Paul Industries designs, installs and services data center cooling in Utah, building chiller plants, dry cooler and hybrid heat rejection, economizer systems and the piping that ties them to the data hall for operators along the Wasatch Front and beyond. Utah hands a cooling designer an unusual mix: dry summer air that makes evaporative and economizer cooling very effective, winters with more than a hundred freezing nights, an airport elevation above 4,200 feet that thins every airstream, and a water supply that owners and cities watch closely. Paul Industries engineers the plant around those conditions, then fabricates, installs, tests and maintains it.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
Salt Lake City July 93 F high, 65 F low; afternoon humidity near 22% (NOAA normals)
Airport elevation About 4,231 feet; air pressure near 86% of sea level
Freezing nights 112 a year at or below 32 F in Salt Lake City
Commercial power 10.06 cents/kWh in Utah against 13.37 US (EIA, 2025)
Reviewed November 2026

What does data center cooling in Utah have to account for?

Data center cooling in Utah has to account for four site conditions at once: low summer humidity, cold winters, high elevation and water that costs money and attention to use. Each one pulls the design in a different direction. Dry air favors evaporation and outdoor air. Cold nights favor free cooling but punish any coil or pipe that can freeze. Altitude shrinks the cooling capacity of every fan and air-cooled coil. Water policy pushes owners toward closed loops and dry heat rejection even where a cooling tower would use less power.

The national picture of plant types, components and design steps is on the data center cooling systems page. This page stays with what is particular to Utah: the weather the plant sees hour by hour, the thin air it breathes, the codes it is reviewed against, the power it draws and the places across the state where data halls are rising.

Salt Lake City weather and the cooling plant, month by month

Salt Lake City’s weather gives a cooling plant a short, hot and very dry summer followed by a long cold season, which is close to ideal for a plant built to use outdoor conditions. NOAA’s 1991 to 2020 normals put the July average at 93 degrees Fahrenheit by day and 65 at night, with 62 days a year reaching 90 and about 8 reaching 100. Relative humidity in July averages 36 percent and falls to around 22 percent in the afternoon.

Humidity that low drives the wet bulb temperature far below the dry bulb. Using a standard psychrometric approximation, a 93 degree afternoon at 22 percent relative humidity has a wet bulb of about 66 degrees, and the thin air at Salt Lake elevation lowers it slightly further. Evaporative equipment works against the wet bulb, so a cooling tower or adiabatic precooler on the Wasatch Front delivers water and air several degrees colder than the same equipment produces in a humid Eastern or Gulf summer.

Utah weather conditions and what each does to a data center cooling plant
Condition (Salt Lake City normals)Typical valueEffect on the plantDesign response
July afternoon93 F, humidity near 22%Large gap between dry bulb and wet bulbAdiabatic precooling or towers reach cold water with little lift
Hot days62 a year at 90 F or more, about 8 at 100 FDry coolers lose approach on the hottest afternoonsSize trim chillers or adiabatic assist for the peak hours
July nights65 F average lowOutdoor air cool enough for partial economizing after darkIntegrated economizer controls that blend with mechanical cooling
Freezing days112 a year at or below 32 FWater in outdoor coils, sumps and pipe freezesGlycol loops, heat trace, drain-down and sump heaters
Hard freezes32 nights at or below 20 F, about 6 at or below 10 FDampers ice, coils split, sensors read wrongMixing control, low-limit protection, winter commissioning tests
Annual average64 F high, 42 F lowMost hours sit well below server inlet setpointsEconomizer-first sequences with chillers held for trim

How a new data center, Utah climate data and the design temperatures fit together

For a new data center, Utah climate data should be read as hourly bins rather than as a single summer design point. A plant sized only to the July peak carries chiller capacity that idles for most of the year, while a plant sized to the bins can lean on outdoor air or dry coolers for the long cool season and add mechanical cooling only for the hours that need it. Paul Industries builds the load and weather model from the owner’s IT ramp and server inlet targets, which ASHRAE recommends holding between 64.4 and 80.6 degrees Fahrenheit, before any equipment is chosen.

