Paul Industries provides boiler repair in Texas for refineries, chemical plants, hospitals, food plants and campuses, repairing firetube, watertube and hot water boilers to the National Board Inspection Code and returning them to service under a current Texas certificate of operation. Texas regulates boilers through Health and Safety Code Chapter 755 and the Texas Department of Licensing and Regulation (TDLR) rules in 16 TAC Chapter 65, so a repair here is also a records exercise: the inspector’s acceptance, the report filed with the state and the certificate posted at the boiler. Paul Industries is headquartered at 256 Shore Drive, Kilmarnock, Virginia, and takes boiler work statewide, from the Houston Ship Channel to the Permian Basin.
Request a quote or call 201-450-8280
What Chapter 755 covers before any boiler repair in Texas
Chapter 755 of the Texas Health and Safety Code defines a boiler as a heating boiler, power boiler, unfired steam boiler, nuclear boiler or process steam generator, and requires every boiler it covers to be registered with TDLR and to hold a current certificate of operation. Before a repair is planned, the first question is which of those classes the unit falls into, because the class sets the inspection interval, the paperwork and the rules for extending the time between internal inspections.
The statute draws the lines by pressure, temperature and heat input. A power boiler makes steam above 15 psi for use outside the boiler, or is a high-temperature water boiler running above 160 psi or 250 F. A hot water heating boiler stays at or under 160 psi and 250 F. Hot water supply boilers and potable water heaters come into the program when heat input exceeds 200,000 Btu per hour, water temperature exceeds 210 F (for supply boilers) or the nominal water capacity exceeds 120 gallons. An unfired steam boiler is an unfired pressure vessel in which steam is generated, with evaporators, heat exchangers and steam made from process heat in chemical and petroleum units carved out.
Section 755.022 lists what the Texas boiler law leaves out: boilers owned or operated by the federal government, pressure vessels and process steam generators (except their steam collection or liberation drums), hobby miniature boilers, boilers built for atmospheric pressure with two independent means to prevent pressure buildup, steam cookers and espresso machines. Senate Bill 1185 added two more exemptions from September 1, 2025: small boilers that are a component of an FDA-regulated medical device, and unfired pressure vessels in an autoclave. Heating boilers in buildings used only as homes for four families or fewer keep their registration but skip the inspection, certificate and fee sections.
| Boiler class | How Chapter 755 defines it | Certificate inspection | Longest internal interval with an approved extension |
|---|---|---|---|
| Power boiler | Steam above 15 psi for an external purpose, or water above 160 psi or 250 F | Annual certificate inspection plus an annual external inspection | 60 months in total |
| Unfired steam boiler | Unfired pressure vessel generating steam, excluding evaporators, heat exchangers and process heat recovery | Annual certificate inspection plus an annual external inspection | 84 months, timed to the next scheduled downtime |
| Steam drum of a process steam generator | The collection or liberation drum on a unit making steam from process heat | Annual certificate inspection plus an annual external inspection | 120 months (built before 1970) or 144 months (built 1970 or later) |
| Steam and hot water heating boilers | Steam at 15 psi or less; water at 160 psi and 250 F or less | Every two years | Set by the biennial cycle |
| Hot water supply boilers and potable water heaters | Over 200,000 Btu/h, over 210 F or over 120 gallons | Every three years | Set by the triennial cycle |
How often does a Texas boiler inspection come due, and can it be extended?
A Texas boiler inspection is made internally and externally when the unit is first installed and then at the statutory interval, and the certificate inspection report is what TDLR uses to issue or renew the certificate of operation. The certificate is valid for no longer than the inspection interval and has to be posted on or near the unit, which is why an inspector’s first look in a boiler room is often at the frame on the wall.
Who inspects boilers in Texas depends on insurance. Under 16 TAC 65.61, a unit covered by an insurance policy is inspected by the Authorized Inspection Agency that wrote the policy, using inspectors commissioned by TDLR; any other unit is inspected by the department’s own chief or deputy inspectors. Since September 1, 2025, Senate Bill 917 has required the inspection agency to file the certificate inspection report within 10 days of the inspection, down from 30.
