Paul Industries is a US process equipment contractor for the Philippines that designs, fabricates, factory tests and commissions ultrapure and deionized water systems, process cooling and chilled water plants, pressure vessels, purified water and clean steam systems, CIP skids and process piping for semiconductor and electronics plants in Laguna, Cavite, Batangas, Clark and Cebu, pharmaceutical manufacturers, sugar mills and coconut and food processors. The Philippine grid runs at 60 Hz, the same frequency as the United States, so pumps and motors keep their rated speed, and every vessel ships with the plan set DOLE’s boiler and pressure vessel rules call for. The company’s headquarters is 256 Shore Drive in Kilmarnock, Virginia; Paul was formerly based in northern New Jersey, then Pennsylvania.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
Vessel and boiler rules DOLE OSHS Rules 1160 and 1170
Supply 60 Hz, 230 V
Electrical code Philippine Electrical Code 2017 Part 1
Main seaports Manila, Batangas, Subic, Cebu
VAT 12 percent
Reviewed November 2026

Systems Paul Industries ships as a US process equipment contractor for the Philippines

As a US process equipment contractor for the Philippines, Paul Industries carries one system from the first process sketch to a qualified, running utility: process and mechanical design, panel and controls engineering, fabrication and factory acceptance testing in the United States, export crating and shipping, and installation and start-up at the Philippine plant. The equipment list covers ultrapure water systems, industrial DI water skids, process cooling systems, ASME pressure vessels and receivers, clean steam generators, CIP and SIP skids, tanks, heat exchangers and the stainless, PVDF and carbon steel piping between them.

Philippine buyers pick one of three routes. Supply with Paul supervising installation suits an economic zone plant that already runs a building contract. Design-build adds the utility room layout, interconnecting piping, controls and the DOLE and electrical plan sets. Turnkey process systems place everything from user requirements to executed qualification under a single Paul contract. The Philippines is one of the Asia Pacific countries on Paul’s international projects page.

Semiconductor companies in the Philippines and the electronics corridor

Semiconductor companies in the Philippines form the country’s largest export industry: the Semiconductor and Electronics Industries in the Philippines Foundation reported 2025 electronics exports of about US$49.64 billion, 58.81 percent of all Philippine exports. Most of that output comes from assembly, test and packaging plants, which take wafers from fabs abroad and ship finished components, along with electronics manufacturing services, and the plants cluster in Laguna, Cavite and Batangas south of Metro Manila, at Clark Freeport Zone in Pampanga, and around Lapu-Lapu and the Mactan export zone in Cebu.

An assembly and test plant buys deionized and ultrapure water for wafer saw, die attach cleaning and plating rinse, process cooling water at tight temperature for test handlers and burn-in ovens, chilled water for cleanroom air handlers, clean dry air and nitrogen, and treatment for copper, nickel and tin-bearing rinse streams. Paul designs RO and EDI trains with polishing beds, temperature-stable cooling loops and rinse water treatment modules for those lines, wired for 60 Hz and documented to the plant’s change control process, as covered on the semiconductor industry page.

Rinse water recovery for assembly and test lines

Rinse water recovery cuts both the feed water a Philippine electronics plant buys and the volume it treats before discharge. Dilute rinse streams from saw, clean and plating steps are segregated by contaminant, filtered, run through reverse osmosis or ion exchange, and returned to the ultrapure water train’s feed, while concentrated metal-bearing streams go to precipitation and filtration. Paul sizes the recovery skid from the plant’s measured rinse flows and conductivity, adds online monitoring that diverts off-spec water automatically, and ties the controls into the existing water plant so operators run both from one screen.

Laguna Technopark companies and their plant utilities

Laguna Technopark is an industrial park in Laguna province, and Laguna Technopark companies include electronics and component manufacturers among other export plants. Electronics companies in Laguna Technopark share a pattern of utility demand: water treatment sized for a range of rinse qualities, chilled water and process cooling with tight stability, and compressed air and exhaust systems that grow with each new production line. Export enterprises registered with PEZA, Laguna Technopark tenants among them, also bring duty and VAT terms into the equipment budget, covered under customs below. Paul plans expansions so a new water train or cooling module ties into the running plant during a scheduled shutdown, with a cutover sequence the facilities team approves in advance.

