Paul Industries provides tank fabrication in Arkansas, designing, building and installing shop-built and field-erected steel and stainless tanks for fuel, process liquids, chemicals, water and food products at Arkansas plants, terminals, farms and campuses. Every project starts by sorting each tank into the right rulebook: the Arkansas Storage Tank Rules for petroleum, the boiler and pressure vessel rules for anything under pressure, and the air, spill and fire codes that follow the contents. Paul Industries keeps its headquarters at 256 Shore Drive, Kilmarnock, Virginia, and builds tanks for Arkansas owners and for sites in all 50 states.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
State tank rules 8 CAR Part 80, Division of Environmental Quality
Regulated AST range Over 1,320 up to 40,000 gallons of motor fuel or refined petroleum
Registration fee $75 per tank per year (8 CAR 80-203)
New USTs Secondary containment, checked at least every 30 days
Reviewed November 2026

Tank fabrication in Arkansas: three rulebooks to check first

Tank fabrication in Arkansas falls under different rules depending on the contents and the pressure, so the first engineering step is classification. Petroleum storage, both underground and aboveground within a defined size range, sits under the Storage Tank Rules at 8 CAR Part 80, issued by the Arkansas Pollution Control and Ecology Commission and administered by the Division of Environmental Quality in the Department of Energy and Environment. Tanks that hold pressure above the state thresholds fall under the Boiler Inspection Section’s rules at 20 CAR Part 880. Atmospheric process, chemical and water tanks are governed by their design standard, the fire code and, where emissions occur, the air permit rules.

Which Arkansas rules apply to which tank
TankState rules that applyUsual design standard
Underground fuel or regulated substance tank8 CAR Part 80 with the adopted federal UST rules; registration, secondary containment, release reportingUL 58 or UL 1316 listed tanks, steel or fiberglass
Aboveground tank of 1,321 to 40,000 gallons of motor fuel or refined petroleum8 CAR Part 80 definitions; optional registration for Trust Fund eligibility; fire codeUL 142 shop tanks or API 650
Larger petroleum or chemical storageFire code, SPCC for oil, air permit rules where vapors are emittedAPI 650 field-erected or API 620 for low pressure
Atmospheric process or food tankFire code where flammable; food safety rules for product contactCustom design to API, ASME BPE or 3-A practice
Tank operating above 15 psi20 CAR Part 880: ASME construction, permit, certificate, two-year inspectionASME Section VIII
Water storage tankDrinking water rules where potable; fire code for fire waterAWWA D100 or D103, NFPA 22 for fire water

Classification is worth getting right on paper before steel is ordered. Equipment that looks atmospheric on the drawing but sees a nitrogen pad, a pump deadhead or steam-out pressure above 15 psi moves into the pressure vessel program, and fuel storage sized one step larger than planned can move from a shop-built UL 142 unit to field-erected API 650 construction.

Arkansas above ground storage tank regulations

The Arkansas above ground storage tank regulations in 8 CAR Part 80 define an aboveground storage tank as one or a combination of aboveground containers with a capacity greater than 1,320 gallons and not more than 40,000 gallons, used to contain or dispense motor fuels, distillate special fuels or other refined petroleum products. Containers joined by common piping in tandem count as a combination. Mobile tanks used to transport petroleum and tanks used in the production of petroleum or natural gas are outside the definition.

Arkansas above ground storage tank registration works differently from the underground program. An owner or operator of an aboveground tank containing petroleum may register it at the owner’s option, and registration is what allows potential eligibility for reimbursement under the Arkansas Petroleum Storage Tank Trust Fund Act, Arkansas Code 8-7-901 and the sections after it. A registered tank pays the $75 annual fee and receives a certificate of registration, renewed every year and posted in a conspicuous place at the facility. Before approving a Trust Fund claim on an aboveground tank, the Division can enter the property to review records and check compliance.

Several aboveground tanks fall outside the part entirely. The rules do not apply to aboveground tanks on farms whose contents are used for agricultural purposes and not held for resale, or to tanks placed temporarily at construction sites, roadway maintenance, timber harvesting or emergency response locations. Aboveground storage tank requirements from other programs still reach many of those tanks: federal SPCC planning applies to facilities with more than 1,320 gallons of aboveground oil storage in containers of 55 gallons or more, and the 2021 Arkansas Fire Prevention Code governs flammable and combustible liquid storage.

