Paul Industries provides pressure vessel fabrication in Indiana, designing and building ASME Section VIII vessels for refineries, steel mills, pharmaceutical, food and chemical plants and delivering them ready for National Board registration and an Indiana operating permit. Indiana regulates vessels under 675 IAC 30 and gives most of them a three-year permit, with a five-year term open to owners who keep corrosion data. Paul Industries builds each vessel, and its documentation, with that permit life in mind.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
Vessel rules 675 IAC 30, Indiana Code 22-15-6
Construction code ASME Section VIII, 2019 edition adopted
Registration National Board for vessels installed since Jan 5, 1996
Permit term Three years, up to five on corrosion data
State number IN plus digits, attached at first permit inspection
Reviewed November 2026

What does pressure vessel fabrication in Indiana have to meet?

Pressure vessel fabrication in Indiana has to meet the edition of the ASME Boiler and Pressure Vessel Code in effect when the vessel is designed or built, under rule 675 IAC 30-7-1, and the state’s rule text adopts the 2019 ASME code, including Section VIII Divisions 1, 2 and 3, Section X for fiber-reinforced plastic vessels and the PVHO standard for vessels that hold people. A vessel installed on or after January 5, 1996 that requires an ASME manufacturer’s data report must also be registered with the National Board of Boiler and Pressure Vessel Inspectors.

Indiana defines an unfired pressure vessel in 675 IAC 30-4-50 as a closed vessel whose internal pressure comes from an external source or from an indirect application of heat, which takes in air receivers, reactors, separators, heat exchanger shells, jacketed kettles above the kettle threshold, autoclaves and accumulators. A vessel that lacks an ASME or API-ASME certification mark is a nonstandard vessel under 30-4-34.1, and a vessel of special design that the adopted codes do not cover can be approved through the variance procedure in Indiana Code 22-13-2-11 before it is built.

The Indiana pressure vessel code in one rule set

The Indiana pressure vessel code is not a separate book but the vessel provisions of 675 IAC 30, which the Fire Prevention and Building Safety Commission issues under Indiana Code 22-15-6 and the Department of Homeland Security enforces. Beyond the ASME code, the rule adopts the 2019 National Board Inspection Code, API 510 for in-service inspection, repair and alteration of vessels, and API 579-1/ASME FFS-1 for fitness-for-service assessment. Section 30-3-26 adds one firm limit: strength calculations for minimum thickness, design pressure or temperature, or remaining life may never use a factor of safety lower than the original edition of the construction code allowed.

Which vessels sit outside the state of Indiana pressure vessel program?

The state of Indiana pressure vessel program leaves out vessels whose chambers are small, low pressure or filled with water, along with several kinds of vessel regulated elsewhere, under the list in 675 IAC 30-1-2(f). The volume thresholds depend on the installation date, the relief valve setting and whether the vessel sits in a place of public assembly, so the same air receiver can be regulated in a school and exempt in a factory.

Unfired vessels left out of 675 IAC 30 and vessels covered under another permit
VesselCondition in the Indiana ruleStatus
Small vessel installed after June 30, 1971, outside public assemblyEach chamber 15 cubic feet or less, relief set at 300 psig or lessNot regulated
Small vessel installed after June 30, 1971, in public assemblyEach chamber 5 cubic feet or less, relief set at 250 psig or lessNot regulated
Very small vesselEach chamber 1.5 cubic feet or less, any pressure or locationNot regulated
Low pressure vesselEach chamber relieved at 15 psig or lessNot regulated
Water-filled vesselFull of water or a liquid no more hazardous, at 180 F or lessNot regulated
Anhydrous ammonia fertilizer vesselExempt in distribution and farm storage; regulated in a refinery, utility or manufacturing or processing plantDepends on location
Expansion tank or hot water storage tank in a regulated systemStorage at 210 F or less with overpressure protectionCovered by the system’s permit
Refrigeration vessel in a regulated skid unitPart of a skid-mounted unit under the ruleCovered by the unit’s permit

Several other groups fall out of the program by subject: fire protection vessels, liquefied petroleum gas vessels covered by another commission article, circuit breaker vessels, water softeners, steam kettles with jackets below 50 psig, vessels of 85 gallons or less holding chemical or nuclear waste temporarily, and vessels under federal regulation. Farm vessels and domestic water supply vessels in Class 2 structures and apartment buildings of six units or fewer must still be built to the ASME code but skip inspection and the permit. Paul Industries confirms which bucket a vessel falls into before design starts, since that decides the stamp, the registration and the paperwork the owner receives.

