Paul Industries provides tank fabrication in Indiana, designing, building and installing carbon steel and stainless storage tanks, process tanks and underground and aboveground fuel tanks for refineries, mills, pharmaceutical, food and chemical plants, hospitals and public utilities. Indiana splits tank oversight among the Indiana Department of Environmental Management, the Office of Indiana State Chemist, the fire code and, for tanks under pressure, the boiler and pressure vessel rules. Paul Industries sorts each unit into the right rulebook before the first plate is cut.
Request a quote or call 201-450-8280
Which agency governs a new tank in Indiana?
A new storage vessel in Indiana answers to a different agency depending on what it holds, where it sits and how much pressure it sees, so the first design question is classification. Underground tanks holding petroleum or hazardous substances fall under IDEM’s underground storage tank program; motor fuel tanks at bulk plants and airports fall under IDEM’s newer aboveground registration; fertilizer and pesticide tanks fall under the Office of Indiana State Chemist; oil storage above federal thresholds needs a spill prevention plan; and every flammable or combustible liquid tank meets the Indiana Fire Code.
| Tank | Agency or rule | Key requirement |
|---|---|---|
| Underground petroleum or hazardous substance tank | IDEM, 329 IAC 9, IC 13-23 and 40 CFR 280 | Registration, annual fee, leak detection, corrosion and overfill protection, trained operators |
| Aboveground motor fuel tank at a bulk plant or airport, 1,500 to 20,000 gallons | IDEM AST registration under IC 13-11-2-0.4 | Registration and annual fee; registration needed for Excess Liability Trust Fund coverage |
| Fertilizer tank above 2,500 undivided or 7,500 total gallons; pesticide storage above 55 gallons | Office of Indiana State Chemist, 355 IAC 2 and 355 IAC 5 | Construction, containment and operating requirements |
| Oil storage of 1,320 gallons or more at a facility | EPA SPCC, 40 CFR 112 | Spill prevention plan and secondary containment |
| Liquid hazardous material in an aboveground tank | IDEM, 327 IAC 2-10 | Secondary containment and a spill response plan, with small-tank exemptions |
| Flammable or combustible liquid tank | Indiana Fire Code (675 IAC 22) and NFPA 30 | Listing, venting, spacing, closure under section 5704.2.14 |
| Tank operating above 15 psig | 675 IAC 30 and ASME Section VIII | Pressure vessel construction, IN number and operating permit |
Several of those rules can apply to one vessel at once. A diesel unit serving a hospital generator, for example, follows the fire code, the facility’s SPCC plan and possibly IDEM registration, while a stainless product vessel in a food plant may fall under none of the environmental programs but still needs the fire code if it holds alcohol or a flammable solvent. Paul Industries documents the classification in the design basis so the owner’s environmental staff and the fire inspector see the same reasoning.
Indiana UST regulations for a new or replacement underground tank
Indiana UST regulations come from 329 IAC 9 and Indiana Code article 13-23, which IDEM administers on top of the federal rules in 40 CFR Part 280, and they apply to a tank and its connected underground piping when at least 10 percent of the combined volume lies below ground. Every regulated system must be registered with IDEM, and the state bills an annual fee each calendar year of $90 per regulated petroleum tank and $245 per hazardous substance tank until the tank is closed.
A new underground system must meet the federal and state requirements for design and construction, corrosion protection, spill and overfill prevention and leak detection, and releases must be reported to IDEM within 24 hours of discovery. Indiana also ties the installation, upgrading, decommissioning and testing of USTs and their ancillary equipment to IDEM’s contractor certification program, which moved from the State Fire Marshal to IDEM on July 1, 2023. Paul Industries plans the vessel, piping, sumps, monitoring and testing to those requirements and files the notification paperwork with the owner.
IDEM UST compliance after installation
IDEM UST compliance continues for the life of the system. Each facility designates Class A, B and C operators, and Indiana UST operator training for those roles is offered by IDEM at no cost through its regulatory services portal. Owners also keep financial responsibility in place, which most Indiana petroleum tank owners meet through the Excess Liability Trust Fund under 328 IAC 1. Paul Industries supplies the as-built drawings, test results and equipment data the owner’s operators need for their monthly and annual records.
