Paul Industries designs, supplies, installs and starts up data center cooling in Kansas: chiller plants, water-side economizers, dry coolers, cooling towers, pumps, piping and controls for halls in Johnson County, Kansas City, Topeka, Wichita and the high plains of the west. Kansas gives a cooling designer two climates in one state, a water law that treats every new gallon as a permitted right, and a 2025 tax statute that lists cooling equipment by name. Paul Industries, headquartered at 256 Shore Drive, Kilmarnock, Virginia, is an East Coast contractor that takes this work across Kansas and in all 50 states.
Request a quote or call 201-450-8280
What shapes data center cooling in Kansas?
Data center cooling in Kansas is shaped by four state-specific facts: humidity that falls steadily from east to west, a large share of the year cold enough for economizers, a Water Appropriation Act that requires a permit for non-domestic water, and a sales tax exemption whose definition of data center equipment reads like a cooling plant schedule. Each of the four changes a design decision. The humidity gradient changes which economizer earns its keep, the cold hours change how large the chillers need to be, the water law changes whether evaporative cooling is wise on a given parcel, and the tax statute changes the paperwork that follows every purchase order.
The national picture of plant types, redundancy and controls sits on the data center cooling systems page. This page stays with Kansas: the weather at Topeka, Wichita, Dodge City and Goodland, the rules of the Division of Water Resources, the Southwest Power Pool grid, and the way those facts steer a plant toward one design or another.
Kansas weather by the hour, from Topeka to Goodland
Kansas weather by the hour runs from humid in the northeast to dry on the western high plains, and NOAA’s 1991 to 2020 hourly normals show the gap in numbers. Averaging the 744 hourly July dew point normals gives 67.4 degrees Fahrenheit at Topeka and 66.3 at Wichita, but only 61.4 at Dodge City and 58.1 at Goodland. Over the whole year, Topeka’s hourly normal dew point sits at or above 65 degrees for 1,579 hours, Wichita’s for 1,122, and Dodge City’s and Goodland’s for none.
Dry-bulb temperature tells a similar story with a twist. Western Kansas gets hotter afternoons, yet its nights fall further, so it also logs more cool hours. The table counts hourly normal values at or below 50 and 60 degrees, which are smoothed averages rather than a record of single hours, so real weather adds more hours at both ends.
| Station | July normal high and low | Mean July dew point | Hourly normals at or below 50 F | Hourly normals at or below 60 F | Days at 90 F or above |
|---|---|---|---|---|---|
| Topeka | 90.2 F / 69.3 F | 67.4 F | 3,603 | 4,893 | 49.6 |
| Wichita | 92.6 F / 70.4 F | 66.3 F | 3,401 | 4,703 | 64.9 |
| Dodge City | 93.7 F / 66.4 F | 61.4 F | 3,803 | 5,044 | 70.9 |
| Goodland | 90.4 F / 61.7 F | 58.1 F | 4,298 | 5,609 | 52.4 |
For a cooling plant the dew point column matters more than the high temperature. A cooling tower and an evaporative cooler both work toward the wet bulb temperature, which rises with dew point, so a Topeka tower on a sticky July evening leaves less margin than a Goodland tower at the same dry bulb. A dry cooler works against dry bulb alone, and the cool western nights help it.
How economizer hours change across Kansas
Economizer hours in Kansas rise from east to west, because the western stations log more cool hours and drier air, and that difference is large enough to change the chiller plant a designer selects. At Goodland, 5,609 of the 8,760 hourly normals sit at or below 60 degrees, against 4,703 at Wichita. A chilled water plant that supplies water in the mid-60s or warmer can hand much of that cool weather to a water-side economizer, a plate heat exchanger that lets tower or dry cooler water carry the load while the chillers idle.
The east-west difference shows up most in how the economizer is built. In the Kansas City area and Topeka, humid summers favor a water-side economizer behind a closed plant, with the chillers carrying the hall from late spring into early autumn. On the western plains, dry air widens the window for indirect evaporative units and for dry coolers that run without water for most of the year. Air-side economizers that bring outdoor air into the hall face the same humidity limits in the east and add dust filtration in the west, so Kansas designs usually keep outdoor air outside the white space and take free cooling through a heat exchanger instead.