The pressure vessel fabrication process for an Indiana vessel

The pressure vessel fabrication process for an Indiana vessel runs from the owner’s process data to a stamped, registered vessel set on its foundation, with the authorized inspector reviewing the design, witnessing the hold points and signing the data report. Paul Industries runs every step under one contract, so the design engineer, the welders, the examiners and the field crew answer to the same schedule.

Build sequence for ASME pressure vessel fabrication for an Indiana plant
StepWhat happensRecord produced
1. Data sheet and design basisPressure, temperature, MDMT, corrosion allowance, service, wind and seismic loadsDesign basis and calculation package
2. Drawings and design reviewGeneral arrangement, nozzle schedule and details reviewed with the owner and inspectorApproved drawings
3. MaterialsPlate, heads, forgings and pipe received against specification and traced by heat numberMaterial test reports and traceability log
4. Forming and weldingRolling, head fit-up, longitudinal and circumferential seams, nozzles to qualified proceduresWPS, PQR and welder qualification records
5. ExaminationRadiography or ultrasonic examination, magnetic particle or liquid penetrant as the code requiresNDE reports
6. Heat treatment where requiredPostweld heat treatment for thickness or serviceTime and temperature charts
7. Pressure test and nameplateHydrostatic or pneumatic test witnessed by the inspector; nameplate appliedSigned manufacturer’s data report
8. Delivery, setting and first permit inspectionVessel set and connected; inspector attaches the IN numberNational Board registration and Indiana operating permit

ASME pressure vessel fabrication under Division 1 covers the large majority of plant vessels, while Division 2 suits thick, high-pressure or cyclic vessels where its stricter design and examination rules buy back material. Pressure vessel fabrication inspection by the authorized inspector happens at agreed hold points rather than at the end, and Paul Industries builds those points into the shop schedule so the inspector’s visits never hold up a seam.

Indiana pressure vessel registration and the IN number

Indiana pressure vessel registration has two layers: the National Board number that follows a registered ASME data report, and a state number made of the prefix IN and a series of digits, which the inspector fixes to the vessel when it receives its first operating permit. Under 675 IAC 30-7-2 the IN number’s characters must be at least a quarter inch high and remain visible, never hidden under lagging or paint, which matters on insulated vessels where the nameplate sits under jacketing.

Paul Industries designs a nameplate standoff bracket or an insulation window into every insulated vessel, so the ASME nameplate, the National Board number and the IN number stay readable for the life of the vessel. When ASME stamping on an older vessel becomes indistinct, section 30-3-19 has the inspector direct the owner to restamp it under NBIC Part 2, and Paul Industries performs that work with the inspector’s verification.

How does an Indiana pressure vessel permit work once the vessel runs?

An Indiana pressure vessel permit is an operating permit issued by the Department of Homeland Security after an inspection by an inspector who holds an Indiana license, and for unfired vessels it runs three years unless inspection results call for one or two. Under section 30-3-9 the inspector may extend the permit up to five years when systematic corrosion data supports the longer interval, which matches the five-year ceiling Indiana Code 22-15-6-2 sets for any permit term.

No vessel may run before its first permit is issued, and a vessel that moves to a new location keeps its IN number but loses its permit and needs a new inspection under section 30-3-23. Where the vessel arrives with a new building, addition or major alteration, the project’s design release under Indiana Code 22-15-3 comes first, and Paul Industries ties the vessel’s setting date to that release.

