Paul Industries provides validation and commissioning in Indiana for pharmaceutical, animal health, medical device and food plants, planning and executing commissioning, installation qualification, operational qualification and performance qualification for process equipment, utilities, clean steam, water systems and cleanrooms. Indiana’s life sciences plants answer to FDA rules for drugs, animal drugs and devices, and their pressure equipment also answers to the state’s boiler and pressure vessel permits. Paul Industries builds both sets of requirements into one commissioning and qualification plan, so the systems that Paul Industries installs are started, tested and released with every record in place.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
Drug plants 21 CFR 211 and FDA process validation guidance
Device plants QMSR with ISO 13485:2016, effective Feb 2, 2026
C&Q approach ASTM E2500 and ISPE Baseline Guide 5
Indiana permits Boilers and vessels need an operating permit before use
Lebanon Lilly API site under construction, $4.5 billion added 2026
Reviewed November 2026

What does validation and commissioning in Indiana prove, and to whom?

Validation and commissioning in Indiana involves proving, with documented evidence, that a plant’s equipment and systems are installed as designed, operate as intended across their range and perform consistently with the product, under the FDA regulations that apply to the plant. Commissioning brings a system from mechanical completion to working order; qualification documents that the system meets its user requirements; and process validation shows the manufacturing process reliably produces product of the required quality.

The plants that buy this work in Indiana span three FDA regimes. Human drug manufacturers follow 21 CFR Part 211; animal drug makers follow the same current good manufacturing practice rules under FDA’s Center for Veterinary Medicine; and device makers follow the Quality Management System Regulation, 21 CFR Part 820, which took effect on February 2, 2026 and incorporates ISO 13485:2016 by reference. Paul Industries writes each plan to the regime of the plant, because the vocabulary, the documents and the inspector’s expectations differ between them.

Commissioning vs qualification vs validation: the difference between commissioning and qualification

The difference between commissioning and qualification is purpose: commissioning is the engineering work that makes a system run safely and correctly, while qualification is the documented, quality-approved proof that the system meets the requirements that affect product quality. Validation, in turn, applies to processes, cleaning methods and computerized systems, and it rests on qualified equipment and utilities underneath it.

Modern practice under ASTM E2500 and the second edition of the ISPE Baseline Guide for commissioning and qualification ties the three together through risk. Critical aspects, the features of a system that affect product quality or patient safety, are identified early; commissioning tests that verify those aspects are written and executed with good documentation practice; and qualification draws on those commissioning records rather than repeating the same tests. The result is commissioning, qualification and validation as one continuous verification effort rather than three separate test campaigns.

Commissioning, qualification and validation compared
ActivityQuestion it answersTypical documentsApproved by
CommissioningIs the system installed, started and working as designed?Inspection and test plans, startup checklists, punch lists, test recordsEngineering, with quality reviewing tests of critical aspects
Installation qualificationIs it installed to the approved design and specifications?IQ protocol, drawings, material and weld records, calibration certificatesQuality unit
Operational qualificationDoes it operate across its intended range, including alarms and interlocks?OQ protocol, functional test results, deviation reportsQuality unit
Performance qualificationDoes it perform consistently under real or simulated production?PQ protocol, sampling data, summary reportQuality unit
Process validationDoes the process consistently make product meeting its specifications?Process design records, PPQ protocol and report, continued process verificationQuality unit

Commissioning and qualification for Indiana’s life sciences plants

Commissioning and qualification work in Indiana is driven by the state’s pharmaceutical, animal health and device manufacturers. Eli Lilly, headquartered in Indianapolis, announced a further $4.5 billion in May 2026 for its Lebanon campus in Boone County, expanding both the Lebanon Advanced Therapies facility and the active pharmaceutical ingredient site under construction there to make tirzepatide, and the company has directed more than $21 billion of its domestic manufacturing commitments this decade to Indiana. Elanco opened its global animal health headquarters in Indianapolis in 2025, and Warsaw, where Zimmer Biomet is headquartered, anchors the state’s orthopedic device cluster.

