Paul Industries provides chiller repair in Florida for hospitals, senior care buildings, manufacturing plants, campuses, hotels and data centers, diagnosing and repairing centrifugal, screw and scroll chillers from Miami-Dade to Jacksonville and the Panhandle. Florida chillers carry load in every month of the year in the south of the state and for most of it elsewhere, sit in salt air along hundreds of miles of coast, and have to come back cleanly after every storm that cuts the power. Paul Industries repairs, overhauls, retrofits and replaces those machines, and supplies and installs new chillers when repair stops paying.
Request a quote or call 201-450-8280
What chiller repair in Florida has to plan around
Chiller repair in Florida is planned around three conditions that machines further north rarely face together: a cooling load that barely pauses in winter, coastal air that attacks condenser coils and cabinets, and a hurricane season from June through November that can take a whole plant offline at once. A repair that would wait for a mild spell in Pennsylvania has no such window in Miami, so the outage plan, the parts list and the temporary cooling arrangement are settled before the machine is opened.
The faults themselves are the familiar ones: refrigerant leaks, high head pressure, low suction and freeze trips, compressor and bearing wear, starter and drive failures, controls faults and fouled heat exchanger tubes. What changes in Florida is how fast run hours accumulate, which component wears first, and what the owner has to document afterward. The general fault guide sits on the national chiller repair page; this page is about the Florida side of each decision.
Florida run hours: a cooling season that hardly ends
Florida run hours are high because the cooling season in the south of the state covers nearly the whole year and the nights stay warm and humid. Miami’s July normals are a 91 degree Fahrenheit high and a 78 degree low, and its January normal high is 76 degrees (NOAA, 1991 to 2020), so a hospital or hotel chiller plant there may never see a month with no mechanical cooling. Orlando’s July normals are 92 and 75 degrees and Jacksonville’s are 92 and 76, with real winters that give North and Central Florida plants a few months of reduced load.
The energy code reflects the difference. Miami-Dade, Broward and Monroe counties are in climate zone 1A, the warm, humid zone, and most of the rest of the state is in zone 2A. A 78 degree night with a high dew point gives a waterside economizer almost nothing to work with, so the compressor carries the load around the clock, and overhaul intervals written for a northern duty cycle arrive early in Florida.
| Region | Operating pattern | Wear that shows up first | Where repair effort goes |
|---|---|---|---|
| Miami-Dade, Broward and Palm Beach | Year-round cooling; coastal exposure on many sites | Coil and fin corrosion, compressor hours, condenser tube fouling | Coil recoating or replacement, tube cleaning, staged overhauls |
| Tampa Bay and Lakeland | Long season, Gulf humidity, heavy industrial and campus loads | High lift on humid afternoons, tower fouling | Tower and tube work, condenser water control tuning |
| Orlando and Central Florida | Hotels, theme venues, convention space and campuses with peak events | Cycling at part load, starter and drive faults | Controls and drive repair, part-load sequencing |
| Jacksonville and Northeast Florida | Hot summers, cooler winters, port and plant loads | Seasonal startup faults, salt exposure near the river mouth and beaches | Spring startup checks, coil and enclosure protection |
| Space Coast | Aerospace and electronics manufacturing with process loads | Salt air on outdoor units, tight process temperature limits | Process chiller repairs timed to production, corrosion control |
| Tallahassee, Pensacola and the Panhandle | Campus and government plants, colder winter nights | Freeze exposure on idle outdoor piping, storm damage | Winter protection, post-storm inspection |
| Fort Myers and Southwest Florida | Seasonal population peak in winter, coastal sites | Peak load arriving in the dry season, coil corrosion | Repairs scheduled for late summer and early autumn |
Salt air, lightning and storm surge: Florida weather on a chiller
Florida weather damages chillers through three routes: salt carried inland on sea breezes corrodes air-cooled condensers and electrical cabinets, frequent summer thunderstorms bring power disturbances that trip and stress motors and drives, and hurricanes add wind-driven debris, flooding and long outages. Each route leaves its own evidence, and a sound repair addresses the cause as well as the failed part.
On air-cooled machines, salt deposits attack the joint between aluminum fins and copper tubes, the fins lose contact and capacity falls long before any fin looks missing. Corrosion at brazed joints then turns into refrigerant leaks. Paul Industries checks coil condition at every visit on coastal sites, measures condenser approach against the original rating, and recommends coating, rinsing schedules or coil replacement before the coil becomes a leak source. On water-cooled plants, the same salt air reaches tower fill, fan motors and basin steel, which is why a Florida chiller repair often extends to the tower.
