Paul Industries is a US process equipment contractor for Chile that designs and fabricates pump and dosing skids, pressure vessels, tanks, water treatment plants and complete process systems for the 50 Hz, 380/220 V supply, ships them duty-free under the US-Chile Free Trade Agreement, and installs and commissions them at mines, salmon plants, food factories and drug plants or supervises their installation. Boilers and autoclaves are documented for Decreto Supremo 10, frames and anchors are designed for Chilean seismic loads, and records come in Spanish. The company’s headquarters are at 256 Shore Drive, Kilmarnock, Virginia; Paul was formerly based in northern New Jersey and then Pennsylvania.
Request a quote or call 201-450-8280
Scope Paul Industries brings to Chilean plants as a US process equipment contractor for Chile
A US process equipment contractor for Chile has to answer to three conditions that most US jobs never meet together: an earthquake design basis, sites high in the Andes or on a salt-laden coast, and documentation in Spanish for Chilean authorities. Paul Industries takes a Chilean order from process engineering through shop fabrication, factory testing and ocean freight to start-up at the site. The equipment includes reagent, dosing and transfer skids, pressure vessels and receivers, process and storage tanks, heat exchangers, water treatment and reverse osmosis plants and effluent treatment systems.
Chilean owners pick one of three routes. Supply with supervision of installation suits a mine or plant with a construction contract already in place. Design-build adds layout, foundations interface, utility tie-ins and controls. Complete installation keeps erection, piping, wiring, start-up and commissioning with Paul until handover. The international projects page shows every country Paul works in, and the Brazil page and Mexico page cover the other large Latin American markets.
Mining companies in Chile and the other industries that buy process systems
Mining companies in Chile are the country’s largest buyers of process equipment, because Chile produced about 23 percent of the world’s mined copper in 2025 by a US Geological Survey estimate and ranks second in lithium production. The mining industry in Chile runs concentrators, leaching and solvent extraction plants, electrowinning tank houses, tailings water recovery and desalinated water supply, and every one of them buys pumps, reagent skids, tanks and treatment trains. Salmon farming, fruit and wine, pulp and paper, chemicals and pharmaceuticals fill out the demand, as the table shows.
| Region | Industries | Equipment in demand |
|---|---|---|
| Antofagasta and Tarapaca | Copper concentrators, leaching and electrowinning, lithium chemical plants, ports | Reagent dosing skids, acid and solution tanks, desalination pretreatment, pumping systems |
| Atacama and Coquimbo | Copper and iron mining, lithium brine projects, agriculture | Water treatment, brine handling skids, process tanks |
| Santiago Metropolitan and Valparaiso | Pharmaceuticals, food and beverage, chemicals, copper smelting and refining | Purified water, CIP skids, heat exchangers, pressure vessels |
| O’Higgins and Maule | Fruit, wine and food processing, copper mining | Process cooling, CIP and washing systems, boiler feed and steam systems |
| Biobio and Araucania | Pulp and paper, wood products, chemicals | Chemical dosing, effluent treatment, heat recovery exchangers |
| Los Lagos, Aysen and Magallanes | Salmon farming and processing | Water treatment and recirculation support, refrigeration support, washdown systems |
Copper mining companies in Chile
Copper mining companies in Chile range from Codelco, the state-owned producer, to private operators of large open pits in the Antofagasta region, and their concentrators and hydrometallurgical plants sit at altitudes where few US plants operate: several large mines work above 3,000 meters. At that height air is thinner, motors and air-cooled equipment lose cooling capacity, water boils at a lower temperature and pump suction margins shrink, so the design basis changes before a single part is ordered. Hydrometallurgical plants add their own needs: sulfuric acid dosing, organic and electrolyte handling in solvent extraction and electrowinning, and heat exchangers that hold electrolyte temperature, all in materials chosen for acid service. Many northern mines also pump desalinated seawater up from the coast, which brings intake screening, pretreatment, reverse osmosis and long-distance pumping into scope.
Who mines lithium in Chile?