Owners and buyers checking a property’s history use the Indiana underground storage tank database that IDEM maintains with each facility’s registered tanks, status and release history. That record shows whether a site sits in Indiana leaking underground storage tanks files under the Office of Land Quality, which oversees investigation and cleanup when a regulated tank leaks, and it is the first thing Paul Industries reviews before replacing or removing tanks at an existing site.
Removing underground storage tanks: Indiana closure and IDEM UST closure sampling
Closing or removing an Indiana underground storage tank follows IDEM’s closure procedures, including notice before the work and IDEM UST closure sampling of soil and, where present, groundwater around the tank and piping to show whether a release occurred. Paul Industries empties, cleans and inerts the vessel, removes or closes it in place as the plan calls for, and coordinates the sampling so the closure report reaches IDEM complete. Tank cleaning before closure runs through industrial tank cleaning.
Indiana aboveground storage tanks: registration, containment and closure
Indiana aboveground storage tanks gained a registration program in 2023, when a law signed on May 4 of that year defined a registrable aboveground tank as one storing a regulated substance, with no more than 10 percent of its volume below ground and a capacity over 1,500 and up to 20,000 gallons, used at a bulk plant that distributes motor fuel to retailers or at an airport. Registration opened on July 1, 2023, annual fees applied to regulated aboveground tanks in use from January 1, 2024, and a release is eligible for Excess Liability Trust Fund reimbursement only if the tank was registered before the owner confirmed or suspected the release and the release is reported within 30 days.
Outside that program, other rules carry the load. Facilities storing 1,320 gallons or more of oil need an SPCC plan with secondary containment under 40 CFR 112. IDEM’s rule 327 IAC 2-10 requires secondary containment and a spill response plan for liquid hazardous materials in aboveground tanks, with exemptions for small new facilities that shrink inside a delineated wellhead protection area. Any suspected or confirmed aboveground release must be reported to IDEM within 24 hours, and closure follows section 5704.2.14 of the Indiana Fire Code. Paul Industries designs dikes, double-wall tanks and containment pads to suit whichever of these apply.
Fertilizer and agricultural chemical tanks
Fertilizer and pesticide storage in Indiana follows the Office of Indiana State Chemist rather than IDEM: bulk fertilizer storage above 2,500 gallons in one undivided tank or 7,500 gallons in total, and pesticide storage above 55 gallons, must meet 355 IAC 2 and 355 IAC 5. Indiana’s grain, seed and agricultural retail sites therefore need vessels, containment and load pads built to the State Chemist’s requirements, and Paul Industries fabricates and installs those systems with the containment volume calculations the inspector expects.
Storage tank fabrication: shop-built or field-erected for an Indiana site?
Storage tank fabrication for an Indiana site starts with the choice between a shop-built tank shipped complete and a field-erected tank built on its foundation, and the deciding factors are diameter, road and rail limits, site access and schedule. Shop-built units to UL 142, UL 2085 or API 650 shop rules cover most fuel, chemical and process storage up to roughly the size a truck can carry; larger API 650 shells for refinery, terminal, water and mill service are erected in the field course by course.
| Standard | Tank type | Typical Indiana use |
|---|---|---|
| API 650 | Welded atmospheric storage tanks, shop or field built | Refinery and terminal storage, mill water and oil, large process storage |
| API 620 | Large low-pressure tanks up to 15 psig | Low-pressure gas and liquid storage at chemical plants |
| UL 142 | Shop-built aboveground tanks for flammable and combustible liquids | Generator base tanks, day tanks, plant fuel and lubricant storage |
| UL 2085 | Protected, insulated aboveground tanks | Fuel tanks near buildings and vehicle fueling where the fire code requires protection |
| AWWA D100 | Welded steel water storage tanks | Fire water, process water and municipal storage |
| ASME BPE with ASME Section VIII where pressurized | Sanitary stainless process tanks | Pharmaceutical, animal health, food and beverage plants |
| API 653 and STI SP001 | In-service inspection, repair and alteration | Existing field-erected and shop-built tanks |
Indiana winters shape field work. Shells erected between November and March need weather enclosures and preheat for welding, and hydrostatic tests use heated water or wait for warmer weather, while freeze protection of fire water and process water tanks is designed in from the start. Paul Industries schedules field erection around those seasons and builds shop units year round.
