Paul Industries provides process piping in Indiana, designing, fabricating, installing and testing ASME B31.3, B31.1, B31.9 and BPE piping for pharmaceutical and food plants, refineries, steel mills, chemical plants and assembly plants. Indiana sorts plant piping into trades by what flows through it: water supply, drainage and venting fall under the state’s plumbing law and code, while steam, chemicals, product, gases and process water follow the ASME B31 codes. Paul Industries draws that line on every project before the first spool is cut.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
Piping codes ASME B31.3, B31.1, B31.9 and BPE
Plumbing code 2012 Indiana Plumbing Code, 675 IAC 16-1.4
Mechanical code 2014 Indiana Mechanical Code, 675 IAC 18-1.6
State wage law Common construction wage repealed July 1, 2015
Manufacturing Highest manufacturing job concentration of any state (BLS)
Reviewed November 2026

What counts as process piping in Indiana?

Process piping in Indiana is the piping that carries a plant’s product, raw materials, utilities and waste streams between equipment: chemicals and solvents, steam and condensate, compressed air and gases, cooling and chilled water, purified water, clean-in-place solutions and hydraulic and lube oil. Its design, materials, fabrication, examination and testing follow the ASME B31 code that matches the service, most often ASME B31.3 for process plants.

The boundary matters in Indiana because the state’s plumbing statute, Indiana Code 25-28.5, defines plumbing as the piping, fixtures and appliances for sanitary and storm drainage, venting, and public or private water supply within or adjacent to a building, together with stormwater, sewer and water service lines to the property line. A potable water header feeding a plant’s restrooms, eyewash stations and break rooms is plumbing; a steam line to a reactor jacket, a nitrogen header or a glycol loop is process piping. Paul Industries maps each system to its governing code in the design basis, so the plumbing inspector, the plant’s engineer and the owner’s insurer each see the same division.

Where the Indiana plumbing license applies

Indiana plumbing license requirements under Indiana Code 25-28.5 attach to work within that plumbing definition, and the statute makes acting as a plumbing contractor or journeyman plumber without a license from the Indiana Plumbing Commission a Class A misdemeanor. The statute also lists exceptions, including public utilities working with their own forces, maintenance employees working at their own place of employment, and contractors working on sewer and water lines outside a building’s foundation walls. Paul Industries scopes the potable water tie-ins, backflow preventers and drains on a process project to the plumbing law and code, and the process systems to ASME B31, under one contract and one schedule.

Which codes govern plant piping under the Indiana plumbing code and mechanical code?

The Indiana plumbing code in force is the 2012 Indiana Plumbing Code, 675 IAC 16-1.4, which adopts the 2006 International Plumbing Code with Indiana changes and has been in effect since December 24, 2012; the Indiana Mechanical Code is the 2014 edition, 675 IAC 18-1.6, adopting the 2012 International Mechanical Code. Both are rules of the Fire Prevention and Building Safety Commission and apply statewide to Class 1 structures, meaning buildings used by the public, employees or three or more tenants.

Code updates are underway. The commission has drafted a 2026 Indiana Building Code built on the 2024 International Building Code, with its effective date still to be set, and in 2026 it opened public comment on Indiana plumbing code amendments to two sections of 675 IAC 16-1.4. Projects designed now are checked against the editions in force on the design release date, and Paul Industries tracks the rulemaking so a project straddling an adoption is designed to the correct edition.

