Paul Industries provides industrial welding services in Pennsylvania for plants, mills, utilities and yards, welding pipe, structural steel, tanks, boilers and pressure equipment under ASME Section IX and AWS procedures, with a record for every joint. Pennsylvania still builds and repairs heavy equipment on a scale few states match, from steel in the Mon Valley and ships on the Delaware River to gas processing in the west and pharmaceutical plants outside Philadelphia. Paul Industries welds in the shop and in the field, during operation and during outages, and hands the plant the paperwork its inspectors and quality staff expect.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
Boiler and vessel repairs Welded repairs approved and signed off by an inspector (34 Pa. Code 3a.81, 3a.83)
Philadelphia hot work L&I Hot Work License and Fire Code Chapter 35
Structural welding 2021 IBC special inspection rules under the UCC from January 1, 2026
Public work Prevailing wage applies above $25,000 in total project cost
Reviewed November 2026

Which welding jobs do Pennsylvania plants, mills and yards bring?

Pennsylvania plants, mills and yards bring five kinds of welding work: new process and utility piping, structural steel for platforms, racks and equipment supports, repairs to boilers and pressure vessels under state law, wear and crack repairs on heavy equipment, and outage welding packed into short shutdown windows. Most jobs mix several of these. A new process line needs pipe welding, supports and a structural connection to an existing frame; a boiler outage brings tube work, a header repair and new platform steel at the same time.

The national industrial welding services page explains welding processes, inspection methods and repair decisions in general. This page deals with what is particular to Pennsylvania: the industries that set the workload, the state rules for boiler and vessel repairs, hot work inside Philadelphia, structural inspection under the Uniform Construction Code, and how outage welding is planned at the state’s mills and plants.

Industrial welding across Pennsylvania’s steel, shipbuilding and energy economy

Industrial welding across Pennsylvania follows the state’s heavy industry: steelmaking and metals in the southwest, shipbuilding and port industry on the Delaware River, gas production and processing across the north and west, and pharmaceutical, food and specialty manufacturing in the southeast and center. Each brings its own mix of materials, codes and schedules.

Industrial welding, Pittsburgh, PA and the Mon Valley

Industrial welding in the Pittsburgh region is tied to steel, metals, gas processing, power and chemicals. U.S. Steel announced in June 2026 an investment of roughly $2 billion to $2.5 billion at its Mon Valley Works, centered on a new hot strip mill at the Edgar Thomson plant in Braddock that will replace an 87-year-old mill at Irvin in West Mifflin, with construction expected to begin later in 2026 and take about three years. A project of that size draws structural, piping, equipment and maintenance welding into the region, on top of the steady repair work that mills, coke plants and power stations generate. Welding there is heavy: thick plate, crane rails and runway girders, large-bore carbon and alloy piping, and hardfacing on wear parts.

Industrial welding, Philadelphia, PA and the Delaware River

Industrial welding in Philadelphia and along the Delaware River serves shipbuilding, chemical plants, terminals, refineries, water and wastewater plants and the hospitals and universities of the city. Hanwha completed its $100 million purchase of Philly Shipyard in December 2024 and renamed it Hanwha Philly Shipyard, keeping a commercial and government shipbuilder on the Navy Yard waterfront. Around the yards and terminals, the welding is marine and structural steel, tank and transfer piping repairs, and corrosion work on aging riverfront equipment. When a plant compares welding companies, Philadelphia’s hot work license and fire code are among the first things to settle, because they apply inside the city limits and nowhere else in the state.

Lehigh Valley, Reading and Northeast Pennsylvania

Welding in Allentown, Bethlehem, Easton, Reading and the Scranton and Wilkes-Barre region serves pharmaceutical and medical device plants, food and beverage plants, packaging lines, warehouses and the new data center campuses planned in the northeast. Stainless process piping and equipment frames make up much of the work, with structural steel for mezzanines and conveyor supports.

Industrial welding, Lancaster, PA, York and Harrisburg

Central Pennsylvania’s snack, confectionery, dairy, meat and brewing plants around Lancaster, York, Hanover, Lebanon, Hershey and Harrisburg keep welders busy with hygienic stainless piping, equipment modifications, ammonia refrigeration piping and steam and condensate repairs. Most of that work happens between production runs, on weekends and during plant holidays, and it has to leave product-contact surfaces clean enough for the plant’s sanitation program.

