Paul Industries provides tank fabrication in Minnesota, designing, building and installing carbon steel and stainless steel storage and process tanks for ethanol plants, refineries, food and dairy processors, device manufacturers and commercial buildings, with the containment, overfill and corrosion protection the Minnesota Pollution Control Agency requires. Minnesota regulates aboveground tanks under Minnesota Rules chapter 7151 and underground tanks under chapter 7150, and the way chapter 7151 treats food-based products, stainless steel and indoor tanks makes Minnesota different from most states. Paul Industries is headquartered at 256 Shore Drive, Kilmarnock, Virginia, and fabricates tanks for Minnesota sites and in all 50 states.
Request a quote or call 201-450-8280
Tank fabrication in Minnesota under MPCA chapter 7151
Tank fabrication in Minnesota for outdoor storage is shaped by chapter 7151 of the Minnesota Rules, which applies to owners and operators of aboveground storage tank systems and sets requirements for tank and piping design, secondary containment, substance transfer areas, corrosion protection, overfill protection, monitoring, maintenance and closure. New tanks installed on or after November 2, 1998 must meet the new-tank parts of the rule; older tanks meet a parallel set for existing systems. Part 7151.2100 incorporates the industry standards a new tank is built to, including API 650 for welded steel tanks, API 620 for large low-pressure tanks, and API 651, 652 and 653 for cathodic protection, bottom linings and in-service inspection.
The rule reaches further than the petroleum focus of most storage tank regulations in other states. Minnesota defines “other regulated substances” to include any substance, including a food-based product intended for human or animal consumption, that can pollute state waters and is neither petroleum nor a hazardous material. An outdoor carbon steel tank of corn syrup, vegetable oil, molasses or whey can therefore be a regulated tank in Minnesota. The general methods of tank design and construction are covered on the tank fabrication service page; this page covers what Minnesota’s rules, climate and industries change.
Does chapter 7151 cover a stainless steel food or process tank?
Chapter 7151 excludes a stainless steel aboveground storage tank holding other regulated substances, which takes most stainless food and ingredient tanks outside the rule, while a carbon steel tank holding the same food product outdoors stays inside it. That single exclusion makes material choice a regulatory decision for Minnesota food plants as well as a sanitary one. Part 7151.1300 lists the exclusions, and the ones that matter most on plant projects are set out below.
| Excluded tank | Condition | What it means for the design |
|---|---|---|
| Stainless steel tank of other regulated substances | Food products and other non-petroleum, non-hazardous liquids | Stainless food and ingredient tanks are designed to sanitary and structural standards rather than to chapter 7151 |
| Indoor tank | Inside a building on an impermeable floor, with a release contained, kept in the building or sent to a permitted treatment system | Room curbing, sealed floors and drain routing do the containment work |
| Water tanks | Drinking water, filtered surface water, demineralized water, noncontact cooling water and fire water | Built to water and fire protection standards |
| Small tanks | 1,100 gallons or less, unless over 500 gallons and within 500 feet of a Class 2 surface water | Small day tanks and lube tanks often fall here; the location check matters near rivers and lakes |
| Heating oil tanks | 1,100 gallons or less, used on the premises | Outside the rule but still installed to fire and mechanical codes |
| Tote tanks | 1,100 gallons or less, never refilled on site, kept under 180 days | Portable containers rather than installed tanks |
| Equipment reservoirs | Hydraulic lift tanks, lubricating oil reservoirs, electrical and heating and cooling equipment | Part of the machine, not a storage tank |
| Major facilities | Total storage capacity of 1,000,000 gallons or more at one site | Governed by a major facility permit under chapter 7001 instead |
Two of those exclusions reward early decisions. A plant planning an outdoor tank for a food product can choose stainless steel and design to sanitary standards, or choose carbon steel with a lining and design to chapter 7151 with containment and monitoring; the second is cheaper in steel and more expensive in everything around it. A plant that brings the tank indoors onto a curbed, sealed floor can also move it outside the rule, provided a release stays in the building or goes to a permitted treatment system. Paul Industries prices both paths so the owner can compare the full installed cost.