Codes that govern piping systems at Indiana plants
SystemGoverning codeIndiana rule or statute
Chemical, solvent, product and process gas linesASME B31.3Owner’s specification; fire code for flammables
Boiler external piping and high-pressure steamASME Section I and B31.1675 IAC 30 for the boiler and its controls
Building heating, chilled water and low-pressure steamASME B31.92014 Indiana Mechanical Code, 675 IAC 18-1.6
Ammonia and other refrigerant pipingASME B31.5 and IIAR 2 for ammonia2014 Indiana Mechanical Code
Purified water, WFI, clean steam and product transferASME BPE with B31.3 High Purity rulesFDA current good manufacturing practice for the product
Natural gas and propane to equipmentFuel gas code and NFPA 54 or 58Indiana Fuel Gas Code, 675 IAC 25
Potable water, drainage and ventingPlumbing code2012 Indiana Plumbing Code and IC 25-28.5 licensing

Design releases before piping goes into a new building

Indiana requires a construction design release from the Department of Homeland Security, or from a city or county whose plan review the commission has approved, before construction of a Class 1 structure begins, and starting construction without one is a Class C infraction under Indiana Code 22-15-3-7. A process piping project inside a new building or a major addition therefore rides on the building’s design release, and the mechanical and plumbing drawings submitted with it must show the code-governed systems. Paul Industries prepares those drawings with the process piping design, so the release and the piping package agree.

ASME B31.3 fluid service categories and testing

ASME B31.3 assigns every process line a fluid service category, and that category sets the examination extent and the test. Normal fluid service covers most process lines. Category D covers nonflammable, nontoxic fluids at low pressure and temperature, such as plant air and cooling water, and allows an initial service leak test in place of a hydrostatic test. Category M covers toxic fluids where a single exposure to a small leak can cause serious harm, with more examination and a sensitive leak test. High Pressure and High Purity services each have their own chapter.

B31.3 categories, examination and tests on Indiana projects
Fluid serviceTypical Indiana examplesLeak test
Category DPlant air, cooling water, low-pressure nitrogenInitial service leak test permitted
NormalSolvents, process water, steam to process, glycolHydrostatic at 1.5 times design pressure, temperature corrected, or pneumatic at 1.1 times
Category MHighly toxic services the owner designates Category MHydrostatic or pneumatic plus a sensitive leak test
High PurityPurified water, WFI, clean steam, biologic product transferPer B31.3 Chapter X with ASME BPE examination
High PressureHydraulic test stands, high-pressure gasPer B31.3 Chapter IX

Pneumatic tests carry stored energy hazards and need a written procedure, exclusion zones and staged pressurization, so Paul Industries uses them where water would harm the system or cannot be removed, and documents each test with gauges, durations and witnesses. Every weld on pressure piping follows procedures and welders qualified under ASME Section IX, with the examination records filed by line number.

Piping materials for Indiana process services

Piping materials for Indiana plants are chosen from the fluid, temperature, pressure and cleanliness the service demands, and the choice drives cost and schedule more than any other decision on a piping project. Carbon steel covers steam, condensate, oil, fuel gas and most utilities; austenitic stainless covers process water, food and drug service and many chemicals; chrome-moly alloys take high-temperature steam and refinery hydrogen service; and lined or plastic systems handle the acids that attack metals.

Common piping materials by service at Indiana plants
ServiceTypical materialFabrication notes
Plant steam and condensateCarbon steel, ASTM A106 or A53Socket or butt welds by size; condensate lines sized for flash steam
High-temperature steam and hydrogen serviceChrome-moly, P11 or P22Preheat and postweld heat treatment to B31.1 or B31.3
Purified water, WFI and clean steam316L stainless tubing to ASME BPEOrbital welding, borescope, passivation
Food product and CIP304 or 316L sanitary tubingSanitary fittings, sloped and drainable
Hydrochloric acid and picklingLined steel or thermoplasticFlanged construction; supports for plastic creep
Compressed air and nitrogenCarbon steel, stainless or aluminum systemsCategory D where conditions allow
Hydraulic and lube oilCarbon or stainless steelPickled and flushed to the cleanliness class required

Material availability changes with the market, and Indiana projects compete for alloy fittings and stainless tubing with every other plant expansion in the region. Paul Industries checks lead times during design, proposes approved alternates where the specification allows, and releases long-lead valves and alloy components at award so field installation is never waiting on a single fitting. Valves get the same attention: control valves, actuated isolation valves and specialty sanitary valves are often the longest lead items on a project, and their dimensions are confirmed with the vendor before isometrics are released for fabrication.

