Paul Industries installs data center liquid cooling in Utah: coolant distribution units, cold plate and rear door loops, secondary piping and the glycol dry coolers that reject the heat outdoors, for data halls from Salt Lake City and Lehi to Eagle Mountain and St. George. High-density racks concentrate heat where air cannot carry it away, and Utah’s mix of cold dry air, long freezing winters, altitude and new large-load power rules shapes how that heat should leave the building. Paul Industries designs, prefabricates, installs, flushes, fills and maintains the full liquid path from chip to yard.
Request a quote or call 201-450-8280
What does data center liquid cooling in Utah change about the plant?
Data center liquid cooling in Utah changes the plant by raising the temperature at which heat leaves the building, and Utah’s climate rewards that change more than most. When servers accept warm facility water, the outdoor coolers can reject heat to Utah air for nearly every hour of the year without compressors. The chiller plant shrinks to a trim role, and in some designs it disappears for the liquid-cooled load.
The rest of the change is inside the hall. A liquid-cooled row needs a technology cooling loop at the rack, coolant distribution units that separate it from facility water, manifolds and quick disconnects, filtration and a water quality program. Air handling stays for the residual heat from power supplies, memory and storage. How these parts work in general is on the data center liquid cooling page. This page covers how Utah’s weather, altitude, codes and power situation decide the details.
How are data centers liquid cooled, from cold plate to Utah dry cooler?
Data centers are liquid cooled through a chain of loops, each separated by a heat exchanger so that a leak or contamination in one stays out of the others. At the chip, a cold plate passes coolant over the processor. That technology cooling loop runs to a coolant distribution unit, which hands the heat to the facility water loop through a plate exchanger. Facility water then carries the heat to the outdoors, through a dry cooler, a cooling tower or a chiller.
In Utah, the outdoor end usually becomes its own glycol loop as well, because the facility water inside the building should stay plain treated water for best heat transfer while the outdoor coils must survive a long run of nights below freezing. That gives a typical Utah layout three or four fluids: rack coolant, facility water, outdoor glycol and, where towers are used, condenser water. Every interface adds an approach temperature, so the layout is planned to keep the number of exchanges as small as the freeze risk allows.
| Loop | Typical fluid | Where it runs | Utah consideration |
|---|---|---|---|
| Technology cooling loop | Treated water or PG25 per the server maker | Cold plates, manifolds, coolant distribution unit | Fill water quality and filtration at commissioning |
| Facility water loop | Treated water | Coolant distribution units to the central plant | Supply temperature set as high as the servers allow |
| Outdoor heat rejection loop | Inhibited glycol | Plate exchanger to dry coolers in the yard | Concentration matched to the coldest expected night |
| Condenser water loop | Treated tower water | Trim chillers and towers, where used | Seasonal water hardness, basin freeze protection |
Warm facility water and the hours Utah air can carry the load
Warm facility water lets a Utah dry cooler carry the full liquid load for most of the year because Salt Lake City’s normals put the annual average high at 64 degrees Fahrenheit and the average low at 42. ASHRAE’s liquid cooling classes describe facility water supply limits, from the W32 class at up to 32 degrees Celsius, about 90 degrees Fahrenheit, to W45 at up to 45 degrees Celsius, about 113. A dry cooler needs the outdoor air to sit some degrees below the water it is cooling, so the warmer the class the servers accept, the more of the year the dry cooler works alone.
The summer peak decides the trim. Salt Lake City averages 62 days a year at 90 degrees or more and about 8 at 100. A W32 design will need trim cooling on many of those afternoons, while a W45 design rides through nearly all of them on dry coolers. Paul Industries runs the selection against hourly weather for the actual site, since St. George to the south is markedly warmer and Cache Valley to the north colder than the Salt Lake normals.
| Facility supply design | Outdoor heat rejection in a Wasatch Front summer | Trim cooling need | Notes |
|---|---|---|---|
| Cool water, near 65 F | Dry coolers carry the load only in cool months | Chillers through most of summer | Matches older air-cooled plants; least benefit from liquid |
| W32 class, up to about 90 F | Dry coolers carry most of the year | Hot afternoons, roughly June through August | Common for mixed halls during transition |
| W40 class, up to about 104 F | Dry coolers carry all but the hottest hours | Adiabatic assist on peak days | Smaller chiller plant, lower fan energy |
| W45 class, up to about 113 F | Dry coolers carry essentially all hours | Little or none in northern Utah | Opens heat recovery to adjacent buildings |
Glycol, freezing nights and the outdoor loop in a Utah winter
Glycol protects the outdoor loop of a Utah liquid cooling plant through a winter in which Salt Lake City records about 112 days at or below freezing, 32 nights at or below 20 degrees and roughly 6 at or below 10. Liquid cooling raises the stakes, because a liquid-cooled rack holds far less thermal mass than a hall full of air and cannot ride through a stopped loop for long. The outdoor loop must keep flowing no matter how cold the night.