Commissioning and qualification of pharmaceutical facilities at that scale runs for years, with utilities, clean steam, water systems, cleanrooms and process equipment qualified in waves as construction completes. Paul Industries matches that rhythm with system-by-system turnover packages, commissioning executed while trades are still on site, and qualification protocols drafted from the design so they are ready the day each system is mechanically complete.

Pharmaceutical validation services for drug and API plants

Pharmaceutical validation services for Indiana drug and active ingredient plants cover the full lifecycle in FDA’s 2011 process validation guidance: process design, process performance qualification and continued process verification, built on qualified equipment and utilities. For validation services, pharmaceutical industry owners in Indiana usually need equipment and utility qualification first, followed by cleaning validation, computerized system validation and process performance qualification. Paul Industries focuses on the equipment, utility and system layers that the process sits on, and delivers them in the owner’s quality system format so the process validation team can rely on them directly.

Medical device validation services under the QMSR

Medical device validation services in Indiana changed vocabulary in 2026, when FDA’s Quality Management System Regulation replaced the old Quality System Regulation and brought ISO 13485:2016 into 21 CFR Part 820. Process validation now sits under ISO 13485 clause 7.5.6, which requires validation of processes whose output cannot be fully verified by later inspection, such as sterilization, cleaning, passivation, sealing and many welding and coating processes. Device makers in Warsaw and Northern Indiana validate those processes and the equipment that runs them, and Paul Industries qualifies the equipment, utilities and controlled environments those validations depend on.

The IQ OQ PQ validation process, step by step

The IQ OQ PQ validation process moves a system from approved design to released status in a fixed order, and each stage builds on the records of the one before. Paul Industries runs it as a single schedule with commissioning, so a punch list item never blocks a qualification test that could have run, and a failed test is traced back to its root cause before the protocol moves on.

Equipment validation process for an Indiana plant
StageInputsWork performedOutput
User requirements and risk assessmentProcess needs, product knowledgeIdentify critical aspects and acceptance criteriaApproved URS and risk assessment
Design review and design qualificationSpecifications and drawingsConfirm the design meets the URSDesign review record
Factory and site acceptance testsBuilt equipmentTest at the vendor and again on siteFAT and SAT reports usable in qualification
CommissioningInstalled systemStartup, functional checks, punch list closureCommissioning report and turnover package
Installation qualificationTurnover packageVerify installation, documentation and calibrationExecuted IQ
Operational qualificationExecuted IQTest functions, ranges, alarms, interlocks and recoveryExecuted OQ
Performance qualificationExecuted OQDemonstrate consistent performance under loadExecuted PQ and summary report
Release and change controlSummary reportQuality release; system enters change controlReleased system and requalification plan

Writing IQ OQ PQ protocols that execute cleanly

IQ OQ PQ protocols execute cleanly when every test step has a defined method, a measurable acceptance criterion traced to a requirement, a place to record the actual result and the instrument used, and a clear path for deviations. Protocols written before the design is final fail in the field because tag numbers, setpoints and ranges change; Paul Industries drafts protocols from the approved design, updates them against the as-built drawings, and walks them down on the installed system before quality approval so execution does not stall on errors in the document.

Good documentation practice applies to every record: contemporaneous entries, legible corrections with a reason and initials, no blank fields, and calibrated instruments with traceable certificates. Electronic records and signatures follow 21 CFR Part 11 where the plant uses electronic execution systems, and computerized systems such as building management, environmental monitoring and process control are qualified under a GAMP 5 approach scaled to their risk.

Utilities, water and clean steam qualification

Utility qualification is where most Indiana projects spend their commissioning hours, because purified water, water for injection, clean steam, compressed gases and HVAC serve every production system. Water systems are qualified against USP requirements for purified water and water for injection, usually in a three-phase sampling program that proves the system’s chemical and microbial control through a full year of seasonal variation. Clean steam is tested for condensate quality, non-condensable gases, superheat and dryness. Compressed air and nitrogen that contact product are tested for particles, moisture, oil and microbes at points of use.