Power quality is the quieter problem. Voltage sags and phase loss during summer storms trip chillers on safeties, and repeated hard restarts wear starters, contactors and variable speed drives. Surge protection, phase monitoring and restart sequencing in the plant controls reduce that wear, and Paul Industries reviews them whenever a drive or starter has failed more than once.
Restarting a chiller plant after a hurricane
Restarting a chiller plant after a hurricane is a sequence, not a switch: a machine that sat in floodwater or lost power mid-run can be damaged further by an early start. The steps below are the order Paul Industries follows before a storm-affected plant carries load again.
| Step | What is checked | Why it comes first |
|---|---|---|
| 1. Water and debris | Flood level against motors, starters and controls; debris in towers and air-cooled coils | Energizing wet electrical gear destroys it |
| 2. Electrical service | Voltage, phase balance and rotation on utility or generator power | Phase loss and low voltage burn compressor motors |
| 3. Refrigerant circuit | Standing pressures, signs of leaks, oil level and oil heater operation | A cold, oil-diluted compressor fails on its first start |
| 4. Water side | Chilled and condenser water flow, strainers, tower basin and makeup | No-flow and low-flow starts freeze or overheat tubes |
| 5. Controls and safeties | Sensor readings, flow switches, alarms, building automation link | Bad sensor data after a surge causes nuisance trips or no protection |
| 6. Staged return to load | One machine at a time, readings logged against pre-storm values | Finds hidden damage before the whole plant depends on it |
Does Florida’s Boiler Safety Act cover a chiller?
Florida’s Boiler Safety Act, Chapter 554 of the Florida Statutes, is written around boilers: its definitions cover heating boilers, power boilers and high pressure, high temperature water boilers, and its inspection schedule sets annual certificate inspections for power boilers and biennial inspections for heating boilers. The evaporator and condenser shells of an electric-drive chiller are unfired pressure vessels, a class the act’s definitions do not name, so the state’s boiler inspection program does not schedule them.
The act still touches chiller plants in two ways. Steam and hot water absorption chillers draw their energy from boilers the act does cover, so the boiler feeding an absorption machine carries its own certificate and inspection history under the Division of State Fire Marshal’s program. And the State Boiler Code in Rule 69A-51.010 of the Florida Administrative Code adopts the 2017 ASME Boiler and Pressure Vessel Code, including Section VIII, along with the 2017 National Board Inspection Code; when a chiller shell, water box or tube sheet needs a weld repair, Paul Industries plans it to the ASME Section VIII construction rules and the National Board Inspection Code repair methods, with the nameplate and repair records kept with the machine.
Which Florida contractor categories cover chiller work?
Florida’s construction contracting law, section 489.105(3) of the Florida Statutes, sorts heating and cooling work into categories, and the size of the chiller decides which one applies. The Class B air-conditioning category is limited to 25 tons of cooling and 500,000 Btu per hour of heating in any one system, while the Class A air-conditioning and mechanical contractor categories are unlimited and also take in boiler and unfired pressure vessel systems. Almost every chiller in a hospital, plant, campus or office tower is well above 25 tons, so the work falls in the unlimited categories.
Permits follow the Florida Building Code, 8th Edition (2023), in force since December 31, 2023. A like-for-like repair inside the machine usually needs no permit, while a replacement chiller, a new refrigerant type, a relocated unit or new rooftop supports goes through the building department with mechanical and, where equipment sits outdoors, wind anchorage details. Machinery room requirements for refrigerant detection and ventilation draw on ASHRAE 15 through the mechanical code, and they matter most when a replacement brings a different refrigerant safety class into an old room.
Water chiller repair on Florida cooling tower systems
Water chiller repair in Florida centers on the condenser, because towers that run eleven or twelve months a year in warm water give scale, silt and biological growth no seasonal break. Fouled condenser tubes raise condensing pressure, cut capacity and push centrifugal compressors toward surge on humid afternoons, and the first sign is usually a condenser approach temperature that creeps up week by week.
How often should chiller tubes be cleaned in a Florida plant? Annual cleaning is a common floor where the tower runs all year, with cleaning brought forward whenever the logged condenser approach rises a few degrees above its clean baseline. Paul Industries cleans tubes with rotating brushes, or chemically where scale has hardened, then tests a sample or the full bundle by eddy current to measure wall loss and pitting. A rising rate of fouling is a water treatment signal, so the visit often leads to cooling tower repair or a review of tower chemistry, and that is where chiller maintenance and repair meet: a clean bundle in a dirty tower is fouled again within months.
