Paul Industries provides tank fabrication in Delaware, building shop-fabricated and field-erected storage tanks, stainless process tanks and chemical tanks in carbon steel, stainless and alloys, and setting them to the design, containment and inspection rules of Delaware’s aboveground storage tank regulation. Delaware’s rule reaches further than fuel: a tank over 250 gallons holding a regulated substance, which includes many plant chemicals, is registered with DNREC, and larger tanks need 60 days’ notice and an approved design before installation starts. Paul Industries designs, fabricates, installs and documents the tank so it goes into service with that approval in hand.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
Tank rule 7 DE Admin. Code 1352, under the Jeffrey Davis Aboveground Storage Tank Act
Covered tanks Over 250 gallons of a regulated substance, including hazardous chemicals
Before installing Notice to DNREC at least 60 days ahead, with drawings
Containment 110% of the largest tank, or 100% plus six inches of freeboard
External inspection At least every five years
Reviewed November 2026

What does tank fabrication in Delaware involve?

Tank fabrication in Delaware involves the design and welding of the tank to an accepted standard such as API 650 or UL 142, the foundation, containment, overfill protection and leak detection that DNREC requires around it, and the registration and inspection steps that keep it legal for its service life. A sanitary mix vessel in a Newark pharmaceutical suite and a field-erected fuel reservoir at a terminal share the welding but little else: the contents decide which rules apply.

The national picture of types, materials, heads, nozzles and testing is on the tank fabrication page. This page covers what is particular to Delaware: the Jeffrey Davis Aboveground Storage Tank Act and its regulation, the underground tank rules, the coastal zone along the Delaware River, and the industries in the state that buy tanks. The Delaware overview lists the other process and utility systems Paul Industries builds for plants across the state.

Delaware above ground storage tank regulations: which tanks they cover

Delaware above ground storage tank regulations cover any single aboveground containment vessel with a capacity over 250 gallons that holds a regulated substance, which the rule defines as petroleum and heating fuel, any liquid or gas containing 1 percent or more of a CERCLA hazardous substance, and anything containing 0.1 percent or more of an EPA-listed carcinogen. The regulation is 7 DE Admin. Code 1352, issued under the Jeffrey Davis Aboveground Storage Tank Act in Chapter 74A of Title 7.

The chemical reach matters to Delaware plants. Sodium hydroxide, sulfuric acid, nitric acid and phosphoric acid are CERCLA hazardous substances, so the caustic and acid storage that feeds cleaning systems, water treatment and neutralization is regulated in Delaware once a vessel passes 250 gallons. Vessels holding food products, process water or nonhazardous materials sit outside the rule.

The regulation also removes some equipment entirely. Flow-through process tanks that form an integral part of a production process, such as seal, surge, bleed, check and delay, phase separator and reaction tanks, are excluded, but a vessel that stores material before it enters the process, stores product or by-product afterward, only recirculates material, or holds fuel for process heat is still an AST. Septic tanks, surface impoundments, transformers and wastewater vessels at publicly owned treatment works are excluded as well.

How Regulation 1352 sorts aboveground tanks
Tank groupExamplesWhat applies
Full coverage: non-fuel regulated substances of 12,499 gallons or moreBulk acid, caustic, solvent and chemical storageRegistration, 60-day notice and approval, Part B design rules, Part C inspections
Full coverage: diesel, kerosene or heating fuel of 40,000 gallons or moreTerminal, refinery and large plant fuel tanksRegistration, 60-day notice and approval, Part B design rules, Part C inspections
Reduced set: non-fuel regulated substances over 250 and under 12,499 gallonsDay tanks of acid or caustic, chemical feed tanksRegistration, fees and selected Part A duties, release reporting
Reduced set: diesel, kerosene or heating fuel over 250 and under 40,000 gallonsGenerator base and day tanks, boiler fuel tanksRegistration, fees and selected Part A duties, release reporting
Limited coverageFarm tanks to 1,100 gallons, propane, small heating fuel tanks, temporary tanks, vessels under the boiler lawSelected Part A sections and Part E release reporting
ExcludedFlow-through process tanks, septic tanks, impoundments, food and water tanksOutside Regulation 1352

Equipment that operates above 15 psig is a pressure vessel under Delaware’s boiler law, Chapter 74B, and Regulation 1352 applies to it in a limited way. That equipment is built to ASME Section VIII and registered with the Boiler Safety Program, as covered on pressure vessel fabrication in Delaware.