Erie, State College and the northern tier

Erie’s metalworking and plastics plants, the institutional central plants around State College, and gas compression and processing sites across the northern tier and the southwest gas fields add carbon steel pipe welding, pressure piping repairs and structural work, much of it outdoors and through cold winters.

Pennsylvania regions and the welding work they generate
RegionMain facilitiesTypical weldingCodes most often specified
Pittsburgh and the Mon ValleySteel mills, coke and metals plants, power, gas processingThick structural plate, crane runways, large-bore piping, hardfacingAWS D1.1, ASME B31.1 and B31.3, Section IX
Philadelphia and the Delaware RiverShipbuilding, chemicals, terminals, water plants, hospitalsMarine and structural steel, tank and transfer piping, corrosion repairsAWS D1.1, API 653, ASME B31.3, Philadelphia Fire Code for hot work
Lehigh Valley, Reading, Northeast PAPharmaceutical, medical device, food, packaging, data centersStainless piping, equipment frames, mezzaninesASME BPE, B31.3, AWS D1.6
Lancaster, York and HarrisburgSnack, dairy, meat, brewing, confectioneryHygienic stainless, refrigeration and steam piping3-A sanitary practice, B31.3, B31.5 for refrigeration
Erie, State College and the gas fieldsMetalworking, plastics, campus plants, compression stationsCarbon steel pipe, pressure piping repairs, outdoor structuralB31.3, B31.1, API 1104 on pipeline segments

Which welding codes govern work at Pennsylvania plants?

Welding at Pennsylvania plants is governed by the construction code of the item being welded, while ASME Section IX qualifies the welding procedures and welders for pressure work and AWS D1.1 does the same for structural steel. The state adds its own layer for boilers and unfired pressure vessels through the Boiler and Unfired Pressure Vessel Law and 34 Pa. Code Chapter 3a, and for buildings and structures through the Uniform Construction Code.

Welding codes and Pennsylvania rules by type of work
WorkConstruction codeQualificationPennsylvania layerRecords at turnover
Process pipingASME B31.3ASME Section IXPlant standard; OSHA PSM where applicableWeld map, NDE reports, test record
Boiler external and steam pipingASME B31.1ASME Section IXBoiler law for the boiler and its repairsWeld and heat treatment records, test record
Boiler and pressure vessel repairsASME code of construction and the National Board Inspection CodeASME Section IX34 Pa. Code 3a.81 to 3a.83: inspector consulted, repair approved and signedR-1 or Department record of welded repair
Structural steelAWS D1.1 (D1.6 for stainless)AWS D1.1UCC permit and IBC Chapter 17 special inspection where requiredInspection reports, welder certifications to the job
Hygienic stainlessASME BPE with B31.3ASME Section IXFDA or food safety program at the plantWeld logs, coupons, borescope records
Storage tank repairsAPI 653 for repair of API 650 tanksASME Section IXDEP storage tank program for regulated tanksRepair and inspection records for the tank file

Boiler and pressure vessel weld repairs under Pennsylvania law

Boiler and pressure vessel weld repairs in Pennsylvania are controlled by 34 Pa. Code Chapter 3a, which requires the owner or user to consult an inspector before any repair that affects the working pressure or safety of the boiler or vessel, and requires repairs to follow the ASME code of construction or the National Board Inspection Code. Welded repairs and tube replacements fall under the National Board “R” repair program, the welding must meet ASME Section IX, and the repair is recorded on an R-1 report or the Department’s record of welded repair form.

The inspector approves the repair and signs the record, may require a hydrostatic test, and the boiler or vessel cannot return to operation until the inspector approves the work. Because unfired pressure vessels in Pennsylvania are field-inspected every three years and boilers carry their own certificate of operation, a good time for a planned weld repair is often just before or alongside the scheduled inspection, when the inspector is already involved. Paul Industries plans the repair method, prepares the welding procedure and repair documentation for the inspector’s review, makes the repair and closes out the record. The boiler repair in Pennsylvania and pressure vessel fabrication in Pennsylvania pages cover the equipment side of that work.

Hot work rules at Pennsylvania plants and inside Philadelphia

Hot work at Pennsylvania plants is governed by OSHA’s welding and cutting standard, 29 CFR 1910.252, the plant’s own hot work permit program and its insurer’s requirements, which usually follow NFPA 51B. OSHA requires a fire watch during the work where combustibles are present and for at least half an hour after it ends, and many Pennsylvania plants extend that to an hour.