Pharmaceutical companies in the Philippines and Philippines FDA GMP

Pharmaceutical companies in the Philippines manufacture under the Food and Drug Administration of the Philippines, which applies the PIC/S Guide to Good Manufacturing Practice and adopts each new edition after a transition period. The FDA filed its application to join the Pharmaceutical Inspection Co-operation Scheme in May 2023, so Philippines FDA GMP inspections already look at water, steam and equipment through the PIC/S annexes on sterile products and on qualification and validation.

Under the FDA Philippines GMP guidelines, a purified water or WFI system is a direct-impact utility: it needs sanitary design, documented materials and welds, qualification from design through performance, and ongoing monitoring. Plants making tablets, syrups, injectables and vitamins in Metro Manila, Laguna, Cavite and Bulacan buy purified water generation and loops, WFI stills, clean steam, formulation tanks and CIP skids. Paul builds them to ASME BPE with orbital weld logs, borescope video, passivation records and surface finish data, and writes and runs the IQ and OQ protocols, as described on the pharmaceutical industry page.

Sugar mills, coconut processing and food plants in the Philippines

Sugar mills in the Philippines number 25 operating mills in the 2023 to 2024 crop year, 11 of them with their own refineries, according to the industry’s records, and the two Negros provinces produce about half of the nation’s sugar under the oversight of the Sugar Regulatory Administration. A mill’s boiler house, juice heaters, evaporators, vacuum pans and refinery melt and clarification stations drive steady demand for heat exchangers, pressure vessels, boiler feed and water treatment, and condensate return piping. Coconut processors, which make the Philippines the top producer and exporter of virgin coconut oil and ship copra, coconut oil, copra meal and desiccated coconut, run oil expellers, refining and deodorizing vessels, dryers and hot water systems.

Beverage, dairy, meat, seafood and snack plants around Metro Manila, Laguna, Batangas, Cebu and Davao add CIP skids, sanitary process tanks, pasteurizer utilities and refrigeration. Paul builds sanitary tanks, heat exchanger packages, CIP and hot water systems for those plants, and the food and beverage page shows how hygienic design carries across them.

Philippine industrial regions, their plants and the systems Paul Industries ships to them
RegionPlants (market facts)Usual sea entrySystems Paul Industries supplies
CALABARZON (Laguna, Cavite, Batangas)Chip assembly and test, electronics, automotive parts, food and pharmaceutical plantsManila or BatangasUltrapure and DI water, process cooling, purified water, CIP skids
Metro Manila and BulacanPharmaceutical, beverage and food plantsManilaPurified water, WFI, clean steam, sanitary tanks
Central Luzon (Clark, Subic)Electronics and freeport manufacturersSubic Bay or ManilaDI water, chilled water plants, compressed air packages
Cebu (Mactan, Lapu-Lapu)Electronics and export zone plantsCebuProcess cooling, water treatment, wastewater modules
Negros and the VisayasSugar mills and refineriesCebu or another Visayas portHeaters, evaporator exchangers, boiler feed systems

What are the DOLE pressure vessel requirements for a US-built vessel?

DOLE pressure vessel requirements come from the Occupational Safety and Health Standards of the Department of Labor and Employment: Rule 1160 governs boilers and Rule 1170 governs unfired pressure vessels, which it defines as closed vessels other than boilers that hold steam, hot water, gas or air, and it applies the boiler permit provisions of Rule 1162 to them. Rule 1162.01 adopts the ASME Boiler and Pressure Vessel Code, ASME piping codes, API, ISO and the PSME code at their latest revisions for fabrication, inspection and approval, which makes an ASME Section VIII vessel built in the United States a direct fit for the Philippine framework.

Each vessel and boiler also needs a manufacturer’s certificate listing its design standards and dimensions and a maker’s nameplate fixed to the equipment, under Rule 1162.05. Paul supplies the ASME data report, nameplate details, design calculations, material test reports and the hydrostatic test record with every vessel, so the documents in the DOLE file match the steel on site.

DOLE application for pressure vessel installation

The DOLE application for pressure vessel installation is filed in five copies with the Bureau or the DOLE Regional Office before installation starts, under Rule 1168, with a location plan, a room layout, installation and foundation plans, foundation design computations and detailed construction drawings. The title block on each sheet carries the printed name, signature and seal of a professional mechanical engineer with registration details, along with the owner’s signature, and installation proceeds under the supervision of a professional mechanical engineer. Rule 1168 makes the approved application and plans the installation permit, so the DOLE pressure vessel permit for installation rests on a complete, consistent plan set. Paul prepares that set in Philippine format during engineering.