Stress analysis, supports and thermal growth

Stress analysis decides how a hot or cold line moves and where it pushes on equipment, and it is required by B31.3 and B31.1 whenever a line’s flexibility cannot be shown by simple comparison with a proven design. Steam lines, hot oil lines and long runs on pipe racks grow several inches between cold and operating conditions, and the supports, guides, anchors and expansion loops must let that movement happen without overloading pump and turbine nozzles.

Paul Industries models critical lines in pipe stress software, checks nozzle loads against the equipment manufacturers’ allowables, and designs spring hangers, guides and anchors to suit. Indiana’s temperature swings also matter for outdoor lines that sit idle: a carbon steel line on an exterior rack can see winter metal temperatures well below zero Fahrenheit, so minimum design metal temperature and impact testing are checked for every exterior service.

Flushing, cleaning and turnover

Flushing and cleaning turn an installed piping system into one fit for its service, and each service sets its own standard. Utility water lines are flushed until the discharge runs clear; hydraulic and lube oil systems are flushed at turbulent velocity until particle counts meet the specified cleanliness class; steam lines are blown to remove mill scale before turbines or control valves see steam; and stainless high-purity systems are cleaned, passivated and verified before qualification.

Turnover closes the job. Paul Industries hands over marked-up and final as-built isometrics, weld maps and logs, examination and test records, material certifications, flushing and cleaning records, and valve and instrument data, organized by system so maintenance staff can find any line years later. On regulated work the package also carries whatever records the plumbing or mechanical inspector, the boiler inspector or the plant’s quality group needs.

Process piping for Indiana pharmaceutical and device plants

Process piping for Indiana pharmaceutical plants is dominated by stainless high-purity systems: purified water and WFI loops, clean steam, clean-in-place supply and return, buffer and media transfer and product lines, all built to ASME BPE with orbital welds, borescope inspection, slope verification and passivation. Eli Lilly is building an active pharmaceutical ingredient site and expanding its Lebanon Advanced Therapies facility in Boone County under a further $4.5 billion investment announced in May 2026, and every such plant carries miles of utility and process piping alongside its high-purity systems.

Paul Industries builds the sanitary systems through sanitary process piping in Indiana and the utility and process systems around them under this page’s scope, and qualifies both through validation and commissioning in Indiana. Device plants in Warsaw and Northern Indiana add purified water, compressed dry air, nitrogen and process cooling for machining, cleaning and passivation lines.

Industrial piping: Indiana mills, refineries and assembly plants

Industrial piping in Indiana serves an economy more concentrated in manufacturing than any other state’s: the Bureau of Labor Statistics found that Indiana’s share of jobs in manufacturing was 2.04 times the national share in 2022, and transportation equipment made up about a quarter of the state’s manufacturing employment. Assembly, engine and parts plants run compressed air, paint system, hydraulic, coolant and process water piping that changes with every model or line rearrangement.

Heavy industry adds harder services. Northwest Indiana’s integrated steel mills run high-pressure water for descaling, oxygen and fuel gas lines, hydraulic systems and acid piping for pickling lines, while the state’s two refineries, BP at Whiting and CountryMark at Mount Vernon, together rated at 471,700 barrels per calendar day by the Energy Information Administration for 2026, run hydrocarbon, hydrogen, steam and utility piping maintained in turnarounds. Paul Industries fabricates and installs carbon steel, stainless, chrome-moly and alloy piping for those services, and the steam supply that drives much of it ties back to boiler repair in Indiana.

Process piping in Indianapolis and Central Indiana

Process piping in Indianapolis and the surrounding counties covers pharmaceutical, animal health, food and beverage and engine plants and the steam and chilled water plants of hospitals and universities. Process piping, Indianapolis to Lebanon, is busiest at drug manufacturing sites, where utility and process systems are installed alongside high-purity work and validated together.