Lithium in Chile comes mainly from brine in the Salar de Atacama, where SQM and Albemarle operate, and lithium mining in Chile’s Atacama desert entered a new phase in December 2025, when Codelco and SQM formed NovaAndino Litio by merging their lithium subsidiaries to run SQM’s Salar de Atacama operations through 2060. Lithium mining companies in Chile pump brine to evaporation ponds and then refine the concentrate to lithium carbonate and hydroxide in chemical plants near Antofagasta, which buy the reagent systems, crystallizer support equipment, filtration and water treatment described on the chemical manufacturing page.
Salmon, fruit and wine, and the Chile pharmaceutical industry
Chile is the world’s second-largest farmed salmon producer, and salmon and trout exports reached about US$6.5 billion in 2025, processed in plants around Puerto Montt and further south. Fruit packing, wine and food processing run through the central valleys, and those plants buy the cooling, CIP and steam systems on the food and beverage page. Pharmaceutical companies in Chile answer to the Instituto de Salud Publica, which enforces GMP through Norma Tecnica 127, approved in 2012 and updated in 2020. The Chile pharmaceutical industry buys purified water, clean steam and process skids qualified against that norm, covered on the pharmaceutical industry page. Since March 2026 the ISP also accepts inspection reports from PIC/S members and PAHO/WHO-recognized authorities as support when it verifies GMP compliance of foreign manufacturers.
What does Decreto Supremo 10 require of boilers and autoclaves?
Decreto Supremo N° 10 of 2012 from Chile’s Ministry of Health is the regulation for boilers, autoclaves and equipment that uses steam, in force since April 2014 in place of the older DS 48 and amended since. Readers looking up DS 10 calderas y autoclaves will find it covers steam boilers, hot water heating boilers, thermal fluid heaters and autoclaves, fixed or mobile, together with the steam distribution network. Steam packages in food and salmon plants, sterilizing autoclaves in hospitals and laboratories, and thermal fluid heaters in wood products mills all come under the same decree. Each unit is registered with the health authority, and reviews and tests of boilers, autoclaves and steam networks are carried out by a professional authorized by the regional health secretariat, the SEREMI de Salud.
The decreto DS 10 calderas rules also reach into the documentation. Every boiler and autoclave keeps a libro de vida for its whole service life, which must include an explanatory report in Spanish with the technical specifications and design calculations and the national or foreign standards used, and boilers carry a daily operating log filled in every four hours. Operators need completed secondary education, and operators of steam boilers at 42 kg/cm2 and above also need a technical or professional qualification in an industrial field. Paul prepares the Spanish design report, calculations, material and test records and nameplate data for every boiler, autoclave and steam package it ships to Chile, so the libro de vida opens complete on the day of registration.
| Rule | Authority | Effect on the equipment |
|---|---|---|
| Decreto Supremo N° 10 (2012) | Ministry of Health, SEREMI de Salud | Registration, authorized-professional testing, Spanish design report and libro de vida for boilers, autoclaves and steam networks |
| NCh 2369 | INN, made mandatory by MINVU decree | Seismic design of industrial structures, equipment supports and anchorage |
| Decreto 8 (2019) and RIC technical sheets | Ministry of Energy, SEC | Design, switchboards, project submission and commissioning of electrical installations at 380/220 V, 50 Hz |
| DS 298/2005 | SEC | Safety certification and QR marking of listed electrical and fuel products before sale |
| Norma Tecnica 127 | Ministry of Health, ISP | GMP for drug manufacturing, including water and process equipment qualification |
| US-Chile Free Trade Agreement | Chilean customs (Servicio Nacional de Aduanas) | Zero duty on originating US goods, supported by a certification of origin |
Seismic design: NCh 2369 for industrial structures and equipment
NCh 2369 is the Chilean standard for seismic design of industrial structures and installations, and it governs skid frames, vessel supports, tank anchorage and pipe racks on Chilean plants. The 2003 edition was revised after the 2010 Maule earthquake, when industrial structures generally performed well but bracing and anchorages failed where detailing was poor; a 2023 edition followed, and the INN published NCh 2369:2025 on 28 May 2025, which becomes mandatory once the housing ministry approves it by decree. Paul designs frames, anchor bolts, base plates, vessel legs and skirts and nozzle loads to the edition the owner specifies, with ductile detailing and calculations in the turnover file, and checks that shipping restraints come off without weakening the seismic load path.