How thin air at 4,200 feet changes fans, coils and air-cooled condensers

Thin air at Salt Lake City elevation changes fan and coil performance because air density, not volume, carries heat, and the air at about 4,231 feet is roughly 14 percent less dense than at sea level. Standard atmosphere tables put the pressure there near 12.6 pounds per square inch. A fan moving the catalog airflow at that altitude moves less mass, so it removes less heat from a server aisle, a dry cooler or an air-cooled condenser than its sea-level rating suggests.

The correction belongs in the equipment selection, not in the field. Fan walls, computer room air handlers, dry coolers and air-cooled chillers are selected at site altitude, with fan speed, coil rows or unit count raised to recover mass flow. Electric motors and drives also run hotter in thin air, which affects enclosure ventilation in electrical rooms that share the cooling plant. Paul Industries checks every selection against the site elevation, which ranges from roughly 2,700 feet around St. George to well above 6,000 feet in the Park City area, so the installed capacity matches the drawings.

Economizer hours across the Wasatch Front: air-side or water-side?

Economizer hours across the Wasatch Front are plentiful because Salt Lake City’s annual average high is 64 degrees and its average low is 42, so most hours of the year fall well under the temperatures servers can take at their inlets. The choice between air-side and water-side economizing turns on air quality, humidity control and building form more than on temperature.

Air-side economizers bring outdoor air into the hall. In Utah they face winter inversions that trap fine particulates in the valleys, summer ozone and occasional wildfire smoke, plus very dry winter air that can push humidity below the hall’s low limit. Filtration, smoke detection with automatic changeover and humidification answer those risks, at a cost in fan energy and water. Water-side economizers keep the hall sealed and cool the chilled water through dry coolers, towers or plate heat exchangers instead, which removes the air quality question entirely.

Economizer and heat rejection options for a Utah data hall
OptionWhere it fits in UtahWater useWhat to watch
Air-side economizer with evaporative assistSingle-story halls in open sitesModerate, summer onlyInversion particulates, smoke events, winter humidity
Water-side economizer with plate exchangerChilled water plants with towersTower makeup all yearFreeze protection on towers and exchangers
Dry coolers with trim chillersSites where water use is cappedClose to noneAltitude derate, peak-hour chiller capacity
Adiabatic or hybrid coolersOwners balancing water and powerShort spray periods on hot afternoonsSpray water quality, pad or nozzle scaling
Warm-water liquid cooling loopsHigh-density racksLow when rejected through dry coolersFacility water temperature class, glycol choice

Data center cooling without water: dry coolers, adiabatic units and hybrid plants

Data center cooling without water is practical along the Wasatch Front for most hours of the year, because dry coolers can reject heat whenever the outdoor dry bulb sits comfortably below the facility water temperature. A dry cooler is a large finned coil and fan bank with glycol or water inside; nothing evaporates, so makeup water drops close to zero. The trade is fan energy and size: a dry cooler needs more coil surface than a tower for the same duty, and the thin Utah air adds to that.

The hottest afternoons decide the rest of the plant. On a 95 degree day a dry cooler cannot return water much below the low 100s, so the plant needs either trim chillers that run for those hours, an adiabatic stage that wets the entering air for a short period, or warmer facility water that servers and coolant distribution units accept. Liquid-cooled racks that take warm water change this arithmetic sharply, which is covered on the data center liquid cooling in Utah page.

An adiabatic or hybrid unit sprays or wets pads only when the dry bulb rises past a set point. In Utah’s low humidity the spray cools the entering air close to the wet bulb, so a few hours of water use buys back much of the summer capacity. The spray water has to be soft or treated, because hard water leaves mineral on fins and nozzles, and the controls have to drain and dry the system before the first frost.

How much water do data centers in Utah use for cooling?