HVAC chiller repair at Florida hospitals and senior care buildings
HVAC chiller repair at Florida hospitals, nursing homes and assisted living facilities is shaped by rules written after Hurricane Irma: Rule 59A-4.1265 for nursing homes and Rule 58A-5.036 for assisted living facilities require each building to keep resident areas at 81 degrees Fahrenheit or below for at least 96 hours after primary power is lost. For nursing homes the rule calls for a sufficient alternate power source, fuel on site for at least 72 hours, and at least 30 net square feet per resident in the space kept at that temperature.
Those rules make the chiller, or the dedicated cooling that backs it up, part of a life safety plan. A repair that takes the chiller generator-backed cooling path out of service needs a stand-in for the outage, and a replacement chiller has to fit within the generator capacity the plan relies on. Paul Industries checks the facility’s emergency environmental control plan before isolating a machine, confirms which units the generator carries, and arranges temporary cooling where the plan would otherwise be uncovered. In hospitals, operating rooms, sterile processing and pharmacies add temperature and humidity limits of their own, and outages are planned with the facility team around them.
Commercial chiller repair in Florida hotels, offices and campuses
Commercial chiller repair in Florida hotels, office towers, convention space and university campuses follows occupancy rather than the calendar. Hotels and theme venues around Orlando peak during holidays and school breaks, Southwest Florida buildings peak in the winter season, and campuses in Gainesville, Tallahassee and Tampa run research buildings year-round. Paul Industries schedules major work into the quietest occupancy weeks for each building type, and an Orlando chiller service plan for a hotel looks quite different from one for an office park a few miles away.
Industrial chiller repair in Florida plants
Industrial chiller repair in Florida plants is tied to production. Beverage and citrus plants, medical device makers, pharmaceutical and supplement manufacturers, electronics and aerospace plants on the Space Coast, and food plants in Polk County run process chillers and glycol loops whose temperature limits are set by the product. Paul Industries plans those repairs into scheduled shutdowns, stages parts ahead of the window, and provides change and test records for validated systems, including the air handling that serves cleanrooms in Florida. Single-line process machines are covered further on the process chillers page.
EPA refrigerant rules and a Florida chiller’s leak history
EPA refrigerant rules under the American Innovation and Manufacturing Act now attach a paper trail to every refrigerant addition on most Florida chillers. From the start of 2026, any appliance charged with 15 pounds or more of an HFC needs a leak rate worked out, by the annualizing or the rolling average method, whenever refrigerant goes in. Comfort-cooling chillers trigger repair above a 10 percent annual rate, industrial process machines above 30 percent and commercial refrigeration above 20 percent, and the leak then has to be fixed within 30 days, or 120 days where an industrial process shutdown is needed. Each repair needs an initial and a follow-up verification test.
Florida’s long run hours make those records more consequential than in a mild climate, because a slow leak on a machine that runs all year loses more refrigerant before anyone notices it. Paul Industries logs each leak rate calculation, the leak located, the repair and both verification tests together, so the owner’s file shows a complete chain for each event. Refrigerant handling itself follows Clean Air Act Section 608 recovery and technician rules.
| Refrigerant | Where it appears | Rule status | What it means for a Florida repair |
|---|---|---|---|
| R-22 | Older air-cooled screw and reciprocating units, often on rooftops | No new production or import since January 1, 2020; reclaimed supply only | Repair for short horizons; coastal coil leaks make recharges costly |
| R-123 | Low-pressure centrifugal machines in hospitals, hotels and campuses | Import allowances end in 2030 | Purge performance and tightness protect a dwindling supply |
| R-134a | Centrifugal and water-cooled screw chillers of the last thirty years | HFC under the leak repair rule at 15 pounds or more | Fully repairable; leak records required for each addition |
| R-410A | Scroll and modular air-cooled chillers | HFC blend; new comfort chillers since January 1, 2025 limited to GWP below 700 | Repairable; a replacement brings a different refrigerant |
| Low-GWP HFOs and blends | Chillers installed in the last few years | Meet new-equipment limits; many substitutes fall outside the leak rule | Check the refrigerant safety class against the machinery room before a swap |
Repair, retrofit or replace at Florida electricity prices
The repair, retrofit or replace decision for a Florida chiller weighs the machine’s condition, its refrigerant, its leak history and the energy gap to a new machine across the state’s long run hours. Florida’s 2024 average industrial electricity price was 8.50 cents per kilowatt-hour against a national 8.13 (EIA), and with equivalent full-load hours that often run well past those of northern plants, efficiency carries real weight in the comparison.