| Contents | Common material | Design notes |
|---|---|---|
| Diesel, fuel oil and lubricants | Carbon steel, single or double wall | UL 142 or UL 2085 listing; SPCC containment |
| Fire and process water | Coated carbon steel | AWWA D100 and NFPA 22; freeze protection |
| Hydrochloric pickling acid | Fiberglass-reinforced plastic or lined steel | Fume scrubbing and acid-resistant containment |
| Sulfuric acid, 93 to 98 percent | Carbon steel with controlled velocity | Desiccant breather; stainless or alloy at nozzles |
| Sodium hydroxide | Carbon steel or stainless | Heat tracing against freezing at high concentration |
| Purified water and WFI | 316L stainless, polished | ASME BPE, sanitary vent filter, hot storage |
| Food product and syrups | 304 or 316L stainless | Sanitary finish, CIP sprayballs, drainable bottom |
Stainless steel tank fabrication for Indiana pharmaceutical and food plants
Stainless steel tank fabrication for Indiana’s pharmaceutical, animal health and food plants follows ASME BPE for product-contact surfaces, drainability and documentation, and ASME Section VIII where a tank is jacketed or operates under pressure. Eli Lilly’s active pharmaceutical ingredient site under construction in Lebanon, Boone County, backed by a further $4.5 billion investment announced in May 2026, is the clearest sign of how much stainless process equipment the state’s drug makers are adding.
Paul Industries builds process, mix, buffer and media vessels, WFI and purified water storage and clean-in-place supply units in 316L stainless, with polished interiors, sanitary nozzles, sprayballs and vent filters. Surface finish readings, weld maps, borescope records and passivation documentation go with each vessel into qualification through validation and commissioning in Indiana, and the tanks are tied into the plant through process piping in Indiana.
Pressurized tank fabrication and the 15 psig line
Pressurized tank fabrication crosses into Indiana’s boiler and pressure vessel rules once a tank’s chambers are protected by relief devices set above 15 psig, because 675 IAC 30 exempts vessels relieved at 15 psig or less. Above that line, the unit is an unfired pressure vessel that must be built to ASME Section VIII, registered with the National Board where a data report applies, given an IN number and placed under an operating permit. Vessels full of water at 180 degrees Fahrenheit or less are outside the vessel rules, and hot water storage tanks at 210 degrees or less with overpressure protection fall under the permit of the boiler system they serve. Paul Industries designs pressurized units through pressure vessel fabrication in Indiana when the duty crosses that line.
Industrial tank fabrication for Indiana refineries, mills and utilities
Industrial tank fabrication in Indiana serves some of the heaviest tank users in the Midwest. Whiting, on Lake Michigan, holds the bigger of Indiana’s two refineries at 435,000 barrels per calendar day in the Energy Information Administration’s January 2026 tables, with Mount Vernon’s 36,700 on the Ohio River, and their crude, intermediate and product storage runs on API 650 construction and API 653 inspection cycles. Indiana’s integrated steel mills, which lead the nation in crude steel production, use storage for pickling acid, rolling oil, quench water, scale pits and cooling water.
Water tank fabrication for fire protection, process water and treated water storage follows AWWA D100 and NFPA 22, with coatings and cathodic protection chosen for the water chemistry. Carbon steel tank fabrication remains the economical choice for oil, fuel, water and most chemicals, while stainless, lined or fiberglass construction takes over for acids and high-purity duties. Paul Industries welds tank repairs and nozzle additions through industrial welding services in Indiana when an existing vessel needs work rather than replacement.
Vents, gauges and overfill devices that make a storage system work
Vents, gauges and overfill devices decide whether a well-built shell performs safely in service, and each standard sets its own rules for them. Normal venting must pass the air displaced during filling and the vapor generated by daily temperature swings, while emergency venting protects an aboveground shell exposed to fire; API 2000 and the fire code size both. Overfill protection on fuel systems combines a high-level alarm with an automatic shutoff or flow restrictor, and underground systems add spill buckets at the fill and containment sumps under dispensers and at the submersible pump.