Delaware tank registration and annual fees

Delaware tank registration is required for every aboveground storage tank covered by Regulation 1352 except the limited-coverage group, and no one may own or operate an unregistered AST. The owner files DNREC’s AST registration form, signs it, and pays an annual per-tank fee under 7 Del. C. 7413A on or before February 1 of each year, with a 10 percent late charge after that date. The first fee falls in the calendar year after installation is completed.

Registration also carries ongoing notices. The owner tells DNREC in writing at least 10 days before a change in service, which includes a change of contents, ownership, operator or status. Retrofits and upgrades are notified on a DNREC form with construction plans at least 10 days before work starts. A buyer of a facility is told of the registration duties by the seller. DNREC tank management is handled by the DNREC Tanks Compliance program in the Division of Waste and Hazardous Substances, which can mark a noncompliant system with a red tag on the fill pipe and prohibit deliveries until it is corrected.

The 60-day notice before a new Delaware tank is installed

The 60-day notice is the step that most often sets the schedule for a large new installation in Delaware: owners and operators notify DNREC at least 60 days before installing or relocating a fully covered AST, with a package of drawings and design data, and installation begins once DNREC issues a formal letter of approval. The approval letter is posted at the construction site, stays valid for one year, and any substantial design change is approved in writing by the engineer of record and resubmitted.

What the Delaware notice package for a new or relocated AST contains
ItemWhat it showsWho prepares it on a Paul Industries project
Start date and site planDimensioned plan view locating the tank against property lines, buildings and surroundingsPaul Industries, from the owner’s site survey
Tank drawings and design dataDesign standard, dimensions, materials, nozzles, foundationPaul Industries engineering
Leak detection detailsCut sheets for tank and piping leak detectionPaul Industries engineering
ContentsSafety Data Sheet and CAS numbers, except for heating fuel, diesel, kerosene and gasolineOwner, attached by Paul Industries
Overfill protectionDevice type, drawings and manufacturer dataPaul Industries engineering
Secondary containmentContainment drawing with capacity calculationsPaul Industries engineering
Cathodic protectionSystem design for bottoms or piping in contact with soilPaul Industries engineering

Underground tanks follow a parallel rule. Delaware underground storage tanks are governed by 7 DE Admin. Code 1351 under the Delaware Underground Storage Tank Act, Chapter 74 of Title 7, and owners notify DNREC at least 30 days before installing an underground system. Many Delaware owners retiring an aging underground fuel system choose an aboveground replacement, which moves the project under Regulation 1352 and its notice period.

Field-erected tanks under Regulation 1352

Field-erected tanks under Regulation 1352 are welded tanks built to API 620, API 650, API 12D, NACE SP0294 for concentrated sulfuric acid and oleum, NFPA 30, or another standard DNREC approves. The foundation must carry the shell full of product or test water without excessive differential settlement as API 653 defines it, drain water away from the base, and protect the tank from flotation in flood-prone areas.

Bottoms in contact with soil get cathodic protection, and every new metallic field-erected tank sits on a release prevention barrier, an impervious layer that keeps a bottom leak from reaching soil and channels it to leak detection. The exterior is coated against corrosion, and the completed installation is inspected and signed off by an API 653 inspector. Fixed-roof units holding flammable liquids as NFPA 30 defines them, spent acids or spent caustics, installed after June 11, 2004, also need an automatic inert gas blanketing system to NFPA 69 that keeps the vapor space below its limiting oxidant concentration.

Paul Industries erects shells in courses on the prepared foundation, welds shell, bottom and roof to qualified procedures, examines and tests the welds, hydrotests the structure, and installs the nozzles, ladders, platforms and instruments. Steel tank fabrication on a Delaware River site is planned around wind on the shell during erection and the coastal zone rules covered below.

Shop-fabricated tanks and day tanks

Shop-fabricated tanks in Delaware are built to UL 2085 for protected tanks, UL 142 for steel aboveground tanks for flammable and combustible liquids, API 650 Annex J for shop-assembled storage tanks, NFPA 30, or ASME Section VIII, Division 1, and they need a foundation that carries the tank full without excessive settlement. Shop-built units arrive complete, which shortens site work and suits generator fuel, chemical feed and process service up to the size the road allows.