Each Indiana pressure vessel inspection after the first follows the same pattern: the owner prepares the vessel to the inspector’s instructions, the inspector examines it and reports to the Department, and the operating fee is paid before the permit renews. Preparation for an internal look means isolating, draining, venting and purging the vessel, cleaning it, blanking every line that could admit product or steam, and opening manways. Paul Industries builds blind flange locations, vent and drain connections and davits for heavy manway covers into new vessels so that each later inspection takes hours of preparation rather than days.

Pressure vessel inspection: Indiana’s internal and alternative examinations

Pressure vessel inspection in Indiana is external on the permit schedule, with an internal inspection required where the vessel is subject to internal corrosion, following NBIC Part 2 or API 510. The internal inspection of pressure vessel interiors does not have to coincide with the permit inspection, and the rule lists vessels where an alternative examination can take its place: vessels a person cannot enter, vessels that cannot be entered safely, and vessels in service where opening them does more harm than good, such as ammonia vessels in which oxygen and moisture promote stress corrosion cracking.

The accepted alternatives include ultrasonic thickness measurement, phased array ultrasonics, eddy current, radiography and borescope examination, performed by qualified personnel and accepted by the inspector. Paul Industries designs inspection access into new vessels, adds thickness monitoring locations at the points corrosion will attack first, and builds the corrosion baseline the owner needs to argue for the five-year term later.

ASME pressure vessel inspection requirements as Indiana applies them
StageRequirementSource
During fabricationAuthorized inspector reviews design, witnesses hold points and the pressure test, signs the data reportASME Section VIII
InstallationInspection by an inspector holding an Indiana license; IN number attached; permit issued before operation675 IAC 30-7-2 and 30-3-9
In service, externalOn the permit cycle, normally three years675 IAC 30-3-9
In service, internalWhere subject to internal corrosion, or an accepted alternative examinationNBIC Part 2 or API 510
Extended intervalUp to five years with systematic corrosion data and inspector approval675 IAC 30-3-9 and IC 22-15-6-2
Repair or alterationUnder a National Board R Certificate of Authorization to NBIC Part 3, API 510 or the original code675 IAC 30-5-11

Owners asking about ASME pressure vessel inspection frequency should note that the ASME code itself governs construction, while the in-service frequency comes from the state: in Indiana, the permit term in 675 IAC 30-3-9 and the corrosion-driven internal schedule from NBIC Part 2 or API 510. Pressure vessel inspection requirements for a refinery vessel under API 510 can therefore run on a risk-based schedule inside the state’s permit cycle.

Vessels for Indiana refineries, mills and pharmaceutical plants

Indiana’s vessel market is anchored by refining, steel, pharmaceuticals and food. With 471,700 barrels per calendar day of refining capacity at Whiting and Mount Vernon on the Energy Information Administration’s January 2026 count, the state’s refinery separators, drums, exchangers and reactors carry API 510 programs on top of the state permit. Steel mills in Northwest Indiana run air receivers, accumulators, gas holders and cooling system vessels across very large sites.

Pharmaceutical and animal health manufacturing adds stainless vessels built to ASME BPE surface and drainability requirements as well as Section VIII. Eli Lilly is building an active pharmaceutical ingredient site in Lebanon, Boone County, and expanding its Lebanon Advanced Therapies facility under $4.5 billion of further investment announced in May 2026, and Elanco opened its global headquarters in Indianapolis in 2025. Process vessels for those plants are qualified through validation and commissioning in Indiana, with the piping between them run through process piping in Indiana.

Warsaw’s orthopedic device cluster, where Zimmer Biomet is headquartered, uses steam sterilizers, autoclaves, ultrasonic cleaning systems and compressed air receivers, each a regulated vessel when it exceeds the rule’s thresholds. Food and grain processors across the state run cookers, retorts, deaerators and air receivers on the same three-year cycle.

Jackets, cladding and sanitary finishes on Indiana process vessels

Jacketed vessels are the workhorse of Indiana’s pharmaceutical, food and chemical plants, and each jacket is a second pressure chamber with its own design pressure, relief device and code calculations. Conventional jackets, dimple jackets and half-pipe coils each suit different heating and cooling duties: half-pipe coils handle high jacket pressures and fast heat transfer on large reactors, dimple jackets keep weight down on thinner vessels, and conventional jackets suit low-pressure glycol or tempered water. Paul Industries sizes the jacket from the batch heat-up and cool-down times the process needs, then checks the inner shell for external pressure from the jacket.