DOLE permit to operate pressure vessel and boiler inspections

A DOLE permit to operate pressure vessel or boiler equipment is issued after the final inspection and runs for one year from the inspection date, with periodic inspection at intervals of no more than 12 months and notice to the Regional Office 30 days before the permit expires. Department Order 74-05 sets an 18-month validity for power utility boilers and 12 months for industrial boilers, so any boiler Philippines plants operate stays on a yearly inspection cycle. Paul plans the first inspection into commissioning, keeps relief valve and test records ready for the inspector, and hands the plant a register of every pressure-retaining item with its design data and renewal dates. The hydrostatic testing page explains the pressure test that underpins those records.

Philippine code requirements and the matching documents in each Paul Industries shipment
RequirementRuleRecords from Paul Industries
Code of constructionOSHS Rule 1162.01: ASME, API, ISO, PSME at latest revisionASME Section VIII design, data report, material test reports
Installation permitOSHS Rule 1168: plans in five copies, signed and sealed by a professional mechanical engineerLocation, layout, foundation and construction drawings with computations
Permit to operateFinal inspection; one-year permit; inspections at 12-month intervals or lessHydrostatic test record, relief valve data, pressure equipment register
Electrical installationPhilippine Electrical Code 2017 Part 1; plans signed and sealed by a Professional Electrical Engineer under RA 7920Single-line diagrams, load schedules, panel and grounding drawings
GMP equipmentPIC/S GMP Guide applied by FDA PhilippinesURS trace matrix, IQ and OQ protocols, weld and passivation records

Philippines voltage, 60 Hz and the Philippine Electrical Code

Philippines voltage for plant equipment is 230 V single-phase at 60 Hz, with three-phase power stepped down at each plant from distribution lines that Meralco and the other utilities run at 13.8 kV and 34.5 kV, among other levels. On the US vs Philippines voltage question, the frequency is the same 60 Hz, so a pump curve, fan speed or compressor rating from a US design holds on the Philippine grid; the change is in the voltage, so Paul confirms the plant’s three-phase level and transformer arrangement with the electrical engineer of record before motors, drives and transformers are ordered.

Philippine Electrical Code Part 1 and the electrical permit

The Philippine Electrical Code Part 1, 2017 edition, governs wiring inside Philippine plants, and the Board of Electrical Engineering adopted it under Republic Act 7920 with a direction to adhere strictly to its provisions. The electrical permit identifies the Professional Electrical Engineer who signed and sealed the plans and specifications, and the code’s wiring, overcurrent protection and Philippine Electrical Code grounding system rules set conductor, breaker and earthing sizes for each circuit. For Philippine Electrical Code compliance, Paul delivers single-line diagrams, load schedules, panel layouts, conductor and breaker sizing and grounding details in a format ready for the permit set. The electrical services page covers the wiring work Paul performs on site.

Typhoons, humidity and salt air in equipment design

Philippine plants deal with heavy rain, typhoon winds, year-round humidity and salt air near the coast, so Paul specifies enclosures with anti-condensation heaters and sealed glands, stainless or coated frames and fasteners, and anchorage for skids and tanks to the plant’s structural design basis. Outdoor cooling towers, tanks and pipe racks get wind loading checks, and electronics plant utilities that must ride through a voltage dip get UPS-backed controls and automatic restart logic.

Shipping to Manila International Container Terminal, Batangas port and Subic Bay

Manila International Container Terminal, at the Port of Manila, is the main container gate for Metro Manila and much of Luzon, while Batangas port, Subic Bay and Cebu serve the CALABARZON economic zones, Central Luzon and the Visayas. For buyers asking how long does cargo shipping take from USA to Philippines, forwarder transit data shows about 34 days from New York to Subic Bay, about 39 days from New York to Batangas, and about 37 to 44 days from Savannah to Manila on transshipment services.

