Paul Industries provides boiler repair in Indiana for steel mills, refineries, pharmaceutical and food plants, hospitals and campuses, repairing tubes, drums, refractory, burners, controls and safety valves on power, process and heating boilers. Indiana writes its boiler rules into 675 IAC 30, the Indiana Boiler and Pressure Vessel Rules, and ties every regulated unit to an operating permit that lapses on a fixed date. Paul Industries scopes each repair around that permit, the National Board Inspection Code and the plant’s production calendar.
Request a quote or call 201-450-8280
What does boiler repair in Indiana have to satisfy?
Boiler repair in Indiana has to satisfy 675 IAC 30, a set of rules issued by the Fire Prevention and Building Safety Commission under Indiana Code 22-15-6 and enforced by the Boilers and Pressure Vessels Section of the Indiana Department of Homeland Security. Those rules moved from the old Boiler and Pressure Vessel Rules Board, where they sat in 680 IAC 2, to the commission in July 2019, and a rewrite took effect on July 1, 2021. Owners who still keep binders labeled 680 IAC are reading the same lineage under a new title.
The rule text adopts the 2019 editions of the ASME Boiler and Pressure Vessel Code and the National Board Inspection Code, together with API 510 and the API 579-1/ASME FFS-1 fitness-for-service standard. Where 675 IAC 30 is silent, section 30-1-2 sends the reader to the ASME code and the NBIC. Indiana’s definition of a boiler also reaches past the pressure parts: under 30-4-5 the term includes the apparatus that generates the heat and every control and safety device attached to it, so a burner management fault or a failed low water cutoff is a boiler repair in the eyes of the state, the same as a leaking tube.
Which units sit outside the Indiana boiler law?
The Indiana boiler law leaves out small heating boilers that meet three tests at once: they sit in a Class 2 structure, an apartment building with fewer than seven units, or a non-residential space that is not a place of public assembly; they heat at no more than 15 psig of steam or 30 psig of hot water; and their gross output is 215,000 Btu per hour or less. Fired process heaters, domestic water heaters, steam kettles with jackets below 50 psig and vessels under federal regulation are also outside the article. A rooftop heating boiler in an office building can therefore fall out of the program while an identical unit serving a school gymnasium falls in, because the gymnasium is a place of public assembly.
Indiana boiler inspection frequency by boiler class
Indiana boiler inspection frequency is set by section 30-3-9, which gives power boilers a one-year operating permit, heating and hot water supply boilers a two-year permit, and steam equipment built into a continuous chemical or refining process a three-year permit that the inspector may stretch to five years on corrosion data. Readers asking how often is a boiler inspected in Indiana get a different answer for each of those classes, and a single plant often holds all three.
Power boilers carry the tightest schedule. A power boiler, which Indiana defines as one making steam or vapor above 15 psig, gets an external inspection under pressure roughly six months after its permit is issued and a full internal and external inspection, out of service, within every 12 months. Heat recovery steam generators count as power boilers under the same definition.
| Boiler class | Permit term | Inspections | Extension route |
|---|---|---|---|
| Power boiler, steam above 15 psig | 12 months | External under pressure at mid-term; internal and external out of service within 12 months | Up to 36 months for units of 300,000 lb/h or more, with a water treatment case |
| Low pressure steam heating boiler | 24 months | Internal where construction permits, and external, every 24 months | Up to 6 months for unexpected plant difficulties |
| Hot water heating or hot water supply boiler | 24 months | Internal where construction permits, and external, every 24 months | Up to 6 months for unexpected plant difficulties |
| Steam equipment integral to a continuous process unit | 36 months, or 12 to 24 if results warrant | Tied to the permit term | Up to 5 years on systematic corrosion data, with inspector approval |
Two further reliefs exist. The division grants a two-month extension of any permit on notice for unexpected issues, and very large power boilers can move to a 36-month cycle in 12-month steps when the owner files a written request, the reports of every interim external inspection and a letter from an inspector covering water chemistry procedures, laboratory facilities, the outage record and safety relief valve history. During that extended cycle the external inspections under pressure continue about every six months.