Generator base and day storage for hospitals, data centers and campuses usually falls in the reduced-set group, since diesel storage under 40,000 gallons register and meet selected Part A duties. Paul Industries supplies them with overfill protection, level gauging and leak monitoring built in, and connects the fuel piping covered under process piping in Delaware. Plants that also burn oil in their boiler house will find that side on boiler repair in Delaware.

Containment and overfill protection around a Delaware tank

Containment around fully covered Delaware storage is sized to hold 110 percent of the largest tank in the diked area, or 100 percent of the largest tank plus six inches of freeboard for rain, regardless of any engineering controls. Dikes are built of materials compatible with the contents, have no openings or unsealed penetrations without DNREC approval, and have sumps with floors sloped to them. Curbing and paving used as containment meet the same capacity, and transfer areas where trucks connect hold 110 percent of the largest compartment of the largest vehicle that may unload there.

Overfill rules depend on who watches the transfer. Where a trained operator is absent during a transfer, the system needs automatic shutoff that stops flow at no more than 95 percent full and fails safe on power loss or malfunction. Where an operator does watch the transfer, a high-level alarm with sight and sound signals is required. Every AST has a level gauge that is readily visible and accurate. Paul Industries designs the containment, piping penetrations, sumps and overfill controls with the vessel, so the notice package shows one coordinated design.

How often should storage tanks be inspected in Delaware?

Delaware answers how often should storage tanks be inspected in layers: a routine in-service inspection of the shell, its aboveground piping and its containment at least every 31 days for field-erected tanks and every 30 days for shop-fabricated tanks, an external inspection by a qualified API 653, API 570 or STI SP001 inspector at an interval set by the corrosion rate and never longer than five years, and internal inspections on the API 653, NACE SP0294 or STI SP001 schedule.

Recurring duties for a fully covered Delaware AST under Regulation 1352, Part C
DutyFrequencyBasis
Routine in-service inspection, field-erectedAt least every 31 daysAPI 653 Annex C and API 574 Annex A checklists
Routine in-service inspection, shop-fabricatedAt least every 30 daysAPI 653 or STI SP001 and API 570 guidance
Inventory reconciliationMonthly or every 30 daysInvestigation when variation exceeds 1 percent for two periods
Overfill prevention testAt least every 93 daysRecords kept at the facility for 3 years
Level gauge calibrationAt least every 12 monthsRecords kept at the facility for 3 years
External inspectionCorrosion-rate interval, never more than 5 yearsAPI 653, API 570, NACE SP0294 or STI SP001
Internal inspectionInterval from the applicable standardAPI 653, NACE SP0294 or STI SP001

How often should water storage tanks be inspected, by comparison? Water tanks fall outside Regulation 1352, so their schedule comes from the owner’s program, NFPA 25 for fire water storage, and the condition of the coating and lining, with exterior checks between multi-year interior inspections. Paul Industries builds new vessels with the manways, gauge points and bottom access that make every one of those inspections quicker.

Process, food and chemical tanks across Delaware

Process, food and chemical tanks across Delaware are built in stainless steel or alloy whenever product purity or corrosion decides the material, and Delaware’s AST rule reaches the ones that store a regulated substance. How are stainless steel tanks made for that service? Sheets are rolled and seam welded, heads are formed, nozzles and manways are welded on, product-contact welds are ground and polished to the specified finish, and the vessel is passivated and tested before it ships.

Sanitary tanks for pharmaceutical and biotech plants in Wilmington and Newark connect to clean utilities and cleaning circuits covered on CIP and SIP systems in Delaware, and the bulk caustic and acid tanks that feed those circuits are the regulated part of the same project. In Sussex and Kent counties, poultry and food plants buy hot water, sanitation chemical and wastewater tanks; the 2017 Census of Agriculture put Sussex County first among all US counties for broiler production, and its processing plants depend on cleaning chemicals for daily sanitation. Shells, nozzles and repairs that need field welding are covered under industrial welding services in Delaware.