Cargo shipping from USA to Philippines plants uses 40-foot high cube containers for skids whenever the module envelope allows, and flat racks or breakbulk for columns, tanks and long pipe racks. Paul designs each skid around the shipping container from USA to Philippines limits early in layout, crates every piece in ISPM 15 treated wood, and seals stainless internals with nitrogen and desiccant for the humid voyage. Sea freight from USA to Philippines ports is priced as its own line so the buyer sees it in US dollars.

Batangas port location and the road from Manila to Batangas port

The Batangas port location is Batangas City on the southern Luzon coast, at the end of the expressway corridor that runs through Laguna and Batangas, and for buyers asking where is Batangas port in relation to the economic zones, it sits closer to the southern CALABARZON plants than Manila does. The Philippine Ports Authority manages the port, which serves as an alternate port to Manila, and its container terminal handles international cargo. Paul compares Manila to Batangas port routing for each project by road conditions, crane limits and clearance, and picks the entry that gets oversize modules to the plant with the fewest handling steps.

Philippines VAT rate, duty and economic zone incentives

The Philippines VAT rate is 12 percent and applies to imported goods along with customs duty set by tariff line, assessed by the Bureau of Customs at entry. Registered export enterprises in PEZA and other economic zones receive customs duty exemption on capital equipment, raw materials and spare parts, and VAT exemption on importation, for goods directly tied to their registered activity, under the CREATE law as amended by CREATE MORE, Republic Act 12066, which keeps a 70 percent export sales threshold. The Certificate of Authority to Import is the document that proves the exemption at entry. Paul prepares the invoice, packing list, certificate of origin and bill of lading with tariff classifications and separate lines for machinery, spares and consumables, so the importer applies the exemption cleanly.

How a Philippine project with Paul Industries runs, stage by stage

A Philippine project with Paul Industries runs in nine stages, and the DOLE installation plan set is prepared during engineering so the permit is ready before the equipment lands. The table lists the work at each stage and the record the plant keeps.

Stages of a process equipment project for a plant in the Philippines
StageWork by Paul IndustriesWhat the Philippine plant receives
1. RequirementsProcess duty, water or GMP targets, 60 Hz supply and three-phase level, site dataAgreed specification and code basis
2. EngineeringDesign to ASME VIII, B31.3 and BPE; panel design for the Philippine Electrical CodeDrawings, calculations, data sheets in English
3. Permit setsRule 1168 installation plans and electrical permit drawingsPlan sets ready for engineer seals and filing
4. FabricationWelding, examination, passivation and panel build in the United StatesMaterial test reports, weld maps, NDE reports
5. Factory testHydrostatic test, functional run and water quality check, open to the buyerSigned FAT report and open items list
6. Shipping and entryCrating, sailing to Manila, Batangas, Subic or Cebu, entry documentsShipping documents and cleared cargo
7. InstallationSetting, piping and wiring by Paul, or Paul supervision of that workField records and marked-up drawings
8. Start-upCommissioning, DOLE final inspection, IQ and OQPermit to operate file and executed protocols
9. HandoverTraining, spares, inspection and maintenance calendarManuals and as-built dossier in English

After handover, Paul services the equipment with scheduled maintenance, spare parts, membrane and resin replacement, relief valve testing, requalification and repairs, and it updates the pressure equipment register before each permit renewal.

Who builds process systems for plants in the Philippines?

Paul Industries builds process systems for plants in the Philippines: ultrapure and DI water, process cooling and wastewater modules for semiconductor assembly and test plants in Laguna, Cavite, Batangas, Clark and Cebu; purified water, WFI, clean steam and CIP systems for pharmaceutical plants under FDA Philippines; heaters, evaporator exchangers, vessels and boiler feed systems for sugar mills on Negros and across the Visayas; and sanitary tanks, CIP and hot water systems for coconut, beverage and food processors. Every system ships with the DOLE plan set for its vessels and boilers and the drawings for the electrical permit, and Paul installs and commissions it or supervises its installation. Paul’s site also has pages for Vietnam and Japan.

How much does delivering a process system to the Philippines cost, and what moves the price?

The delivered cost of a process system for a Philippine plant depends on six drivers beyond the equipment, and Paul shows each one as a separate line in a US dollar proposal.