Electrical rules and SEC certification in Chile
Chile’s Superintendencia de Electricidad y Combustibles, the SEC, regulates electrical installations under Decreto 8 of 2019 and its technical sheets, known as RIC, which cover switchboards, conductors, project submission and commissioning. Buyers searching for SEC certification Chile requirements usually mean one of two things: the safety certification and QR marking that listed electrical and fuel products need before sale under DS 298/2005, or the declaration and commissioning of a finished installation under the RIC sheets. Paul builds control panels to IEC 60204-1 and the RIC requirements for switchboards, selects listed components with the Chilean marking where they apply, and delivers single-line diagrams and test records for the installation declaration.
What is the voltage in Chile, and is Chile 50 or 60 Hz?
Chile’s electricity supply is 380/220 V at 50 Hz: 380 V between phases for motors and heaters and 220 V phase to neutral for lighting and small loads, on three-phase, four-wire systems. The Chile voltage that matters for a skid is therefore 380 V for its drives, the Chile 3 phase voltage, and large mines and smelters take higher distribution voltages and transform down to that Chile industrial voltage at each motor control center. Because the Chile voltage and frequency both differ from US practice, a skid built for 480 V and 60 Hz needs new motor selections rather than a transformer alone.
Frequency and altitude both change the mechanical design. A 60 Hz motor runs about 17 percent slower at 50 Hz, so a pump’s flow falls with speed and its head with the square of speed, and IEC 60034-1 rates motors for altitudes up to 1,000 meters, so a mine at 3,000 meters or more needs derated or oversized motors and enclosures with extra cooling. Paul selects motors, pumps, blowers and compressors on 50 Hz data and on the site altitude, checks pump suction against the lower boiling point of water at height, and confirms each duty point during the factory acceptance test.
| Condition | Where it applies | Design response |
|---|---|---|
| 50 Hz, 380/220 V supply | Every Chilean site | 50 Hz motor and pump selections, 380 V windings, 220 V control and lighting |
| High altitude | Andean mines and lithium plants in the north | Motor derating, larger enclosures and cooling, suction margin checks, altitude-rated instruments |
| Seismic loads | The whole country | NCh 2369 frames, anchors and supports with ductile detailing |
| Coastal salt and fog | Antofagasta, Mejillones, Valparaiso and the salmon coast | Coating systems for marine exposure, stainless grades for chlorides, sealed enclosures |
| Desert dust and wide temperature swings | Atacama mining and brine sites | Filtered panel ventilation, freeze protection, sealed bearings |
| Spanish documentation | Authorities and operators | Spanish design reports, manuals, labels and training material, metric drawings |
Shipping containers to Chile from USA ports
Shipping containers to Chile from USA ports runs through the Panama Canal to the Pacific coast: San Antonio is the main container port for Santiago and central Chile, Valparaiso serves the same region, and Antofagasta and Mejillones serve the mining north. How long does it take to ship from US to Chile? Route planners list about 16 days from Charleston to San Antonio on the quickest transshipment routing and about 25 to 27 days from Port Everglades, and other East Coast ports fall in that range depending on the service. Paul sizes crates and flat-rack loads during design, books the sailing, and plans the road leg to the mine or plant.
Does Chile have a free trade agreement with the US?
The United States and Chile have had a free trade agreement in force since 1 January 2004, and trade between them is now duty-free for originating goods. Under the US-Chile Free Trade Agreement, a skid built in the United States therefore pays zero Chile import duty when it meets the US Chile free trade agreement rules of origin and the importer claims the preference. The US regulations for the agreement accept a certification of origin in no prescribed format, on letterhead, on the commercial invoice or on a formal certificate, in English or Spanish, so buyers searching for a US Chile free trade agreement form or a US Chile free trade agreement certificate of origin template need the required data elements rather than one official form. Paul prepares the US-Chile free trade agreement certificate of origin for each shipment with the HS codes matched to the invoice.