Philadelphia adds a city layer. The Department of Licenses and Inspections issues a Hot Work License for work that produces a spark or flame, including welding and flame cutting, though work performed under a construction permit does not need a separate license. Hot work in the city must comply with Chapter 35 of the Philadelphia Fire Code, which requires at least one 2-A:20-B:C extinguisher within 30 feet and bars hot work in areas with an impaired sprinkler system unless the fire code official approves it. Paul Industries works under the plant’s permit system, places fire watches and extinguishers to the stricter of the plant and city rules, and keeps the permits with the job records.

Structural welding and special inspection under the Pennsylvania UCC

Structural welding on Pennsylvania buildings and structures is reviewed under the Uniform Construction Code, which has been based on the 2021 International Codes since January 1, 2026, and the 2021 International Building Code calls for special inspection of structural steel welding unless an exception applies. On a plant project, that means new mezzanines, pipe racks, platforms and equipment supports on a UCC permit may need the owner’s special inspector to verify welder qualifications, joint fit-up and finished welds against AWS D1.1.

The structural steel welding requirements a plant usually writes into a specification are AWS D1.1 prequalified or qualified procedures, welders qualified for the positions and processes used, visual inspection of every weld, and ultrasonic testing of complete-joint-penetration welds in moment and tension connections. Inside existing buildings, field welding to old steel also needs the base metal identified, because older Pennsylvania mill buildings can contain steel whose chemistry calls for preheat or a different filler. Paul Industries supplies the procedures, welder records and inspection access the special inspector needs, and fabricates the steel through its structural steel fabrication work.

Pipe welding: Pennsylvania gas processing, steam and pharmaceutical lines

Pipe welding in Pennsylvania splits into three main families: carbon and alloy steel on gas processing, chemical and steam lines; stainless on pharmaceutical, food and water lines; and the dissimilar joints that connect them. Each needs its own procedure qualification, filler metal and examination, and the process piping in Pennsylvania page covers the piping design and testing around the welds.

Carbon steel lines are usually welded with a gas tungsten arc root and shielded metal arc or flux-cored fill and cap, with preheat set by material and wall thickness and raised in cold conditions. Chrome-moly steam lines at power and industrial boiler plants need preheat and postweld heat treatment controlled and recorded with thermocouples. Stainless lines are joined by orbital or manual gas tungsten arc welding with an argon backing purge, because welding stainless steel pipe without purging leaves a heavily oxidized, rough root that corrodes and traps product. Welding stainless steel to carbon steel pipe, at a utility tie-in or a skid boundary, uses an over-alloyed filler such as a 309L type so the weld metal stays tough and corrosion resistant after dilution.

Radiography or ultrasonic examination in a running Pennsylvania plant?

Radiography and ultrasonic testing are the two volumetric methods used to examine butt welds at Pennsylvania plants, and the choice between them inside an operating unit is often made by the schedule and the people around the work rather than by the code. Radiography with a gamma source needs a cleared exclusion zone while the shot is taken, usually at night or between shifts, and radioactive material licensing in Pennsylvania is administered by the Department of Environmental Protection’s Bureau of Radiation Protection, because the state regulates those sources under an agreement with the Nuclear Regulatory Commission.

Phased array ultrasonic testing needs no exclusion zone, produces a digital record that can be reviewed later, and suits thicker welds where radiography takes long exposures. Where the code or the plant’s specification allows either method, Paul Industries proposes ultrasonic examination for welds in busy areas and radiography where the geometry, material or plant preference favors it. Visual examination covers every weld, liquid penetrant suits stainless and nonmagnetic welds, magnetic particle suits carbon steel surfaces, and positive material identification confirms alloy before welds go into chrome-moly or high-alloy service.

Welding during outages at Pennsylvania mills, refineries and food plants

Welding during outages at Pennsylvania mills, refineries, chemical plants and food plants is planned weeks ahead, because the outage window is fixed and every day of overrun costs production. The planning sets which welds can be made before the outage on spools and frames fabricated off site, which have to be made in place, which need postweld heat treatment or radiography that will occupy the area, and which hot work permits and fire watches each location needs.