Clad and lined vessels answer corrosive service in refining and chemical plants. Stainless or nickel alloy cladding on a carbon steel backing gives the corrosion resistance of the alloy with the strength and cost of carbon steel, and the clad thickness is excluded from strength calculations unless the code’s conditions for counting it are met. Sanitary vessels for drug and food plants add ASME BPE requirements: polished product-contact surfaces, full drainability, sanitary nozzles and sprayball coverage for clean-in-place. Paul Industries documents surface finish readings, ferrite checks and borescope records for every product-contact weld, because those records feed straight into qualification.

Specialty vessels round out the list. Steam sterilizers and autoclaves with quick-actuating closures need interlocks that prevent opening under pressure; vacuum vessels are designed for full external pressure; and air receivers for mills and assembly plants are sized for compressor duty cycles, with drains and relief valves placed where operators can reach them. Each of these vessels carries the same Indiana registration and permit path as any other regulated vessel once it crosses the rule’s thresholds.

Outdoor vessels and Indiana winters

Outdoor vessels in Indiana need a minimum design metal temperature chosen for real winter lows, because a carbon steel vessel that sits idle on a January night in Fort Wayne or along Lake Michigan can reach temperatures where impact testing becomes essential. Paul Industries sets the MDMT from site weather data and the vessel’s coincident pressure, selects impact-tested plate where needed, and specifies heat tracing and insulation for vessels whose contents freeze or condense.

Wind loads and seismic loads also enter the design. Southwestern Indiana lies near the Wabash Valley and New Madrid seismic zones, so tall vessels and skirts in Evansville and the Ohio River counties are checked for the seismic design category of the site, while tall columns everywhere in the state are checked for wind-induced vibration.

Repairs, rerates and relocated vessels

Repairs to a regulated Indiana vessel are made under a valid National Board R Certificate of Authorization, following NBIC Part 3, API 510 or the code the vessel was built to, and alterations including rerates follow NBIC Part 3 with the allowable stresses from the original construction edition. The hydrostatic leak test after a repair may not exceed the original test pressure, and the inspector and owner may agree to an alternative examination where filling the vessel is impractical.

A used vessel brought into an Indiana plant must be reinstalled to NBIC Part 1 and inspected for a new permit. Paul Industries reviews the data report, the National Board registration and a thickness survey before the owner buys, so a secondhand vessel is never discovered to be unregistrable after it arrives. Weld repairs to vessel supports, platforms and ladders run through industrial welding services in Indiana, and boilers sharing the same steam system are handled through boiler repair in Indiana.

What sets the price of pressure vessel fabrication in Indiana?

Pressure vessel fabrication cost depends on design pressure and temperature, diameter and length, material and thickness, the code division, nozzle count and size, internals such as baffles, trays or agitator supports, examination extent, postweld heat treatment, surface finish for sanitary service, insulation and jacketing, and delivery and setting. Material is often a major share of the price, and alloy or clad vessels can cost several times an equivalent carbon steel vessel. Design choices move the number as well: a slightly thicker shell that avoids postweld heat treatment, standard head sizes, flanges in common ratings and nozzle loads settled early all shorten the schedule and lower the price, and Paul Industries reviews the data sheet with the owner’s engineer to find those savings before the design is frozen.

Paul Industries gives a budget price from the data sheet and a comparable vessel, then a firm price once the design calculations and the material quotes are complete. Owners with fixed outage dates send the latest delivery date with the request, and Paul Industries orders long-lead forgings and heads early to protect it.

Who fabricates pressure vessels in Indiana?

Paul Industries fabricates pressure vessels for Indiana plants, acting as the pressure vessel fabrication contractor from design through installation: ASME Section VIII Division 1 and 2 vessels, stainless and alloy process vessels, air receivers, separators, heat exchanger shells, jacketed reactors, and replacement vessels matched to existing nozzles and supports. As a pressure vessel fabrication company working across the state, Paul Industries supplies the vessel alone, designs and builds it, or delivers it installed, connected, tested and permitted.