As an illustration with stated assumptions, a 400-ton chiller that runs 4,000 equivalent full-load hours a year and improves from 0.70 to 0.52 kilowatts per ton after replacement saves 288,000 kilowatt-hours, or about $24,500 a year at 8.50 cents. Paul Industries runs the same arithmetic on the owner’s trend data, real tonnage and actual utility rate, whether that is FPL, Duke Energy Florida, Tampa Electric or a municipal utility such as JEA, before recommending either route.
| Factor | Leans toward repair | Leans toward replacement |
|---|---|---|
| Coil and cabinet condition | Coated coils, sound joints, cabinet intact | Fin loss across the coil, corroded joints leaking, rusted base frame |
| Refrigerant | R-134a or a current low-GWP refrigerant | R-22 with recurring leaks, or R-123 with no supply plan past 2030 |
| Compressor | A bearing, seal, vane or valve fault | Repeat failures or a motor already rewound |
| Tube bundle | Eddy current shows modest wall loss | Widespread pitting, plugging near the design limit |
| Storm history | No flood exposure, controls dry | Motor or starter submerged, controls replaced piecemeal after storms |
| Load match | Load unchanged since installation | Added wings, process lines or data rooms, or a large load reduction |
How is cooling kept on while a Florida chiller is repaired?
Cooling is kept on during a Florida chiller repair by running the remaining machines harder, shedding noncritical load, or connecting a temporary chiller, and in South Florida the temporary chiller is the usual answer because there is rarely a cool week with spare capacity. The plan starts with a load estimate for the hottest hours of the repair window and a check of the generator arrangement, since a rental machine also needs a power source that survives a storm-season thunderstorm.
Plants that already have valved, capped connections on the chilled water headers can put a rental unit to work with hoses and a short electrical tie-in. Where they are missing, Paul Industries installs permanent connections during the repair so the next outage starts faster, and anchors any outdoor temporary equipment to suit the wind exposure of the site. Air-cooled rentals need a clear pad for airflow; water-cooled rentals need condenser water, which is planned before the original machine is opened.
Who repairs chillers in Florida?
Paul Industries repairs chillers in Florida for hospitals, senior care buildings, plants, campuses, hotels and data centers. The company is an East Coast contractor whose headquarters is 256 Shore Drive in Kilmarnock, Virginia; it was formerly based in northern New Jersey, then Pennsylvania. It takes chiller repair, overhaul, retrofit and replacement work across Miami-Dade, Broward and Palm Beach, Orlando and Central Florida, Tampa Bay, Lakeland and Polk County, Jacksonville, the Space Coast, Tallahassee, Pensacola and Fort Myers, and in all 50 states. Paul Industries handles water-cooled and air-cooled machines from the major manufacturers, from Trane chiller repair to York and Carrier units, and every chiller repair service visit ends with a written report of readings, findings and parts.
One contract can carry the chiller, its tower, pumps and piping, so the diagnosis follows the fault wherever it sits. Heating plants on the same campus are covered on boiler repair in Florida, chilled water and process lines on process piping in Florida, mission-critical cooling plants on data center cooling systems in Florida, and full campus mechanical scopes on data center mechanical contractor in Florida. Plants along the Panhandle and Gulf shore are part of Paul’s wider Gulf Coast work. The headquarters state page, chiller repair in Virginia, and the North Carolina chiller repair page set out how the same work runs in those markets.
What does chiller repair in Florida cost?
The chiller repair cost in Florida is set by the fault and the parts it needs, the machine size and type, refrigerant recovery and recharge, rigging and access, whether temporary cooling is needed for the outage, and how much corrosion work comes with the repair on a coastal site. A control or sensor fault costs a small fraction of a compressor rebuild, and a rebuild is a fraction of a replacement, which adds removal, rigging, electrical, piping, structural supports and permitting.