What a state of Indiana boiler inspection asks of the owner
A state of Indiana boiler inspection that includes an internal look, like every boiler inspection Indiana schedules under 675 IAC 30, starts with preparation the owner must finish before the inspector arrives: isolating the unit from pressure and fuel, draining and venting it, cooling and cleaning the interior, blocking any backflow of steam or water, pulling manhole and handhole plates and plugs, and removing grates, internals or insulation the inspector needs out of the way. Under section 30-3-10 the inspector sets the date at least 14 days after notice, and under 30-5-2 an unprepared boiler can be turned away and its permit withheld. Paul Industries folds that preparation into the outage plan, so the repair crew is staged and the boiler is open and clean on the inspector’s date.
How does an Indiana boiler permit get renewed after a repair?
An Indiana boiler permit, the state of Indiana boiler permit known formally as an operating permit, is renewed by applying on the division’s form, having the unit inspected by an inspector who holds an Indiana license issued under IC 22-15-6-5, submitting that inspection report and paying the operating fee set in 675 IAC 12-3-13. Indiana Code 22-15-6-2 fixes the default permit at one year and lets the commission set longer terms by rule up to five years, which is where the two-year, three-year and five-year terms in the table come from.
A repair outage and a permit renewal are worth combining. When a tube failure or a cracked weld forces the boiler down within a few months of its permit date, the same internal inspection that accepts the repair can serve the renewal, saving a second cooldown. Paul Industries checks the permit date on the boiler’s posting at the start of every job and builds the schedule around whichever comes first, the repair or the expiration.
| Work on the boiler | Treatment under 675 IAC 30-5-11 and NBIC Part 3 | What the owner receives |
|---|---|---|
| Rerolling an existing tube | Not a repair under the Indiana rule | Maintenance record |
| Installing and rolling a replacement tube | A repair, made to NBIC Part 3 | NBIC repair documentation |
| Seal welding or explosive welding a tube plug | A repair, made to NBIC Part 3 | NBIC repair documentation |
| Weld repair to a shell, drum, header or tube sheet | Repair or routine repair as NBIC Part 3 categorizes it | NBIC repair documentation and test record |
| Rerating to a new pressure or temperature | An alteration under NBIC Part 3, using the original edition’s allowable stresses | Alteration documentation and new nameplate data |
| Replacing a safety valve or low water cutoff | Reinstalled to 675 IAC 30; new set pressure needs inspector approval | Valve and control test records |
The Indiana boiler code on welded repairs and rerates
The Indiana boiler code requires every repair on a regulated boiler or pressure vessel to be made under a valid National Board R Certificate of Authorization, or NR for nuclear items, with the work categorized as a repair or a routine repair as Part 3 of the NBIC defines those terms. Section 30-5-11 then settles several questions plant engineers often argue about: rerolling an existing tube is maintenance rather than a repair, but rolling in a replacement tube is a repair, and seal welding or explosively welding a tube plug is a repair as well.
Alterations follow NBIC Part 3 in every case, and a rerate must use the allowable stresses from the edition of the construction code the boiler was originally built to, so an older boiler gains no capacity from the higher stresses in recent ASME editions. Welding on pressure parts is done to procedures and welders qualified under ASME Section IX, and the authorized inspector is consulted on the repair method before the first weld. Paul Industries prepares the weld procedure, material certifications and repair plan in advance so the inspector reviews a complete package rather than a description.
Testing the repaired boiler
Testing a repaired Indiana boiler follows section 30-5-5: a hydrostatic leak test on a welded or riveted boiler may not exceed the original hydrostatic test pressure, the water may be no hotter than 120 degrees Fahrenheit, and each safety valve is removed or held closed with a testing clamp rather than by screwing down the spring. If the inspector and the owner agree, another examination from the ASME code or NBIC Part 3 may replace the leak test, which matters on a large watertube boiler where filling and draining costs a day. Safety appliances get their own protection under 30-5-6: none may be removed or altered while the boiler runs except under an inspector’s direction or for an emergency repair, and a valve reset to a new pressure needs the inspector’s approval.