Concentration is a trade. Propylene glycol at the strength needed for a northern Utah record low lowers heat transfer and raises viscosity, which costs pump energy and dry cooler surface. Paul Industries sets the concentration from the site’s design low with margin, keeps the outdoor glycol separate from indoor facility water through a plate exchanger, and adds controls that hold flow through every coil and bypass the yard when the loop runs cold. Heat trace and insulation cover any pipe that can stagnate, and drain points are located so a coil can be emptied if it must come out of service in January. The broader approach to glycol cooling systems applies, scaled to data hall loads.
Leak detection and containment around liquid-cooled racks
Leak detection and containment around liquid-cooled racks protect the servers from the one failure mode air cooling never had: water in the white space. Each coolant distribution unit carries its own leak sensors and can isolate its loop, rack manifolds use dripless quick disconnects, and sensing cable runs under manifolds, along overhead pipe routes and beneath any valve or joint above equipment. Drip trays sit under overhead mains where they cross rows.
The controls matter as much as the hardware. A leak alarm should close the right valves and keep the healthy loops flowing, not shut down the whole hall, so isolation zones are drawn around groups of racks and tested one by one at commissioning. Paul Industries labels every isolation valve with the racks it serves, documents the sequence in the operating manual and trains the site team on manual isolation. Pressure testing before fill, at a pressure and hold time set by the governing piping code, catches most joint problems before coolant ever enters the room.
Liquid cooling across Utah’s data center regions
Liquid cooling across Utah’s data center regions follows the same loop design, but each region shifts the balance between free cooling, trim cooling and freeze protection. The Salt Lake Valley and northern Utah County hold most of the state’s halls today, while Davis and Weber counties to the north, Tooele County to the west and Washington County in the south each add a different climate. The table summarizes what changes from one area to the next.
| Region | Energy code climate zone | Outdoor loop emphasis | Trim cooling |
|---|---|---|---|
| Salt Lake City and West Jordan | 5B | Glycol dry coolers, inversion-proof sealed halls | Summer afternoons with W32 water |
| Lehi and Eagle Mountain | 5B | Dry cooler banks added in phases, wind loads on yard equipment | Adiabatic assist on peak days |
| Ogden, Layton and Clearfield | 5B | Snow clearance at dry cooler intakes, strong glycol mix | Limited with warm-water classes |
| Tooele County | 5B | Closed loops with minimal makeup water | Adiabatic or trim chillers sized for desert afternoons |
| St. George | 3B | Larger dry coolers, lighter freeze protection | Longer trim season through summer |
Data halls in Utah’s mountain counties, which fall in climate zone 6B, gain the most free cooling hours but need the strongest glycol and the most careful snow planning. Paul Industries selects every dry cooler at the site elevation, which runs from below 3,000 feet in Washington County to well above 6,000 in the mountain valleys.
Pumps, venting and coolant at 4,200 feet
Pumps and venting behave differently at Salt Lake City’s elevation of about 4,231 feet because atmospheric pressure there is close to 12.6 pounds per square inch, against 14.7 at sea level. Water boils near 204 degrees Fahrenheit at that pressure, and dissolved air comes out of solution more readily at the high points of a loop. Liquid cooling loops are sensitive to both, since trapped air at a cold plate starves a processor of flow.
The design answers are well established. Expansion tanks are precharged for the site pressure, air separators sit where the loop is warmest and lowest in pressure, automatic vents are placed at every high point and isolated during pressure tests, and pump suction pressure is checked against the available net positive suction head at the actual elevation. During fill, coolant is circulated through degassing equipment until air readings stabilize. These steps take a few hours more in Utah than at sea level and save the owner from intermittent thermal alarms after the racks go live.
Power-dense racks and the Utah grid
Power-dense racks make liquid cooling a grid question in Utah because the cooling plant is sized to the IT load, and the IT load now depends on when and how much power the utility can deliver. PacifiCorp’s Rocky Mountain Power division reports more than 1.2 million customers across Utah, Idaho and Wyoming. In 2025 the Legislature enacted Utah Code Title 54, Chapter 26, which sets procedures for large-scale service requests, meaning new or added demand of at least 100 megawatts within five years, along with a framework for closed private generation systems that serve large load customers.