Paul Industries builds and qualifies the systems underneath those tests: high-purity water systems in Indiana, clean steam generators and distribution, CIP and SIP skids through CIP and SIP systems in Indiana, and the stainless distribution piping that ties them together through process piping in Indiana. The installation records from that work, including orbital weld logs, borescope records, slope checks and passivation reports, become the backbone of each installation qualification.

Indiana operating permits come before steam OQ

Indiana adds one step that out-of-state validation teams often miss: under 675 IAC 30-3-9, no regulated boiler or unfired pressure vessel may be operated until the state issues an operating permit, and the inspector attaches the vessel’s IN registration number at that first permit inspection. Clean steam generators, steam-jacketed process vessels, autoclaves and sterilizers, compressed air receivers and other regulated vessels therefore need their state inspection and permit before they can be run at pressure for operational qualification. Steam kettles with jackets below 50 psig and small vessels under the rule’s thresholds are exempt. Paul Industries schedules the permit inspection into the commissioning plan so OQ never waits on paperwork, and new vessels arrive through pressure vessel fabrication in Indiana with everything the inspector needs.

Cleanroom, autoclave and sterilization qualification

Clean room validation services for Indiana plants cover HVAC and controlled environment qualification: airflow velocity and volume, air change rates, HEPA filter integrity testing, room pressure cascades, recovery testing, airflow visualization in critical zones, and particle classification to ISO 14644-1 at rest and in operation, followed by an environmental monitoring program under ISO 14644-2 and the plant’s own requirements. Paul Industries builds and qualifies controlled environments through cleanrooms in Indiana.

Autoclave validation services and sterilization validation services prove that steam sterilizers reach and hold sterilizing conditions throughout every load. Operational qualification covers chamber leak rate, air removal and steam penetration tests, temperature distribution in the empty chamber and alarm and interlock functions; performance qualification maps heat penetration in defined loads with thermocouples and biological indicators. Indiana device makers also validate washers, ultrasonic cleaners and passivation lines, and Paul Industries qualifies that equipment alongside the sterilizers, installed through autoclave installation where new units are needed.

Equipment validation in pharma and food plants

Equipment validation in pharma plants covers process vessels, mixers, filling and packaging equipment, freezers and incubators, washers, CIP skids and storage tanks, each qualified to the critical aspects its risk assessment identifies. Equipment validation services from Paul Industries start with the installation and work forward: verifying materials of construction and surface finish, calibrating critical instruments, testing agitator speeds, temperatures and pressures across their ranges, proving alarms and interlocks, and confirming cleanability through riboflavin coverage testing where spray devices are used.

Food and beverage plants in Indiana use a lighter version of the same discipline under FDA’s food safety rules and their customers’ audits, with commissioning, thermal process verification and cleaning verification documented for each line. Tanks and process vessels supplied through tank fabrication in Indiana arrive with the finish readings and weld records that make their qualification straightforward.

GxP validation services for computerized and control systems

GxP validation services extend qualification to the software and controls that run regulated equipment: process control systems, building management systems monitoring GMP areas, environmental monitoring systems, data historians and laboratory instruments. The GAMP 5 framework scales the testing to the system’s risk and complexity, from configured off-the-shelf products to custom applications. Paul Industries tests the control functions it installs, including alarm handling, audit trails, user access levels, data backup and recovery, and documents them to 21 CFR Part 11 where electronic records are kept.

Which Indiana requirements shape a commissioning schedule?

Indiana requirements outside FDA’s rules shape a life sciences commissioning schedule as much as the protocols do, because a system that cannot legally run cannot be tested. A new building or addition needs its construction design release from the Department of Homeland Security before construction starts; potable water, drainage and building mechanical systems are inspected under the 2012 Indiana Plumbing Code and 2014 Indiana Mechanical Code; and regulated boilers and pressure vessels need their state operating permit before they run. Paul Industries places each of those milestones on the commissioning schedule so the quality-driven work never waits on a code-driven one.

