Paul Industries provides boiler repair in Utah for steam and hot water boilers at refineries, supplement and food plants, hospitals, campuses and commercial buildings, working to the Utah Labor Commission’s inspection rules from the first finding to the returned certificate. Utah adds two conditions most boiler owners elsewhere never think about: a state inspection program that writes its intervals into statute, and plants sitting more than 4,000 feet above sea level, where thin air changes how every burner behaves. Paul Industries diagnoses, repairs, retubes, rebuilds and replaces boilers, and tunes the burners and controls that keep them in service.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
State law Utah Code 34A-7, Part 1, with rule R616-2
Inspecting agency Labor Commission, Boiler, Elevator and Coal Mine Safety Division
High pressure boilers Internal at least every 14 months; 30 for qualifying large power boilers
Low pressure boilers Internal and external at least every two years
Welded repairs National Board R program, division advised a week ahead (R616-2-10)
Reviewed November 2026

What does boiler repair in Utah cover?

Boiler repair in Utah covers the mechanical, pressure-part, combustion and control work that keeps a boiler safe to operate under Utah Code Title 34A, Chapter 7, plus the paperwork the state inspector reviews before a Certificate of Inspection and Permit to Operate is reissued. On a firetube boiler that usually means tube leaks, tube sheet cracking, refractory, gaskets and handhole seats. On a watertube unit it means tube failures, drum internals, burner and windbox problems. On every boiler it includes the low-water cutoffs, safety valves, flame safeguard and fuel train that the inspector tests.

The national picture of faults and methods sits on the boiler repair page. This page stays with what is particular to Utah: the statute and rule that set the inspection clock, the way a finding becomes a repair order, the National Board program that governs welded repairs, and the altitude that every burner adjustment along the Wasatch Front has to respect.

Which Utah law and agency govern boiler work?

Utah boiler work is governed by Title 34A, Chapter 7, Part 1 of the Utah Code and by administrative rule R616-2, both administered today by the Utah Labor Commission through its Boiler, Elevator and Coal Mine Safety Division. The state program dates from the Boiler and Pressure Vessel Act that took effect on July 1, 1967. The statute reaches boilers and pressure vessels in industrial and manufacturing establishments, business establishments, sawmills, construction jobs and any place where workers or the public could be exposed to the risk of their operation.

Three exemptions are written into section 34A-7-101: units already inspected or controlled under federal law, air tanks on vehicles carrying passengers or freight, and units the ASME Boiler and Pressure Vessel Code itself excludes. Every other boiler Utah businesses run for steam or hot water falls inside the program.

R616-2-3 adopts by reference the codes a repaired boiler is judged against: ASME Section I for power boilers, Section IV for heating boilers, Section VIII for pressure vessels, ASME CSD-1 for automatically fired boilers with a fuel input of 400,000 Btu per hour or more, the National Board Inspection Code, NFPA 85 and API 510. The division also issues a Utah boiler and pressure vessel compliance manual under R616-2-7, and where the manual and an adopted code disagree, the code governs.

How often are boiler inspections required in Utah?

Utah requires each boiler outside the statutory exemptions to be inspected internally and externally every year while it is shut down and depressurized, with no more than 14 months between internal inspections. Two exceptions change the clock. A large power boiler, which the statute defines as one operated and monitored continuously with adequate maintenance, combustion and water controls, may go up to 30 months between internal inspections. A low pressure boiler, meaning steam at no more than 15 psi or water at no more than 160 psi, is inspected internally and externally at least every two years where its construction permits.

Utah boiler and pressure vessel inspection intervals
EquipmentInspection intervalWhere it is writtenWhat the repair plan should account for
High pressure steam and high temperature water boilersAnnual internal and external, no more than 14 months between internalsUtah Code 34A-7-103(1), (3)(a)Schedule tube, refractory and drum work inside the annual outage window
Large power boilers run and monitored continuouslyUp to 30 months between internal inspections34A-7-103(3)(a), (b)Longer runs make water treatment records and condition data the evidence for the interval
Low pressure steam (15 psi maximum) and hot water (160 psi maximum) boilersInternal and external at least every two years, where construction permits34A-7-103(4)Cast iron sections and controls tend to surface as findings at the two-year visit
Heat exchangers served by high pressure steam or high temperature waterEvery 24 monthsR616-2-8(A)(2)(a)Tube bundle and shell findings often land in the same outage as the boiler
Autoclaves above 15 psi steamEvery 24 monthsR616-2-8(A)(2)(b)Door closures, seals and safety interlocks are the usual repair items
Other pressure vessels under the divisionEvery 48 monthsR616-2-8(A)(2)(c)Receivers, deaerators and blowdown tanks around the boiler share the cycle