Data centers in Utah use anywhere from almost no cooling water to a large daily volume, and the cooling design, not the size of the building, sets which end of that range a site sits on. A tower plant evaporates water to reject heat; a common rule of thumb is that a cooling tower evaporates about 1 percent of its circulating flow for every 10 degrees Fahrenheit of range, plus blowdown to control minerals. A closed loop with dry coolers evaporates nothing, and an adiabatic plant uses water only on hot afternoons.

Data center water usage closed loop designs keep the same fluid circulating for years, losing only what leaks or is drained for service, which is why Utah owners under water scrutiny favor them. Where towers are used, water chemistry becomes a design input. Salt Lake City Public Utilities reports that more than 60 percent of its water starts in Wasatch canyon streams and that summer supply is supplemented with deep wells whose water is harder. A tower that runs at high cycles on spring runoff may scale on summer well water, so the treatment program and blowdown control have to follow the season. Paul Industries pairs every tower plant with a cooling tower water treatment program sized to the actual makeup water.

Cities have taken notice of water at large sites. Meta, for example, states that it pays Eagle Mountain City the full cost of water and wastewater service for its data center, which is one reason owners in the state model water cost as carefully as power cost before they choose a plant.

Winter in Utah: freeze protection for heat rejection equipment

Winter in Utah demands freeze protection on every outdoor component of a cooling plant, because Salt Lake City averages 112 days a year with a low at or below freezing and about 32 nights at or below 20 degrees. A data center runs its heat rejection all winter, so the plant cannot simply drain and shut down the way a seasonal comfort system does.

The common defenses are an inhibited glycol loop on the outdoor side with a plate heat exchanger separating it from the indoor chilled water, heat trace and insulation on exposed pipe, basin heaters and drain-down sequences on towers, and controls that hold a minimum water temperature leaving each coil. Snow and ice matter too. Dry coolers and condensers need intake clearance above the snow line and fan control that sheds ice. Paul Industries designs these details into the yard layout and tests the freeze sequences during commissioning, as described on the data center commissioning in Utah page.

Winter checklist for a Utah data center cooling plant
ComponentWinter riskProtectionCheck
Dry cooler coilsSplit tubes if water freezesGlycol at a concentration matched to the site’s record lowRefractometer reading each autumn
Cooling tower basinIce in the basin and on fillBasin heaters, bypass to the basin, fan reversal or cyclingHeater amperage and thermostat test
Exposed pipingFreezing in dead legs and drainsHeat trace, insulation, eliminate stagnant branchesTrace circuit continuity and alarm test
Air-side economizerCoil freeze from stratified cold airMixing baffles, low-limit thermostats, preheatLow-limit trip test at design airflow
Makeup and spray waterFrozen supply to adiabatic stagesDrain-down valves, heated enclosuresAutomatic drain sequence verified

Utah data center cooling and the electricity bill

Utah data center cooling runs on power that has cost less than the national average: EIA reports a 2025 average commercial price of 10.06 cents per kilowatt-hour in Utah against 13.37 nationally. One megawatt of continuous load uses 8,760,000 kilowatt-hours a year, about $881,256 at the Utah commercial average and $1,171,212 at the national average. Cooling energy rides on top of the IT load, so every point of efficiency gained in the plant is worth real money even at Utah prices.

Power supply is now part of cooling design. Rocky Mountain Power, a division of PacifiCorp, serves more than 1.2 million customers in Utah, Wyoming and Idaho, and EIA lists coal as Utah’s primary source of generation in 2024. Utah Code Title 54, Chapter 26, enacted in 2025, sets procedures for large-scale service requests, defined as new service expected to reach 100 megawatts or more within five years, and the state’s Operation Gigawatt plans to double Utah’s power capacity. When the grid connection arrives in phases, the cooling plant has to start small and grow, which favors modular chillers, dry coolers added in banks and headers sized for the final build.

Codes that govern a Utah data center cooling system

A Utah data center cooling system is reviewed against the State Construction Code, which Utah Code 15A-2-103 sets statewide and which, from July 1, 2026, includes the 2024 International Mechanical Code, the 2024 International Plumbing Code, the 2023 National Electrical Code and the 2024 International Energy Conservation Code, each with Utah amendments. City and county building departments review plans and inspect work under that code.