Warmer supply water multiplies the benefit everywhere. ASHRAE TC 9.9 recommends server inlet air between 64.4 and 80.6 degrees Fahrenheit, and a plant designed to deliver air near the upper half of that range can run its chilled water warmer, which moves the economizer changeover point up and adds hundreds of partial or full free-cooling hours a year at every Kansas station.
Partial economizer hours deserve their own line in the energy model. Between the point where the economizer carries the whole hall and the point where the chillers carry it alone sits a band of weather in which the plate heat exchanger precools the return water and the chillers finish the job at low lift. In Kansas that band covers much of spring and autumn, and plants piped for series operation, with the exchanger upstream of the chillers, capture it where a simple switchover plant leaves it unused. Paul Industries pipes Kansas plants for series operation as standard practice when the economizer is water-side, and programs the controls to hold the exchanger in service as long as it removes any heat at all.
Data center cooling methods for Kansas halls
Data center cooling methods suited to Kansas halls fall into five families, and the right fit depends on where the site sits on the humidity gradient, how much water it holds rights to, and how dense the racks are. The table compares them for Kansas conditions.
| Method | How heat leaves the site | Fit in eastern Kansas | Fit in western Kansas | Water draw |
|---|---|---|---|---|
| Water-cooled chillers with towers and water-side economizer | Evaporation in open towers | Strong efficiency; humid evenings narrow tower margin | Strong efficiency; makeup water rights decide it | High |
| Air-cooled chillers with free-cooling coils | Dry heat transfer to outdoor air | Workable; higher summer power | Good; cool nights extend free cooling | Near zero |
| Dry coolers with trim chillers | Dry coolers carry most hours; chillers trim peaks | Good with warm supply water | Very good; long dry-cooler season | Near zero |
| Indirect evaporative air handlers | Evaporation on the outdoor side of a heat exchanger | Limited by summer dew points | Good; dry air lowers wet bulb | Moderate, seasonal |
| Direct liquid cooling to the rack | Coolant loops to dry coolers or towers | Good for dense racks | Good for dense racks | Follows the heat rejection choice |
Liquid cooling for high-density racks has its own Kansas page, data center liquid cooling in Kansas, which covers coolant distribution units and freeze protection for dry cooler loops. Where towers stay in the design, the data center cooling towers page explains tower selection, and cooling tower water treatment covers the chemistry that hard Kansas makeup water demands.
Data center cooling water usage and Kansas water rights
Data center cooling water usage in Kansas is governed by the Kansas Water Appropriation Act of 1945, under which no person acquires a new right to use water for anything other than domestic use without the approval of the chief engineer of the Division of Water Resources in the Kansas Department of Agriculture (K.S.A. 82a-705). The act also makes it unlawful to appropriate water from any source without first applying for and obtaining a permit (K.S.A. 82a-728), so a campus that drills its own wells for tower makeup needs an approved appropriation before it pumps.
Kansas water rights are tied to a definite supply, a specific quantity, a rate of diversion and a beneficial use, and earlier rights take priority over later ones. For a cooling plant that means the tower makeup volume belongs in the site study before the plant type is fixed. A campus served by a municipal utility buys water under that utility’s rights and contracts instead, but the same question follows it: how much water the plant will draw in a dry July, and what the plan is if supply tightens.
Estimating data center cooling water consumption
Data center cooling water consumption in an evaporative plant can be estimated from physics. Evaporating a pound of water absorbs roughly 1,000 Btu, so every megawatt of heat rejected entirely by evaporation boils off about 3,400 pounds, or roughly 400 gallons, an hour before any blowdown is added. Blowdown depends on makeup water hardness and the cycles of concentration the water treatment program allows, and hard Kansas groundwater usually holds cycles lower than softer surface supplies. Paul Industries runs this estimate hour by hour against NOAA weather for the site, since economizer hours with dry coolers or a closed loop draw almost nothing.