The division may extend a boiler’s internal interval in writing when the owner presents evidence of the method of operation, performance records and water treatment. That provision rewards a plant that keeps daily logs, water chemistry and blowdown records, because the same records that support an extension also tell a repair crew where to look first. The national boiler water treatment page covers the chemistry programs that produce that evidence.

Who performs a Utah boiler inspection?

A Utah boiler inspection is performed either by an inspector employed by the Labor Commission’s division or by a deputy inspector employed by an insurance company that writes boiler and pressure vessel coverage in Utah. Both hold the commission’s certificate of competency under R616-2-2. When the insurance company’s deputy performs the inspection inside the statutory time limit and files the report with the division within 30 days, the inspection satisfies the statute and the boiler is exempt from the state inspection fee for that cycle.

For a plant manager the practical difference is scheduling. A Utah state boiler inspection is booked with the division, while an insurer’s deputy follows the policy and the access agreement between insurer and owner. In either case the Utah boiler inspector writes up deficiencies, and those findings are where most repair orders start. The division’s public web portal shows the status of an inspection and the current certificate for each boiler by its state number.

From inspection finding to repair order

An inspection finding in Utah becomes a repair order when the division notifies the owner in writing of each deficiency and directs the specific improvements needed to bring the boiler into compliance under R616-2-8(D). The rule gives the owner a reasonable time to make the changes. A boiler whose deficiencies are left uncorrected, or whose owner refuses entry or the fee, is being operated unlawfully, and the commission may order its operation to cease. Where an inspector judges that people in the area are in danger, the rule directs that they be withdrawn and the boiler taken out of service until it is repaired.

Most boiler repair Utah plants order begins in exactly that way, with a list in an inspection report rather than a failure. Paul Industries reads the report line by line, separates items that need a welded repair from those that need parts, adjustment or testing, prices them separately and plans the order of work so the boiler goes back to the inspector ready for a single return visit.

Preparation for an internal inspection is the owner’s responsibility under the same rule, and it has to meet OSHA’s permit-required confined space standard, 29 CFR 1910.146, and its lockout and tagout standard, 29 CFR 1910.147. Paul Industries cools, drains, opens, isolates and cleans boilers for inspection under those procedures, which lets the inspector see the waterside and fireside surfaces and lets any repair found that day start without a second shutdown.

Common Utah inspection findings and the repair that answers each
Finding on the reportLikely causeTypical repairInspector involvement
Low-water cutoff fails to trip or is slow on blowdownSludge in the float chamber, worn mechanism, wiring faultClean or replace the cutoff, retest with a slow-drain testRetest witnessed or documented for the next visit
Safety valve leaking, overdue or capacity in doubtSeat damage, age, a capacity change since installationReplace with a correctly sized ASME-marked valve, or repair under the National Board VR programValve data recorded against the boiler’s state number
Tube leak or tube thinningScale, oxygen pitting, overfiring, poor circulationPlug, replace or retube; correct the water or combustion causeWelded work under the National Board R program, division advised ahead
Cracked tube sheet ligament or stayThermal cycling, scale buildup, low water eventWeld repair to an NBIC procedure, examination and hydrostatic testRepair plan accepted by the inspector before welding
Flame safeguard or fuel train deficiencyFailed scanner, leaking safety shutoff valve, missing proof of closureReplace components and retest the sequence to CSD-1 or NFPA 85Function test results kept for the inspector
Refractory or door seal damageThermal shock, age, poor door gasket seatingRecast or replace refractory, reseal the door, cure on a controlled firing scheduleInspector checks on return

Welded boiler repairs under the National Board R program

Welded boiler repairs and alterations in Utah have been required since July 1, 1999 to be made by an organization holding a valid National Board Certificate of Authorization for the R stamp, and relief valve repairs by one holding the VR certificate, under R616-2-4(E). A welded repair is made under the National Board R program with the inspector consulted, following the repair rules of the National Board Inspection Code that R616-2-3 adopts. The work is documented on the NBIC repair report and the repair is identified on the boiler.