From its headquarters at 256 Shore Drive in Kilmarnock, Virginia, the home of pressure vessel fabrication in Virginia, Paul Industries carries a history that began in northern New Jersey and continued in Pennsylvania. It builds vessels for plants across Indiana, the Midwest and all 50 states, using the same procedures behind pressure vessel fabrication in North Carolina.

Paul Industries vessel scope for Indiana owners

Paul Industries designs, fabricates, examines, tests, delivers and installs pressure vessels for Indiana refineries, mills, pharmaceutical, food and chemical plants, with the data report, National Board registration and everything the first permit inspection needs in the turnover package. Atmospheric storage that falls below the vessel rules is covered by tank fabrication in Indiana, and the national scope is set out on the pressure vessel fabrication services page. Other Indiana work is listed on the Indiana page. Send the data sheet and required delivery date and request a quote.

Standards referenced: Indiana Code 22-15-6 · 675 IAC 30, Indiana Boiler and Pressure Vessel Rules · ASME Boiler and Pressure Vessel Code, 2019 edition, Section VIII Divisions 1 and 2, Sections II, V and IX · National Board Inspection Code (NBIC), 2019 edition, Parts 1, 2 and 3 · API 510 Pressure Vessel Inspection Code, 10th edition · API 579-1/ASME FFS-1 Fitness-For-Service, 2016 · ASME BPE · Indiana Code 22-15-3 (construction design releases)

Frequently asked questions

Who builds pressure vessels for refineries and mills in Whiting, Gary and East Chicago?

Paul Industries builds separators, drums, accumulators, air receivers and exchanger shells for refineries, steel mills and chemical plants across Northwest Indiana. Refinery vessels there run API 510 programs inside Indiana’s permit cycle, so Paul Industries delivers each one with thickness monitoring locations, a corrosion baseline and the full data report, ready for the first permit inspection and later risk-based planning.

Does Paul Industries supply stainless process vessels to plants in Indianapolis and Lebanon?

Paul Industries supplies stainless process vessels, jacketed reactors, buffer and media vessels and clean steam components to pharmaceutical, animal health and food plants in Indianapolis, Lebanon and Boone County. Those vessels are built to ASME Section VIII and ASME BPE, with surface finish, drainability and documentation that support qualification, and they are installed and connected to the plant’s piping under the same contract.

Who fabricates vessels for plants in Evansville, Mount Vernon and the Ohio River counties?

Paul Industries fabricates pressure vessels for refining, chemical, plastics and food plants in Evansville, Mount Vernon and along the Ohio River in southern Indiana. Tall vessels in that part of the state are checked for the site’s seismic design category as well as wind, and Paul Industries sizes skirts, anchor bolts and foundations to suit before fabrication begins.

Does an air receiver in an Indiana plant need an operating permit?

An air receiver in an Indiana manufacturing plant needs an operating permit when any chamber exceeds the rule’s limits, which for a vessel installed after June 30, 1971 outside a place of public assembly means more than 15 cubic feet or a relief valve set above 300 psig. Receivers of 1.5 cubic feet or less are exempt anywhere. Paul Industries checks the threshold for every receiver it supplies.

Can an Indiana vessel earn a five-year operating permit?

Indiana pressure vessel inspections normally support a three-year operating permit for most unfired vessels, or one or two years if the inspection results call for a shorter term. With systematic corrosion data and the inspector’s approval, the permit can run up to five years, the ceiling Indiana law allows. Internal inspections follow NBIC Part 2 or API 510 where the vessel is subject to internal corrosion.

Can a vessel that cannot be entered skip the internal inspection in Indiana?

A vessel that cannot be entered, cannot be entered safely, or would be harmed by opening can be examined by an alternative method in place of an internal inspection under 675 IAC 30-3-9. Ultrasonic thickness readings, phased array, eddy current, radiography and borescope examination are all accepted when performed by qualified personnel and accepted by the inspector. Paul Industries designs examination points into new vessels for that purpose.