Storage tanks along the Delaware River and the coastal zone

Storage tanks along the Delaware River serve the state’s heaviest industry, including the Delaware City refinery, whose operator reports a crude unit capacity of 190,000 barrels per day, chemical plants in New Castle County, and the Port of Wilmington at the confluence of the Christina and Delaware rivers. Much of that shoreline sits in the coastal zone, where the 1971 Coastal Zone Act prohibits new heavy industry uses and offshore bulk product transfer facilities that were not operating in 1971, and allows expansions of existing uses by permit only.

The 2017 Coastal Zone Conversion Permit Act opened 14 existing heavy industry sites to new heavy industry uses through conversion permits, with no conversion permit available for bulk transfer of liquefied natural gas. For a storage project in the zone, the permit question turns on whether the addition raises the facility’s overall processing capability. Paul Industries supplies the capacities, drawings and process descriptions the owner’s permit team needs, and sequences fabrication to the permit and DNREC tank approvals. Refinery and terminal storage work is described on the oil and gas industry page.

Tank fabrication in Wilmington, Dover and the rest of Delaware

Tank fabrication in Wilmington and the industrial river corridor differs from tank work in Dover or Georgetown in contents and scale: New Castle County holds the large fuel, chemical and terminal storage, while Kent and Sussex counties buy process, sanitation, fuel and wastewater tanks for food, poultry, institutional and agricultural sites. The table below shows where each kind of project tends to sit and which Delaware rules shape it.

Typical Delaware tank projects by region
RegionTypical tank projectsRules that shape the design
Wilmington, Edgemoor and the Port of WilmingtonTerminal storage, chemical bulk storage, fuel for port equipmentFull Regulation 1352 coverage, Coastal Zone Act, API 650 and API 653
New Castle and Delaware CityRefinery and chemical plant storage, acid and caustic tanksInert gas blanketing for spent acids and caustics, NACE SP0294 for sulfuric acid, coastal zone permits
Newark and MiddletownStainless process and clean utility tanks, generator fuelASME BPE finishes, CIP chemical storage under the reduced set
Dover, Smyrna and Kent CountyFood plant process tanks, boiler and generator fuel, public buildingsUL 142 shop tanks, reduced-set registration, prevailing wage on public work
Georgetown, Milford, Seaford and Sussex CountyPoultry sanitation chemicals, hot water, wastewater, feed and farm fuelCERCLA chemical coverage, farm tank limits at 1,100 gallons, flood anchorage

Repairs, relocation and removal of existing Delaware tanks

Repairs, modifications and relocations of Delaware ASTs are performed, inspected and tested to API 653, STI SP001, STI SP031, NACE SP0294 or ASME RTP-1, and owners send DNREC the completion documentation within 90 days, with soil sampling results wherever soil, concrete or asphalt was opened during the work. A relocated AST is emptied, cleaned, moved, reinstalled and inspected before it holds product again, and it goes through the same 60-day notice as a new tank.

How long do storage tanks last in Delaware service? A well-founded carbon steel vessel with cathodic protection, a sound coating and regular inspection commonly serves for decades, with bottoms and floors usually the first parts to need replacement; how long do steel fuel tanks last depends most on water management at the bottom and on the coating. Stainless process vessels last as long as their welds and finish are maintained. Storage tank demolition and closure follow Regulation 1352’s removal and closure-in-place sections, and Paul Industries removes, cleans, cuts and hauls the old unit as part of a replacement contract.

What drives tank fabrication cost in Delaware?

Tank fabrication cost in Delaware is driven by capacity and dimensions, material and plate thickness, shop or field construction, roof type, nozzles, coatings and linings, and the Delaware scope around the tank: foundation, containment, overfill and leak detection, cathodic protection, inert gas blanketing where required, and the engineering for the notice package. Field erection adds equipment and site time; shop construction adds oversize transport.

Storage tank regulations add cost mainly through containment and controls, which is why Paul Industries prices the vessel and its compliance scope together instead of leaving the containment as a later surprise. The owner receives a budget range from comparable scope once capacity, contents and site are known, and a firm price after the design and foundation are settled. Annual registration fees, inspections and testing are listed separately so the owner sees the cost of ownership as well as the cost of the build.

Who fabricates storage tanks in Delaware?