R616-2-10 adds a timing rule that catches owners out. Before a boiler is installed, or before a major revision or repair, particularly welding, begins on a boiler or pressure vessel, the division must be advised at least one week in advance unless an emergency dictates otherwise, and the rule recommends reviewing plans with the division well ahead. Paul Industries builds that notice into every planned outage so the welding date and the inspector’s hold points line up.

Utah also has a category of boiler that needs care before any repair is scoped. Nonstandard units, meaning boilers without ASME and National Board stamping and registration, installed before July 1, 1999 may stay in service only where the owner proves design equivalence, and they may not be relocated. Every boiler or pressure vessel installed on or after May 1, 1978 has to be registered with the National Board with its number on the data plate, so the data plate and the National Board record are the first documents Paul Industries asks for.

Burners at 4,200 feet: what altitude does to a Utah boiler

Altitude changes burner performance because the air at Wasatch Front plants carries noticeably less oxygen per cubic foot than air at sea level. The National Weather Service lists Salt Lake City’s airport at 4,226 feet, Ogden at 4,440, Provo at 4,495 and Logan at 4,446. In the standard atmosphere, air at 4,226 feet is about 88 percent as dense as at sea level, so a fan and burner set up for sea level conditions deliver less combustion air than the nameplate assumed.

Elevation, atmospheric pressure and boiling point at Utah plant locations (standard atmosphere)
LocationElevation (NWS station)Atmospheric pressureWater boils at aboutWhat it means for repairs
Salt Lake City4,226 ft12.6 psia204 FCombustion setup and gas pressure checked against altitude, not sea level tables
Ogden4,440 ft12.5 psia204 FVented condensate and feed tanks flash at lower temperatures
Provo4,495 ft12.5 psia204 FLess pump suction margin on hot feedwater and condensate
Logan4,446 ft12.5 psia204 FCold winters add freeze risk for idle boilers and outdoor lines
St. George2,872 ft13.2 psia207 FSmaller altitude correction, higher summer heat in boiler rooms

Combustion tuning after a burner repair is therefore done with a flue gas analyzer at the site, adjusting air and fuel across the firing range until oxygen and carbon monoxide sit where the burner maker’s data calls for at that elevation. Paul Industries records the final readings at low, middle and high fire, so the next tune-up starts from known numbers.

The lower atmospheric pressure also changes the steam side. Water in an open, vented condensate receiver or feedwater tank boils at roughly 204 degrees Fahrenheit in Salt Lake City, against 212 at sea level, so hot condensate flashes earlier and boiler feed pumps have less margin against cavitation. Feed pump repairs that keep recurring at Utah plants are often a suction head problem, and the fix is in the tank height, the condensate temperature or the pump selection, not in another seal kit.

Controls, fuel trains and air permits for burner work

Controls and fuel train work on Utah boilers is judged against ASME CSD-1 for automatically fired boilers of 400,000 Btu per hour fuel input or more, and against NFPA 85 for larger boilers and combustion systems, both adopted in R616-2-3. That covers flame safeguards, safety shutoff valves, proof of closure, low-water and high-limit controls, and the purge and ignition sequence. Paul Industries replaces failed components with equivalents that keep the listing intact, then runs the full safety sequence and records the results.

A burner replacement or fuel change can also reach the Utah Division of Air Quality. Rule R307-401 requires a notice of intent and an approval order from the director before an air pollutant source is constructed, modified, installed or relocated, unless one of the exemptions in R307-401-9 through R307-401-17 applies. A like-for-like burner repair does not usually change emissions, but a new low NOx burner, a larger firing rate or a second fuel can. Paul Industries confirms which path applies before equipment is ordered. On Enbridge Gas service, the gas pressure available at the meter sets what a replacement burner and regulator train can be.

Can a boiler be repaired, or is replacement the Utah answer?

A boiler can be repaired whenever the pressure parts are sound enough to return to code condition at a cost that makes sense against the remaining life, and Utah’s rules add three facts to that decision. Under R616-2-5, replacing a boiler is treated as a new installation, so the replacement is judged against the codes in effect when installation starts. Relocating a boiler, or even moving it within the same building, is also a new installation. And a nonstandard pre-1999 boiler may not be relocated at all.