Indiana and federal milestones in a life sciences commissioning plan
MilestoneSourceWhen it falls
Construction design releaseIndiana Code 22-15-3Before construction of a new Class 1 structure or addition
Plumbing and mechanical inspections2012 Indiana Plumbing Code; 2014 Indiana Mechanical CodeDuring construction, before occupancy
Boiler and pressure vessel operating permits675 IAC 30-3-9Before regulated equipment is operated, ahead of OQ at pressure
Commissioning of critical aspectsASTM E2500; ISPE Baseline Guide 5As each system reaches mechanical completion
IQ, OQ and PQ21 CFR 211 or 21 CFR 820; plant quality systemAfter commissioning, system by system
Process performance qualificationFDA process validation guidance (2011)After equipment, utility and cleaning qualification

Deviations, punch lists and keeping protocols moving

Deviations are inevitable in qualification, and the way they are handled decides whether a schedule holds. A deviation records what was expected, what was found, the impact on the test and on product quality, the root cause and the correction, and it is approved by the quality unit before the affected test is closed. Paul Industries separates construction punch items from true qualification deviations early, closes punch items during commissioning so they never become deviations, and keeps a daily deviation log with owners and due dates.

The same discipline applies to calibration and instruments. Critical instruments are calibrated against traceable standards before IQ, with certificates in the package, and any instrument found out of tolerance during testing triggers an impact assessment on the data it produced. Paul Industries carries its test instruments with current calibration and records their identities in every protocol step that uses them.

Cleaning verification and riboflavin coverage testing

Cleaning verification starts with the equipment itself: spray devices must wet every product-contact surface, lines must drain, and dead legs must be short enough to clean. Riboflavin coverage testing makes that visible, coating vessel interiors with a fluorescent solution, running the CIP cycle and inspecting under ultraviolet light for any residue. Paul Industries performs coverage testing during commissioning of tanks, vessels and CIP circuits, so spray device problems are fixed before the plant’s cleaning validation begins.

CIP skids themselves are commissioned for flow, temperature, conductivity and chemical concentration at each circuit, with supply and return verified at the far end of every line. Those commissioning results give the cleaning validation team a documented, capable system to validate against product residues and microbial limits.

HVAC and building systems at life sciences sites

HVAC and building systems at Indiana life sciences sites are commissioned in two layers: the building-level commissioning that confirms air handlers, exhaust, chilled water, heating hot water and controls meet the design intent, and the GMP qualification that proves the conditions in controlled rooms, such as temperature, humidity, pressure and particles, stay within limits. Indiana’s summers and winters both stress those systems, so performance testing is planned for seasonal extremes where the risk assessment calls for it. Paul Industries runs both layers under one plan, so the building commissioning records support the GMP qualification rather than duplicating it.

Regional work across Indiana

Validation work in Indiana concentrates where the life sciences plants are, and Paul Industries takes projects in every region of the state. Indianapolis and Central Indiana hold drug, animal health and contract manufacturing plants; Lebanon and Boone County hold Lilly’s multibillion-dollar active ingredient and advanced therapies build-out; Warsaw and Northern Indiana hold the orthopedic device cluster; and food, beverage and ingredient plants across the state, from Lafayette and Kokomo to the Ohio River counties around Evansville and Jeffersonville, need commissioning and process verification for new lines. Paul Industries also commissions mission-critical cooling through data center commissioning in Indiana.

What drives the cost of validation and commissioning in Indiana?

The cost of validation and commissioning in Indiana depends on the number and complexity of systems, their criticality and the depth of testing the risk assessment requires, whether commissioning records will be leveraged into qualification, the plant’s document templates and review cycles, the number of protocol revisions, sampling programs for water and environmental monitoring, computerized system scope, and how long the qualification window runs. Water system qualification, with its months of sampling, and large cleanroom suites carry the longest durations.