  • Purity and materials. PVDF and high-purity stainless for electronics water, BPE-grade stainless for pharmaceutical utilities.
  • Permit documents. Rule 1168 plan sets, data reports and electrical permit drawings.
  • Climate design. Typhoon anchorage, corrosion-resistant finishes and humid-climate enclosures.
  • Freight. Five to six weeks of ocean transit, flat racks for oversize items, and port charges in Manila, Batangas, Subic or Cebu.
  • Entry costs. Duty and 12 percent VAT, less any economic zone exemption the importer holds.
  • Site route. Complete installation inside an operating plant, or installation directed by Paul’s supervisors, each quoted as an option.

Paul Industries for Philippine electronics, pharmaceutical, sugar and food plants

Paul Industries engineers, fabricates and tests water systems, cooling plants, pressure vessels, process skids and piping for Philippine plants, ships them to Manila, Batangas, Subic or Cebu, and installs and commissions them or supervises the installation, with DOLE, electrical and qualification documents in English. Send the process duty, the plant location, the supply details and the start-up target, and Paul replies with a US dollar price, the permit document plan and the fabrication and shipping schedule. Request a quote for a plant in the Philippines.

Standards referenced: DOLE Occupational Safety and Health Standards Rule 1160 (Boilers) · DOLE Occupational Safety and Health Standards Rule 1170 (Unfired Pressure Vessels) · DOLE Department Order 74-05 · Philippine Electrical Code 2017 Part 1 · Republic Act 7920 · PIC/S GMP Guide (FDA Philippines) · ASME Boiler and Pressure Vessel Code Section VIII · ASME B31.3 · ASME BPE · Incoterms 2020 · ISPM 15

Frequently asked questions

Does US-built equipment run at full speed on the Philippine grid?

The Philippine grid runs at 60 Hz, the same frequency as the United States, so pumps, fans and compressors keep the speed and capacity on their US performance curves. The difference is voltage: single-phase supply is 230 V and the three-phase level depends on the plant transformer. Paul Industries confirms that level with the plant before ordering motors, drives and transformers.

What is the Philippine Electrical Code, and which edition applies to a new plant panel?

The Philippine Electrical Code governs electrical installations in the Philippines, and Part 1 in its 2017 edition covers wiring within buildings and plants, adopted by the Board of Electrical Engineering under Republic Act 7920. Paul Industries designs panels and field wiring to its rules and supplies single-line diagrams, load schedules and grounding details for the electrical permit set.

Where is Batangas port, and which plants use it?

Batangas port is in Batangas City on the southern Luzon coast, managed by the Philippine Ports Authority as an alternate port to Manila. Plants in Batangas, southern Laguna and the economic zones along the expressway receive equipment through it. Paul Industries compares Batangas and Manila routing for each shipment and books the entry with the simpler road route to the site.

How long does a container take from the US East Coast to Manila?

Forwarder transit data puts ocean freight from New York to Subic Bay at about 34 days and from Savannah to Manila at about 37 to 44 days on transshipment services, with breakbulk and flat rack cargo often slower. Paul Industries schedules the sailing from the factory acceptance test date and carries the voyage, entry and road delivery in the project plan.

Who builds ultrapure water systems for semiconductor plants in Laguna and Cavite?

Paul Industries designs and builds ultrapure and DI water systems for assembly, test and packaging plants in Laguna, Cavite and Batangas: pretreatment, reverse osmosis, electrodeionization, polishing, distribution and rinse water recovery. Systems are wired for 60 Hz, factory tested in the United States, and installed and commissioned by Paul or installed under its supervision.

Does Paul Industries supply process cooling systems to electronics plants at Clark and in Cebu?

Paul Industries supplies closed loop process cooling packages, chilled water plants, heat exchanger skids and water treatment for electronics plants in Clark Freeport Zone, the Mactan export zone and Lapu-Lapu in Cebu, and economic zones across Luzon. Each package is sized for the plant’s design ambient and humidity, factory tested, and commissioned at the site.

What does the DOLE pressure vessel permit process require?

The process starts with an installation application under OSHS Rule 1168, filed in five copies with location, layout, foundation and construction drawings signed and sealed by a professional mechanical engineer; the approved plans act as the installation permit. After the final inspection, DOLE issues a one-year permit to operate. Paul Industries prepares the plan set and the vessel data reports during engineering.

Does an ASME Section VIII vessel satisfy the Philippine boiler and pressure vessel rules?