When an Indiana inspector stops a boiler
An Indiana inspector who finds a boiler unsafe notifies the division immediately, the owner suspends operation, and the division issues an order suspending the operating permit and listing the repairs or other corrective measures required before the boiler runs again. That sequence, written into section 30-3-12, means the repair scope is effectively defined by the order, and Paul Industries works from the order’s wording when it prices and plans the job.
Less urgent findings take a gentler route. A boiler that falls short of the rules but remains safe stays in service while the division issues an order granting a reasonable time to correct the violation, and the department’s guidance is that a physical fix does not close the matter until the owner notifies the department before the comply-by date. A boiler judged beyond repair is declared prohibited from further use and stamped XXX IND XXX, after which using it or selling it for anything but salvage carries penalties.
Accidents and the 24-hour and 48-hour clocks
Accidents carry their own reporting duty under section 30-3-21. When a boiler or vessel is put out of service by an incident that injures someone or causes major property damage, the owner notifies the division and files an initial report within 48 hours; an explosion or a death must be reported within 24 hours by telephone or email, and nothing may be removed or disturbed before the inspection except to protect health and safety. A detailed report, completed by an inspector, follows with the cause, the origin and recommendations against a repeat. Paul Industries keeps the failed parts, photographs and measurements in order so that report rests on evidence.
Industrial boiler repair: Indiana’s mills, refineries and process plants
Industrial boiler repair in Indiana is shaped by the state’s heavy industry, which leans on steam far more than most states. Indiana leads the nation in crude steel production, and the integrated mills at Gary Works, Indiana Harbor and Burns Harbor are the three biggest blast furnace plants in the country by capacity, each with power boilers, waste heat boilers and steam networks that feed blowers, turbines and process heating.
Refining adds a second steam market. The Energy Information Administration lists two Indiana refineries as of January 1, 2026: BP’s Whiting refinery at 435,000 barrels per calendar day and CountryMark’s Mount Vernon refinery at 36,700. Waste heat boilers in those plants are classified by their build under section 30-4-51: a unit with drums and tubes is treated as a power boiler, while one built like a shell-and-tube exchanger is treated as an unfired pressure vessel, which changes the inspection cycle and the repair documents. Steam generators that form part of a continuous refining or chemical unit take the three-year permit with the five-year option, so their repairs land in turnarounds planned years ahead.
Paul Industries plans those turnaround repairs before the unit is shut down, with tube and header inspection plans, materials, weld procedures and NBIC paperwork ready, and the feedwater and steam connections disturbed by the work restored through process piping in Indiana. Pressure-retaining repairs on deaerators, blowdown tanks and other vessels in the same steam system are handled through pressure vessel fabrication in Indiana.
Commercial boiler repair: Indiana hospitals, campuses and public buildings
Commercial boiler repair in Indiana centers on heating and hot water boilers in hospitals, universities, schools, office towers and government buildings, most of which sit on the two-year permit cycle for low pressure steam and hot water units. Those boilers usually run in banks, so a repair takes one unit out while the others carry the load, and the job is planned for the shoulder seasons when Indiana’s heating demand is lowest.
Public owners have one fewer rule to track than in many states: Indiana repealed its Common Construction Wage Act effective July 1, 2015, so state and municipal public works contracts awarded since then carry no state wage scale, while federally funded projects still follow the Davis-Bacon Act. Paul Industries prices commercial boiler repair in Indiana on the funding basis the owner confirms at the start.
Indiana boiler work from Lake Michigan to the Ohio River
Boiler repair across Indiana follows a statewide rulebook, but each region brings a different mix of boilers and owners. Paul Industries takes boiler work in every part of the state under one set of procedures and records.