Owners asking how much does it cost to replace a chiller in Florida should expect the HVAC chiller replacement cost to include items northern projects can skip: wind anchorage design for outdoor units, coil coatings for coastal sites, generator coordination for buildings under the senior care rules, and often a temporary chiller for the changeover. Chiller maintenance cost under a contract depends on the number of machines, run hours and the scope of tube, oil and refrigerant work included. Paul Industries prices a chiller system repair after diagnosis, with parts, refrigerant and labor shown separately, and gives a replacement budget range from comparable scope alongside any major repair so both routes can be compared.
Chiller repair and replacement across Florida from Paul Industries
Paul Industries repairs, overhauls, retrofits, maintains, supplies and installs chillers for Florida hospitals, senior care buildings, plants, campuses, hotels, offices and data centers, with records for refrigerant, leak repairs and pressure-vessel work kept with each machine. Chiller service in Florida under a service contract covers seasonal tube work, oil and refrigerant analysis, leak rate records and coastal coil inspections, and it meets the chiller maintenance requirements set by the manufacturer, the EPA and the facility’s own emergency plans. Send the make, model and serial number, refrigerant and charge, alarm history and recent logs, and call 201-450-8280 or request a quote. The Florida page lists the water, piping and process work Paul Industries takes across the state.
Standards referenced: Florida Boiler Safety Act, Chapter 554, Florida Statutes · Rule 69A-51.010, Florida Administrative Code (State Boiler Code) · Section 489.105(3), Florida Statutes (contractor categories) · Florida Building Code, 8th Edition (2023), Mechanical and Energy Conservation · Rule 59A-4.1265, Florida Administrative Code · Rule 58A-5.036, Florida Administrative Code · EPA Emissions Reduction and Reclamation rule, 40 CFR 84.106 · EPA Technology Transitions rule, 40 CFR Part 84 Subpart B · Clean Air Act Section 608 · ASHRAE 15 · ASME Boiler and Pressure Vessel Code, Section VIII · National Board Inspection Code
Frequently asked questions
Who handles chiller repair in Miami, Fort Lauderdale and Palm Beach?
Paul Industries handles chiller repair in Miami and across Miami-Dade, Broward and Palm Beach counties, for hospitals, hotels, condominium towers, offices and plants. South Florida machines run nearly all year, so repairs are planned with temporary cooling in mind, and coastal sites get coil, fin and cabinet corrosion checks at every visit. Send the make, model, refrigerant and recent alarms to start the diagnosis.
Does Paul Industries provide chiller repair in Orlando and the rest of Central Florida?
Yes. Paul Industries provides chiller repair in Orlando, Kissimmee, Lake Mary and across Central Florida, where hotels, convention space, theme venues, hospitals and campuses carry large chiller plants. Many of those plants peak during holidays and events, so major repairs and overhauls are booked into quiet weeks on the event calendar, with machines taken out one at a time and redundancy confirmed before each one is isolated.
Who provides chiller repair in Tampa, St. Petersburg and Lakeland?
Paul Industries provides chiller repair in Tampa, St. Petersburg, Clearwater, Lakeland and Polk County. Gulf humidity and long tower seasons make condenser fouling, high head pressure and tower problems common repair calls in the region, alongside process chiller work at food, beverage and phosphate-region plants. Paul Industries plans tube cleaning, eddy current testing and tower work together where the data point to the condenser side.
Is chiller repair in Jacksonville different from South Florida work?
Chiller repair in Jacksonville and Northeast Florida follows a more seasonal pattern than in Miami, because winters there are cool enough to cut loads for a few months. That leaves a window for overhauls and retubing that South Florida plants rarely get. Sites near the St. Johns River mouth and the beaches still face salt exposure, so coil and enclosure condition is checked at each visit.
Does Paul Industries repair chillers in Pensacola, Tallahassee and the Panhandle?
Yes. Paul Industries repairs chillers at campuses, hospitals, government buildings and plants in Pensacola, Tallahassee, Panama City and across the Panhandle. Colder winter nights there call for freeze protection on idle outdoor piping and machines, and hurricane exposure along the Gulf makes post-storm inspection and restart planning part of the service plan.
Does a chiller in Florida need a state boiler inspection?
An electric-drive chiller’s evaporator and condenser are unfired pressure vessels, which the Florida Boiler Safety Act’s definitions do not name, so the state boiler program does not schedule them. Boilers that feed steam or hot water absorption chillers are covered, with annual certificate inspections for power boilers and biennial inspections for heating boilers under section 554.108 of the Florida Statutes.
Which contractor category covers a 300-ton chiller replacement in Florida?