Northwest Indiana, South Bend and Fort Wayne

Northwest Indiana’s mills and refinery, South Bend and Elkhart manufacturing, and Fort Wayne’s assembly and food plants each bring their own mix of services, from oxygen and hydraulic lines to food-grade water and ammonia refrigeration. Lake-effect winters along Lake Michigan make heat tracing and freeze protection standard on exterior lines, and Paul Industries designs mechanical insulation and tracing with the piping rather than after it.

Evansville, Lafayette, Kokomo and Columbus

Southwestern Indiana’s chemical, plastics, food and refining plants along the Ohio River, Lafayette’s and Kokomo’s automotive and food plants, and Columbus’s engine plants make up the rest of the state’s industrial piping market. Industrial piping insulation, process cooling loops and compressed air systems are common threads across all of them.

Compressed air, nitrogen and gas distribution

Compressed air and gas distribution is a constant piping retrofit in Indiana’s assembly and parts plants, because every new line, robot cell or paint booth adds demand to a header sized for an earlier layout. Undersized headers and long dead-end branches waste energy through pressure drop, so Paul Industries designs loop headers that feed each drop from two directions, sizes branches for peak flow rather than average, and places drains and drip legs where condensate collects.

Air quality follows the end use. Instrument air and breathing air need drying and filtration to the class the user specifies, food-contact air follows the plant’s food safety program, and drug plants test compressed gases that contact product for particulates, moisture, oil and microbes. Nitrogen for blanketing, purging and laser cutting is piped in stainless or copper where purity matters, and carbon steel where it does not. Paul Industries leak tests every new system, records the baseline flow at no load, and gives the plant a simple way to measure leakage in later years.

Ammonia and glycol refrigeration piping for Indiana food plants

Ammonia refrigeration piping serves Indiana’s meat, dairy, frozen food, beverage and cold storage operations, and it follows ASME B31.5 for refrigeration piping together with the IIAR standards that the industry uses for ammonia system design, installation and safety. Ammonia piping is carbon steel or stainless, never copper or brass, and its welds, supports, valves and relief headers are designed for the system’s pressure and the plant’s emergency response plan.

Glycol and brine secondary loops are taking over many process cooling duties because they keep ammonia charge in the machine room and out of production areas. Paul Industries installs both, from engine room headers and evaporator connections to glycol distribution with insulation and vapor barriers suited to sub-freezing service, and tests and documents each system for the plant’s process safety records. Vessels on those systems, such as receivers and recirculators, are built and registered through the pressure vessel rules.

Shop prefabrication and installation in operating Indiana plants

Shop prefabrication moves most of the welding on an Indiana piping project off the plant floor: spools are cut, welded, examined, cleaned and tagged under controlled conditions, then shipped for bolt-up and closure welds in the field. That approach shortens the time the plant lives with hot work permits and open systems, improves weld quality and lets the field crew install in planned outage windows.

Installing in an operating plant adds isolation and tie-in planning. Paul Industries surveys existing lines with laser scanning or field measurement, prepares tie-in packages with isolation points, hot tap or line stop requirements and lockout steps, and stages the work so production keeps running until the cutover. Process vessels and storage installed in the same project come through pressure vessel fabrication in Indiana and tank fabrication in Indiana, and structural supports and pipe racks through industrial welding services in Indiana.

Cost drivers for process piping in Indiana

The cost of process piping in Indiana depends on material and schedule, diameter and footage, the fluid service category and examination extent, fittings and valves, supports, insulation and tracing, the proportion of shop to field welding, access, height and congestion, tie-ins to live systems, testing and documentation. High-purity stainless with orbital welding, borescopes and passivation costs far more per foot than carbon steel utility piping, and work in outage windows carries premium time.

On public work, piping budgets in Indiana have carried no state wage schedule since the 2015 repeal of the Common Construction Wage Act, with Davis-Bacon rates returning wherever federal dollars fund the job, while private plants set their own terms. Paul Industries gives a budget range from P&IDs and a line list, then a firm price once isometrics and the takeoff are complete.