Waterless cooling data center designs on the plains
A waterless cooling data center design rejects all heat through dry coolers or air-cooled chillers, and western Kansas is one of the better places in the country to build one because its air is dry and its nights are cool. The trade is electricity: on the hottest afternoons dry equipment needs more fan and compressor power than a tower plant. A hybrid plant, with dry coolers for most of the year and adiabatic assist or a small tower for the hottest hours, often lands closest to both goals and keeps the water right a site needs small.
The Kansas data center sales tax exemption and the cooling plant
The Kansas data center sales tax exemption, enacted in 2025 and effective July 1, 2025, exempts purchases for constructing and equipping a qualified data center, and its definition of data center equipment names chillers, refrigerant piping, adiabatic and free cooling systems, cooling towers, water softeners, air handling units, direct exchange units, fans, ducting and filters (K.S.A. 74-50,331). Labor to install, repair, service or maintain data center equipment at a qualified site is covered as well.
The exemption is one of the larger Kansas data center tax incentives, and it carries conditions that touch the cooling design directly. The table sets out the parts a mechanical team works with.
| Statute term | What it says | What it means for cooling work |
|---|---|---|
| Investment threshold (74-50,332) | At least $250 million of eligible costs by the fifth year of operations | Phased plants count toward the total; the cooling plant is a large share of it |
| Jobs (74-50,332) | At least 20 new jobs within two calendar years of operations | Operations staff for the plant are part of the headcount |
| Water commitments (74-50,332) | Conserve, reuse and replace water: efficient fixtures, rainwater, recirculating and recycling water before discharge, reclaimed water | Closed loops, high-cycle tower treatment, reclaimed makeup and rainwater capture all support the commitment |
| Equipment list (74-50,331) | Chillers, towers, free cooling, softeners, air handlers, piping, water conservation systems | Most of the mechanical bill of materials falls inside the definition |
| Duration (74-50,333) | 20 years after operations begin | Later repairs, replacements and upgrades of equipment also fall in the window |
| Paperwork (79-3606) | The owner obtains a project exemption certificate and furnishes it to the contractor | Purchase orders reference the certificate; records are kept for audits |
Paul Industries tracks the exemption certificate on every cooling purchase for a qualified project and keeps the invoices and equipment records in a form the owner can hand to auditors. The wider mechanical scope of a Kansas campus, including generator fuel systems, is set out on data center mechanical contractor in Kansas.
Power, utilities and the Southwest Power Pool
Power for Kansas data center cooling is delivered by utilities that, in the words of the Kansas Corporation Commission, are all members of the Southwest Power Pool, the regional transmission organization that runs the wholesale market for 14 states including Kansas. Evergy and Liberty Utilities serve under the commission’s jurisdiction, while cooperatives and municipal systems generally fall outside it, so the tariff a site buys under depends on which utility holds the territory.
Kansas industrial electricity averaged 8.04 cents per kilowatt-hour in 2025, below the 8.51 cent US average (EIA). Low power prices still leave cooling energy a large line: one megawatt of cooling overhead running all year uses 8,760,000 kilowatt-hours, about $704,000 at that average price. Lifting chilled water temperature, adding economizer hours and choosing efficient pumps cut that overhead year after year, and the exemption statute requires a qualified firm to buy its electricity from the certificated utility for 10 years, which makes the plant’s efficiency a long commitment.
Data center cooling requirements and standards on a Kansas permit
Data center cooling requirements on a Kansas project come from the building and mechanical codes adopted by the city or county that issues the permit, from the Kansas Fire Prevention Code administered by the State Fire Marshal, and from the industry standards the owner writes into the design. In Wichita and Sedgwick County, for example, the Unified Building and Trade Code adopts the 2024 International Building Code, the 2024 International Mechanical Code and the 2023 National Electrical Code, and other Kansas jurisdictions adopt their own editions.
The main data center cooling standards a Kansas plant is designed against are ASHRAE TC 9.9 for server inlet conditions, ASHRAE 90.4 for data center energy performance, and ASHRAE 15 for refrigerant safety in machinery rooms. Paul Industries confirms the code editions in force with the permitting jurisdiction at the start of design, so pressure tests, machinery room ventilation and refrigerant detection match what the inspector will look for.