Arkansas underground storage tank regulations

The Arkansas underground storage tank regulations adopt the federal UST rules in 40 CFR Part 280, as promulgated through August 24, 2018, and add state requirements on top. Every owner and operator registers their underground tanks, and fuel cannot be delivered into an underground tank unless the owner shows current proof of registration to the seller. The annual fee is $75 per tank, due within 30 days of entering service, and each one counts as in use until it is removed or permanently closed with written notice to the Division.

Secondary containment is the core state addition. Every new underground tank and the piping connected to it is secondarily contained and monitored for leaks, and when an existing tank or a run of piping is replaced, the replacement is secondarily contained. New or replaced motor fuel dispenser systems get under-dispenser spill containment that is liquid-tight and inspectable. The containment is checked for evidence of a release at least every 30 days, double-walled tanks detect failure of the inner wall, and external liners or vaults hold 100 percent of the largest tank inside them.

Releases are reported fast and in writing. A release from an underground or aboveground system is reported under the federal release rules, and a verbal notice to the Division is followed by written notice within three business days. Arkansas underground storage tanks are also served by separate licensing programs in Subparts 5 and 6 of the rules for installers, service personnel and testers, and Subpart 7 sets operator training. Paul Industries plans storage tank installation and storage tank removal around those requirements, with closure records and notices assembled so the Division’s file matches the site.

Arkansas fuel tank regulations for generators, fleets and plants

Arkansas fuel tank regulations reach most plants through their emergency generators, fleet fueling and boiler backup fuel. A diesel day tank inside a generator enclosure, 10,000 gallons of fleet diesel and underground gasoline storage at a distribution center each land in a different place in the table above, and the fire code governs location, spacing, venting and overfill protection for all of them.

Paul Industries designs fuel systems as a whole: the tank, its spill and overfill equipment, emergency and normal vents, interstitial monitoring, piping, dispensing and the containment around it. Hospitals, data centers and campuses in Little Rock, Fayetteville and Bentonville typically need generator fuel storage that holds several days of run time; distribution centers in Northwest Arkansas and along the interstates need fleet fueling; and plants in the Delta and south Arkansas need fuel for boilers, dryers and mobile equipment. Each system is sized for the actual use. Each one is then checked against the 1,320 and 40,000 gallon lines that change its rules.

Overfill and venting details decide whether a fuel system passes its first fire inspection. Paul Industries fits audible and visual high-level alarms where the fill point is out of the operator’s sight, mechanical overfill valves on underground fills, normal vents sized for peak fill and withdrawal rates, emergency vents sized for fire exposure on aboveground units, and spill buckets at each fill connection. Generator systems add day-tank level controls, return lines and fuel polishing connections so stored diesel stays usable between monthly test runs and an actual outage.

Storage tank dike capacity and spill containment

Storage tank dike capacity at an Arkansas site is set by the program that applies, and the strictest applicable rule governs the design. Under SPCC, secondary containment for bulk storage holds the full capacity of the largest container plus enough freeboard for precipitation. The fire code sets diking and remote impounding rules for flammable and combustible liquids. For underground systems, Arkansas requires external liners and vaults to contain 100 percent of the capacity of the largest tank within them.

Arkansas rainfall shapes the detail. A dike that fills with rainwater loses capacity, so the design includes a drain valve kept closed and locked, a written practice for inspecting accumulated water before release, and sloped floors to a sump. Paul Industries builds steel and concrete dikes, double-wall tanks that serve as their own containment, and spill pallets for small containers, and sizes each one with the calculation kept in the plant’s spill plan.

Storage tank vs process tank in Arkansas plants

The storage tank vs process tank question in Arkansas plants decides which standards a design follows. A storage tank holds a liquid until it is used or shipped: fuel, water, bulk chemicals, rice bran oil or molasses. A process tank takes part in the process itself: it mixes, heats, cools, reacts, ferments or cleans, so it carries agitators, jackets, coils, spray devices, instrument nozzles and often sanitary or pharmaceutical finishes.