Who installs process piping in Indiana?

Paul Industries installs process piping in Indiana as one of the industrial process piping contractors that carries a project from design through turnover: piping design and stress analysis, material procurement, shop spool fabrication, field installation, examination, testing, flushing and cleaning, insulation and the final documentation package. Owners comparing industrial piping contractors and process piping contractors in Indiana can choose supply of prefabricated spools, design-build, or complete installation with every system tested and handed over.

Kilmarnock, Virginia, at 256 Shore Drive, is the headquarters of Paul Industries and the base for process piping in Virginia; the company’s earlier homes were northern New Jersey and then Pennsylvania. Paul Industries accepts process piping work across Indiana, the Midwest and all 50 states, with the same procedures used for process piping in North Carolina.

Paul Industries piping scope for Indiana plants

Paul Industries designs, fabricates, installs, tests and documents process and utility piping for Indiana plants, from refinery and mill services to pharmaceutical utilities and assembly plant compressed air, with the plumbing-code systems scoped and installed alongside. The national scope is set out on the process piping services page, and the rest of the Indiana work is listed on the Indiana page. Send P&IDs, a line list and the site schedule and request a quote.

Standards referenced: ASME B31.3 Process Piping · ASME B31.1 Power Piping · ASME B31.9 Building Services Piping · ASME B31.5 Refrigeration Piping · ASME BPE · ASME Section IX · 2012 Indiana Plumbing Code (675 IAC 16-1.4) · 2014 Indiana Mechanical Code (675 IAC 18-1.6) · Indiana Fuel Gas Code (675 IAC 25) · Indiana Code 25-28.5 (plumbing licensing) · Indiana Code 22-15-3 (design releases) · 675 IAC 30, Indiana Boiler and Pressure Vessel Rules

Frequently asked questions

Who installs process piping, Indianapolis and Boone County drug plants included?

Paul Industries installs process and utility piping for pharmaceutical, animal health, food and engine plants in Indianapolis, Lebanon, Boone County and the rest of Central Indiana. At drug plants the work runs alongside high-purity systems and validation, so Paul Industries delivers weld logs, test records and as-built isometrics in the format the qualification team uses.

Who prefabricates turnaround piping for Calumet region mills and the Whiting refinery?

Paul Industries fabricates and installs carbon steel, stainless, chrome-moly and alloy piping for steel mills, the refinery and chemical plants across Northwest Indiana and the Calumet region. Turnaround piping is prefabricated before the unit comes down, with tie-in packages, isolation plans and test procedures ready, so the outage is spent installing rather than measuring.

Who handles plant piping in Fort Wayne, South Bend and Elkhart?

Paul Industries installs process, compressed air, cooling water, hydraulic and steam piping for assembly, food and manufactured housing plants in Fort Wayne, South Bend, Elkhart and across Northern Indiana. Exterior lines there get heat tracing and insulation designed for lake-effect winters, and line changes are staged around model changeovers and holiday shutdowns.

Is the Indiana plumbing code 2012 edition still in force?

The 2012 Indiana Plumbing Code, 675 IAC 16-1.4, adopting the 2006 International Plumbing Code with Indiana amendments, remains listed by the Department of Homeland Security as the code in effect. In 2026 the Fire Prevention and Building Safety Commission opened public comment on amendments to two of its sections. Paul Industries designs to the edition in force on the project’s design release date.

Does process piping need a plumbing license in Indiana?

Indiana’s plumbing license law, IC 25-28.5, applies to plumbing as the statute defines it: drainage, venting and water supply piping within or adjacent to a building and service lines to the property line. Steam, chemical, gas and product piping governed by ASME B31 falls outside that definition. Paul Industries scopes the potable water and drainage tie-ins of a process project to the plumbing law and the rest to ASME B31.

Which edition of the Indiana mechanical code applies to plant utility piping?