Type A, B and C substances in Minnesota above ground storage tanks
Minnesota above ground storage tanks are grouped by what they hold, and the substance type decides the containment material and soil standard, while tanks of other regulated substances are released from several new-tank requirements. Part 7151.1200 sets the three types.
| Type | Substances | Containment and protection consequences |
|---|---|---|
| Type A | Gasoline, aviation gas, naphtha, denatured ethanol and hazardous materials | Concrete containment must be treated with a material impermeable to the stored substance; tightest soil permeability where soils are used |
| Type B | Crude oil, diesel, kerosene, jet fuel, fuel oil numbers 1 to 4 and waste oils | Untreated concrete accepted for containment; full corrosion and overfill protection on new tanks |
| Type C | Asphalt cement, fuel oil numbers 5 and 6, other heavy residuals named in the rule, and other regulated substances such as food products | Untreated concrete accepted; tanks of other regulated substances are exempt from the substance transfer area, corrosion and overfill parts and from the under-tank detection design |
Denatured ethanol is a Type A substance, which matters in a state with 18 fuel ethanol plants and 1,457 million gallons a year of capacity on January 1, 2025 (EIA). Product tanks at those plants therefore carry the strictest containment treatment in the rule.
Secondary containment sized for Minnesota rain and snow
Every tank regulated by chapter 7151 must have secondary containment able to hold at least 100 percent of the design capacity of the largest tank in the area, plus the volume displaced by the other tanks, plus an additional 10 percent where the containment is exposed to precipitation. Part 7151.5400 lists the acceptable materials: compacted clay, geosynthetic clay liner, concrete (treated for Type A substances), synthetic membrane, the outer shell of a double-walled tank, the lower bottom of a double-bottomed tank, fabricated steel or fiberglass.
Minnesota’s winters test containment in ways a warm-state design misses. Snow drifts into dikes and fills the volume the rule counts on, so part 7151.7300 requires precipitation to be removed as often as practical and requires the owner to reduce the stored volume if accumulated precipitation drops the containment below 100 percent. Frost heave cracks concrete floors and walls, and meltwater that sits against a tank bottom accelerates corrosion. Paul Industries designs containment with drainage that can be opened and closed under control, joints that tolerate frost movement and access for snow removal equipment, and often recommends double-walled or elevated tanks where an open dike would spend winter full of snow.
The area directly under a new regulated tank must also be built so a release can be detected before it permeates the containment, through visual monitoring of an elevated tank, interstitial monitoring between shells, or vapor monitoring in the soil under the tank. That detail is decided at the foundation design, which is where storage tank engineering for a Minnesota site starts.
Foundations below Minnesota frost
Minnesota Rules part 1303.1600 sets the minimum footing depth for frost protection at five feet in Zone I, the northern counties including St. Louis, Itasca, Clay and Otter Tail, and three and a half feet in Zone II, which includes Hennepin, Dakota, Anoka and Blue Earth, unless an engineer competent in soil mechanics determines otherwise. Ring walls, pier footings for elevated tanks and containment walls all respond to that depth.
Tank foundations face a second Minnesota problem: a large flat-bottomed tank on a slab acts as an insulated cover, and if the stored product is heated, the ground beneath stays warm while the perimeter freezes, producing uneven settlement. Heated asphalt, fuel oil number 6 and some food tanks need insulated or ventilated foundations for that reason. Paul Industries designs foundations with the geotechnical data for the site and builds the corrosion protection into the same pour, because part 7151.5600 requires a steel tank floor to be protected by elevation, a continuous slab that keeps water from accumulating under the floor, a double wall or double bottom, or cathodic protection with an API 652 lining or API 653 inspection.