Paul Industries prices from the system list and the plant’s validation master plan, giving a budget range first and a firm price once the URS, risk assessments and protocol count are settled. Combining installation with commissioning and qualification under one contract removes the handoff between installer and validation team, which is where many Indiana schedules slip.

Who provides validation and commissioning in Indiana?

Paul Industries provides validation and commissioning in Indiana for owners who want the systems built, started, tested and qualified by one accountable team: commissioning and qualification plans, risk assessments, FAT and SAT, commissioning execution, IQ, OQ and PQ protocols and execution, summary reports and turnover packages. Owners choose qualification of systems Paul Industries installs, qualification of existing systems, supply of skids and equipment with factory and site acceptance testing, or a design-build route that carries new utilities and process systems from design through complete installation and qualification.

From its headquarters at 256 Shore Drive in Kilmarnock, Virginia, where it carries out validation and commissioning in Virginia, Paul Industries takes qualification work across Indiana, the Midwest and all 50 states, applying the methods behind validation and commissioning in North Carolina. Paul Industries was formerly based in northern New Jersey and later in Pennsylvania before settling on the Northern Neck.

Paul Industries C&Q scope for Indiana plants

Paul Industries commissions and qualifies utilities, water and clean steam systems, process equipment, cleanrooms, sterilizers and control systems for Indiana drug, animal health, device and food plants, with the state’s boiler and vessel permits built into the schedule. The national scope is set out under validation and commissioning services, and every service offered to Indiana owners is on the Indiana overview. Send the system list and validation master plan and request a quote.

Standards referenced: 21 CFR Part 211 (current good manufacturing practice for finished pharmaceuticals) · 21 CFR Part 820 Quality Management System Regulation (incorporating ISO 13485:2016) · 21 CFR Part 11 (electronic records and signatures) · FDA Guidance: Process Validation, General Principles and Practices (2011) · ASTM E2500 · ISPE Baseline Guide Volume 5, Commissioning and Qualification, 2nd edition · GAMP 5, second edition · ISO 14644-1 and ISO 14644-2 · USP <1231> · 675 IAC 30, Indiana Boiler and Pressure Vessel Rules

Frequently asked questions

Who qualifies utilities and process systems in Indianapolis and Lebanon?

Paul Industries commissions and qualifies purified water, WFI, clean steam, compressed gases, CIP and process equipment for drug, animal health and contract manufacturing plants in Indianapolis, Lebanon and Boone County. Qualification packages follow each plant’s templates and quality procedures, and installation records from construction feed directly into each IQ.

Does Paul Industries validate equipment for orthopedic device plants in Warsaw?

Paul Industries qualifies washers, ultrasonic cleaning lines, passivation equipment, sterilizers, purified water systems, compressed air and controlled environments for orthopedic and other device makers in Warsaw and Northern Indiana. That equipment underpins the process validations device makers perform under the Quality Management System Regulation and ISO 13485:2016.

Who commissions new food and beverage lines in Lafayette, Fort Wayne and Evansville?

Paul Industries commissions process equipment, CIP systems, tanks and utilities for food, beverage and ingredient plants in Lafayette, Fort Wayne, Evansville and across Indiana. Each line is started, tested and documented with thermal process and cleaning verification records that support the plant’s food safety program and customer audits.

What changed for Indiana device makers when the QMSR took effect?

On February 2, 2026, FDA’s Quality Management System Regulation replaced the Quality System Regulation in 21 CFR Part 820 and incorporated ISO 13485:2016 by reference, and device inspections moved to a new compliance program. Process validation requirements now follow ISO 13485 clause 7.5.6. Paul Industries writes equipment qualification documents to that structure for Indiana device plants.

Does a clean steam generator need an Indiana permit before OQ?

A clean steam generator that falls under Indiana’s boiler and pressure vessel rules needs a state operating permit before it is operated, and the inspector attaches its IN registration number at the first permit inspection. Operational qualification at pressure therefore follows that inspection. Paul Industries schedules the inspection inside the commissioning plan so the permit is in hand when OQ starts.

Can commissioning tests count toward qualification?