Kansas data center development by region
Kansas data center development runs along the state’s main fiber and power corridors, and each region asks something different of a cooling plant. The Kansas City metro straddles the state line, and published market facts show the scale arriving there: Meta lists a Kansas City, Missouri data center with an investment of more than $1.2 billion and a 2022 groundbreaking, and Google lists a Kansas City, Missouri site as in development. Owners weighing a data center in Kansas City on the Kansas side, in Johnson or Wyandotte County, work in the same humid climate and the same Southwest Power Pool market.
| Region | Climate | Cooling priorities |
|---|---|---|
| Kansas City, Johnson County and Wyandotte County | Humid summers, cold winters | Water-side economizer, warm chilled water, careful tower makeup planning on municipal supply |
| Topeka and Lawrence | Most humid of the four stations; 1,579 hourly normals with dew point at or above 65 F | Chillers sized for humid evenings; dehumidification for support spaces |
| Wichita and Hutchinson | Hot summers, 64.9 days a year at 90 F or above at Wichita | Peak chiller capacity, hybrid heat rejection, tower water treatment |
| Salina and Manhattan | Hot summers, colder nights than the east | Dry coolers with trim chillers; freeze protection |
| Garden City, Dodge City and Liberal | Dry air, cool nights, hot afternoons | Waterless or hybrid plants; water rights reviewed first |
An enterprise room or a colocation suite for a data center in Wichita, KS faces the hottest afternoons of the eastern half, so condenser capacity and tower approach govern there. A data center in Topeka, KS faces the most humid evenings, so the chiller and economizer changeover need margin for latent load. Owners of data centers in the Kansas City area face both. Western Kansas sites trade those concerns for longer runs to fiber and transmission, larger yards for dry coolers, and water rights that may already be committed to irrigation, so the site study there starts with the Division of Water Resources records rather than the chiller catalog.
Across all five regions, Kansas winters reach well below freezing. Wichita’s January normal low is 22.5 degrees and Goodland’s hourly normals sit at or below 32 degrees far more often than eastern stations, so every outdoor coil, pipe and basin is designed for freezing weather as well as summer peaks. The Kansas page describes the wider process work Paul Industries takes on in the state, and the Midwest page sets Kansas beside its neighbors.
Redundancy and controls for a Kansas cooling plant
Redundancy and controls for a Kansas cooling plant are planned around two weather extremes: a humid 95 degree afternoon in the east and a sub-zero night that idles the chillers while the economizer carries the load. Most halls run N+1 chillers, pumps and heat rejection units, with 2N distribution where the tenant requires it. Controls stage chillers and economizers by entering water temperature and wet bulb, not by calendar date, so the plant moves between modes on whatever day Kansas weather allows.
Cold-weather design deserves as much care as summer capacity. Dry coolers and outdoor piping on a closed loop carry glycol at a strength set by the site’s design low, towers that run in winter need basin heaters and bypass control, and economizer heat exchangers need protection against freezing on the tower side. Paul Industries tests every mode transfer during commissioning, and the Kansas commissioning sequence is described on data center commissioning in Kansas.
What does data center cooling cost in Kansas?
The cost of data center cooling in Kansas depends on the IT load and its growth path, the redundancy level, the plant type chosen for the site’s humidity and water rights, the chilled water temperatures, the equipment lead times, and whether the cooling purchases qualify under the state sales tax exemption. A waterless plant in western Kansas usually costs more in heat rejection equipment and less in water, treatment and permitting than a tower plant of the same capacity.
Operating cost follows the same choices. At Kansas’s 2025 average industrial price, every 100 kilowatts of continuous cooling overhead costs about $70,000 a year, so the difference between a plant designed for warm water and one built around cold water shows up quickly. Paul Industries gives a budget range from comparable scope once the load and site are known, then a firm price when the design basis is fixed. Chiller service for existing Kansas plants is covered on chiller repair in Kansas.
Who installs data center cooling in Kansas?
Paul Industries installs data center cooling in Kansas, taking design-build, supply-only and complete installation work on chiller plants, economizers, dry coolers, towers, pumps, piping and controls for owners in Kansas City, Overland Park, Lenexa, Olathe, Topeka, Lawrence, Manhattan, Salina, Wichita, Hutchinson, Garden City, Dodge City and Liberal. Paul Industries is headquartered at 256 Shore Drive, Kilmarnock, Virginia, and takes work in all 50 states.