Food and poultry plants across the state run both kinds. The Arkansas Economic Development Commission reports that seven of the world’s top ten food and beverage companies have manufacturing facilities in Arkansas and lists rice, grains, chickens and catfish among the state’s farm output. Those plants need brine and marinade vessels, scald and chill water systems, CIP solution, hot water and wastewater equalization storage, and stainless storage for oils and liquid ingredients. Rice country, which the USDA places in the Arkansas Grand Prairie and the Mississippi Delta, and where Riceland Foods is based in Stuttgart, adds tanks for oil, water and processing utilities. Chemical producers in south Arkansas, including Albemarle’s bromine plants in Magnolia, need tanks in corrosion-resistant alloys or lined steel. Paul Industries builds each to the duty, with CIP and SIP systems in Arkansas and passivation services in Arkansas covering the sanitary side.

How tanks are manufactured: shop-built and field-erected

How tanks are manufactured depends mostly on diameter. Units up to the size that can ride a truck, roughly 12 feet in diameter, are built complete off site, tested and shipped ready to set. Larger ones are field-erected from rolled shell plates, bottom plates and roof sections fabricated off site and welded on the foundation.

Tank construction routes for Arkansas projects
RouteTypical sizes and usesInspection and testing
Shop-built UL 142 steel tankGenerator, fleet and plant fuel storage, single or double wallFactory leak test, listing label, field installation check
Shop-built custom process tankStainless and alloy process, CIP and chemical vesselsWeld examination, hydro or leak test, finish verification
Field-erected API 650 tankLarge water, fuel and chemical storageBottom vacuum box test, shell radiography, hydrostatic fill test, settlement survey
API 620 low-pressure tankStorage needing up to 15 psigPressure and leak tests per the standard
Welded water storage tankPotable, process and fire waterAWWA D100 examination and disinfection where potable
Underground UST systemFuel at fleets, generators and dispensing sitesTightness and containment tests, Arkansas registration

Field erection in Arkansas is planned around weather and the foundation. A sand-and-gravel ringwall or concrete slab is checked for level before the bottom is laid; shell courses go up course by course; the hydrostatic fill test proves the shell and foundation together, with settlement readings taken as the tank fills. Paul Industries plans the fill test water and its disposal before erection starts, since a large unit holds more water than many plant systems can supply in a day.

How often should storage tanks be inspected in Arkansas?

How often storage tanks should be inspected in Arkansas depends on the program and the standard behind each tank. Underground systems run the federal operation and maintenance schedule adopted by the state, including the 30-day containment checks in the Arkansas rule, periodic walkthrough inspections, and testing of spill prevention equipment, containment sumps and overfill devices. Aboveground petroleum tanks under SPCC follow the industry standard the plan cites, commonly the Steel Tank Institute SP001 for shop-built units and API 653 for field-erected ones.

API 653 sets external inspections by an authorized inspector at intervals tied to corrosion rate and no longer than five years, with internal inspections set by the measured bottom corrosion rate. Tanks that hold pressure fall under the Arkansas two-year vessel inspection. Paul Industries builds inspectability into new tanks with manways, gauging nozzles, nameplates clear of insulation and accessible bottoms, and repairs and alters existing tanks to API 653 when an inspection finds bottom corrosion, shell wastage or settlement.

Steel tank lifespan in Arkansas conditions

Steel tank lifespan in Arkansas depends on bottom corrosion, coating condition and the contents far more than on age. Bottoms sitting on damp foundations corrode from underneath, which is why API 650 construction often gets cathodic protection, a release prevention barrier or a raised foundation. Shells corrode at the liquid line and under insulation where water gets trapped, and roofs corrode where condensation and rain collect.

Well-coated, cathodically protected carbon steel tanks run for decades with periodic API 653 repairs, while an unprotected bottom in aggressive service can perforate far sooner. Stainless vessels in food service last as long as their welds and finishes are kept clean and passive. Paul Industries extends steel tank lifespan with bottom replacements, shell patches and inserts, nozzle repairs, roof replacements and coating systems chosen for the contents.