Power boilers, unfired steam boilers and process steam drums can have the time between internal inspections extended under Section 755.026, but only when continuous water treatment under competent supervision has been in effect since the last internal inspection, the last internal and current external inspections support it, and the water sampling records exist. Rule 65.64 asks the owner to file the request no less than three business days before the certificate expires, for no more than one year past that date, with records ready for the authorized inspector. A unit that has sat out of service for repairs for more than 15 consecutive days is presumed to need an internal inspection, so a long repair can reset the extension plan. For certificates expiring on or after December 1, 2025, a late inspection draws a fee of $25 a day for the owner and, where it was responsible, the inspection agency.
How does an inspection finding become a repair order?
An inspection finding in Texas becomes a repair order through Section 755.041: when a unit is found unsafe, the chief or a deputy inspector issues a written preliminary order requiring the repairs needed to make it safe, and can order it out of use until they are done. The owner can ask for a hearing, but in practice the order sets the scope of the repair and the order of work.
Two provisions shape the schedule. The chief inspector can issue a temporary certificate of operation for up to 30 days while repairs or a replacement are completed, which keeps a plant legal while parts arrive. And a unit found beyond safe repair is condemned and its use prohibited, which turns a repair plan into a replacement project. Operating a boiler in breach of the chapter, a rule or an inspector’s order is a Class B misdemeanor under Section 755.043, on top of TDLR’s administrative penalties.
Preparing a Texas boiler for its internal inspection
Rule 65.210 puts the preparation on the owner or operator, and a repair plan built around it saves a day of outage. The unit is drained and its watersides washed, loose scale removed, manholes, handholes and plugs opened, the furnace cooled and cleaned, probe-type low-water cutoffs removed and float types dismantled, and the pressure gauge siphon cleared. Where units share a header, the nonreturn, stop, feedwater and blowdown valves are closed, locked and tagged, with drains open between paired valves. Manhole and handhole gaskets on pressure parts are replaced with new gaskets, never reused, and sealing compounds on those gaskets are prohibited. Paul Industries plans the opening, cleaning and closing of the unit around the inspector’s visit so findings can be repaired in the same outage.
What do the Texas boiler rules require of welded and mechanical repairs?
The Texas boiler rules in 16 TAC 65.612 require repairs and alterations to conform to the current edition of the National Board Inspection Code and to be acceptable to the inspector. Welded repairs are made under a National Board R certificate of authorization, or under a TDLR owner-operator certificate of authorization for plants that maintain their own approved program, within the scope the certificate covers, with the inspector consulted before work starts.
Mechanical repairs have their own rules. Replacement pressure plate needs a material test report with traceability maintained throughout; replacement parts fabricated by welding must carry the appropriate ASME Code symbol and be inspected; cast or forged parts originally marked with the Code symbol are replaced with marked parts or parts the manufacturer documents to the original code; and boiler tubes are replaced with tubes of an allowed material under the original code of construction. A lap seam crack found along a riveted longitudinal joint ends that shell’s service under pressure permanently. Derating the maximum allowable working pressure or temperature needs TDLR approval before the alteration begins, and raising it again later needs prior approval too. Every repair and alteration report is filed with the department within 90 days of completion under Rule 65.84.
| Repair | Rule that governs it | What the owner should receive |
|---|---|---|
| Tube replacement or retubing | NBIC; tubes of an allowed material to the original code of construction (65.612) | NBIC repair report, material records, inspector acceptance |
| Weld repair to a shell, drum, furnace or header | NBIC under an R or TDLR owner-operator certificate of authorization; inspector consulted before work | Repair report filed with TDLR within 90 days, NDE results, hydrostatic test record where required |
| Replacement of a welded component | Part carries the ASME Code symbol and is inspected (65.612(c)) | Manufacturer’s partial data report and traceability to the boiler |
| Safety valve repair or reset | Repaired, tested, set and sealed under an ASME V, HV or UV, National Board VR, or TDLR owner certificate (65.614) | Valve repair nameplate and set pressure record |
| Rerating or derating | Alteration under the NBIC; derating approved by TDLR before work starts | Alteration report, new nameplate data, updated certificate |
| Restamping or nameplate replacement | NBIC and 16 TAC 65.212 | Record of the restamping witnessed under the NBIC |
Safety valves, carbon monoxide interlocks and boiler room rules
Safety and relief valves on Section I, Section IV and Section VIII Division 1 boilers in Texas are repaired, tested, set and sealed under an ASME V, HV or UV certificate, a National Board VR certificate, or a TDLR owner-operator certificate limited to the owner’s own boilers. Valve work is therefore scoped with the certificate that covers it, so the repaired valve carries the nameplate and set record the rule expects.