Paul Industries fabricates storage tanks in Delaware, shop-built and field-erected, together with stainless process tanks, chemical tanks and the containment and controls around them. Paul Industries, whose earlier homes were northern New Jersey and then Pennsylvania, now operates from its headquarters at 256 Shore Drive, Kilmarnock, Virginia, and builds tanks for owners statewide in Delaware, across the 50 states and at sites outside the United States. The same service for the headquarters state is described on tank fabrication in Virginia, and for neighboring states on tank fabrication in Maryland and tank fabrication in Pennsylvania.

Plants comparing storage tank companies, tank fabrication companies or tank design companies get the most from one contract that covers design, the DNREC notice package, fabrication, foundation, containment, installation and the first inspection records. Paul Industries carries that whole scope, so there is one schedule and one set of drawings from approval letter to first fill.

Tank fabrication and installation from Paul Industries in Delaware

Paul Industries designs, fabricates, supplies, installs, repairs and replaces tanks for Delaware owners, including tank fabrication in Wilmington and New Castle County for chemical, refining, pharmaceutical and terminal sites, and tanks for food, poultry, institutional and utility plants in Kent and Sussex counties. Each regulated tank is built to its design standard and delivered with the drawings, calculations and test records DNREC’s storage tank rules ask for. Supply of the tank alone, a design-build package and a complete installation are each offered. Send capacity, contents, design pressure and temperature, and the site, and request a quote.

Standards referenced: 7 DE Admin. Code 1352, Aboveground Storage Tanks · 7 Del. C. Chapter 74A, Jeffrey Davis Aboveground Storage Tank Act · 7 DE Admin. Code 1351, Underground Storage Tank Systems · API 650 · API 620 · API 653 · API 570 · API 12D · UL 142 · UL 2085 · STI SP001 · NACE SP0294 · NFPA 30 · NFPA 69 · ASME Section VIII, Division 1 · Delaware Coastal Zone Act, 7 Del. C. Chapter 70

Frequently asked questions

Who builds storage tanks for chemical plants and terminals in Wilmington, New Castle and Delaware City?

Paul Industries builds field-erected and shop-fabricated tanks for chemical plants, refineries, terminals and port operations in Wilmington, Edgemoor, New Castle and Delaware City. Because much of that shoreline is coastal zone, tank projects are planned with the Coastal Zone Act review in mind, and fully covered tanks go through DNREC’s 60-day notice and approval before installation.

Does Paul Industries fabricate tanks for food and poultry plants in Sussex and Kent counties?

Paul Industries fabricates hot water, sanitation chemical, wastewater and product tanks for poultry processors, feed mills and food plants in Georgetown, Millsboro, Seaford, Milford, Dover and Smyrna. Product and water tanks sit outside Delaware’s AST rule, while caustic and acid tanks over 250 gallons are registered with DNREC.

Who supplies stainless process tanks to pharmaceutical and research sites in Newark and Middletown?

Paul Industries supplies stainless mix, hold, buffer and clean utility tanks to drug makers, biotech firms and research sites in Newark, Middletown and along the I-95 corridor. Those tanks are built with sanitary finishes, drainable geometry and spray devices for cleaning in place, with material and finish records for validation.

Is a caustic tank a regulated aboveground storage tank in Delaware?

Yes, when it holds more than 250 gallons. Sodium hydroxide is a CERCLA hazardous substance, so a solution containing 1 percent or more of it is a regulated substance under Regulation 1352. Small caustic tanks register and meet a reduced set of duties; caustic tanks of 12,499 gallons or more meet the full design, notice and inspection rules.

Does a generator day tank count as a Delaware AST?

A diesel day tank or base tank over 250 gallons is an aboveground storage tank under Regulation 1352. Diesel tanks under 40,000 gallons fall in the reduced-set group, which means registration, annual fees and selected general duties, while larger fuel tanks carry the full design, notice and inspection requirements.

What does DNREC do with the 60-day notice for a new tank?

DNREC reviews the notice and its drawings for compliance with Regulation 1352 and either issues a formal letter of approval or a denial listing the corrections needed. Installation may begin as soon as the approval letter is issued, even inside the 60 days. The letter is posted at the construction site and remains valid for one year.

Which tank standards does Delaware accept for a new fuel or chemical tank?