Instruments complete the system. Radar or guided-wave level transmitters, temperature elements, interstitial leak sensors on double-wall construction and, for regulated underground systems, automatic tank gauging that performs the monthly leak test all feed the owner’s control system or a standalone monitor. Paul Industries specifies, installs and tests these devices with the vessel, wires them to the owner’s alarm points and records the setpoints in the turnover package, so the operator’s first monthly check starts from a documented baseline.
Product-specific details round out the design. Sulfuric acid service needs desiccant breathers to keep moisture out; caustic and fats need heat tracing; volatile solvents need conservation vents or nitrogen blanketing with pressure control; and food and pharmaceutical units need sanitary vent filters with integrity-testable cartridges. Each of those choices is recorded on the data sheet so a replacement part matches the original intent years later.
Soils, floodplains and anchorage at Indiana tank sites
Foundations for Indiana storage systems range from compacted granular pads with concrete ringwalls under field-erected tanks to reinforced slabs under shop-built units, and the soil report sets the choice. Glacial till across northern and central Indiana generally supports ringwalls well, while river-bottom soils along the Wabash, White and Ohio rivers can call for deeper foundations or ground improvement.
Flood exposure matters along the Ohio River in Evansville, Mount Vernon and Jeffersonville and on other floodplains statewide. An empty or partly filled unit in a flood can float, so Paul Industries checks buoyancy against the site’s flood elevation and adds anchor straps, deadman anchors or heavier foundations as needed, and raises vents and fill points above the flood level. Southwestern Indiana’s seismic exposure, from the Wabash Valley and New Madrid zones, also enters anchorage design for tall, slender units in that part of the state.
The tank fabrication process from design to first fill
The tank fabrication process for an Indiana project runs from classification and design through fabrication, examination, delivery or erection, testing and turnover, and Paul Industries carries every step under one contract. Design sets capacity, material, shell and bottom thickness, nozzles, venting and emergency venting, overfill protection, wind and seismic anchorage, and the foundation loads. Fabrication follows qualified weld procedures with radiography or other examination as the standard requires.
Testing is where the standards diverge. API 650 shells are hydrostatically tested full, with vacuum box testing of bottom welds; UL 142 units are leak tested at the shop; sanitary vessels are tested and then passivated; and pressure units are hydrostatically tested to Section VIII. Paul Industries hands over the test records, data reports, coating inspection results and as-built drawings with each unit, along with whatever IDEM or State Chemist notification the tank needs.
Replacing storage at a plant that keeps running
Replacing storage at an operating Indiana plant is mostly a sequencing problem: the new unit has to be built, tested and connected while the old one keeps feeding production, and the cutover has to fit a single shift or weekend. Paul Industries sets the replacement beside the existing unit where the site allows, prefabricates the connecting spools to field measurements, and hydrotests the new vessel before any product line is touched. Temporary frac tanks or totes bridge the gap where no side-by-side space exists.
After cutover, the retired unit is emptied, cleaned, inerted and either removed or closed in place under the rule that governs it, with the IDEM, State Chemist or fire code records filed in the same week. Owners receive a single closeout package covering the new installation and the retirement, so an auditor reviewing the site years later finds the full history in one place.
Cost drivers for tank fabrication in Indiana
The cost of tank fabrication in Indiana depends on capacity and dimensions, material and thickness, shop-built or field-erected construction, the governing standard, nozzles and internals, coatings, linings or polished finishes, double walls and containment, foundations, delivery and setting, and the testing and documentation required. Underground installations add excavation, backfill, monitoring and piping, and stainless sanitary tanks add finishing and qualification documents.
Paul Industries gives a budget range from comparable tanks once it has the duty, capacity, material and site, then a firm price after design. For publicly funded tanks, the wage basis is simpler than in many states: since Indiana’s Common Construction Wage Act was repealed in mid-2015, a water utility or county tank carries no state wage schedule, though federal money still brings Davis-Bacon rates.
Who fabricates and installs tanks in Indiana?