Chile customs duty rates matter only for goods outside a trade agreement, which pay a general tariff of 6 percent. The Chile import tax rate that applies to every import is the 19 percent IVA, charged on the customs value plus any duty. Chile import requirements also include a Chilean customs agent, the agente de aduanas, for commercial imports over US$1,000 FOB, a commercial invoice, packing list, bill of lading and origin certification, and Spanish documentation for the equipment. Under Incoterms 2020, Chilean mines with established logistics buy FCA at a US port, plants that want the sea freight handled choose CFR or DAP, and DDP puts clearance and IVA inside Paul’s delivered price.
How a Chile project with Paul Industries runs
Paul Industries runs a Chilean project in nine stages, and the opening two settle the seismic basis, the altitude and electrical basis, the DS 10 items and the port and road route that later stages depend on. The table lists the output each stage leaves for the Chilean file.
| Stage | Work | Record for the Chilean file |
|---|---|---|
| 1. Basis of design | Process duty, site altitude and climate, NCh 2369 edition, DS 10 items, SEC requirements, HS codes | Design basis memorandum and conformity list |
| 2. Engineering | P&IDs, layout, seismic calculations, 380/220 V 50 Hz electrical design, crate and flat-rack envelope | Calculations and metric drawings, Spanish design report for DS 10 items |
| 3. Shop fabrication | Vessel and pipe welding, frame assembly, panels and instruments with heat-number traceability | Mill certificates, weld maps, NDT reports |
| 4. FAT | Hydrostatic, functional and control tests with the owner on the shop floor or on camera | FAT report and closed punch list |
| 5. Export | Seaworthy packing, ocean freight via Panama, road transport to the site | Invoice, packing list and FTA certification of origin with matching HS codes |
| 6. Erection or supervision | Setting on foundations, anchoring to the seismic design, piping and cable work | Erection and anchor torque records, as-installed markups |
| 7. Start-up | Flushing, motor checks, DS 10 tests by the authorized professional, first process fluid | Start-up report and libro de vida entries |
| 8. Commissioning | Performance runs for mines and food plants, IQ and OQ for drug plants through validation and commissioning | Executed protocols and performance data |
| 9. Handover | Operator training in Spanish, critical spares, service program | Spanish manuals, as-built drawings, turnover dossier |
Continental Chile keeps time between UTC-4 in the southern winter and UTC-3 in the southern summer, so Santiago runs level with US Eastern time for part of the year and up to two hours ahead for the rest. That overlap lets Chilean engineers follow a factory test live during their normal working day, and Paul schedules design reviews and witnessed tests without night shifts on either side. After handover, Paul keeps drawings, calculations and control programs on file, stocks critical spares at the site against the shipping time, and plans service visits around the plant’s shutdowns.
Who builds process systems for plants in Chile?
Paul Industries builds process systems for plants in Chile, from reagent and dosing skids for copper and lithium operations to water treatment, desalination support, steam and CIP systems for salmon, food and pharmaceutical plants, and it takes each system through factory testing, export, installation, start-up and commissioning. Paul designs for 50 Hz power, altitude and NCh 2369 seismic loads, documents boilers and autoclaves for DS 10 in Spanish, and stays with the equipment through service. Mines and plants in Antofagasta, Calama, Copiapo, Santiago, Concepcion and Puerto Montt work with one contractor and one set of records from basis of design to spare parts.
What drives the cost of process equipment for a Chilean mine or plant?
The delivered cost of process equipment for a Chilean site turns on five items beyond the equipment price: the Panama routing and road haul, seismic and altitude engineering, Spanish and DS 10 documentation, IVA and any duty under the Incoterm chosen, and the installation route. Paul breaks out each one so the buyer can compare scope rather than totals.
- Freight and haul. Flat racks for oversized skids, transshipment and the road climb to a high-altitude mine add to the ocean freight.
- Seismic and altitude design. Heavier frames and anchors under NCh 2369 and derated or larger motors for altitude add material and engineering.
- Documentation. Spanish design reports, manuals and DS 10 files add engineering and translation hours.