Outage welding readiness checklist for a Pennsylvania plant
ItemWhy it mattersPrepared by
Weld list by location and materialSets crew size, procedures and examination for each jointPaul Industries with the plant’s maintenance planner
Welding procedures and welder qualificationsInspectors and quality staff review them before work startsPaul Industries
Prefabricated spools, frames and patchesMoves welding out of the outage windowPaul Industries, fabricated off site
Isolation, lockout and gas-free certificatesLines and vessels must be safe to open and enterThe plant’s operations team
Hot work permits and fire watch planOSHA 1910.252, the plant program and, in Philadelphia, the city fire codeThe plant issues; Paul Industries staffs the fire watch
Boiler and vessel inspector notice34 Pa. Code 3a.81 requires consultation before repairs affecting safetyThe owner, with Paul Industries’ repair documents
Radiography and heat treatment scheduleRadiography clears areas; heat treatment holds a joint for hoursPaul Industries, sequenced with other trades

Paul Industries brings the prefabricated work in staged by location, runs shifts sized to the weld list, and closes each joint with examination and paperwork before the plant restarts, so the outage report and the welding records match. Larger outage scopes are covered on the shutdown and turnaround services page.

Crack and wear repairs on heavy equipment at Pennsylvania plants

Crack and wear repairs on heavy equipment are a large share of welding at Pennsylvania mills, quarries, cement and aggregate plants, foundries, power stations and food plants, where frames, housings, chutes, rolls, buckets and crusher parts take repeated loading and abrasion. A crack in a frame or bracket is usually a fatigue crack, so the repair starts with finding why it grew: a stress raiser at a weld toe, a missing gusset, a loose bolt pattern or vibration from an out-of-balance drive.

The repair itself follows a fixed sequence. The crack is located with magnetic particle or dye penetrant testing, removed completely by grinding or air carbon arc gouging, and the groove is checked again to confirm that no crack remains. The base metal is identified, because cast steel, high-carbon parts and older Pennsylvania mill equipment often need preheat, low-hydrogen filler and slow cooling to avoid new cracks beside the repair. Where the original detail caused the crack, Paul Industries proposes a reinforcement or a better weld profile so the repair outlasts the original. Wear parts are rebuilt with hardfacing overlays matched to the type of wear, impact or abrasion, and liners or wear plates are added where they protect the base structure. When the damage is too extensive for a sound repair, Paul Industries fabricates and installs a replacement part from drawings or from measurements taken on the old one.

What sets the price of plant welding in Pennsylvania?

The price of plant welding in Pennsylvania is set by the number and size of joints, the material, the code and examination level, access and height, preheat and postweld heat treatment, hot work controls, and whether the welding must fit an outage window or night and weekend shifts. A carbon steel structural repair at grade with visual inspection is a small fraction of the cost per joint of a chrome-moly steam weld with heat treatment and radiography, or a sanitary stainless weld with purge, coupons and borescope records.

Pennsylvania adds cost factors of its own. Publicly funded work over $25,000, at water authorities, universities, schools and public hospitals, is subject to the Prevailing Wage Act. Projects inside Philadelphia may need a Hot Work License or a construction permit. Boiler and vessel repairs add the inspector’s review and any hydrostatic test, and winter work in the northern tier and the Laurel Highlands needs heated enclosures and preheat. Paul Industries prices welding by scope after reviewing drawings or photos, and offers a budget range from comparable work before the final scope is fixed.

Who performs industrial welding services in Pennsylvania?

Paul Industries performs industrial welding services in Pennsylvania. Formerly based in Pennsylvania and now headquartered at 256 Shore Drive in Kilmarnock, Virginia, the company is an East Coast contractor that welds pipe, structural steel, tanks, equipment and pressure parts at plants in Philadelphia, the Lehigh Valley, Reading, Lancaster, York, Harrisburg, Scranton and Wilkes-Barre, State College, Erie and Pittsburgh, and it accepts welding work in all 50 states and at plants overseas, described on its international page.

Plants can engage Paul Industries for supply of welded spools, frames and assemblies fabricated off site, for field welding on a time and materials or fixed-price basis, or for complete design-build packages that include the engineering, fabrication, installation and records. The same service in the headquarters state is described on the industrial welding services in Virginia page, and the industrial welding services in New Jersey page covers the state next door. Tank work in Pennsylvania is covered on the tank fabrication in Pennsylvania page.