A hyperscale data center in Utah may therefore receive power in stages, or from on-site generation built under that framework, and the liquid cooling has to grow in step. Utah data center capacity is also part of the state’s wider plan: the Office of Energy Development’s Operation Gigawatt aims to double the state’s power capacity. Paul Industries lays out facility water headers, coolant distribution unit positions and dry cooler pads for the final load, installs the first phase, and leaves valved, capped branches so later rows connect without draining the operating loop. On the energy side, a 100 kilowatt liquid-cooled row running all year uses 876,000 kilowatt-hours, about $88,126 at Utah’s 2025 average commercial price of 10.06 cents, so pump and fan efficiency in the cooling path is worth measuring.
Retrofitting liquid cooling into an air-cooled Utah hall
Retrofitting liquid cooling into an air-cooled Utah hall starts with the facility water, because many existing Utah halls run cold chilled water sized for air handlers. Coolant distribution units can accept that water, but the plant then gains none of the free cooling that warm water would bring. Where the chilled water plant has spare capacity, the first liquid rows often connect to it, and a dedicated warm-water loop with dry coolers follows as density grows.
The physical work happens around live equipment. Piping enters over or under occupied rows, hot taps or valves installed in an earlier window connect to the existing headers, and each step follows a method of procedure approved by the operator. Paul Industries prefabricates manifolds and pipe spools off site so that work in the hall is mostly fit-up and pressure testing, then flushes and fills the new loop before any server connects. The air system is rebalanced after each phase because liquid-cooled rows reject less heat to the room.
Rear door heat exchangers as a first step for Utah halls
Rear door heat exchangers give many Utah operators a first step into liquid cooling without changing the servers, because the door sits on the back of a standard rack and cools the exhaust air before it reaches the room. Water flows through a finned coil in the door; passive doors rely on the server fans, and active doors add their own fans for denser racks. The room then sees air close to its supply temperature, so the existing air handlers carry less load.
In Utah’s dry indoor air, rear doors run with little condensation risk, and the facility water serving them can be warmer than conventional chilled water, which lets the dry coolers or water-side economizer carry them for much of the year. The piping work is lighter than for cold plates: a supply and return to each door, usually from an overhead branch with isolation valves and a flexible connection that allows the door to swing. Paul Industries sizes the branch for later conversion to cold plate service, so the same piping can serve direct-to-chip racks when the owner moves to them.
Data center liquid cooling equipment and where it sits
Data center liquid cooling equipment spans the rack, the white space, the mechanical gallery and the yard, and each location has its own installation and access needs. The table below lists the main items in a Utah installation and what Paul Industries checks when each one is set.
| Equipment | Location | Installation checks | Utah detail |
|---|---|---|---|
| Coolant distribution unit | In row or mechanical gallery | Leveling, pipe stress, filter access, leak detection | Expansion tank precharge set for site pressure |
| Rack manifolds and quick disconnects | At each rack | Compatibility, pressure rating, labeling | Air purge at the manifold high points |
| Rear door heat exchangers | On rack rear doors | Hinge clearance, hose routing, condensate risk | Very dry winter air makes condensation rare |
| Facility water piping | Overhead or below floor | Supports, seismic bracing, isolation valves | Designed under the 2024 International Mechanical Code |
| Plate heat exchanger to glycol | Central plant | Approach temperature, cleaning access | Separates freeze protection from indoor water |
| Dry coolers | Yard or roof | Snow clearance, wind, altitude-corrected selection | Thin air cuts capacity per fan |
Immersion tanks are another route for very high densities; they replace cold plates with a dielectric bath and still reject heat through facility water. Paul Industries installs them with the same yard and loop practices, as described on the data center immersion cooling page.
Filling, flushing and coolant care before the racks go live
Filling, flushing and coolant care decide whether a Utah liquid cooling loop runs clean for years or clogs its cold plates in weeks. New pipe carries mill scale, cutting debris and residue from fabrication, and cold plate channels are narrow. The loop is flushed with temporary strainers and bypasses around the coolant distribution units and racks, then filled with coolant mixed from water of the quality the server maker specifies.
Utah tap water varies through the year, with harder well water mixed into some city systems in summer, so fill water is treated or brought from a purified source rather than taken straight from the tap. Paul Industries builds fill and makeup stations with filtration and deionization where needed, drawing on the practices on the ultrapure water systems in Utah page, and records coolant chemistry at turnover as the baseline for later sampling. Testing and the startup sequence are part of the wider program on the data center commissioning in Utah page.