The energy code matters most for the cooling plant. Utah’s 2024 energy code sends data center systems to Sections 6 and 8 of ASHRAE 90.4, which measures the mechanical load component of the design against limits that depend on climate zone. Salt Lake, Utah, Davis, Weber, Cache and Tooele counties fall in climate zone 5B, Washington County around St. George in 3B, and the mountain counties of Summit, Wasatch, Morgan and Rich in 6B. The same plant can therefore face different targets in St. George and in Salt Lake, and the economizer and heat rejection choices above are how a design meets them. Paul Industries prepares the mechanical submittals and the documentation the reviewer asks for.

Data centers in Utah: where they are and what each area asks of cooling

Data centers in Utah cluster in the Salt Lake Valley and in northern Utah County, with growth reaching into Tooele County, the west desert and southern Utah as power and land become available. Each area brings a different elevation, temperature profile and water source, so a plant drawn for one site is adjusted before it is reused at another.

Data centers in Salt Lake City and the surrounding valley, from the airport industrial area to West Jordan, sit near 4,200 to 4,500 feet with the normals described above. Data centers in Eagle Mountain, Utah, include Meta’s Eagle Mountain Data Center, a campus Meta describes as a $3 billion-plus investment with operational buildings, where the cooling plants face similar summers but colder, windier winters on the west side of Utah Lake. A hyperscale data center, Utah’s newest category of load, often arrives in phases on large rural parcels where city water service is limited, which pushes the design toward closed loops.

Utah regions and the cooling design emphasis for each
RegionClimate and settingCooling emphasis
Salt Lake Valley and West JordanZone 5B, hot dry summers, valley inversionsWater-side economizers, filtered air paths, tower water treatment
Lehi, Eagle Mountain and northern Utah CountyZone 5B, wind and cold winter nightsDry coolers in banks, glycol loops, phased plant growth
Ogden, Layton and Davis CountyZone 5B, lake-effect snowSnow-clear intakes, freeze sequences, heat trace
Tooele and the west desertZone 5B, remote sites, scarce waterClosed loops, adiabatic trim, minimal makeup
St. George and Washington CountyZone 3B, annual average high 77 FLarger trim chiller share, longer adiabatic season
Logan and Cache ValleyZone 5B, colder wintersLongest free cooling season, strongest freeze protection

What does data center cooling in Utah cost?

The cost of data center cooling in Utah is set by the IT load and its ramp, the redundancy level, the heat rejection method, the water strategy and the altitude corrections, more than by the building’s floor area. Dry cooler plants cost more in equipment and yard space than tower plants of the same capacity but save water and treatment cost. Chilled water plants with water-side economizers cost more in piping and controls than packaged air-cooled units but run far more hours without compressors. Liquid cooling adds coolant distribution units and secondary piping while shrinking the air system.

Other Utah drivers are freeze protection, which adds glycol, heat exchangers and heat trace, and phasing, which adds valves, caps and headers sized for the final load. Paul Industries prices each option from the owner’s load profile, water allowance and site elevation, gives a budget range from comparable scope early, and firms the price when the design is fixed. Operating cost is part of every comparison, using the Utah power price and the actual makeup water source.

Who installs data center cooling in Utah?

Paul Industries installs data center cooling in Utah, from the chiller plant and heat rejection yard to the piping, coolant distribution units and controls that serve the data hall. The company is headquartered at 256 Shore Drive in Kilmarnock, Virginia, was formerly based in northern New Jersey and then Pennsylvania, and takes work across Utah and in all 50 states. Owners choose supply-only delivery of documented equipment and prefabricated skids, design-build from a performance target, or complete installation through startup and turnover.

Paul Industries brings the same plant discipline to Utah that it applies on the data center cooling in Virginia pages for its headquarters state and on the data center cooling in Texas work, adjusted for dry air, freezing nights and altitude. It sets data center chillers, builds tower and dry cooler yards including data center cooling towers, prefabricates headers and pump skids off site, and pressure tests, flushes and commissions the plant. On larger campuses the cooling scope sits inside the wider package described on the data center mechanical contractor in Utah page, and service after startup includes chiller repair in Utah.