A replacement in Utah therefore carries more than a boiler. It needs National Board registration, external steam piping to ASME Section I or ASME B31.1 under R616-2-4(C), the controls required by CSD-1 or NFPA 85, a notice to the division a week before installation, and the mechanical and fuel gas work that the State Construction Code governs. Since July 1, 2026 that code is built on the 2024 International Mechanical Code and 2024 International Fuel Gas Code, and every Utah city and county follows the same State Construction Code.

Commercial boiler useful life varies widely with water treatment, cycling and maintenance, so Paul Industries bases the repair or replace recommendation on the boiler’s own inspection history, tube condition and efficiency rather than on age alone, and prices both routes when the answer is close. Where replacement wins, Paul Industries supplies and installs the new boiler, the piping and the controls under one contract.

Boiler repair across Utah’s industrial regions

Boiler repair across Utah follows the industrial map of the Wasatch Front, where most of the state’s process steam is raised, with additional plants in Cache Valley, the Tooele Valley and the St. George area. Each region brings its own boiler population and its own reasons for repairs.

Boiler repair Salt Lake City, UT and the Salt Lake Valley

Hospitals, university plants, food and beverage processors, laundries and commercial buildings in Salt Lake City, West Valley City, West Jordan and South Jordan make up the valley’s boiler population. Paul Industries handles the boiler service Salt Lake City buildings rely on through the heating season and process boiler repair at valley plants.

North Salt Lake and Woods Cross

Southern Davis County holds a refinery corridor that includes HF Sinclair’s Woods Cross refinery and Big West Oil’s North Salt Lake refinery, with process steam, waste heat and package boilers whose repairs are planned around scheduled turnarounds.

Boiler repair Ogden and Weber County

Manufacturing, food processing and distribution sites along the northern Wasatch Front run package boilers for process heat and space heating, and their findings cluster around controls, refractory and feedwater equipment.

Utah County: Provo, Orem, Lehi and Spanish Fork

Utah County is home to supplement and food manufacturing, including the Spanish Fork plant where Nature’s Sunshine reports most of its products are made, and those plants use steam for process heating, cleaning and humidity control.

Boiler repair Logan, Utah and Cache Valley

Dairy and food processing anchor Cache Valley, where long winters keep heating and process boilers busy for much of the year and summer layup matters for idle units.

Tooele, St. George and boiler repair Park City, Utah owners need

Industrial sites west of the lake, a growing commercial base in Washington County and the resort and hospitality heating plants around Park City round out the map.

Paul Industries takes work across all of these areas and in all 50 states, and pairs boiler repair with the chiller repair in Utah that the same central plants need in summer. Supplement and food plants that run clean steam or purified water off the same boiler house can pair this work with high-purity water systems in Utah.

What does boiler repair in Utah cost?

Boiler repair in Utah costs what the scope, the pressure parts involved and the outage window dictate, so Paul Industries prices each job from the inspection report, the boiler data and the plant’s schedule rather than from a flat rate. A safety valve replacement and a low-water cutoff rebuild sit at one end of the range. A retube, a tube sheet repair or a refractory rebuild sits at the other, and a burner replacement can add an air permit review and a new fuel train.

What drives the price of a Utah boiler repair
Cost driverWhy it matters in UtahWhat to send for a firm price
Welded pressure-part workR program repair, NBIC documentation, inspector hold points and a week’s notice to the divisionInspection report, data plate photo, National Board number
Outage windowAnnual inspection outages, refinery turnarounds and winter heating demand compress the calendarDates the boiler can be down and any backup capacity
Burner and controls scopeAltitude tuning, CSD-1 or NFPA 85 sequence testing, possible DAQ approval order for a new burnerBurner make and model, firing rate, fuel and gas pressure
Access and preparationConfined space entry and lockout under OSHA, cleaning before internal inspectionBoiler room layout, manway and handhole access
Replacement triggerReplacement or relocation is a new installation under R616-2-5Boiler age, inspection history, efficiency and fuel records

Paul Industries gives a budget range early from comparable work and a firm price once the boiler has been opened and the scope is fixed, with welding, parts, refractory and testing shown as separate lines.

Who repairs boilers in Utah?