Air permits and tank emissions in Arkansas

Tanks storing volatile liquids at Arkansas plants can trigger air permit requirements under the Rules of the Arkansas Plan of Implementation for Air Pollution Control, 8 CAR Part 41, and, for larger sources, the Rules of the Arkansas Operating Air Permit Program, 8 CAR Part 42, together with federal performance standards for volatile organic liquid storage. A new solvent, fuel or chemical tank at a permitted plant is a change the environmental manager reviews before purchase, since the permit may limit throughput or require floating roofs, vapor balancing or controls.

Paul Industries designs the emission controls into the tank instead of adding them later: internal floating roofs, fixed-roof vapor recovery connections, conservation vents with set pressures that match the permit basis, and submerged fill pipes. The tank data sheet lists those features so the permit application and the fabrication drawings describe the same equipment.

Tank work by Arkansas region

Arkansas regions differ in the storage and process equipment their plants buy, and the differences follow industry. The commission counts more than a dozen paper and packaging companies and almost 19 million acres of timberland in the state, and describes Mississippi County as the largest steel producing county in the nation, so storage needs in the south and northeast lean toward water, chemicals and fuel at heavy industrial sites, while the northwest leans toward food.

Typical Arkansas storage and process equipment by region
RegionCommon ownersEquipment Paul Industries builds there
Little Rock, Conway and Pine BluffHospitals, campuses, government, manufacturersGenerator fuel storage, hot water and fire water storage
Springdale, Rogers, Bentonville and FayettevillePoultry and food processors, distribution centersStainless brine, CIP and ingredient vessels, fleet fueling
Fort Smith and the River ValleyFood and manufacturing plantsProcess water, wastewater equalization and chemical storage
Jonesboro, Blytheville and Mississippi CountySteel mills, grain and rice processorsCooling and process water storage, fuel, oil and chemical storage
Stuttgart and the Grand PrairieRice mills and grain handlersOil, water and utility storage, dryer fuel
El Dorado, Magnolia and TexarkanaChemical and bromine producers, industrial plantsAlloy and lined chemical storage, fire water, wastewater

Each region also brings its own site conditions. Delta soils call for careful foundation design and settlement monitoring on large field-erected units, while hillside sites in the Ozarks need grading, retaining work and longer pipe runs to reach a level pad. Paul Industries reviews the geotechnical data and the access route for every delivery before fabrication starts, since an oversized shop-built unit that cannot reach the pad turns into a field-erected one.

What does tank fabrication in Arkansas cost?

The cost of tank fabrication in Arkansas follows capacity, material, construction route and accessories. Steel weight drives the price of carbon steel construction, stainless and alloy grades multiply it, field erection adds foundation work, cranes and on-site welding, and accessories such as heating coils, agitators, insulation, ladders and platforms, containment and monitoring add their own lines. State costs on a regulated tank include the $75 annual registration fee per tank where registration applies.

Paul Industries gives a budget range from comparable projects once it knows the contents, capacity, dimensions or footprint, material, design code and accessories, then a firm price on the approved design. Tank fabrication companies differ in what a quote covers, so Paul Industries quotes the installed system, with foundation interface, containment and piping included, and the full cost is visible from the start.

Who fabricates and installs tanks in Arkansas?

Paul Industries fabricates and installs tanks in Arkansas, from shop-built fuel and process tanks to field-erected storage, with the classification, permits, registration support, containment and testing handled as part of the same job. Among storage tank contractors, Paul Industries covers the full sequence: design calculations, fabrication, foundations coordination, setting or erection, piping, instruments, coatings and insulation, testing and turnover records.

Owners choose the route. Supply-only delivers a listed or code-built tank with its documents. Design-build takes the tank from process data through drawings, fabrication and delivery. Complete installation adds the foundation interface, setting or erection, containment, piping, controls and startup. Related Arkansas pages cover the pressure, piping and welding work that surrounds storage: pressure vessel fabrication in Arkansas, process piping in Arkansas and industrial welding services in Arkansas, along with industrial tank cleaning and process tanks.