Paul Industries and Utah data center cooling

Paul Industries designs, fabricates, installs, starts up and maintains Utah data center cooling plants: chilled water and condenser water systems, dry cooler and adiabatic yards, water-side economizers, glycol freeze protection, liquid cooling loops and the controls that sequence them. It serves operators in Salt Lake City, West Jordan, Lehi, Eagle Mountain, Ogden, Tooele, Logan and St. George, and it covers the rest of the region from the Southwest page and the full state from the Utah page. More on the market sits on the data centers industry page. Send the IT load and ramp, the site elevation, the water allowance and the redundancy target, and request a quote for a plant sized to Utah’s air and water.

Standards referenced: Utah State Construction Code (Utah Code 15A-2-103) · 2024 International Mechanical Code · 2024 International Energy Conservation Code with Utah amendments · ASHRAE 90.4 · ASHRAE thermal guidelines for data processing environments · Utah Code Title 54, Chapter 26 (large-scale electric service) · ASME B31.9

Frequently asked questions

How much water do data centers in Utah use?

The answer depends on the cooling plant. A tower plant evaporates roughly 1 percent of its circulating flow for every 10 degrees Fahrenheit of range, plus blowdown, so a large campus on towers uses a substantial daily volume. A closed loop with dry coolers uses almost no makeup water, and an adiabatic plant uses water only on hot afternoons. Paul Industries models the water for each option against the site’s makeup source and the city’s service terms before the owner commits to a design.

Where are data centers in Utah, and does the location change the cooling design?

Most sit in the Salt Lake Valley and northern Utah County, with newer sites in Tooele County, the west desert and southern Utah. Location changes the design through elevation, winter lows and water source. St. George is in energy code climate zone 3B with much warmer annual temperatures, while Salt Lake, Utah and Cache counties are in 5B, so the trim chiller share, freeze protection and economizer hours differ from one site to the next.

Who installs data center cooling for data centers in Salt Lake City?

Paul Industries installs chiller plants, dry cooler and tower yards, economizers and hall piping for data centers in Salt Lake City and across the valley, from the airport industrial area to West Jordan. Projects include new builds, phased expansions and retrofits in operating halls, with work sequenced so live load stays cooled. Call 201-450-8280 or request a quote with the load, the redundancy target and the site plan.

Can a Utah data center run all year on outdoor air?

Close to it, with care. Salt Lake City’s annual averages are 64 degrees by day and 42 at night, so outdoor air or dry coolers carry most hours. Summer afternoons above 90 degrees, winter inversions that load filters, wildfire smoke and very dry winter air are the exceptions. A sealed hall with water-side economizing avoids the air quality issues and still captures most of the free cooling hours.

Why do fans and air-cooled chillers lose capacity in Utah?

Air at Salt Lake City’s elevation of about 4,231 feet is roughly 14 percent less dense than at sea level, and heat moves with mass, not volume. A fan at its catalog airflow carries less heat, and an air-cooled condenser rejects less. Selections made at site altitude, with more coil surface, more fans or higher speeds, restore the capacity the drawings call for. Paul Industries checks altitude on every selection before purchase.

What glycol strength suits outdoor data center loops in Utah?

The concentration is set from the site’s coldest expected temperature with a margin, then confirmed in the field with a refractometer each autumn. Salt Lake City sees about 6 nights a year at or below 10 degrees, and mountain valleys go much colder, so northern sites run stronger mixtures than St. George. Too much glycol cuts heat transfer and raises pump energy, which is why the outdoor glycol loop is usually separated from indoor water by a plate heat exchanger.

Do Utah's winter inversions affect data center cooling?

Inversions trap fine particulates in the valleys for days at a time in winter, which is exactly when an air-side economizer wants to bring in the most outdoor air. Filters load faster, and some owners switch to recirculation during bad air days. Water-side economizers avoid the issue because outdoor air never enters the hall. Where air-side systems are used, Paul Industries adds filter pressure monitoring and automatic changeover sequences.