Rule 65.206 adds boiler room requirements that come up during replacements. Where one or more boilers were installed or reinstalled on or after September 1, 2020, and the fuel can produce carbon monoxide, the room needs a manually reset CO detector with a ppm display, interlocked to shut down the burners at 50 ppm, or with remote monitoring an alarm at 50 ppm and burner shutdown at 200 ppm, calibrated at least every 18 months with the record kept at the boiler. The same rule bans storage of flammable material and gasoline-powered equipment in the boiler room, requires exit doors to open outward and calls for adequate drainage and a sound roof over indoor boilers. TDLR recommends ASME Section VI and Section VII as operating guides for heating and power boilers.
Replacing a Texas boiler: installation report, temporary permit and first inspection
A replacement Texas boiler must be built, inspected and stamped to the applicable section of the ASME Code and registered with the National Board, except cast iron and cast aluminum sectional boilers, before Rule 65.200 lets it operate. A boiler stamped to another state’s equivalent standard, or a special design, needs a written request to TDLR and a special inspection, which carries a $1,700 fee.
The Texas boiler installation report is due by the time the installation or reinstallation is complete under Rule 65.13, and the boiler cannot be test fired or run before its first inspection unless a Temporary Boiler Operating Permit has been approved, which allows up to 30 days of operation. That report is also how a new unit enters the Texas boiler registry and receives its Texas boiler number, which the Texas boiler regulations then use to track every later inspection and repair. Paul Industries sequences a replacement so the installation report, the temporary permit request and the first inspection line up with the startup date rather than holding up commissioning. Owners planning a new unit rather than a repair can also see how deaerators and feedwater equipment are set at the same time.
Burner and fuel changes: TCEQ air permits for Texas boilers
Burner replacements, fuel changes and capacity increases also need an air authorization from the Texas Commission on Environmental Quality, separate from TDLR’s certificate. Many small and mid-size units run under permit by rule 30 TAC 106.183, which covers boilers and heaters up to 40 million Btu per hour firing sweet natural gas, liquefied petroleum gas or low-sulfur fuel gas, with distillate oil as a backup limited to 720 hours a year at under 0.3 percent sulfur, and gas-fired units above 10 million Btu per hour designed for no more than 0.1 pounds of NOx per million Btu.
Larger units, other fuels or emission increases move to the boiler standard permit or a Chapter 116 construction permit. Plants in the Houston-Galveston-Brazoria and Dallas-Fort Worth areas also answer to the NOx rules in 30 TAC Chapter 117, and both areas were reclassified to severe nonattainment for the 2008 ozone standard effective November 7, 2022. A low-NOx burner retrofit is therefore planned with its permit basis, tuning targets and stack test, if one is required, before the burner arrives.
Boiler repair across Texas regions
Repair work across Texas follows the industry map: power and process boilers along the Gulf Coast, hospital and campus plants in the large metros, and food and beverage steam everywhere. The Texas boiler inspection requirements are the same statewide, but the units, the operating patterns and the city requirements differ.
Boiler repair, Houston, TX and the Ship Channel
The Houston region carries refinery and chemical plant steam systems, waste heat units and the hospital and research boilers of the Texas Medical Center. Inside Houston city limits, the city adds its own operator rule: a Boiler Operator Permit for low-pressure boilers and power boilers up to 1,676,000 Btu, and a stationary engineer license to run high pressure steam boilers above that size, with an annual city review of the installation. Plants in Pasadena, Baytown, Deer Park and La Porte work under the state rules and their own operating permits.
Beaumont, Port Arthur and Orange
The refinery and petrochemical complex at the Sabine-Neches waterway runs large watertube boilers, unfired steam boilers and steam drums on process steam generators, and Texas as a whole holds about one-third of US crude refining capacity. Extensions to the next turnaround are common here, which makes water treatment records as important as the pressure parts.