- Taxes and duty. Originating US goods pay no duty under the trade agreement, while the 19 percent IVA is the buyer’s under FCA or DAP and Paul’s to clear under DDP.
- Installation. Mine site access, induction and camp logistics shape crew costs, and installation supervision costs less than full erection.
Paul Industries for mines and plants in Chile
Paul Industries engineers and fabricates process equipment for Chilean mines and plants, tests it in the United States, ships it under the US-Chile agreement, and installs and commissions it on site or supervises the installation, with seismic, DS 10, electrical and as-built records handed over together. Tell Paul the process duty, the site and its altitude, the owner’s specifications and the start-up target, and the reply will carry a route, a program and a price in US dollars. Request a quote for a Chilean project.
Standards referenced: Decreto Supremo N° 10 (2012), Ministerio de Salud · NCh 2369 seismic design of industrial structures and installations · Decreto 8 (2019), Ministerio de Energia · SEC Pliegos Tecnicos Normativos RIC · DS 298/2005 product certification · ISP Norma Tecnica 127 (GMP) · US-Chile Free Trade Agreement · ASME Boiler and Pressure Vessel Code Section VIII · ASME B31.3 · IEC 60204-1 · IEC 60034-1 · Incoterms 2020 · ISPM 15
Frequently asked questions
Which mining companies in Chile buy reagent and dosing skids from abroad?
Copper producers, including Codelco and the private operators of the large Antofagasta region mines, and lithium producers in the Salar de Atacama buy engineered reagent, flocculant, acid and lime dosing skids, solution tanks and pumping systems from overseas builders when they need a defined design, schedule and document set. Paul Industries designs those skids for 50 Hz power, altitude and NCh 2369 seismic loads and commissions them on site.
Is Chile 220 V or 380 V for the motors on an imported skid?
Chile supplies 380 V between phases and 220 V phase to neutral at 50 Hz, so a skid’s motors and heaters are rated for 380 V and its controls and lighting for 220 V. Large mines distribute at higher voltages and transform down at each motor control center. Paul Industries designs the panel and every motor for that basis and for the site’s altitude before fabrication begins.
Is a Chile voltage adapter enough to run US-built equipment?
A Chile voltage adapter changes plug shape for small portable devices and leaves voltage and frequency untouched, and even a transformer only fixes voltage. Process equipment is hardwired, and its motors need 50 Hz selections because a 60 Hz motor runs about 17 percent slower in Chile. Paul Industries builds skids with 380 V, 50 Hz motors and drives from the start.
Does a US-built boiler need DS 10 registration before it runs in Chile?
Boilers and autoclaves in Chile fall under Decreto Supremo N° 10 of 2012, so each unit is registered with the health authority, tested by a professional authorized by the SEREMI de Salud, and keeps a libro de vida with a Spanish design report and calculations. Paul Industries prepares the Spanish report, calculations, material and test records and nameplate data, and completes the installation the tests check.
How does NCh 2369 change the design of a skid for a mine in Antofagasta?
NCh 2369 sets the seismic design of industrial structures and equipment in Chile, so a skid for an Antofagasta mine gets a frame, base plates and anchor bolts sized for the seismic forces of its site, with ductile connections and a continuous load path to the foundation. Tall vessels and tanks get checked supports and anchorage. Paul Industries includes the seismic calculations in the turnover file.
How do high-altitude mines near Calama change motor and pump selection?
Motors under IEC 60034-1 are rated for up to 1,000 meters, and several large mines in the Calama and Antofagasta districts operate above 3,000 meters, so motors are derated or oversized, enclosures get more cooling, and pump suction is checked against the lower boiling point of water at altitude. Paul Industries applies the site altitude to every selection during design and confirms duty points at the factory test.
Who builds water treatment systems for salmon plants around Puerto Montt?
Paul Industries builds water treatment, filtration, disinfection, washdown and CIP systems for salmon processing plants around Puerto Montt and further south in Aysen and Magallanes. The designs use stainless construction and marine-grade coatings for the coastal climate, run on 50 Hz power, and come with Spanish manuals and training. Paul installs and commissions the systems or supervises their installation.
Does Chile charge import duty on equipment made in the United States?