Do anhydrous ammonia vessels in Indiana fall under the boiler and pressure vessel rules?

Anhydrous ammonia vessels used in transporting, distributing or storing fertilizer are exempt from 675 IAC 30 where another agency sets their construction and safety rules, but the exemption does not reach vessels in refineries, utilities or manufacturing and processing plants. An ammonia receiver in a food plant’s refrigeration system is therefore regulated, and Paul Industries builds it to Section VIII with permit documentation.

Is a hot water storage tank a regulated pressure vessel in Indiana?

A hot water storage tank holding water at 210 degrees Fahrenheit or less, with overpressure protection, falls under the permit of the regulated boiler system it serves rather than needing its own permit, and it must still meet the rest of IC 22-15-6 and 675 IAC 30. Vessels full of water at 180 degrees or less are outside the rule. Paul Industries confirms the classification before ordering.

What edition of the ASME code does Indiana adopt for new vessels?

The Indiana rule text adopts the 2019 edition of the ASME Boiler and Pressure Vessel Code, and a new vessel must conform to the edition in effect when it was designed or built. Owners therefore receive vessels to the current ASME edition at the time of design, which the Indiana inspector accepts, and Paul Industries notes the edition and addenda on the data report and drawings.

Can a nonstandard or non-ASME vessel be used in Indiana?

Indiana requires new vessels to conform to the ASME code, and a vessel of special design that the adopted codes do not cover can be approved before construction through the variance procedure in Indiana Code 22-13-2-11. Older nonstandard vessels installed before 1953 have their own working pressure rules. Paul Industries replaces nonstandard vessels with ASME vessels matched to the existing connections when owners want the variance question settled for good.

What happens to the permit when a pressure vessel moves between Indiana plants?

A pressure vessel that moves within Indiana keeps its IN number, but its operating permit becomes invalid when it is moved, and a new inspection and permit are needed so the fittings and appliances meet the rules for new installations. The owner also notifies the Department of the new location. Paul Industries handles the relocation, the reinstallation to NBIC Part 1 and the inspection.

Does a fitness-for-service assessment count in Indiana?

Indiana adopts API 579-1/ASME FFS-1 in 675 IAC 30-1-1, so a fitness-for-service assessment is a recognized basis for keeping a corroded or damaged vessel in service, subject to the inspector’s acceptance. Section 30-3-26 still bars any calculation that uses a lower factor of safety than the original construction edition. Paul Industries supplies the thickness data and repairs the assessment calls for.

What sets the delivery date of a new ASME vessel for Indiana?

An ASME vessel’s schedule is set by design and approval time, material lead time for plate, heads and forgings, shop fabrication, examination, heat treatment and testing, then delivery and setting. Carbon steel vessels with stock material move fastest, and alloy, clad or heavy-wall vessels take longest. Paul Industries orders long-lead items at award and states the delivery date in the quote.

How are Indiana vessels delivered to a plant that cannot stop production?

Paul Industries plans delivery, rigging and setting around the plant’s operations: route surveys, crane selection, temporary supports, and tie-ins prepared in advance so the cutover happens in one short outage. Replacement vessels are built to the existing nozzle locations and support dimensions measured on site, so the new vessel drops into the old footprint with minimal piping changes.

What turnover documents come with an Indiana pressure vessel?

An Indiana pressure vessel from Paul Industries arrives with the signed ASME manufacturer’s data report, National Board registration, design calculations, approved drawings, material test reports, weld procedure and welder qualification records, examination reports, heat treatment charts, the pressure test record and nameplate photographs. Those documents support the first permit inspection and every inspection after it.

What does a pressure vessel quote request for an Indiana plant need?

A pressure vessel quote request should include the data sheet with pressure, temperature, volume, service and corrosion allowance, the material if specified, nozzle sizes and ratings, any internals, the installation location, and the required delivery date. Paul Industries returns a budget figure from comparable vessels and a firm price once the design is calculated.