The 2014 Indiana Mechanical Code, 675 IAC 18-1.6, adopting the 2012 International Mechanical Code, applies to mechanical systems in Class 1 structures, including hydronic heating and cooling piping, refrigeration and ventilation. Building services piping is commonly built to ASME B31.9 under it, and refrigeration piping to ASME B31.5. Paul Industries designs utility systems to those codes and the owner’s standards.

How do Indiana plants compare industrial process piping contractors?

Indiana plants comparing industrial process piping contractors look at code knowledge across B31.3, B31.1 and BPE, weld procedure coverage for their materials, shop prefabrication capacity, safety and quality records, and the documentation they will receive. Paul Industries answers each of those with procedures, sample turnover packages and a project plan, and carries design, fabrication, installation and testing under one contract.

What do stainless steel process piping contractors deliver at an Indiana drug plant?

Stainless steel process piping at an Indiana drug plant comes with orbital weld logs and coupons, borescope records, slope verification, surface finish certifications, material traceability, passivation records and as-built isometrics. Paul Industries delivers those records in the plant’s qualification format, so installation qualification draws directly on the construction documents.

Does piping inside a new Indiana building need a design release?

A new Class 1 structure or a major addition in Indiana needs a construction design release before construction begins, and the plumbing and mechanical drawings submitted with it cover the code-governed piping. Process piping installed inside an existing building with no structural change usually follows the plant’s own engineering procedures. Paul Industries confirms the release requirement at the start of each project.

When is pneumatic testing allowed on Indiana process piping?

ASME B31.3 permits a pneumatic test at 1.1 times design pressure when a hydrostatic test is impractical, for example where water would damage the system or cannot be removed. Because compressed gas stores far more energy than water, the test needs a written procedure, exclusion zones and staged pressurization. Paul Industries plans and documents pneumatic tests with those controls.

What is a Category D line under B31.3?

A Category D line carries a nonflammable, nontoxic fluid that is not damaging to human tissue, at low pressure and temperature within the code’s limits, such as plant air or cooling water. B31.3 allows lighter examination and an initial service leak test for these lines. Paul Industries classifies every line on the line list so examination and testing match the service.

How is boiler piping treated under Indiana rules?

Boiler external piping, from the boiler to the first stop valve on steam and feedwater lines, is part of the boiler under ASME Section I and B31.1, and Indiana’s 675 IAC 30 treats the boiler’s controls and safety devices as part of the boiler too. Repairs within that boundary follow the National Board R program. Paul Industries designs the boundary into steam system drawings so each weld follows the right code.

Does Indiana require prevailing wages on public piping projects?

Public agencies in Indiana may not impose a state wage scale on public works contracts awarded after July 1, 2015, when the Common Construction Wage Act was repealed. Davis-Bacon wage rates still attach to work paid for with federal funds. Paul Industries prices public piping projects on the funding basis the owner confirms at the outset.

Which factors decide a piping project's length at an Indiana plant?

A process piping project’s schedule depends on design and isometrics, material lead times for pipe, fittings and valves, shop fabrication, field installation windows, testing and flushing. Prefabrication runs in parallel with site preparation, and tie-ins are grouped into the fewest outages possible. Paul Industries sets the schedule in the proposal with the outage dates it assumes.

Can piping be replaced while an Indiana plant keeps running?

Most piping replacement in operating Indiana plants is done live up to the tie-in points, with new lines prefabricated and installed alongside the old, and the cutover made in a short outage. Hot taps and line stops let new branches connect to running headers where the service allows. Paul Industries plans isolation, lockout and cutover steps with the plant’s operations staff.

What should an Indiana plant send to price a piping project?

Send P&IDs, a line list with design pressures, temperatures and materials, plot plans or a model if available, the specification, the outage windows, and any site rules. Paul Industries returns a budget range from comparable work and a firm price once isometrics and the material takeoff are complete.

Planning new or replacement piping at an Indiana plant?

Send P&IDs, a line list and the outage windows you have. Call 201-450-8280 or request a quote.