| Region | Typical boilers | How outages are planned |
|---|---|---|
| Indianapolis, Central Indiana, Lebanon and Boone County | Hospital and campus steam, pharmaceutical plant steam and clean steam generators | Shoulder-season outages; validated systems protected during repair |
| Northwest Indiana and the Calumet region | Mill power boilers, waste heat boilers, refinery steam generators | Furnace campaigns and refinery turnarounds |
| Fort Wayne, South Bend, Elkhart and Warsaw | Plant steam and hot water for washing, heat treating, paint lines and building heat | Production shutdown weeks and holiday breaks |
| Evansville, Mount Vernon and the Ohio River counties | Chemical, plastics, food and refinery process steam | Three-year process permit cycles and planned unit outages |
| Lafayette, Kokomo and Columbus | Automotive, engine and food plant steam and hot water | Model changeovers and summer shutdowns |
Boiler repair, Indianapolis and Central Indiana
Boiler repair in Indianapolis covers hospital and university steam plants, downtown office and government buildings, and pharmaceutical and animal health manufacturing, including the Eli Lilly campus at Lebanon in Boone County, where an active pharmaceutical ingredient site is under construction after a further $4.5 billion investment announced in May 2026. Boiler service, Indianapolis pharmaceutical plants included, extends to clean steam generators and the plant steam that feeds them, where a repair has to protect the validated state of the downstream system.
Northwest Indiana and the Calumet region
Boiler repair, Gary, Indiana and its neighbors Whiting, Hammond, East Chicago and Burns Harbor means mill and refinery boilers, waste heat recovery and process steam, where outages are scheduled around furnace campaigns and refinery turnarounds. The lake-effect winter along Lake Michigan also makes freeze protection of idle boilers and their piping part of every winter repair plan.
Fort Wayne, South Bend, Elkhart and Northern Indiana
Boiler repair, Fort Wayne to South Bend, covers food, automotive and manufactured housing plants, hospitals and university steam systems. Plants in Elkhart County and around Warsaw, where orthopedic device manufacturing is concentrated, run hot water and steam boilers for washing, heat treating and building heat.
Boiler repair, Evansville and Southwest Indiana
Boiler repair in Evansville and the surrounding counties serves chemical, plastics, food and refining plants along the Ohio River, including the refinery at Mount Vernon, where process steam generators follow the three-year cycle. Lafayette, Kokomo, Columbus and the Ohio River towns around Jeffersonville round out the industrial map with automotive, engine, food and chemical plants that each hold a mix of power and heating boilers.
When an Indiana boiler should be replaced, and the IN number that follows
Boiler repair is usually the better choice when the shell, drums and tube sheets are sound and the failure is confined to one area, while replacement makes sense when the pressure envelope is thinning across wide areas, parts are no longer made, or the plant’s steam demand has changed. Owners asking how often do boilers need to be replaced find no fixed answer in the Indiana rules; replacement is driven by measured wall loss, repeated failures and efficiency, and Paul Industries backs the recommendation with ultrasonic thickness readings and the repair history.
A new boiler brings Indiana’s installation steps with it. Section 30-6-1 requires it to conform to the ASME code edition in effect when it was built and, where a manufacturer’s data report applies, to be registered with the National Board; a reinstalled or secondhand boiler must meet NBIC Part 1. The inspector attaches an Indiana registration number, the letters IN followed by digits at least a quarter inch high, at the first operating permit inspection, and the number must stay visible rather than disappear under lagging or paint. A boiler moved within the state keeps its number but loses its permit and needs a fresh inspection, and the Department’s guidance notes that a construction design release from its plan review section may be needed before a new installation goes in. Paul Industries handles boiler repair and installation under one contract, from removal of the old unit to the new unit’s first permit inspection.
What drives the price of boiler repair in Indiana?
The cost of boiler repair in Indiana depends on the boiler class and size, the type of failure, whether the work counts as a repair or an alteration under NBIC Part 3, materials and their lead times, access and rigging, refractory work, nondestructive examination, the hydrostatic test or its substitute, and whether the work runs in a planned outage or a forced one. Overtime, temporary steam and turnaround premiums add to the cost when the plant cannot run without the boiler.
Paul Industries gives a budget range from comparable scope once it sees the nameplate data, the Indiana registration number, the latest inspection report and any order from the division, then a firm price once the boiler is opened and the findings are measured. Plants that want the price fixed earlier can send thickness surveys, photographs and the repair history with the request.
Who repairs boilers in Indiana?
Paul Industries repairs boilers in Indiana for industrial, commercial and institutional owners, covering firetube, watertube, waste heat and package boilers, burners and burner management, controls, feedwater equipment and safety valves. As a boiler company in Indiana’s industrial market, Paul Industries diagnoses the failure, plans the repair to NBIC Part 3, prepares the boiler for the inspector, performs the repair and testing, and returns the unit to its operating permit with every record in the owner’s file.