Welding from Paul Industries at Pennsylvania plants

Paul Industries welds new piping and steel, repairs boilers, vessels, tanks and heavy equipment, and staffs outage welding at plants, mills, utilities and yards across Pennsylvania, with procedures, welder qualifications, examination reports and repair records delivered with the work. Send drawings, photos, materials, the applicable code and the dates the work must fit, and Paul Industries will scope and price it. Call 201-450-8280 or request a quote. Every other Paul Industries service offered in the state appears on the Pennsylvania page.

Standards referenced: ASME Section IX · ASME B31.1 and B31.3 · ASME BPE · National Board Inspection Code (NB-23) · AWS D1.1 Structural Welding Code, Steel · AWS D1.6 Structural Welding Code, Stainless Steel · API 1104 · API 653 · OSHA 29 CFR 1910.252 · NFPA 51B · Pennsylvania Boiler and Unfired Pressure Vessel Law; 34 Pa. Code ch. 3a · Pennsylvania Uniform Construction Code · Philadelphia Fire Code, Chapter 35 · Pennsylvania Prevailing Wage Act

Frequently asked questions

Who welds at steel mills, coke plants and power stations around Pittsburgh?

Paul Industries welds at steel mills, metals plants, coke and power plants and gas processing sites around Pittsburgh, in the Mon Valley and along the Ohio River. Work there runs to heavy structural plate, crane runway repairs, large-bore carbon and chrome-moly piping with heat treatment, and hardfacing of wear parts, much of it during scheduled outages. Send the weld list, materials and outage dates for a scope and price.

How do welding companies in Philadelphia, PA handle the city's hot work rules?

Inside Philadelphia, hot work such as welding and flame cutting needs a Hot Work License from the Department of Licenses and Inspections unless the work is performed under a construction permit, and it must comply with Chapter 35 of the Philadelphia Fire Code. Paul Industries works under the plant’s permit program as well, places extinguishers and fire watches to the stricter of the two sets of rules, and files the permits with the job records.

Does Paul Industries weld at pharmaceutical and food plants in the Lehigh Valley and around Lancaster?

Yes. Paul Industries welds stainless process piping, equipment frames and platforms at pharmaceutical, medical device and food plants in Allentown, Bethlehem, Reading, Lancaster, York and Hershey. Product-contact welds are made with a backing purge and documented with weld logs, coupons and borescope records, and the work is scheduled into weekends, plant holidays and planned shutdowns so production keeps running.

What industries use welding most in Pennsylvania?

Steel and metals, shipbuilding, gas production and processing, chemicals and refining, power generation, pharmaceutical and medical manufacturing, food and beverage, water and wastewater utilities and building construction all rely on industrial welding in Pennsylvania. The mix shifts by region, with heavy steel and energy work in the west, marine and chemical work on the Delaware River, and stainless hygienic work in the southeast and center of the state.

Is Pittsburgh known for welding and fabrication work today?

Yes. Pittsburgh’s steel heritage carries on in the Mon Valley mills, metals plants, power stations and fabricators of the region, and U.S. Steel’s 2026 plan for a new hot strip mill at the Edgar Thomson plant in Braddock adds a multiyear construction program. Gas processing, chemical and polymer plants along the Ohio River add pipe welding and maintenance work, so heavy industrial welding remains a large part of the regional economy.

Who approves a weld repair on a boiler or pressure vessel in Pennsylvania?

A Pennsylvania boiler or pressure vessel inspector does. Under 34 Pa. Code Chapter 3a, the owner consults the inspector before a repair that affects working pressure or safety, the repair follows the ASME code of construction or the National Board Inspection Code, and the inspector approves the completed repair and signs the record. The equipment returns to service only after that approval, sometimes following a hydrostatic test the inspector requires.

What paperwork does a welded boiler repair need in Pennsylvania?

A welded repair is recorded on a National Board R-1 report or the Department of Labor and Industry’s record of welded repair form, supported by the welding procedure, the welder’s qualification, material records and any examination or hydrostatic test results. The inspector signs the record before the boiler or vessel is operated. Paul Industries prepares the repair documents for the inspector’s review and closes them out after the repair.

Can stainless steel pipe be welded at an operating Pennsylvania plant?

Yes. Stainless pipe is welded in operating plants every day, provided the line is isolated, drained, cleaned and released for hot work. Orbital or manual gas tungsten arc welding with an argon backing purge gives a smooth, corrosion-resistant root, and coupons are welded at shift start or with each machine setup where the plant’s quality system requires them. Afterward, the line is cleaned and, for hygienic service, passivated before it returns to use.