Paul Industries repairs boilers in Utah, from Salt Lake City and the Davis County refinery corridor to Ogden, Provo, Lehi, Logan, Tooele and St. George. Paul Industries is headquartered at 256 Shore Drive in Kilmarnock, Virginia, and was formerly based in northern New Jersey, then Pennsylvania. It is an East Coast contractor that takes work across Utah and in all 50 states. Its headquarters-state page, boiler repair in Virginia, covers that program; this page applies the same repair method to Utah’s statute, rule and altitude. Owners comparing state programs will find a different inspection structure on the boiler repair in Texas page.

The same contract can cover what surrounds the boiler: steam trap surveys and replacement, process piping in Utah for steam and condensate, industrial welding services in Utah for supports and auxiliary equipment, and the receivers, deaerators and blowdown tanks covered by pressure vessel fabrication in Utah.

Boiler work from Paul Industries for Utah plants

Paul Industries diagnoses, repairs, retubes, rebuilds and replaces steam and hot water boilers across Utah, prepares boilers for internal inspection, makes welded repairs under the National Board R program, replaces safety valves, low-water cutoffs, flame safeguards and fuel trains, and tunes burners for the elevation of each site. Replacement boilers are supplied alone, delivered as design-build packages or installed complete with piping and controls. The Utah page lists every service Paul Industries delivers in the state, and the Southwest page compares Utah’s rules with its neighbors. Send the inspection report and the boiler data and request a quote.

Standards referenced: Utah Code Title 34A, Chapter 7, Part 1 (Boilers and Pressure Vessels) · Utah Admin. Code R616-2 · ASME Boiler and Pressure Vessel Code, Sections I, IV and VIII · ASME CSD-1 · National Board Inspection Code (NBIC) · NFPA 85 · ASME B31.1 · Utah Admin. Code R307-401 · Utah State Construction Code (Utah Code Title 15A) · OSHA 29 CFR 1910.146 and 1910.147

Frequently asked questions

How often are boiler inspections required in Salt Lake City?

Salt Lake City boilers follow the statewide schedule in Utah Code 34A-7-103: an annual internal and external inspection for high pressure boilers, with no more than 14 months between internals, and at least every two years for low pressure steam and hot water heating boilers. The city does not set a separate interval. Paul Industries plans repair work so it finishes before the inspection date the certificate shows.

Who handles boiler repair in Ogden and the northern Wasatch Front?

Paul Industries handles boiler repair in Ogden, Weber County and Davis County, including firetube and watertube repairs, safety valve and low-water cutoff replacement, burner tuning and boiler replacement. Plants along the northern Wasatch Front sit around 4,400 feet, so combustion setup after any burner repair is checked with an analyzer at the site. Call 201-450-8280 with the boiler data and the latest inspection report.

Does a Utah boiler need a permit to operate?

Yes. When a boiler inspected by the division or a deputized insurance inspector complies with the safety codes and rules, the owner receives a Certificate of Inspection and Permit to Operate under R616-2-8(C). The division may suspend that certificate when a boiler cannot continue in operation without danger, and the suspension lasts until the boiler conforms and a new certificate is issued.

What are the steam boiler inspection requirements for a Utah refinery or process plant?

A process steam boiler is inspected internally and externally every year while depressurized, with no more than 14 months between internal inspections. A large power boiler that runs and is monitored continuously with adequate maintenance, combustion and water controls may go up to 30 months, and the division may extend intervals in writing on evidence of operation, performance records and water treatment. Paul Industries keeps repair records in the form those decisions rely on.

Can a Utah boiler inspection interval be extended to fit a turnaround?

The division may extend an internal inspection interval in writing when the owner presents proper evidence of the method of operation, performance records and water treatment. Plants that line up the boiler inspection with a refinery turnaround or annual shutdown should request it well ahead. Paul Industries assembles repair histories, water chemistry summaries and condition findings that support the request and plans the repair scope for the agreed date.

What happens if a Utah boiler fails its inspection?

The owner is notified in writing of each deficiency and directed to make the specific changes needed, with a reasonable time to complete them. Leaving them uncorrected makes the operation unlawful, and the commission may order the boiler shut down. Where people are in danger the inspector removes the boiler from service. Paul Industries prices each listed item and plans the repairs so the boiler returns ready for reinspection.

How much notice does the Utah division need before welding on a boiler?