Paul Industries is headquartered at 256 Shore Drive, Kilmarnock, Virginia, where it also provides boiler repair in Virginia, and it was formerly based in northern New Jersey, then Pennsylvania. It takes boiler work across Indiana, the Midwest and all 50 states, applying the same planning used for boiler repair in Pennsylvania. Steam leaving the boiler room is often the next problem, and Paul Industries services that side through steam trap work.
Paul Industries boiler repair for Indiana owners: the full scope
Paul Industries provides industrial boiler repair in Indiana from first diagnosis to the returned permit: tube replacement and plugging, drum, header and tube sheet weld repairs, refractory rebuilds, burner and burner management repairs and replacements, low water cutoff and safety valve replacement, rerates and complete boiler replacement. Related welding on structural supports and stacks runs through industrial welding services in Indiana, and chilled water plants in the same buildings are covered by chiller repair in Indiana. The national scope is described on the boiler repair services page, and the full list of Indiana work is on the Indiana page. To start, send the nameplate, the IN number and the latest inspection report and request a quote.
Standards referenced: Indiana Code 22-15-6 (boilers and pressure vessels) · 675 IAC 30, Indiana Boiler and Pressure Vessel Rules · 675 IAC 12 (general administrative rules, operating permit fees) · ASME Boiler and Pressure Vessel Code, 2019 edition, Sections I, IV and IX · National Board Inspection Code (NBIC), 2019 edition, Parts 1, 2 and 3 · ASME CSD-1 · NFPA 85 · Indiana Code 22-15-3 (construction design releases)
Frequently asked questions
Who repairs hospital and campus boilers in Indianapolis and Carmel?
Paul Industries repairs steam and hot water boilers for hospitals, universities, state and city buildings and office towers in Indianapolis, Carmel, Fishers and the rest of Central Indiana. Most of those units hold two-year Indiana permits, so Paul Industries lines up tube, burner and control repairs with the permit inspection where the dates allow, and stages the work so the remaining boilers in the bank carry the building while one is open.
Does Paul Industries repair mill and refinery boilers in Gary, Whiting and Burns Harbor?
Paul Industries repairs power boilers, waste heat boilers and process steam generators at steel mills, refineries and chemical plants across Northwest Indiana and the Calumet region. Mill boilers are planned around furnace and caster outages, and refinery steam generators around turnarounds, with weld procedures, materials and NBIC Part 3 paperwork ready before the unit comes down.
Who handles boiler repair, South Bend, Lafayette and Kokomo plants included?
Paul Industries repairs boilers at automotive, engine, food and chemical plants in South Bend, Lafayette, Kokomo, Columbus and the surrounding counties. Plant steam in those facilities feeds paint systems, washers, process heating and building heat, so Paul Industries reviews condensate return and feedwater chemistry whenever tube failures repeat, rather than replacing the same tubes on a cycle.
Who inspects boilers in Indiana?
Boilers in Indiana are inspected by inspectors who hold a license issued under IC 22-15-6-5, working for the Department of Homeland Security or for an inspection agency such as an insurer. State inspectors cover state-owned units and take others as time permits. The inspector’s report goes to the Department with the permit application, and Paul Industries sets the repair schedule with whichever inspector holds the boiler.
What is the Indiana boiler registry number and where does it go?
The Indiana boiler registry number is the state registration number, the letters IN followed by digits, that an inspector attaches at the first operating permit inspection. It must be at least a quarter inch high and stay visible, never covered by lagging or paint. The number stays with the boiler if it moves within Indiana, so Paul Industries protects and restores it during insulation and casing work.
Can an Indiana boiler run while its operating permit renewal is pending?
An Indiana boiler needs a valid operating permit to operate, and the rules give owners relief for timing problems rather than a grace period: a two-month extension on notice for unexpected issues, a six-month extension for unexpected plant difficulties on non-process boilers requested before expiry, and longer cycles for very large power boilers with a water treatment case. Paul Industries schedules repairs so the inspection lands before the permit date.
Is rerolling a leaking boiler tube a repair under Indiana rules?