The company, once based in northern New Jersey and then in Pennsylvania, is now headquartered in Kilmarnock, Virginia, and works as an East Coast contractor whose home-state work includes tank fabrication in Virginia. Owners with plants east of the Mississippi can compare tank fabrication in Tennessee under that state’s tank rules. The national tank fabrication page covers construction methods, and the Southeast page covers the region.

Tanks from Paul Industries for Arkansas sites

Paul Industries designs, fabricates, supplies, installs, repairs and removes tanks for Arkansas plants, terminals, farms, hospitals and campuses, with each unit classified and documented for the state storage tank rules, the vessel rules or the fire and air codes that apply. Send the contents, capacity, footprint, material, location and whether the job is new, a replacement or a relocation. Call 201-450-8280 or request a quote. More of Paul Industries’ Arkansas work appears on the Arkansas page.

Standards referenced: 8 CAR Part 80, Arkansas Storage Tank Rules · 40 CFR Part 280 (as adopted in Arkansas) · Arkansas Petroleum Storage Tank Trust Fund Act, Arkansas Code 8-7-901 et seq. · 40 CFR Part 112 (SPCC) · 8 CAR Parts 41 and 42 (air permits) · 2021 Arkansas Fire Prevention Code · 20 CAR Part 880 (pressure tanks) · API 650 · API 620 · API 653 · UL 142 · AWWA D100 · NFPA 30

Frequently asked questions

Does Paul Industries handle generator fuel storage for Little Rock hospitals and campuses?

Paul Industries designs and installs generator fuel storage, along with water, chemical and process vessels, for hospitals, campuses and plants in Little Rock, North Little Rock, Conway and across central Arkansas. Generator fuel systems there are sized for several days of run time and designed with containment, overfill protection and monitoring. Each tank is classified against the Arkansas storage tank rules before fabrication starts.

Does Paul Industries build stainless tanks for food plants in Springdale, Rogers and Fort Smith?

Paul Industries builds stainless brine, marinade, CIP, hot water and ingredient tanks for food and poultry plants in Springdale, Rogers, Fort Smith and across Northwest Arkansas. Product-contact tanks get sanitary welds, drainable bottoms, polished finishes and spray devices sized for cleaning, and they are passivated before startup so wash-down chemicals do not attack the welds.

Which tanks does Paul Industries supply in Stuttgart, Pine Bluff, Jonesboro and El Dorado?

Paul Industries supplies storage and process tanks for rice and grain processors around Stuttgart and Jonesboro, plants in Pine Bluff, and chemical producers in El Dorado and Magnolia. Typical work includes oil and water storage, chemical storage in alloys or lined steel, fuel tanks for dryers and equipment, and wastewater tanks, each designed to the applicable standard and Arkansas rule.

Does an aboveground diesel tank have to be registered in Arkansas?

An aboveground petroleum tank in the regulated range, more than 1,320 and up to 40,000 gallons, can be registered at the owner’s option under the Arkansas Storage Tank Rules, and registration is what allows potential eligibility for Petroleum Storage Tank Trust Fund reimbursement. Registered tanks pay $75 per tank per year. Underground tanks are registered as a rule, and farm tanks used for agriculture are outside the part.

What does the Arkansas Petroleum Storage Tank Trust Fund cover?

The Arkansas petroleum storage tank trust fund, set up under Arkansas Code 8-7-901 and the sections after it, reimburses eligible owners for corrective action costs and pays eligible claims from others harmed by a release, subject to deductibles and the rules in 8 CAR Part 80. Eligibility depends on registration, paid fees and compliance. The Division can inspect an aboveground facility before approving a claim.

What happens when an underground tank is replaced in Arkansas?

A replaced underground tank, or replaced piping connected to one, is installed with secondary containment and leak monitoring under the Arkansas rules, which apply the requirement to the replaced component. A replaced dispenser system gets under-dispenser containment. The old tank is closed under the adopted federal closure rules with written notice to the Division. Paul Industries plans the removal, replacement and records as one project.

How is a release from a storage tank reported in Arkansas?

A release or suspected release from an underground or aboveground storage tank system is reported to the Division of Environmental Quality under the federal release reporting rules adopted in Arkansas. A verbal notice is followed by written notice within three business days, by email, fax, mail or another accepted form. Tank repairs that follow a release are documented so the corrective action file is complete.