| Arrangement | Containment and corrosion approach | Winter behavior | Common use |
|---|---|---|---|
| Single-wall tank delivered whole, set in a concrete dike | Dike holds the largest tank plus displacement, with 10 percent added for precipitation; floor on a continuous slab or elevated | Dike collects snow that must be removed; drain valve kept closed and checked | Fuel and chemical storage at plants with room for a dike |
| Double-walled steel tank | Outer shell is the containment; interstitial monitoring; alarm or shutoff for overfill | No open basin to fill with snow; no weekly containment check around the tank | Generator fuel, small product tanks, northern sites |
| Elevated tank on saddles or legs | Underside visible for monitoring; floor corrosion protection by elevation | Footings carried below frost; supports and nozzles insulated where product thickens | Lube oil, additive and day tanks |
| Field-erected API 650 tank on a ring wall | Earthen or concrete containment; cathodic protection with lining or API 653 inspection | Ring wall below frost; heated tanks need insulated or ventilated foundations | Ethanol, refinery and terminal storage |
| Stainless tank indoors on a curbed floor | Room curbing and sealed floor keep a release inside or send it to treatment | Heated building removes freeze risk; outdoor fill lines need heat tracing | Food, dairy and device process tanks |
The arrangement is usually settled by the site rather than the tank: space for a dike, distance to surface water, snow handling, the substance type and whether the plant wants the tank inside chapter 7151 or outside it. Paul Industries lays out two or three of these options for a new Minnesota tank with installed costs, so the owner decides on the full picture rather than on the tank price alone.
Overfill protection, corrosion protection and the first 30 days
A Minnesota tank filled by transfers of more than 55 gallons at a time needs overfill protection under part 7151.5700: a high-level alarm or automatic shutoff set at no more than 95 percent of capacity, a permanently mounted sight glass or gauge visible to the person controlling the transfer, or manual gauging during the transfer. Double-walled tanks outside a containment area need the alarm or shutoff. Steel lines must be protected from external corrosion by keeping them out of soil, by cathodic protection or by a double wall, and cathodic protection on new steel tanks and lines must be designed by a corrosion expert to API 651 and 1632.
Once the tank is set, section 116.48 of the Minnesota Statutes requires the owner to notify the MPCA within 30 days after installation, giving the tank’s age, size, type, location, uses and contents, and to report any later change in use, contents or ownership within 30 days. Paul Industries hands over the information the notification asks for with the tank, along with the design standard, material certificates, test records and the as-built drawing.
How often should above ground storage tanks be inspected in Minnesota?
Minnesota’s aboveground tank rule requires visual monitoring of the tank site at least weekly where the containment meets the standard in part 7151.5400, or every 72 hours where it does not, and a monthly walk-through that checks containment and transfer areas for cracks, examines tank, piping, valve and pump exteriors for corrosion and leaks, and identifies poor maintenance or malfunctioning equipment. A person must be present for every loading and unloading. Double-walled tanks need no weekly containment check around them.
That schedule is the owner’s routine storage tank management. Longer-interval inspections follow the incorporated standards: API 653 governs in-service inspection, repair, alteration and reconstruction of field-erected steel tanks, and the plant’s inspection plan sets the internal inspection interval from the measured corrosion rate. When people ask how often should storage tanks be inspected, the Minnesota answer is weekly and monthly for the visual checks, with internal inspections planned by the standard and the tank’s history. Paul Industries designs tanks with the walkways, inspection openings and drains that make those checks practical, and repairs or replaces tanks the inspections condemn.
Reusing, moving and closing tanks in Minnesota
A tank removed from one facility may be reinstalled at a second Minnesota facility only after it passes a tracer gas, vacuum, air pressure or hydrostatic leak test, and the containment under it at the new site is built for release detection. A tank lifted or moved within the same facility needs either a thorough internal and external cleaning, degassing and inspection or one of those leak tests. A tank built for underground service may never be used aboveground. Out-of-service tanks follow the closure parts of chapter 7151, including contamination determination.