Commissioning tests can count toward qualification when they verify critical aspects, follow approved test plans, use calibrated instruments, are executed with good documentation practice and are reviewed by the quality unit, as ASTM E2500 and the ISPE Baseline Guide describe. Paul Industries plans commissioning that way from the start, which removes repeated tests from the qualification schedule.

Why does purified water qualification run for a full year?

Purified water and WFI system qualification commonly runs in three phases: intensive daily sampling for several weeks, a second phase confirming control under operating procedures, and a third phase of routine monitoring through a full year to capture seasonal changes in feedwater. Water can typically be used for production after the second phase. Paul Industries plans sampling with the plant’s laboratory capacity.

What is tested during autoclave operational qualification?

Autoclave operational qualification tests chamber leak rate, air removal and steam penetration, empty chamber temperature distribution, cycle parameters, door interlocks, alarms and recovery from faults. Performance qualification then maps heat penetration in defined loads with thermocouples and biological indicators. Paul Industries qualifies new and existing sterilizers at Indiana drug and device plants.

Which cleanroom tests are part of qualification?

Cleanroom qualification covers airflow velocity and volume, air change rates, HEPA filter integrity testing, room pressure differentials, recovery testing, airflow visualization in critical zones, and particle counts classified to ISO 14644-1 at rest and in operation. An environmental monitoring program follows. Paul Industries performs those tests on controlled environments it builds and on existing suites.

Does Paul Industries qualify existing systems already in service?

Paul Industries qualifies existing systems at Indiana plants by first walking down the installation against the drawings, gathering the available construction records, and filling any gaps with field verification before IQ begins. Where records cannot be recovered, Paul Industries performs the inspections and tests needed to establish the system’s installed condition and documents them for the quality unit.

What documents make up a turnover package for an Indiana life sciences project?

A turnover package includes as-built drawings, equipment data and manuals, material certifications, weld logs and examination records, pressure test and cleaning records, passivation reports, calibration certificates, commissioning test records, spare parts lists and, for regulated vessels, data reports and Indiana permit records. Paul Industries organizes it by system so qualification and maintenance teams find any record quickly.

How is a computerized system validated in a GMP plant?

A computerized system is validated under a GAMP 5 approach scaled to its risk: requirements, a risk assessment, supplier assessment, configuration and functional testing, and tests of audit trails, security, data integrity, backup and recovery, with electronic records meeting 21 CFR Part 11. Paul Industries tests the control and monitoring systems it installs and documents them in the plant’s format.

When is requalification needed after a change?

Requalification is needed when a change affects a system’s critical aspects, such as replacing a pump in a water loop, modifying piping, changing a sterilizer load or altering control software, and the plant’s change control process decides the extent based on risk. Periodic reviews also confirm qualified systems remain in a state of control. Paul Industries scopes requalification from the change record.

Do animal health plants in Indiana follow the same validation rules as human drug plants?

Animal drug manufacturers follow FDA current good manufacturing practice rules under the agency’s Center for Veterinary Medicine, so equipment, utility and process validation expectations closely mirror those for human drugs. Some animal biologics fall under USDA instead. Paul Industries confirms the governing regime with each Indiana animal health plant before writing its qualification plan.

How do Indiana plants keep qualification on schedule during a large build?

Large Indiana builds keep qualification on schedule by drafting protocols from the approved design, completing commissioning system by system while trades are still on site, leveraging commissioning records into qualification, scheduling state permit inspections ahead of operational testing, and resolving deviations quickly. Paul Industries runs construction, commissioning and qualification on one schedule to keep those steps connected.

What should an Indiana plant send to price a commissioning and qualification scope?

Send the system list, the validation master plan or project quality plan, user requirement specifications, P&IDs, the plant’s protocol templates and the target release dates. Paul Industries returns a budget range from comparable scopes, then a firm price once risk assessments and protocol counts are agreed.

Planning commissioning and qualification at an Indiana plant?

Send the system list, the validation master plan and your target release dates. Call 201-450-8280 or request a quote.