When does an Arkansas tank become a pressure vessel?

A tank designed for more than 15 psi, other than an air tank, falls under the Arkansas unfired pressure vessel rules unless another exemption applies, which means ASME Section VIII construction, National Board registration, an installation permit, a certificate and inspection every two years. Water vessels of 120 gallons or less and small volumes of 5 cubic feet or less are exempt. Paul Industries rates each tank for its real operating envelope.

Are farm fuel tanks covered by the Arkansas storage tank rules?

Aboveground tanks located on farms are outside 8 CAR Part 80 when their contents are used for agricultural purposes and not held for resale. Federal SPCC planning still applies to farms above the federal oil storage thresholds, and fire code spacing and venting still apply. Paul Industries builds farm fuel tanks with double walls, overfill protection and proper vents so they meet those requirements.

Do anhydrous ammonia storage tanks fall under the tank rules or the vessel rules?

Anhydrous ammonia storage containers in Arkansas are pressure vessels under Subpart 11 of the boiler and pressure vessel rules, built to ASME Section VIII for at least 250 psig, stamped National Board and documented with blueprints filed before shipment into the state. They are separate from the petroleum storage tank rules. See the pressure vessel page for the full list of container requirements.

Can an existing Arkansas tank be relocated to another site?

A shop-built tank can usually be relocated after cleaning, gas-freeing, inspection and repair, with new anchors, containment and piping at the new site. Regulated underground tanks are closed at the old site and handled under the Division’s rules. A field-erected tank can be cut and re-erected, though the cost often approaches a new tank. Paul Industries prices relocation against new construction.

What coatings and linings suit Arkansas tanks?

Exterior coatings are chosen for UV, humidity and rainfall, typically zinc-rich primer with epoxy and polyurethane finishes. Interior linings follow the contents: epoxy phenolic for fuels and many chemicals, NSF-listed systems for potable water, and no lining for stainless in food service. Tank bottoms on soil benefit from cathodic protection. Paul Industries specifies the system with surface preparation and inspection steps written into the project.

How are hot water storage tanks treated under Arkansas rules?

Hot water supply storage tanks heated by steam or other means are exempt from the Arkansas boiler and vessel permits and inspection when heat input stays under 200,000 Btu per hour, water temperature under 210 F and capacity under 120 gallons. Larger tanks fall inside the program, and installers of hot water storage tanks of 200,000 Btu per hour or more hold a license from the Section.

What records come with a new tank from Paul Industries?

Each new tank ships with design calculations, approved drawings, material certificates, welding procedures and welder qualifications, examination and test records, the nameplate or listing label, coating records and, where applicable, the documents an Arkansas registration or permit needs. Field-erected tanks add the foundation survey, settlement readings and hydrostatic test record, all in one turnover package.

How should a plant plan storage tank removal in Arkansas?

Plan storage tank removal with the contents emptied and disposed of properly, the tank cleaned and gas-freed, connected piping isolated and capped, and the required closure notice and site assessment for regulated underground tanks. Aboveground tanks need lifting plans and a spot to stage cut sections. Paul Industries removes tanks and installs replacements under one schedule so the plant’s storage outage stays short.

What water tanks does Paul Industries build in Arkansas?

Paul Industries builds welded steel and stainless water tanks for process water, cooling water, fire protection and potable storage at Arkansas plants and campuses. Potable tanks follow AWWA practice with NSF-listed linings and disinfection, fire water tanks follow NFPA 22, and process water tanks are sized from plant demand and makeup rates. Each includes the overflow, vents, access and level instruments the use requires.

Which details let Paul Industries price an Arkansas tank project?

Send the contents and their temperature and specific gravity, required capacity, the footprint or height limits, material preference, design code if one is specified, accessories such as heating, mixing, insulation and platforms, and whether the tank is underground or aboveground. Include the site location and any containment already in place. Paul Industries returns a budget range and the applicable Arkansas rule path.

Specifying a new or replacement tank in Arkansas?

Send the contents, capacity, footprint, material and site. Call 201-450-8280 or request a quote.