Minnesota underground storage tanks follow chapter 7150, which treats any tank system with 10 percent or more of its volume, including connected piping, beneath the surface as underground. Chapter 7150 covers performance standards, corrosion protection, release detection for tanks and piping, Class A, B and C operator requirements, and temporary and permanent closure. For underground storage tanks Minnesota owners want to replace, the common path is an aboveground tank in containment, which brings the system under chapter 7151 instead. Paul Industries fabricates the replacement, removes the old tank’s connections and sets the new one with its piping.
Tanks for Minnesota ethanol, refining, food and building plants
Minnesota’s demand for new storage and process tanks follows its ethanol, refining, food and building sectors, each with its own rules. Ethanol plants buy fermenters, beer wells, process water tanks, product tanks and denaturant tanks. The two refineries, with 440,000 barrels per calendar day of crude capacity between them on January 1, 2026 (EIA), store crude, intermediates, fuels and asphalt; a tank farm Minnesota counts at one million gallons or more of total capacity is a major facility under a permit rather than under chapter 7151. Dairy, meat and ingredient plants across the south buy stainless silos, process tanks, CIP tanks and wastewater equalization tanks. Hospitals, data centers and office buildings buy generator fuel tanks, where the question of day tank vs storage tank is about separation: a small day tank beside the engine for immediate supply, filled from a larger storage tank that may be outdoors in containment.
Stainless steel tank fabrication: how are stainless steel tanks made for Minnesota plants?
Stainless steel tank fabrication starts with 304 or 316L sheet and plate, rolled into shell courses and welded with gas tungsten arc procedures that keep the inside weld smooth, then joined to formed heads or cones, fitted with nozzles, manways, sprayballs and agitator mounts, and finished by grinding and polishing to the specified surface roughness. Welds are inspected, the tank is pressure or leak tested, cleaned and passivated so the chromium oxide layer is restored after welding. Sanitary tanks for dairy and food follow 3-A Sanitary Standards, and those for device and pharmaceutical plants carry weld logs and material traceability. How long do stainless steel tanks last? With the right alloy for the product and cleaning chemicals, regular passivation and no chloride attack, many stay in service for decades; the failures that shorten life are chloride pitting, stress corrosion cracking and damage at welds that were never passivated. Related surface work is covered on the passivation services in Minnesota page.
What drives the price of a tank built for a Minnesota site?
The price of a tank built for a Minnesota site is set by its size, material, standard and finish, and by the containment, foundation and accessories around it, which can cost as much as the tank. Carbon steel tanks to API 650 cost less per gallon than stainless tanks with sanitary finishes; double-walled tanks cost more than single-walled ones but can remove the need for a dike; and Minnesota’s frost depth and snow make foundations and containment heavier than in warmer states.
Other drivers are whether the tank is built whole and shipped or erected in the field, coatings and linings, heating and insulation for viscous products, overfill and leak detection equipment, and piping. On state projects, Minnesota Statutes section 177.43 requires contracts to state prevailing wage rates for laborers and mechanics on the project site, with an exception for products processed or manufactured by an establishment that regularly supplies them from a fixed place of business. Paul Industries gives a budget range from the capacity, product, material and site, and a firm price when the drawings and containment design are complete.
Who builds and installs storage tanks in Minnesota?
Paul Industries builds and installs storage and process tanks in Minnesota: API 650 and API 620 field-erected tanks, prefabricated steel tanks delivered whole, double-walled fuel tanks, stainless process tanks, silos and mix tanks, along with containment, foundations, piping, heating, insulation and the instruments for overfill and leak detection. Owners comparing tank fabricators, tank fabrication companies and storage tank companies for a Minnesota project get from Paul Industries a design to the right standard, fabrication, delivery, installation and the MPCA notification information under one contract. As a steel tank manufacturer and stainless tank manufacturing source in one, Paul Industries also repairs, relines and replaces existing tanks.