Data center liquid cooling cost for a Utah hall: the main line items
Data center liquid cooling cost for a Utah hall depends on how many rows go liquid at once, the facility water class, the distance from coolant distribution units to the plant, the outdoor heat rejection method and the freeze protection the site needs. Coolant distribution units, rack manifolds and quick disconnects are equipment costs that scale with rack count. Piping, valves, supports and testing scale with distance and the number of branches. Dry coolers, glycol and the plate exchanger scale with the heat load.
Retrofit work in a live hall costs more per foot than a new build because of access, staging and outage planning. Phasing adds valves and capped branches but avoids rework later. Paul Industries gives a budget range early from comparable scope, then a firm price once rack counts, coolant type and the facility water temperature are fixed, with operating cost shown alongside so the owner sees the energy saved by running warmer water.
Who installs data center liquid cooling in Utah?
Paul Industries installs data center liquid cooling in Utah, covering coolant distribution units, technology cooling loops, rear door heat exchangers, facility water piping, glycol loops and dry cooler yards, and it services them after startup. Its headquarters is 256 Shore Drive, Kilmarnock, Virginia; the company was formerly based in northern New Jersey, then Pennsylvania, and it takes liquid cooling work across Utah and all 50 states.
The Utah work draws on the same loop practices as data center liquid cooling in Virginia, Paul Industries’ headquarters state, and the seismic and disclosure-driven projects described for data center liquid cooling in California, adjusted for freezing nights and altitude. The central plant that serves the liquid loops is covered on the data center cooling in Utah page, and the full mechanical package on larger campuses on the data center mechanical contractor in Utah page.
Data center liquid cooling providers in Utah: what Paul Industries delivers
Among data center liquid cooling providers, Paul Industries delivers the whole liquid path as one scope: design or design-assist from the owner’s rack roadmap, supply-only delivery of prefabricated manifolds, pump skids and coolant distribution unit assemblies, or complete installation through flushing, fill, startup and turnover. Its data center liquid cooling solutions range from a single pilot row to a closed-loop cooling system serving a full building. It serves operators in Salt Lake City, Lehi, Eagle Mountain, West Jordan, Ogden and St. George, with the region covered from the Southwest page and the state from the Utah page. Send the rack count, power per rack, coolant specification and facility water target, and request a quote.
Standards referenced: ASHRAE liquid cooling guidelines (W classes) · ASHRAE 90.4 · 2024 International Mechanical Code · 2024 International Energy Conservation Code with Utah amendments · Utah Code Title 54, Chapter 26 (large-scale electric service) · ASME B31.9 · ASME B31.3
Frequently asked questions
How are data centers liquid cooled in a cold, dry state like Utah?
The servers are cooled by coolant through cold plates or rear doors, a coolant distribution unit moves that heat into facility water, and the facility water rejects it outdoors. In Utah the outdoor step is usually a glycol loop with dry coolers, because cold dry air removes heat cheaply most of the year but freezes plain water in winter. Trim chillers or adiabatic assist cover the hottest summer afternoons.
Which company fits coolant distribution units and rack manifolds for Lehi and Salt Lake City halls?
Paul Industries installs coolant distribution units, rack manifolds, rear door heat exchangers, facility water piping and glycol dry cooler yards for data halls in Salt Lake City, Lehi and the rest of the Wasatch Front. Work covers new halls and retrofits in operating rooms, with each connection planned around live load. Call 201-450-8280 or request a quote with the rack count and the coolant specification.
Can a liquid-cooled hall in Utah run without chillers?
Often it can, for the liquid-cooled load. If servers accept facility water in the W40 or W45 class, dry coolers can carry that load through nearly all hours in northern Utah, with adiabatic assist on the hottest days. The residual air load and any older air-cooled equipment usually still need some mechanical cooling. Paul Industries checks the hourly weather for the site before recommending a chiller-free design.
What does Utah's 2025 large-load law mean for a liquid cooling project?
Utah Code Title 54, Chapter 26 sets procedures for requests of 100 megawatts or more within five years and allows closed private generation systems for large load customers. For a liquid cooling project, power may arrive in phases or from on-site generation, so the cooling is laid out for the final load and installed in steps, with valved branches ready for each new row.
Why does altitude matter when filling a liquid cooling loop in Utah?