The same team that builds a Kansas plant services it after turnover, so the records, setpoints and spare parts stay with one contractor. Paul Industries also builds cooling for data centers in its headquarters state, described on data center cooling in Virginia, and for northern Midwest halls on data center cooling in Illinois.
Data center cooling from Paul Industries across Kansas
Paul Industries engineers, prefabricates, installs, tests and maintains cooling plants for Kansas data centers, matching each plant to the humidity, cool hours, water rights and power tariff of its site. Send the IT load by phase, the redundancy target, the site location and its water source, and Paul Industries will return a plant concept and a budget. Call 201-450-8280 or request a quote.
Standards referenced: ASHRAE TC 9.9 Thermal Guidelines for Data Processing Environments · ASHRAE 90.4 · ASHRAE 15 · 2024 International Mechanical Code (Wichita-Sedgwick County) · Kansas Fire Prevention Code, K.A.R. 22-1 · Kansas Water Appropriation Act, K.S.A. 82a-701 et seq. · Kansas qualified data center sales tax exemption, K.S.A. 74-50,331 to 74-50,333 and 79-3606(xxxx)
Frequently asked questions
Who builds cooling plants for data centers in Lenexa, Olathe and the rest of Johnson County?
Paul Industries builds cooling plants for data centers in Lenexa, Olathe, Overland Park and the rest of Johnson County, from the chillers and economizers to the pumps, piping and controls. Johnson County sits in the humid eastern band of Kansas, so plants there are usually water-cooled or hybrid with a water-side economizer and warm chilled water. Call 201-450-8280 or request a quote with the load and site.
Does Paul Industries take data center cooling work in Wichita and Hutchinson?
Paul Industries takes data center cooling work in Wichita, Hutchinson and south central Kansas, including new plants, chiller additions and economizer retrofits. Wichita logs about 65 days a year at 90 degrees or above (NOAA normals), so condenser capacity, tower approach and hybrid heat rejection get close attention there. Send the IT load, redundancy level and water source for a budget range.
Which cooling design suits a data center in Garden City, Dodge City or Liberal?
A data center in Garden City, Dodge City or Liberal usually suits a waterless or hybrid plant: dry coolers or air-cooled chillers with free cooling for most of the year, plus adiabatic assist for the hottest afternoons. Dodge City’s mean July dew point is about 61 degrees and its hourly normals never reach a 65 degree dew point, so dry heat rejection works well. Water rights are reviewed before any tower is considered.
What cooling plant fits a hall in Topeka, Lawrence or Manhattan?
A hall in Topeka, Lawrence or Manhattan sits in the most humid part of the state on NOAA’s numbers, with Topeka averaging a 67 degree July dew point. Plants there are sized for latent load on humid evenings, use a water-side economizer for the long cool season, and keep outdoor air out of the white space. Paul Industries designs, installs and services these plants in northeast and north central Kansas.
Are there data centers in Kansas?
Data centers in Kansas range from enterprise rooms and colocation suites to campuses planned under the 2025 qualified data center sales tax exemption. The Kansas City metro, which spans the state line, also holds large projects on the Missouri side: Meta lists a Kansas City, Missouri site with more than $1.2 billion invested, and Google lists one in development. Cooling demand is growing on both sides of the line.
Does cooling equipment qualify for the Kansas data center sales tax exemption?
Cooling equipment is named in the definition of data center equipment in K.S.A. 74-50,331: chillers, refrigerant piping, adiabatic and free cooling systems, cooling towers, water softeners, air handling units, direct exchange units, fans, ducting and filters. The exemption applies to a qualified firm with an approved agreement, and the owner furnishes the contractor a project exemption certificate for the purchases.
What water commitments does the Kansas exemption require of a data center?
A qualified firm commits to practices that conserve, reuse and replace water, including efficient fixtures, treating and harvesting rainwater, recirculating and recycling water before discharge, reclaimed water where possible and support for watershed restoration (K.S.A. 74-50,332). For the cooling plant, that points toward closed loops, dry coolers, high-cycle tower treatment and reclaimed or captured makeup water.