Tanks connect to the rest of the plant through process piping in Minnesota, and pressurized storage belongs on the pressure vessel fabrication in Minnesota page. Field welding on tank repairs is covered on the industrial welding services in Minnesota page, and sanitary process systems on the CIP and SIP systems in Minnesota page. Paul Industries is headquartered in Kilmarnock, Virginia, which its tank fabrication in Virginia page covers as its home state; it was formerly based in northern New Jersey, then Pennsylvania. Rules in other states appear on tank fabrication in New York, and the regional view on the Midwest page.
Tank work from Paul Industries for Minnesota sites
Paul Industries designs, fabricates, supplies and installs tanks for Minnesota owners: supply-only tanks delivered ready to set, design-build packages from a capacity and product requirement, and complete installations with foundation, containment, piping and start-up. Each design starts from the Minnesota questions that decide its cost: whether chapter 7151 applies, which substance type it holds, how deep the frost goes and where the snow will sit. For the wider view of Paul Industries in the state, see the Minnesota page. Send the product, capacity, site location and any drawings, and request a quote.
Standards referenced: Minnesota Rules chapter 7151 (aboveground storage tanks) · Minnesota Rules chapter 7150 (underground storage tanks) · Minnesota Statutes 116.48 · Minnesota Rules 1303.1600 · API 650 · API 620 · API 651, 652 and 653 · STI R893 · 3-A Sanitary Standards
Frequently asked questions
Who builds tanks for ethanol plants in southwestern and southern Minnesota?
Paul Industries designs, fabricates and installs fermenters, beer wells, process water tanks, product and denaturant tanks for ethanol plants around Marshall, Benson, Atwater, Lake Crystal, Janesville, Fairmont and Albert Lea. Product tanks hold denatured ethanol, a Type A substance under chapter 7151, so containment, overfill protection and corrosion protection are built to the strictest Minnesota standard.
Who fabricates stainless process tanks for food and device plants around the Twin Cities?
Paul Industries builds stainless mix tanks, holding tanks, CIP tanks and purified water tanks for food, dairy and medical device plants in Minneapolis, Saint Paul, the northern suburbs, Plymouth, Maple Grove and Bloomington. Tanks are welded and polished to the specified finish, passivated and delivered with weld logs and material records, then installed and piped into the process.
Who handles tank work for plants in Duluth, the Iron Range and Moorhead?
Paul Industries fabricates and installs fuel, process water, chemical and wastewater tanks for plants in Duluth, on the Iron Range and around Moorhead, where frost footings reach five feet and winters are longest. Designs favor elevated or double-walled tanks where open dikes would fill with snow, and heat tracing and insulation for products that thicken in the cold.
Does a carbon steel corn syrup or vegetable oil tank fall under Minnesota's tank rule?
An outdoor carbon steel tank holding corn syrup, vegetable oil, molasses or another food product is a regulated tank under chapter 7151, because Minnesota counts food-based products that can pollute waters as other regulated substances. The same product in a stainless steel tank is excluded. Regulated food tanks need secondary containment but are excused from the transfer area, corrosion and overfill parts of the new-tank rule.
Do Minnesota aboveground storage tank rules apply to tanks inside a building?
Indoor tanks are excluded from chapter 7151 when they sit on or above an impermeable floor and a release would stay within secondary containment, stay inside the building, or drain to a permitted treatment system. Floor drains, doorways and sumps decide whether a room qualifies, so the room design is part of the tank design. Fire and mechanical codes still apply to the installation.
How much containment does a Minnesota tank need when the dike is open to the sky?
The containment must hold 100 percent of the largest tank’s design capacity plus the displacement of the other tanks inside it, plus 10 percent more because it is exposed to precipitation. Owners must remove rain and snow as often as practical and lower the stored volume if accumulated water or snow cuts the containment below 100 percent, which in a Minnesota winter is a regular task.