At about 4,231 feet, atmospheric pressure near Salt Lake City is around 12.6 pounds per square inch, so dissolved air separates more easily at high points and water boils near 204 degrees. Trapped air in a cold plate loop causes flow loss and thermal alarms. Expansion tanks are precharged for site pressure, vents and separators are placed carefully, and the loop is degassed during fill.
Which glycol does a Utah outdoor cooling loop use?
Most data center loops use inhibited propylene glycol for its lower toxicity, at a concentration set from the site’s coldest expected temperature with margin. Northern Utah valleys need stronger mixtures than St. George. Because glycol reduces heat transfer, it is usually confined to the outdoor loop, with a plate exchanger keeping indoor facility water plain and treated.
How much does a data center liquid cooling system cost to run in Utah?
Pumps, dry cooler fans and any trim cooling make up the running cost. At Utah’s 2025 average commercial power price of 10.06 cents per kilowatt-hour, every 100 kilowatts of continuous load costs about $88,126 a year, so efficient pumps and warm facility water pay back steadily. Paul Industries estimates running cost for each design option using the owner’s actual rate.
Do rear door heat exchangers condense moisture in Utah halls?
Condensation is rare in Utah because the indoor air is dry for most of the year, especially in winter, and the doors run water above the room dew point by design. The coolant distribution unit still controls supply temperature to stay above dew point, and leak detection sits below each door. Summer monsoon humidity is the period to watch in southern Utah.
Can an existing Utah chilled water plant serve new liquid-cooled racks?
Yes, where the plant has spare capacity, and many Utah retrofits start that way. Coolant distribution units accept chilled water, though cold water wastes the free cooling that warm water would allow. As liquid load grows, a dedicated warm-water loop with dry coolers usually follows, and the chillers return to serving the air-cooled load.
What water should fill a technology cooling loop in Utah?
Fill water should meet the server maker’s specification, which usually means low conductivity, low chlorides and filtered to a fine rating. Utah tap water changes with the season, with harder well water mixed into some city systems in summer, so fill and makeup come from treated or purified water. Paul Industries records the coolant chemistry at turnover as the baseline for later sampling.
Is a hyperscale data center in Utah more likely to use liquid cooling?
Large new campuses built for high-density computing increasingly plan liquid cooling from the start, because the rack densities exceed what air can remove economically. Utah’s cool, dry climate makes the warm-water version especially efficient. The building still needs air handling for residual heat, and phasing usually mixes air-cooled and liquid-cooled halls on the same site.
How long does a liquid cooling retrofit take in a live Utah hall?
Duration depends on rows, access and how many outage windows the operator grants. Prefabricating manifolds and spools off site shortens time in the hall, and valves installed during an earlier window let new branches connect without draining the main loop. Paul Industries builds the schedule around the operator’s change windows and confirms each step with a method of procedure.
Does the Utah energy code apply to liquid cooling plants?
Yes. Utah’s State Construction Code, effective July 1, 2026, adopts the 2024 International Energy Conservation Code with Utah amendments, and its data center provision sends designers to ASHRAE 90.4 Sections 6 and 8. Warm-water liquid cooling with dry coolers typically lowers the mechanical load component sharply, which helps a design meet those limits.
Can heat from a Utah liquid cooling loop be reused?
Warm facility water in the W40 and W45 classes is hot enough to preheat ventilation air, warm office space or melt snow on walkways, and Utah’s long heating season gives that heat a use for many months. Recovery needs a heat exchanger, controls and an adjacent heat load. Paul Industries evaluates the payback for each site during design.
What should be sent to price data center liquid cooling in Utah?
Send the rack count and power per rack, the server maker’s coolant and flow requirements, the facility water class, the hall layout and the existing plant data if it is a retrofit. Phasing plans and the power delivery schedule help size headers and dry cooler pads. Paul Industries replies with a budget range and a loop concept.
How often should coolant in a Utah liquid cooling loop be tested?
Sampling at startup, after the first few weeks and then on a regular schedule set by the coolant maker is common, with extra samples after any makeup or repair. Tests track inhibitor level, pH, conductivity, glycol concentration and particulates. Paul Industries keeps the records with the original turnover baseline so trends show before they cause flow problems.
Does Paul Industries maintain liquid cooling systems in Utah after startup?
Paul Industries maintains coolant distribution units, filters, pumps, glycol loops, dry coolers and the controls that sequence them, and responds to leaks, flow alarms and coolant chemistry issues. Programs include seasonal freeze checks before the first Utah cold snap and coil cleaning before summer.