Rerolling an existing tube is treated as maintenance under 675 IAC 30-5-11, while installing and rolling a replacement tube is a repair made to NBIC Part 3. Seal welding or explosively welding a tube plug also counts as a repair. Paul Industries records which category each tube falls into, so the documentation matches the work the inspector sees.
How hot can the water be for a boiler hydrostatic test in Indiana?
The water for a hydrostatic leak test on an Indiana boiler may be no hotter than 120 degrees Fahrenheit, and its minimum temperature follows the construction or repair code. The test pressure may not exceed the original hydrostatic test pressure, and each safety valve is removed or held with a testing clamp. With the inspector’s agreement, an ASME or NBIC Part 3 examination may replace the leak test.
Do waste heat boilers follow power boiler or pressure vessel rules in Indiana?
Indiana classifies a waste heat boiler by how it is built. A unit with drums, tubes and the accessories of a boiler is treated under the power boiler sections of 675 IAC 30, while one built with a shell, tube bundle and channel like a heat exchanger is treated under the unfired pressure vessel sections. Paul Industries confirms the classification first, since it sets the inspection cycle and the repair records.
What safety valve settings does Indiana require on a power boiler?
Indiana requires at least one safety valve on every boiler and two or more on a boiler with more than 500 square feet of water heating surface. At least one valve is set at or below the maximum allowable working pressure, the others no more than 3 percent above it, and the valves together must keep pressure within 6 percent of the highest setting. Weighted-lever valves are prohibited.
Do Indiana steam boilers need a low water fuel cutoff?
Every automatically fired steam or vapor boiler in Indiana needs an automatic low water fuel cutoff unless it has a constant attendant with no other duties. The device must shut off the fuel when the water drops to the lowest safe water line, which may sit no lower than the bottom of the gauge glass, and float designs need a valved drain for flushing and testing. Paul Industries tests the cutoff after every repair.
How fast must a boiler accident be reported in Indiana?
An explosion or a death must be reported to the Indiana Department of Homeland Security within 24 hours by telephone or email, and an incident that disables a boiler and injures someone or causes major property damage must be reported with an initial report within 48 hours. The boiler and its parts stay undisturbed until inspected, except to protect health and safety, and an inspector completes the detailed report.
What happens when an inspector orders an Indiana boiler shut down?
When an inspector finds a boiler unsafe, the owner stops it, and the Department issues an order suspending the operating permit and stating the repairs required. The boiler stays down until those repairs are made and accepted. Paul Industries uses the order as the starting point for the repair scope and returns the boiler to the inspector with the records the order calls for.
Is a secondhand boiler from another state acceptable for an Indiana plant?
A used or secondhand boiler can be installed in Indiana when it is reinstalled to NBIC Part 1 and built to the ASME edition in force when it was made, with National Board registration where a data report applies. An existing Indiana unit that moves keeps its IN number but needs a new inspection and permit. Paul Industries evaluates the boiler’s records and condition before purchase and handles the reinstallation.
Does a burner or fuel change on an Indiana boiler need an air permit review?
A burner, fuel or capacity change on an Indiana boiler is checked against the facility’s air permit with the Indiana Department of Environmental Management before equipment is ordered, since emission limits and fuel terms are written into those permits. Paul Industries confirms the permit terms with the owner’s environmental staff and selects burners and controls that keep the boiler within them.
How often do boilers need to be serviced between Indiana inspections?
Boilers need routine attention far more often than Indiana’s one-year or two-year inspection cycles: daily or shift checks of water level and pressure, regular blowdown, periodic low water cutoff and safety valve tests, burner tuning and water chemistry control. Paul Industries sets up maintenance plans that match each boiler’s class and duty, so the permit inspection confirms condition rather than discovering problems.
What information speeds a firm price on an Indiana boiler repair?
Send the boiler nameplate, the Indiana IN number, the current operating permit date, the latest inspection report and any order from the Department, along with photographs, operating logs and recent water chemistry. Paul Industries uses those to give a budget range from comparable work, then fixes the price once the boiler is opened and measured.
Boiler down or facing an inspector's order in Indiana?
Send the nameplate, the IN number, the permit date and the latest inspection report. Call 201-450-8280 or request a quote.