R616-2-10 asks that the division be advised at least one week before a boiler is installed or before a major revision or repair, particularly welding, begins on a boiler or pressure vessel, unless an emergency dictates otherwise. Paul Industries sends the notice with the repair plan, which keeps the inspector’s hold points and the welding schedule aligned on planned outages.

Can a pre-1999 boiler without ASME stamping keep running in Utah?

A nonstandard boiler installed in Utah before July 1, 1999 may stay in operation where the owner can prove its design is equivalent to the ASME Boiler and Pressure Vessel Code, under R616-2-4(D). It may not be relocated or moved. Owners of such boilers should plan repairs carefully, since major work raises the question of continued equivalence. Paul Industries reviews the records and prices repair and replacement side by side.

Does replacing a boiler in Utah count as a new installation?

Yes. R616-2-5 treats a replaced boiler as a new installation, and the same applies when a boiler is relocated or even moved within its existing location. The new unit must meet the codes in effect when installation begins, carry National Board registration and have compliant external piping and controls. Paul Industries supplies, installs and starts up the replacement and gives the division the documents it reviews.

Why do burners need retuning at Utah plants after a repair?

Air at the elevation of most Wasatch Front plants is roughly 12 percent less dense than at sea level, so the combustion air a fan delivers falls short of sea level assumptions. After a burner, fan or fuel train repair, Paul Industries adjusts the air and fuel across the firing range with a flue gas analyzer to the burner maker’s data for that elevation, then records oxygen and carbon monoxide at each firing point.

Why do boiler feed pumps cavitate more often in Utah?

Water in a vented feedwater or condensate tank boils near 204 degrees Fahrenheit in Salt Lake City, eight degrees below its sea level boiling point, so hot water flashes in the pump suction sooner. Repeated seal and impeller failures often trace to that lost suction margin. Paul Industries checks tank elevation, condensate temperature and pump requirements before replacing parts, and corrects the cause.

Does a new burner need a Utah air quality approval order?

It depends on the change. Rule R307-401 requires a notice of intent and an approval order before an air pollutant source is constructed, modified, installed or relocated, unless an exemption in R307-401-9 through R307-401-17 applies. A like-for-like repair rarely triggers it, while a larger firing rate or a new fuel can. Paul Industries confirms the path with the owner before ordering a replacement burner.

Which codes does Utah apply to boiler controls and safety devices?

R616-2-3 adopts ASME CSD-1 for automatically fired boilers with a fuel input of 400,000 Btu per hour or more and NFPA 85 for boilers and combustion systems in its scope. Those documents cover flame safeguards, safety shutoff valves, limit controls and the purge and ignition sequence. Paul Industries replaces failed devices with listed equivalents and runs and records the full safety sequence after the repair.

Who can repair a boiler safety valve in Utah?

R616-2-4(E) requires relief valve repairs to be performed under the National Board VR program, so a leaking or overdue safety valve is either repaired under that program or replaced with a correctly sized, ASME-marked valve. Paul Industries checks the required relieving capacity against the boiler’s current firing rate, replaces or repairs the valve on that basis and records the valve data with the boiler’s state number.

What should a Utah plant send to get a boiler repair priced?

Send the latest inspection report or certificate, data plate photos with the National Board number, the boiler make, model, pressure rating and fuel, the burner make and firing rate, a description of the fault or finding, and the dates the boiler can be taken out of service. Paul Industries uses those details to set the diagnostic visit and returns a priced scope with parts, welding and testing listed separately.

Does Paul Industries offer boiler service Utah plants can schedule between inspections?

Yes. Paul Industries offers scheduled boiler service in Utah covering combustion tuning, low-water cutoff and safety device testing, fuel train leak checks, waterside and fireside inspection, refractory checks and preparation for the state or insurance inspection. Service records are kept in the form the division reviews, which supports any request to extend an internal inspection interval.

How should boilers in Logan and Cache Valley be laid up in summer?

Heating boilers that sit idle through the summer in Cache Valley need either a wet layup with treated water and controlled oxygen or a dry layup with the waterside drained, dried and protected, since idle oxygen corrosion is a frequent source of autumn tube leaks. Paul Industries sets up the layup, checks it during the idle months and recommissions the boiler with a full safety device test before the heating season.

Boiler written up or down at a Utah plant?

Send the inspection report, the data plate and National Board number, the burner details and the dates the boiler can come out of service. Call 201-450-8280 or request a quote.