and municipal utility piping projects carry those wage rules and the payroll reporting that goes with them.

Safety on the site follows the owner’s programs and the state’s occupational safety and health program, AKOSH, within DOLWD. Hot work permits, confined space entry, lockout and line breaking procedures are agreed with the owner before work starts, and pressure testing follows a written test plan with exclusion zones. Commissioning and startup of new piping is described on the validation and commissioning in Alaska page.

What goes into an Alaska piping turnover package?

An Alaska piping turnover package holds every record the owner, the inspector and the next maintenance crew will need, because at a site served by barge or a long haul road, a missing drawing or test record is far harder to recover after the field team has left. Paul Industries assembles the package as the work proceeds and hands it over at mechanical completion, in paper and electronic form.

Records delivered with new process piping at Alaska sites
RecordWhat it showsWho relies on it
As-built isometrics and line listRouting, materials, design conditions and governing code for each lineOperations, maintenance and future tie-in designers
Weld map and welder logEvery weld with its welder, procedure and examinationOwner’s inspector and API 570 program
Procedure and welder qualificationsASME Section IX records for each procedure usedQuality reviewers and regulators
Material test reportsChemistry, mechanical and impact test results for pipe, fittings and boltingLow-temperature service verification
Pressure test recordsTest medium, pressure, hold time, gauges and sign-off by test packageStartup approval and the owner’s file
Stress and support calculationsThermal movement, nozzle loads, support and anchor designEngineers reviewing later changes
Cathodic protection and coating recordsCP design, test station readings, coating inspectionADEC compliance under 18 AAC 75.080
Thickness monitoring baselineInitial readings at condition monitoring locationsCorrosion rate calculation under API 570
Heat tracing and insulation dataCircuit lists, design minimum, controller settings, insulation typesWinter readiness checks

For seasonal plants the package also carries the drain-down and restart procedure for each system, so the crew that opens the plant in spring finds the same order of steps the installers used.

What does process piping in Alaska cost?

The cost of process piping in Alaska depends on pipe size and length, material and schedule, the number of welds and the examination extent, valves and instruments, supports and stress analysis, heat tracing and insulation, the amount of work inside an operating plant, and freight by barge or road. Cold-service materials, alloy and stainless, and full radiography each add cost, and so does work forced into winter. Prefabricating spools and skids before shipment recovers much of the Alaska premium by moving labor indoors. For a budget range, send the P&IDs or a sketch, the line list or service conditions, the site and the outage window; Paul Industries prices the job first as a range drawn from similar Alaska piping and then as a fixed figure when the drawings are final.

Who designs and installs process piping in Alaska?

Paul Industries designs and installs process piping in Alaska for oil and gas producers, terminals, refineries, mines, seafood processors, utilities, hospitals and campuses, and is one of the piping contractors Anchorage and statewide owners call for B31.3 work carried from line sizing to turnover. Its headquarters is 256 Shore Drive in Kilmarnock, Virginia, after earlier bases in northern New Jersey and then Pennsylvania, and its Alaska piping work reaches Prudhoe Bay pads, Interior plants, Southcentral hospitals and terminals, Aleutian and Kodiak seafood plants and Southeast mines.

The same discipline for other markets is on the process piping in Texas page and, for the headquarters state, the process piping in Virginia page. The national service is on the process piping page, and the state market on the Alaska and West Coast pages.

Process piping from Paul Industries for Alaska plants

Paul Industries designs, fabricates, supplies, installs, tests and repairs process and utility piping for Alaska plants, along with the skids, supports, heat tracing and insulation that go with it. Owners choose supply-only spools and skids, design-build piping systems, or complete installation of an engineer’s design, with tie-ins, testing and turnover records included. Send the drawings or a description of the system and request a quote.

Standards referenced: ASME B31.3 · ASME B31.1 · ASME B31.4 · ASME B31.8 · API 570 · NACE SP0169 (formerly RP0169) · 18 AAC 75.047 and 18 AAC 75.080 · 13 AAC 50 and Appendix LL (hydrocarbon processing buildings) · 2018 Uniform Plumbing Code (8 AAC 63) · ASME Section IX · ASHRAE 15

Frequently asked questions

Who are the piping contractors Anchorage plants call for B31.3 work?

Anchorage plants, hospitals, terminals and utilities call Paul Industries for B31.3 process piping, B31.1 steam piping and utility systems, designed, fabricated as tested spools and installed with tie-ins planned around the operating schedule. The package includes isometrics, weld and examination records, test reports and as-built drawings.

How often should pipes be inspected at an Alaska oil terminal?

Facility oil piping at regulated Alaska terminals is maintained and inspected under an API 570 program, which sets intervals by piping class and corrosion rate. Buried metallic piping without cathodic protection is electrically inspected by a corrosion expert at least every three years and never more than 39 months apart under 18 AAC 75.080(h).

How often are pipes replaced at Alaska plants?