How is a Utah data center cooling system designed for phased power?

Large Utah sites often receive grid capacity in steps, and Utah Code Title 54, Chapter 26 governs requests of 100 megawatts or more within five years. The cooling plant is laid out for the final load, with headers, yard space and electrical capacity reserved, and equipment is installed in modules as power arrives. Isolation valves and capped connections let new chillers or dry coolers join without shutting down the operating plant.

Is a cooling tower or a dry cooler better for a Utah data center?

Each wins on a different measure. Towers use less fan and compressor energy because Utah’s low wet bulb gives cold water, but they consume water and need treatment and freeze protection. Dry coolers use almost no water but need more coil, more fan power and trim cooling for the hottest hours. Many Utah plants combine them, using dry coolers most of the year and evaporative assist for the summer peak.

Does Utah's hard well water affect tower plants?

It affects them seasonally. Salt Lake City Public Utilities draws more than 60 percent of its water from Wasatch canyon streams and supplements summer flow with deep wells whose water is harder. Tower cycles of concentration that work on soft spring water can scale condenser tubes and fill on summer well water. Paul Industries sets up conductivity-based blowdown and treatment that follow the makeup water through the year.

Which energy code applies to a data center cooling plant in Utah?

From July 1, 2026, Utah’s State Construction Code adopts the 2024 International Energy Conservation Code with state amendments. For data centers it points to Sections 6 and 8 of ASHRAE 90.4, which set limits on the mechanical load component by climate zone. Meeting those limits in Utah usually comes down to economizer hours, chiller efficiency at part load and fan energy in the heat rejection yard.

What does data center cooling cost to run in Utah?

Running cost is mostly electricity. EIA reports Utah’s 2025 average commercial price at 10.06 cents per kilowatt-hour, so each megawatt of cooling plant load running all year costs about $881,256. Water, treatment chemicals, glycol, filters and maintenance add to that. Paul Industries compares plant options on combined capital and operating cost using the owner’s actual rate and water source.

Can an existing Utah data hall add cooling capacity without an outage?

In most halls, yes. New chillers, dry coolers or coolant distribution units are connected through valves installed during an earlier planned window or through hot taps where the piping allows. Temporary cooling covers any section that must be isolated. Paul Industries writes a method of procedure for each tie-in, confirms redundancy with the operator and tests new equipment before it carries load.

Does an air-side economizer need humidification in Utah?

Often it does. Utah winter air is cold and very dry, and warming it to hall temperature drops its relative humidity well below what many operators set as a low limit to control static. Adiabatic or ultrasonic humidifiers add moisture, but they need treated water and maintenance. Sealed halls with water-side economizers keep indoor humidity steadier and sidestep most of the question.

How does a data center in St. George differ from one in Salt Lake City?

St. George sits lower and warmer, in climate zone 3B with an annual average high of 77 degrees, against 64 in Salt Lake City. The cooling plant there runs mechanical cooling for more hours, relies more on adiabatic assist and needs less freeze protection. Salt Lake and Utah County sites gain more free cooling hours but must protect every outdoor coil and pipe through a long freezing season.

What should an owner send to price a data center cooling plant in Utah?

Send the IT load and the expected ramp over time, the rack densities and any liquid cooling plans, the redundancy target, the site address and elevation, the available water service and any limit the city sets, and the power delivery schedule. Drawings or a basis of design help, but a load profile and a site plan are enough to start. Paul Industries returns a budget range and a plant concept.

Does Paul Industries maintain Utah data center cooling plants after startup?

Paul Industries maintains new and existing Utah plants, whoever first built them: chillers, dry coolers, towers, pumps, heat exchangers, glycol loops and controls. Service programs include seasonal freeze checks, glycol testing, tower treatment oversight, coil cleaning, vibration and oil analysis on chillers and records that support warranty and energy code reporting. Repairs follow the same method-of-procedure discipline used during construction.