Does a Kansas data center need a water appropriation permit for its cooling towers?
A Kansas data center that diverts its own water for cooling needs an approved appropriation from the chief engineer of the Division of Water Resources before it uses water for anything other than domestic purposes (K.S.A. 82a-705 and 82a-728). A site on a municipal supply buys water from the utility instead. Either way, Paul Industries estimates the plant’s annual makeup volume early so the water question is settled before the plant type is fixed.
How much water does a data center use for cooling in a Kansas summer?
An evaporative plant boils off roughly 400 gallons an hour for every megawatt of heat it rejects through towers, before blowdown, because each pound of water evaporated absorbs about 1,000 Btu. Blowdown adds more, and hard Kansas makeup water usually limits cycles of concentration. A plant built on dry coolers draws close to nothing outside the hottest hours, which is why western Kansas sites lean that way.
How many free cooling hours does a Kansas data center get?
Free cooling hours rise from east to west across Kansas. NOAA’s hourly normals put 3,401 values at or below 50 degrees at Wichita and 4,298 at Goodland, and 4,703 against 5,609 at or below 60 degrees. A plant that supplies warmer chilled water turns more of those hours into economizer operation, since the changeover point moves up with the supply temperature.
Is an air-side economizer a good idea for a Kansas data hall?
An air-side economizer works on many Kansas hours, but humid eastern summers and dusty western winds both push operators toward keeping outdoor air outside the white space. Indirect evaporative units and water-side economizers capture most of the same free cooling without bringing outdoor air across the servers. Paul Industries compares the options hour by hour against the site’s NOAA data before the design is fixed.
Which utility serves a Kansas data center, and does it matter for cooling?
Evergy and Liberty Utilities serve under the Kansas Corporation Commission, while cooperatives and municipal utilities serve other territory, and all the major utilities belong to the Southwest Power Pool. The utility matters for cooling because its tariff and demand charges set the value of every kilowatt the plant saves, and the exemption statute ties a qualified firm to that utility for 10 years.
Which codes apply to a data center cooling plant in Wichita?
In Wichita and Sedgwick County the Unified Building and Trade Code adopts the 2024 International Mechanical Code, the 2024 International Building Code and the 2023 National Electrical Code, and the Kansas Fire Prevention Code applies statewide through the State Fire Marshal. Refrigerant machinery rooms follow ASHRAE 15 through the mechanical code. Paul Industries confirms the editions in force with the permitting office before design starts.
What chilled water temperature should a new Kansas hall use?
A new Kansas hall built for server inlet air near the upper part of the ASHRAE TC 9.9 recommended range, 64.4 to 80.6 degrees, can run chilled water in the 60s or warmer. That raises chiller efficiency and moves the economizer changeover point up, adding free cooling hours at every Kansas station. Older halls designed for 44 degree water often gain by raising the setpoint in steps with monitoring.
How is a Kansas cooling plant protected through a sub-zero night?
A Kansas cooling plant gets through a sub-zero night with glycol in dry cooler and outdoor loops at a strength set by the site’s design low, heat trace on exposed water piping, basin heaters and bypass control on towers that run in winter, and economizer exchangers protected on the tower side. Controls hold minimum flows so nothing stagnates in outdoor coils. Paul Industries tests these sequences before the first winter.
Can Paul Industries add cooling capacity to a running Kansas data hall?
Paul Industries adds cooling capacity to running Kansas halls by installing new chillers, dry coolers or economizers with valved tie-ins, hot taps where needed, and cutovers planned one redundant unit at a time under a written method of procedure. The hall keeps its rated redundancy through each step, and every new unit is tested on load before it joins the plant.
What should a Kansas owner send to price a data center cooling plant?
Send the IT load by phase, the redundancy target, the site address, the water source and any water rights, the utility serving the site, the target server inlet temperature and whether the project has a Kansas exemption agreement. Paul Industries returns a plant concept and budget range, then a firm price once the design basis is fixed. Call 201-450-8280 or request a quote.
Planning a cooling plant for a Kansas data center?
Send the IT load by phase, the redundancy target, the site and its water source. Call 201-450-8280 or request a quote.