Paul Industries builds tanks in Indiana for industrial, commercial and public owners, acting as the tank fabrication company that designs, fabricates, delivers or erects, installs, tests and documents each one. Custom tank fabrication covers odd shapes and duties, from rectangular tanks for tight mechanical rooms to jacketed process tanks and multi-compartment fuel tanks. Owners choose supply of the unit alone, design and fabrication, or a complete installation with foundations, containment, piping and controls.
Paul Industries is headquartered in Kilmarnock, Virginia, at 256 Shore Drive, and the same tank team behind tank fabrication in Virginia and tank fabrication in Pennsylvania takes work across Indiana, the Midwest and all 50 states. The company traces its history to northern New Jersey and later Pennsylvania.
Paul Industries tank scope for Indiana sites
Paul Industries designs, builds, installs and tests storage and process tanks for Indiana plants and buildings, from underground fuel systems and aboveground bulk storage to sanitary stainless process tanks, and hands over every record IDEM, the State Chemist, the fire inspector or the plant’s quality group needs. The national scope is described on the tank fabrication services page, and the rest of the state’s work is listed on the Indiana page. Send the duty, capacity and site details and request a quote.
Standards referenced: 40 CFR Part 280 (federal UST rules) · 329 IAC 9 (Indiana UST rules) and Indiana Code 13-23 · 328 IAC 1 (Excess Liability Trust Fund) · 327 IAC 2-10 (secondary containment for liquid hazardous materials) · 355 IAC 2 and 355 IAC 5 (Office of Indiana State Chemist fertilizer and pesticide storage) · 40 CFR Part 112 (SPCC) · Indiana Fire Code (675 IAC 22) · 675 IAC 30, Indiana Boiler and Pressure Vessel Rules · API 650, API 620 and API 653 · UL 142 and UL 2085 · STI SP001 · AWWA D100 · NFPA 22 · ASME BPE · NFPA 30
Frequently asked questions
Who builds storage tanks for refineries and terminals in Whiting and Northwest Indiana?
Paul Industries builds and repairs API 650 storage tanks, process tanks and fuel tanks for refineries, terminals, steel mills and chemical plants across Northwest Indiana. Field-erected tanks there are scheduled around lake-effect winters, with enclosures and preheat for cold-weather welding, and Paul Industries hands over API 650 test records and an API 653 baseline for the owner’s inspection program.
Does Paul Industries fabricate stainless tanks for plants in Indianapolis, Lebanon and Boone County?
Paul Industries fabricates stainless process, buffer, media, water and clean-in-place tanks for drug, animal health and food manufacturers across Indianapolis, Lebanon and Boone County. Those tanks follow ASME BPE, and ASME Section VIII when jacketed or pressurized, with the finish readings, weld maps and passivation records qualification teams need.
Who handles tank work for plants in Evansville, Fort Wayne and South Bend?
Paul Industries builds and installs fuel, chemical, water and process tanks for plants, hospitals and utilities in Evansville, Fort Wayne, South Bend and the rest of Indiana. Each project starts with classification under IDEM, State Chemist, fire code or pressure vessel rules, so the tank arrives with the right construction standard and paperwork for its location.
What is the Indiana UST fee for a regulated tank?
Indiana bills an annual fee each calendar year of $90 for every regulated petroleum underground storage tank and $245 for every hazardous substance tank, and the fee continues until the tank is closed. The same fee statute was extended in 2023 to registered aboveground tanks at bulk plants and airports. Paul Industries includes closure timing in replacement plans so owners stop paying for retired tanks.
Do underground storage tanks in Indiana need double walls?
New underground storage tanks in Indiana must meet the design, corrosion protection, leak detection and spill and overfill rules in 40 CFR 280 and 329 IAC 9, which for new and replaced systems call for secondary containment with interstitial monitoring. Paul Industries supplies double-wall tanks and piping with containment sumps and monitoring that meet those requirements.
Who may install or test an underground storage tank in Indiana?