Replacement follows measured condition rather than a fixed age. API 570 thickness monitoring gives a corrosion rate and remaining life for each circuit, and lines are replaced when they approach their minimum thickness or when service changes. Corrosion under insulation and freeze damage are the usual reasons Alaska piping is replaced early.

What is the difference in process piping vs plumbing at an Alaska plant?

Plumbing covers domestic water, drainage, venting and building fuel gas under the 2018 Uniform Plumbing Code, inspected by DOLWD in larger communities and by Anchorage inside the city. Process piping carries product, chemicals, steam, refrigerant and utilities to the ASME B31 codes, reviewed through the owner’s engineering, the Fire Marshal and, at oil sites, ADEC.

Can buried oil piping in Alaska use threaded fittings?

At regulated oil facilities, buried facility oil piping placed in service after December 30, 2008 must be all welded, with no clamped, threaded or similar connections on lines larger than 1 inch nominal, under 18 AAC 75.080(e). It must also be coated and cathodically protected unless an approved corrosion-resistant material is used.

What is Appendix LL in the Alaska building code?

Appendix LL is the State Fire Marshal’s set of provisions for hydrocarbon processing buildings, used with the 2021 IBC, IMC, IFC and IFGC for buildings directly connected with transporting or processing oil and gas. It also lets small remote shelters for meters, valves or pipe work be classed as Group U occupancies when they meet its conditions.

Do piping modules built outside Alaska need Alaska-sealed drawings?

For buildings and structures under state plan review, the amended IBC in 13 AAC 50 requires plans for construction that occurs out of state or is manufactured off site to be sealed by an Alaska registered design professional and reviewed before the structure is set on its foundation. Paul Industries prepares module drawings for that review.

What process piping materials hold up in Alaska seawater service?

Seawater and brine attack 304 and often 316L stainless, so Alaska seafood plants and coastal utilities use super duplex or 6Mo stainless, HDPE, lined steel or copper-nickel depending on pressure, temperature and flow. Isolation between dissimilar metals and full drainage for layup matter as much as the alloy choice.

How is piping kept from freezing during an outage in Fairbanks?

Lines are designed to drain to low points, traced and insulated with sealed jacketing, and kept circulating where draining is impractical. Glycol loops are checked for concentration before winter. For planned outages, Paul Industries writes the isolation, drain-down and restart steps so no water is left in a dead leg when the heat goes off.

Who installs process piping on the Kenai Peninsula?

Paul Industries installs process piping on the Kenai Peninsula, including Nikiski, Kenai and Soldotna, for refinery, gas processing, terminal and utility systems. Work covers B31.3 spools, manifold and tie-in work, steam and condensate piping and the API 570 records that regulated oil facilities keep.

Who builds piping for North Slope modules and production pads?

Paul Industries builds B31.3 and B31.4 or B31.8 piping for North Slope modules and pads, with impact-tested materials, heat tracing, stress analysis for wide temperature swings and module frames sized for road or barge transport. Plans for off-site modules are prepared for State Fire Marshal review under Appendix LL.

Does a public school piping project in Alaska pay prevailing wage?

Yes. AS 36.05.010 requires prevailing wages on public construction contracts, and AS 36.95.010 defines public construction to include work under contract for a political subdivision or a regional school board. The rate comes from the DOLWD determination issued at least 10 days before bids are due and is posted at the site.

How are tie-ins made to a live line at an Alaska plant?

Tie-ins are planned with the owner’s isolation and line-breaking procedures, purging or draining, gas testing and a hot work permit. Where shutdown is impractical, hot tapping follows the owner’s procedures and the applicable code. Paul Industries groups tie-ins to use the fewest outages and pre-tests the new spools before they connect.

Who handles pipe fittings and valves for Alaska piping jobs?

Paul Industries buys pipe, fittings, flanges, valves, bolting and supports to the project material specification, checks mill certificates and markings on receipt, and ships them with the spools as a complete kit per line. Spare gaskets, bolts and critical valves are added for sites where replacements arrive by barge.

What tests are done before new process piping goes into service?

New process piping is examined to the code and specification, pressure tested hydrostatically or pneumatically under a written test plan, cleaned or flushed, and checked for supports, slope and tracing. Paul Industries hands over the test records, weld and examination logs and as-built isometrics before startup.

Who installs ammonia refrigeration piping at Dutch Harbor and Kodiak seafood plants?

Paul Industries installs ammonia refrigeration piping for seafood plants in Dutch Harbor, Kodiak, Bristol Bay and Southeast, built to ASME B31.5 and ASHRAE 15 with low-temperature materials, relief piping to safe discharge, and insulation and vapor sealing for freezer and cold store temperatures.

What should be sent to price process piping work in Alaska?

Send P&IDs or a sketch, the line list or service conditions, any existing isometrics, the site location and access, the outage window and the date the system must operate. Paul Industries answers with a budget figure based on similar systems, then a fixed price when the scope is final.

New lines, a module or a tie-in at an Alaska plant?

Send the P&IDs or a sketch, the service conditions, the site and the outage window. Call 201-450-8280 or request a quote.