How much does stainless steel welding cost compared with carbon steel at a plant?

Stainless welding costs more per joint than carbon steel because of purge gas and setup time, slower welding speeds, orbital equipment, coupons and the documentation hygienic plants require. The gap is largest on small-diameter sanitary tubing with borescope inspection and smallest on heavier stainless pipe in utility service. Paul Industries prices stainless work by joint count, size and documentation level, and gives a budget range from comparable scope before drawings are final.

When does structural welding on a Pennsylvania plant project need special inspection?

When the work is on a Uniform Construction Code permit and the 2021 International Building Code calls for it, structural steel welding is subject to special inspection unless an exception applies. On plant projects this typically covers new mezzanines, pipe racks and platforms. The owner’s special inspector checks procedures, welder qualifications and welds against AWS D1.1, and Paul Industries provides the records and access that inspection needs.

How long must a fire watch stay after welding at a Pennsylvania plant?

OSHA’s welding standard requires a fire watch for at least half an hour after welding or cutting ends wherever the work could ignite combustibles, and many Pennsylvania plants and insurers require a full hour. Inside Philadelphia the city fire code applies as well. Paul Industries follows the longest requirement among the plant permit, the insurer, OSHA and the city, and records the fire watch on the permit.

Do welders on publicly funded Pennsylvania jobs earn prevailing wage rates?

They do once a job counts as public work. Pennsylvania’s Prevailing Wage Act reaches construction, reconstruction, repair and alteration financed with public money when the whole project is estimated above $25,000, and dividing the work into smaller contracts to stay below that figure is prohibited. Water authority, school, public university and county hospital welding regularly qualifies. Paul Industries builds the bid on the rates in the job’s wage determination and keeps the payroll records the Department of Labor and Industry asks for.

Who welds tank repairs at Pennsylvania terminals and plants?

Paul Industries welds tank repairs at terminals, chemical plants and water facilities in Pennsylvania, including shell and floor patches, nozzle replacements, roof repairs and new appurtenances. Repairs to API 650 tanks follow API 653, with procedures qualified to ASME Section IX, and tanks regulated under the state storage tank program keep their repair and inspection records in the tank file the program requires.

What is the right filler for welding stainless to carbon steel on a plant tie-in?

An over-alloyed austenitic filler such as a 309L type is the usual choice for joining carbon steel to 304L or 316L stainless, because it keeps enough chromium and nickel in the diluted weld metal to stay tough and corrosion resistant. The procedure is qualified for the dissimilar combination under ASME Section IX, and the joint is placed where the plant’s cleaning chemicals and temperatures suit both materials.

Can Paul Industries fabricate welded assemblies off site for a Pennsylvania plant?

Yes. Paul Industries fabricates pipe spools, equipment frames, platforms, ladders, guards, supports and skid bases off site, then delivers them with weld maps, material certificates and examination records for the plant’s team to set or for Paul Industries to install. Moving welding off site shortens outage windows and keeps hot work in the operating plant to a minimum.

How is welding planned inside a Philadelphia-area hospital or university central plant?

Hospital and university central plants run boilers, chillers and steam systems that cannot all be taken offline, so welding is sequenced around redundant equipment, scheduled outside peak demand and paired with infection control or occupied-building procedures where needed. Hot work permits, fire watches and, inside Philadelphia, the city’s hot work rules apply. Paul Industries plans the sequence with the facility team before isolating any system.

What should be sent to get industrial welding priced at a Pennsylvania plant?

Send drawings or photos of the work, the materials and thicknesses, the code or specification, the examination level, whether the equipment is a boiler or pressure vessel under state inspection, access and height conditions, and the dates or outage window the welding must fit. For public projects include the wage determination. Paul Industries returns a scope, a schedule and a price.

Does Paul Industries weld outside Pennsylvania as well?

Yes. Paul Industries is headquartered in Kilmarnock, Virginia, and takes industrial welding work across the East Coast, in all 50 states and at plants outside the United States. The same procedures, welder qualifications and record keeping apply on every job, so a company with plants in several states can use one welding program and receive the same documentation from each site.

Need welding at a Pennsylvania plant, mill or yard?

Send drawings or photos, the materials, the code and the dates the work must fit. Call 201-450-8280 or request a quote.