A 300-ton machine falls in the unlimited categories of section 489.105(3), Florida Statutes: Class A air-conditioning contractor or mechanical contractor. The Class B category is capped at 25 tons of cooling and 500,000 Btu per hour of heating in any one system. Replacement also goes through the building department under the Florida Building Code, 8th Edition (2023).
What do Florida's 81-degree rules mean for a nursing home chiller repair?
Nursing homes and assisted living facilities must keep resident areas at or below 81 degrees Fahrenheit for at least 96 hours after losing primary power, under Rules 59A-4.1265 and 58A-5.036. A repair that removes generator-backed cooling from service needs a stand-in, such as a temporary chiller on generator power, and any replacement must fit the generator capacity in the facility’s emergency environmental control plan.
How should a Florida chiller plant be prepared before a hurricane?
Before landfall, log current operating readings as a baseline, secure loose items around towers and air-cooled units, confirm anchors and supports, top up generator fuel, and decide which machines stay on generator power. Many owners shut chillers down in sequence ahead of expected power loss rather than let them trip under load. Paul Industries uses those baseline readings during the restart sequence afterward.
Can a chiller that sat in floodwater be repaired?
Often, yes, but only after a careful inspection. Motors, starters, drives and control boards that were submerged usually need drying and testing or replacement, and contaminated oil must be changed before any start. The refrigerant circuit is checked for leaks and moisture. Paul Industries tests insulation resistance on motors and replaces wet electronics before returning the machine to service.
Why do air-cooled chillers near the Florida coast lose capacity?
Salt air corrodes the bond between aluminum fins and copper tubes, so heat transfer falls even when the coil looks intact, and head pressure rises on hot afternoons. Coil coatings, scheduled fresh-water rinsing and timely coil replacement keep capacity up. Paul Industries measures condenser approach against the rating to show how much capacity a coastal coil has lost.
What does an Orlando chiller service contract usually include?
An Orlando chiller service contract from Paul Industries usually covers operating log review, seasonal tube inspection or cleaning, oil and refrigerant analysis, vibration readings, controls and safety checks, leak rate records under the 2026 EPA rule, and storm preparation and restart support. Hotel and venue contracts add scheduling around peak occupancy so planned work never lands on a full house.
How do the 2026 EPA leak rules apply to a Florida hospital chiller?
A hospital comfort-cooling chiller holding 15 pounds or more of an HFC such as R-134a gets a leak rate worked out whenever a technician adds charge. Above 10 percent a year, the leak has 30 days to be fixed, then an initial and a follow-up verification test prove the repair. Paul Industries files those calculations and tests with the repair report.
Is an R-22 rooftop chiller in Florida worth repairing?
Sometimes, for a short horizon. R-22 is no longer produced or imported, so repairs rely on reclaimed refrigerant, and coastal rooftop units often combine refrigerant leaks with coil corrosion. A small, verified leak on an otherwise sound unit can be worth fixing while a replacement is planned. Paul Industries prices the repair and a replacement side by side.
Which months suit a chiller overhaul in Florida?
In North and Central Florida, late autumn through early spring brings the lightest loads of the year. In South Florida, loads stay high all year, so overhauls are staged machine by machine with temporary cooling where redundancy is thin. Southwest Florida buildings with a winter population peak often prefer late summer or early autumn, outside the main hurricane threat window where possible.
Why does a Florida chiller keep tripping during summer thunderstorms?
Voltage sags, brief outages and phase loss during storms trip chillers on undervoltage, phase and motor protection safeties. Repeated hard restarts wear starters and drives. Phase monitors, surge protection, restart delays and sequencing logic in the plant controls reduce the trips and the wear, and Paul Industries reviews those settings when trips recur.
What should a Florida facility send to get chiller repair priced?
Send the chiller make, model and serial number, refrigerant type and charge, alarm history, recent operating logs, the last service report and any refrigerant addition records. For coastal or storm-affected units, photos of the coil, cabinet and electrical gear help. Paul Industries uses that to plan the diagnostic visit and prices the repair with parts, refrigerant and labor separated.
Does Paul Industries install a new chiller when repair no longer makes sense?
Yes. Paul Industries supplies the new chiller or installs an owner-furnished one, recovers refrigerant from the old machine, handles removal, rigging, wind-rated supports, piping and electrical connections, then starts up and tests the new unit. The diagnosis that justified replacement sets the scope, so capacity, refrigerant and controls fit the building as it runs today.