What does the MPCA need to know about a new tank?
Section 116.48 requires the owner of a new aboveground tank to notify the MPCA within 30 days after installation, giving the tank’s age, size, type, location, uses and contents, and to report changes in use, contents or ownership or permanent removal within 30 days. Paul Industries supplies the tank data for the notification with the turnover package.
Is denatured ethanol treated differently from diesel in Minnesota tank rules?
Denatured ethanol is a Type A substance with gasoline, naphtha and hazardous materials, while diesel is Type B. Concrete containment for Type A must be treated with a material impermeable to the substance, and soil containment must meet the tightest permeability standard. Diesel containment can use untreated concrete. Both need full overfill and corrosion protection on new tanks.
Can a used tank from another site be installed at a Minnesota plant?
A used tank can be reinstalled at a second Minnesota facility after it passes a tracer gas, vacuum, air pressure or hydrostatic leak test, provided the containment under it is built to detect a release. A tank originally built for underground service may never be used aboveground. Paul Industries inspects candidate tanks and recommends repair, reuse or replacement from the results.
Which overfill devices satisfy Minnesota's rule?
Tanks filled by transfers of more than 55 gallons at a time need a high-level alarm or automatic shutoff set at no more than 95 percent of capacity, a permanently mounted sight glass or gauge the person controlling the transfer can see, or manual gauging with a level stick during the transfer. A gauge that does not read in volume needs a conversion chart mounted where the operator can see it.
What frost depth applies to a tank foundation in the Twin Cities?
Hennepin, Anoka, Dakota and the other Zone II counties carry a minimum footing depth of three and a half feet under Minnesota Rules part 1303.1600, unless a soils engineer determines otherwise. Northern Zone I counties carry five feet. Ring walls and pier footings for tank foundations and containment walls are designed to those depths or to the geotechnical report.
When does a Minnesota tank farm need a permit instead of following chapter 7151?
A site whose aboveground tanks, including indoor tanks, total 1,000,000 gallons or more of design capacity is a major facility, and major facilities that must hold a permit under chapter 7001 are governed by that permit rather than by chapter 7151. Refineries, terminals and large ethanol plants reach that threshold. The permit sets the tank, containment and inspection requirements for the whole site.
Which standards can a new Minnesota steel tank be built to?
Chapter 7151 requires new tanks and appurtenances to be designed and constructed to the standards it incorporates, including API 650 for welded steel oil storage tanks and API 620 for large low-pressure tanks, with API 651 and 652 for cathodic protection and bottom linings and API 653 for inspection and repair.
How should a Minnesota generator fuel system split between a day tank and a storage tank?
A day tank sits beside the engine and holds enough fuel for immediate running, filled automatically from a larger storage tank sized for the required run time. In Minnesota, a storage tank over 1,100 gallons outdoors falls under chapter 7151, so many sites choose a double-walled tank with overfill alarm, while day tanks indoors are designed to the fire and mechanical codes. Diesel also needs winter blending or heating to stay fluid.
Can Paul Industries repair an existing tank rather than replace it?
Paul Industries repairs existing tanks: floor and shell plate replacement, nozzle repairs, new linings, cathodic protection, roof repairs and containment rebuilds, with API 653 evaluation for field-erected steel tanks. Repairs are weighed against replacement using the inspection results, the remaining life and the cost of bringing the tank and its containment up to the current Minnesota requirements.
Does Minnesota require weekly tank checks even in winter?
The weekly visual check of the tank site and the monthly inspection of tanks, piping and containment continue all year under part 7151.7200, and in winter they also confirm that snow and ice have not reduced containment volume. Sites with double-walled tanks skip the weekly containment check around those tanks, which is one reason they are popular in northern Minnesota.
Adding or replacing a tank at a Minnesota site?
Send the product, capacity, material preference, site location and whether the tank sits indoors or outdoors. Call 201-450-8280 or request a quote.