Field-erected tanks are built to API 620, API 650, API 12D, NACE SP0294 for concentrated sulfuric acid, or NFPA 30. Shop-fabricated tanks are built to UL 2085, UL 142, API 650 Annex J, NFPA 30 or ASME Section VIII, Division 1. DNREC can approve other standards. Paul Industries selects the standard from the contents, size and site.

What is a release prevention barrier on a Delaware tank?

A release prevention barrier is an impervious layer under the tank bottom that keeps a leak from reaching soil and contains or channels it for leak detection. Every new metallic field-erected AST in Delaware sits on one. Common designs are a double bottom with an interstitial space, or a liner under the tank pad that drains to a monitoring point.

When does a Delaware tank need inert gas blanketing?

Fixed-roof ASTs installed after June 11, 2004 that hold flammable liquids as NFPA 30 defines them, spent acids or spent caustics need an automatic system that keeps the vapor space below its limiting oxidant concentration, usually nitrogen blanketing to NFPA 69. Other deflagration controls need DNREC approval before installation.

How big must the containment be around a Delaware storage tank?

Dikes and curbed or paved containment must hold 110 percent of the largest tank in the area, or 100 percent of the largest tank plus six inches of freeboard for precipitation. Truck unloading areas must hold 110 percent of the largest compartment of the largest vehicle that may use them. Penetrations through dike walls or floors need DNREC approval.

Who may perform the external inspection on a Delaware AST?

External inspections on Delaware ASTs are performed by inspectors holding API 653, API 570 or STI SP001 credentials, depending on the tank and piping. The interval follows the applicable standard and the calculated corrosion rate, but never exceeds five years. Monthly routine in-service inspections are carried out by the owner’s trained staff using a written checklist.

What does DNREC tank management expect after a tank repair?

Repairs and modifications are performed, inspected and tested to API 653, STI SP001, STI SP031, NACE SP0294 or ASME RTP-1, and the owner submits completion documentation to DNREC within 90 days. Where soil, concrete or asphalt was removed, soil sampling results are included. Paul Industries prepares the repair records and test results for that submittal.

Can an underground fuel tank be replaced with an aboveground tank in Delaware?

Yes. The underground tank is closed under the Delaware underground storage tank rules, and the new aboveground tank is registered under Regulation 1352, with the 60-day notice where the tank is large enough for full coverage. Paul Industries removes or closes the old tank, builds the new one with containment and overfill protection, and connects the piping.

Do DNREC storage tanks rules apply to a tank that holds water or food product?

DNREC storage tanks rules apply to regulated substances, so tanks holding water, milk, juice, poultry scald water or other food products sit outside Regulation 1352. Those tanks are built to the owner’s sanitary, structural and fire code requirements. A tank that later switches to a regulated substance is registered before the change in service.

How long does a field-erected tank take to build in Delaware?

The schedule includes design and the DNREC notice period, foundation and release prevention barrier, plate procurement, erection, welding and examination, hydrotest, coating, and the API 653 inspection of the completed installation. Plate supply and the approval letter usually set the start of site work. Paul Industries runs design and the notice package in parallel with material orders.

Can an existing Delaware tank be moved to a new spot in the plant?

A relocation means emptying and cleaning the tank, moving it, reinstalling it and inspecting it before it holds product again, and Delaware treats it like a new installation for notice: 60 days ahead with the full package. Owners should plan on a new foundation, containment and, often, a bottom inspection while the tank is off its pad.

What happens to an old Delaware tank that is no longer needed?

Regulation 1352 sets procedures for removal, permanent closure in place and permanent change in contents. The tank is emptied and cleaned, DNREC is notified, any required sampling is done, and the registration fee stops once DNREC has the completed records before the February 1 deadline. Paul Industries removes and dismantles tanks as part of replacement projects.

What should a Delaware tank quote request include?

Send the capacity, contents and concentration, design pressure and temperature, preferred material, dimensions or footprint limits, nozzle list, heating or mixing needs, site location and soil information, and whether the tank is new, a replacement or a relocation. Paul Industries returns a budget range, a schedule including the DNREC notice period, and the list of approvals the tank needs.

Planning a new or replacement tank in Delaware?

Send the capacity, contents, design conditions, material and site details for the tank. Call 201-450-8280 or request a quote.