Originating US goods enter Chile duty-free under the US-Chile Free Trade Agreement, in force since 2004, when the importer claims the preference with a certification of origin. Goods outside a trade agreement pay Chile’s general 6 percent tariff. Every import also pays the 19 percent IVA. Paul Industries prepares the origin certification with HS codes matched to the invoice.
What goes on a US-Chile free trade agreement certification of origin?
The certification identifies the exporter, producer and importer, describes each good with its HS code, states the origin criterion under the US Chile free trade agreement rules of origin, and is signed and dated by an authorized person. US rules for the agreement accept it on letterhead, on the invoice or on a formal certificate, in English or Spanish. Paul Industries issues it with every shipment.
Does a Chilean importer need a customs agent to clear a skid?
Commercial imports valued over US$1,000 FOB clear through a Chilean customs agent, who files the declaration with the commercial invoice, packing list, bill of lading and certification of origin. Under DDP terms Paul Industries arranges the clearance and pays the IVA, and under FCA or DAP it supplies a complete, consistent document set to the buyer’s agent.
How long does shipping to San Antonio, Chile take from the US East Coast?
Route planners list about 16 days from Charleston to San Antonio on the quickest transshipment routing and about 25 to 27 days from Port Everglades, with other East Coast ports in that range depending on the service and the Panama Canal transit. Paul Industries confirms the current sailing at booking, sizes crates and flat-rack loads for it, and plans the truck leg to the site.
Which port suits a mine in the Antofagasta region or a plant near Santiago?
Antofagasta and Mejillones serve the mining north, so equipment for mines around Antofagasta and Calama usually lands there, while San Antonio and Valparaiso serve Santiago and central Chile. Paul Industries books the sailing to the port nearest the site and plans the road route, including permits for oversized loads and the climb to high-altitude mines.
Which GMP rules apply to a new purified water system for a Santiago drug plant?
Drug manufacturing in Chile follows the Instituto de Salud Publica’s GMP standard, Norma Tecnica 127, approved in 2012 and updated in 2020, so a purified water system for a Santiago plant is designed and qualified to it. Paul Industries designs the system, executes IQ and OQ, and delivers Spanish protocols, reports and drawings for the plant’s GMP file.
Do lithium plants near Antofagasta buy equipment from US contractors?
Lithium chemical plants near Antofagasta refine brine concentrate from the Salar de Atacama into carbonate and hydroxide, and they buy reagent systems, filtration, tanks, heat exchangers and water treatment from overseas builders. Paul Industries designs and builds those systems for the corrosive brines involved and installs and commissions them at the plant.
What does SEC require before a skid's electrical installation is energized?
Electrical installations in Chile follow Decreto 8 of 2019 and the SEC’s RIC technical sheets, which set rules for switchboards, conductors, project submission and commissioning, and listed electrical products carry SEC safety certification under DS 298/2005. Paul Industries builds panels to IEC 60204-1 and the RIC switchboard rules and supplies the diagrams and test records for the installation declaration.
Can Paul Industries install equipment at pulp and chemical plants near Concepcion?
Paul Industries installs, starts up and commissions equipment at pulp, paper and chemical plants in the Biobio region around Concepcion, or supervises the installation, depending on the contract. Typical scope includes chemical dosing skids, effluent treatment, heat recovery exchangers and tanks, anchored to NCh 2369 and wired for 380/220 V at 50 Hz.
Which Incoterm do Chilean buyers usually choose for US equipment?
Mines with established logistics teams often buy FCA at a US port, plants that want the sea freight handled choose CFR or DAP, and DDP suits a buyer who wants clearance and IVA inside one delivered price. Paul Industries quotes any of them and lists freight, insurance, IVA and clearance as separate lines.
What should a Chilean mine or plant send Paul Industries for a firm price?
A firm price starts from the process duty and flow sheet, the site location and altitude, the owner’s engineering specifications and NCh 2369 edition, the electrical and water data, the required start-up date and the Incoterm the buyer prefers. From those, Paul Industries prepares a US dollar proposal covering engineering, fabrication, freight route, installation option and program, then locks the figure when the design basis is signed off.