Indiana ties the installation, upgrading, decommissioning and testing of underground storage tanks and their ancillary equipment to IDEM’s contractor certification program, which IDEM took over from the State Fire Marshal on July 1, 2023. IDEM also requires facilities to designate trained Class A, B and C operators. Paul Industries plans UST work to those program requirements and documents it for IDEM.
Do generator diesel tanks need IDEM registration in Indiana?
Generator diesel tanks need IDEM registration when they are regulated underground tanks, while aboveground generator tanks generally fall outside IDEM’s registration program, which covers bulk plants and airports. Those aboveground tanks still follow the Indiana Fire Code and, at 1,320 gallons or more of oil on site, the facility’s SPCC plan. Paul Industries builds UL 142 and UL 2085 tanks sized for the runtime required.
When does a fertilizer tank in Indiana fall under the State Chemist?
A fertilizer tank falls under the Office of Indiana State Chemist when a single undivided tank holds more than 2,500 gallons or the site stores more than 7,500 gallons in total, and pesticide storage above 55 gallons is covered as well, under 355 IAC 2 and 355 IAC 5. Paul Industries builds those tanks with the containment and load pad features the State Chemist requires.
What does an Indiana spill from a tank require?
Any suspected or confirmed release from a regulated underground tank or an aboveground tank must be reported to IDEM within 24 hours of discovery, and for registered tanks seeking Excess Liability Trust Fund reimbursement the release must also be reported within 30 days and followed by an initial site characterization. Paul Industries repairs or replaces the leaking tank and its piping once the release is controlled.
When does a tank become a pressure vessel in Indiana?
A tank becomes a regulated pressure vessel in Indiana when any chamber is protected by a relief device set above 15 psig and it falls outside the other exemptions in 675 IAC 30-1-2. At that point it must be built to ASME Section VIII and carry a state IN number and operating permit. Paul Industries designs blanketed and pressurized tanks to stay on the correct side of that line.
What sets the schedule for a field-erected tank at an Indiana site?
A field-erected tank’s schedule depends on design and approval, plate and nozzle lead times, foundation curing, erection, examination and the hydrostatic test, and Indiana winters add enclosure and preheat time for work between November and March. Paul Industries orders plate at award, pours foundations ahead of steel delivery and states the completion date in its proposal.
Can an existing Indiana tank be repaired instead of replaced?
An existing tank can often be repaired under API 653 or STI SP001 when the shell is sound and corrosion is confined to the bottom, the floor-to-shell weld or isolated areas. Bottom replacement, shell patching, nozzle repairs and new coatings or linings extend a tank’s life for a fraction of a new tank’s cost. Paul Industries inspects first and recommends repair or replacement on measured data.
What lining or material suits an Indiana tank storing pickling acid?
Hydrochloric acid pickling tanks at Indiana steel mills need materials that resist the acid at operating temperature, typically fiberglass-reinforced plastic, rubber-lined carbon steel or other lined steel, rather than unlined carbon or stainless steel. Paul Industries selects the material from the acid concentration, temperature and any abrasion, and builds the containment to match.
Will Paul Industries take the tank, foundation, containment and piping as a single Indiana scope?
Paul Industries covers the tank, its foundation, the containment dike or double wall, the piping, pumps, instruments and controls under one contract, with one schedule and one set of records. Owners who prefer supply of the tank alone receive the tank, its data and installation instructions, and owners who want design-build or complete installation get the whole system tested and handed over.
Do stainless process tanks in Indiana food plants need IDEM permits?
Stainless process tanks holding food, beverage or pharmaceutical product generally fall outside IDEM’s storage tank programs, which focus on petroleum, hazardous substances and fuel distribution. They still meet the Indiana Fire Code where they hold flammable liquids such as ethanol, and the boiler and pressure vessel rules when pressurized above 15 psig. Paul Industries confirms each tank’s status during design.
What information goes into an Indiana tank quote request?
Send the tank’s contents, capacity, operating temperature and pressure, preferred material, site location and access, whether it is above or below ground, and any containment or code requirements already identified. Paul Industries returns a budget range from comparable tanks and a firm price after design, including delivery or erection and testing.
Adding or replacing a tank at an Indiana site?
Send the contents, capacity, location and whether the tank sits above or below ground. Call 201-450-8280 or request a quote.