OSHS Rule 1162.01 adopts the ASME Boiler and Pressure Vessel Code, along with ASME piping codes, API, ISO and the PSME code, for fabrication, inspection and approval. Paul Industries designs and fabricates vessels to ASME Section VIII and ships each one with its data report, nameplate details, material test reports and hydrostatic test record for the DOLE file.

How often are boilers inspected in the Philippines?

Boilers and unfired pressure vessels are inspected at intervals of no more than 12 months, and the permit to operate runs one year for industrial boilers, with notice to the DOLE Regional Office 30 days before it expires; power utility boilers carry an 18-month permit. Paul Industries keeps relief valve, test and repair records current so each renewal inspection has what it needs.

Is FDA Philippines a PIC/S member, and which GMP guide applies to water systems?

FDA Philippines applied to join PIC/S in May 2023 and applies the PIC/S GMP Guide, adopting each new edition after a transition period. Water and steam systems for drug plants therefore follow the PIC/S annexes on sterile manufacture and qualification. Paul Industries builds purified water, WFI and clean steam systems to ASME BPE and executes IQ and OQ to that framework.

Which pharmaceutical plants in Metro Manila and Laguna buy purified water and WFI systems?

Plants making tablets, syrups, vitamins and sterile products in Metro Manila, Laguna, Cavite and Bulacan buy purified water generation and loops, and sterile manufacturers add WFI and clean steam. Paul Industries designs, fabricates and qualifies those systems for Philippine plants, with weld logs, passivation records and protocols in English.

Does Paul Industries build equipment for sugar mills on Negros?

Paul Industries designs and builds juice heaters, evaporator and condenser exchangers, pressure vessels, boiler feed systems and water treatment for sugar mills and refineries on Negros and elsewhere in the Visayas. Equipment ships through Cebu or the nearest suitable port and is installed during the off-season repair window, with DOLE documents for every vessel and boiler.

What is the Philippines VAT rate on imported process equipment?

Imported equipment pays 12 percent VAT along with customs duty by tariff line. Registered export enterprises in economic zones receive duty and VAT exemption on importation for capital equipment tied to their registered activity under CREATE and CREATE MORE, proven with a Certificate of Authority to Import. Paul Industries prepares invoices and packing lists with classifications that support the importer’s entry.

Which Incoterm suits a Philippine economic zone plant ordering from the United States?

Economic zone plants often choose CIF Manila or Batangas, where the seller pays freight and insurance to the port and the importer clears customs with its exemption documents, or DAP to the plant gate. Paul Industries prices whichever Incoterms 2020 rule the plant names, in US dollars, and itemizes ocean freight, cargo insurance and port handling.

How do typhoons change skid and tank design for a Philippine plant?

Outdoor tanks, cooling towers, pipe racks and skids get wind loading checks and anchorage to the plant’s structural design basis, and enclosures are sealed against wind-driven rain. Paul Industries also specifies corrosion-resistant finishes for coastal sites and plans site deliveries and lifts around typhoon warnings and the plant’s shutdown calendar.

Who sets and starts up a new utility skid at a Batangas or Cavite economic zone plant?

Paul Industries carries out installation, start-up and commissioning at plants in Batangas, Cavite, Laguna and the rest of the country, or directs the installation as supervisor, depending on the contract route. Commissioning covers pressure and leak tests, loop checks, controls tuning, the DOLE final inspection, IQ and OQ where GMP applies, and operator training.

What documents ship with a US-built system for a Philippine plant?

Each system ships with P&IDs and general arrangement drawings, design calculations, ASME data reports and nameplate details for pressure equipment, material test reports, weld and examination records, the signed FAT results, electrical drawings for the permit set, and operation and maintenance manuals in English. Paul Industries also supplies the Rule 1168 installation plan sheets.

What should a Philippine plant send Paul Industries for a US dollar price?

Send the process duty or flow sheet, the plant location and economic zone, the three-phase supply level, applicable codes and any GMP scope, the Incoterm you prefer and the start-up month. Paul Industries returns a US dollar proposal with equipment, documents, freight and site work as separate lines, plus engineering, fabrication, shipping and commissioning dates.

Planning a process system for a plant in the Philippines?

Tell Paul Industries the process duty, the plant and economic zone, and the start-up target, and the reply lays out the DOLE and electrical document plan, the voyage plan and a budget in US dollars. Call 201-450-8280 or request a quote.