Boiler repair, Corpus Christi and the Coastal Bend
Refineries, chemical plants and LNG and export facilities around Corpus Christi Bay operate in salt air, so external corrosion on casings, stacks, gauge lines and valve bodies is part of every inspection and repair plan.
Boiler repair, Dallas, Fort Worth and North Texas
Dallas-Fort Worth boilers are mostly heating and process units at hospitals, universities, food and beverage plants and manufacturing sites, many on biennial or triennial cycles, with Sherman and Denison adding semiconductor and food plant steam to the north.
Boiler repair, San Antonio, Austin and Central Texas
San Antonio and Austin carry military, hospital, university and food plant boilers, along with clean steam and process steam at the life science and semiconductor sites along the Interstate 35 corridor.
West Texas, El Paso and the Rio Grande Valley
Gas processing in the Permian Basin, maquiladora-linked manufacturing in El Paso and food processing in the Rio Grande Valley round out the picture, often with smaller packaged boilers that run hard through harvest and production peaks.
| Region | Typical boilers | Factor that shapes the repair |
|---|---|---|
| Houston and the Ship Channel | Watertube power boilers, waste heat units, hospital steam plants | City operator permit inside Houston; HGB ozone rules on burner work |
| Beaumont and Port Arthur | Refinery utility boilers, process steam drums, unfired steam boilers | Interval extensions to turnarounds; water treatment records |
| Corpus Christi and Freeport | Refinery and chemical plant steam, export terminal utilities | Salt-air corrosion on casings, stacks and trim |
| Dallas-Fort Worth and Sherman | Hospital, campus and food plant heating and process boilers | Biennial and triennial cycles; DFW ozone rules on burners |
| San Antonio and Austin | Campus, military, hospital and life science steam | Clean steam and process steam under GMP change control |
| Permian Basin, El Paso and the Valley | Packaged boilers at gas plants and food processors | Seasonal peaks; hard water and scale on feedwater |
Process steam generators and unfired steam boilers at Gulf Coast plants
Process steam generators at Texas refineries and chemical plants sit half inside and half outside the boiler program: the generator itself is exempt as a process vessel, but its steam collection or liberation drum is inspected like a power boiler, with an annual certificate inspection and the possibility of extension up to 120 or 144 months depending on age. That split matters when a waste heat exchanger leaks. Tube and channel repairs on the exchanger side follow the plant’s own mechanical integrity program for pressure vessels, while weld repairs on the drum follow the NBIC with the boiler inspector involved.
Unfired steam boilers, meaning unfired pressure vessels that generate steam and fall outside the evaporator, heat exchanger and process steam generator exclusions, are built to ASME Section I or Section VIII and registered as boilers, with the jurisdictional limits in Rule 65.615. Their safety valves, water gauges, low-water protection and feedwater arrangements follow Rule 65.608, which makes the owner responsible for the design of low-water protection. Paul Industries reviews the classification before scoping a repair, because the class decides whether the inspector or the plant’s integrity program signs off on it. Related vessel work is covered on pressure vessel fabrication in Texas.
What happens after a serious boiler accident in Texas?
A serious boiler accident in Texas triggers an immediate notice to the chief inspector under Rule 65.83, and the owner must leave the pressure parts, fuel train, controls, wiring, ventilation and the surrounding area undisturbed, except to save life or prevent serious harm, until a department inspector has examined it. Operating records, including electronic and automated records, must be preserved unaltered and produced in a readable format.
That rule changes the first hours of a repair. Isolation and make-safe work proceeds, but teardown waits for the investigation, and the repair plan starts from the inspector’s findings. Paul Industries documents the as-found condition with the owner and the inspector, then scopes the repair or replacement once the investigation releases the equipment.
What does boiler repair in Texas cost?
The cost of boiler repair in Texas depends on the boiler class and size, the repair method, whether welding and a hydrostatic test are needed, the outage window and whether a temporary boiler is required to carry the load, so repair prices are set from the inspection findings and the boiler data. The state’s own charges are small and published in 16 TAC 65.300, while the repair itself is priced against the scope.
| Item | Amount or driver |
|---|---|
| Certificate of operation, initial or renewal | $70 |
| Inspection fee, power and other non-heating boilers | $70 |
| Inspection fee, heating boiler without an inspection opening | $40 |
| Interval extension request | $100 |
| Installation report and Temporary Boiler Operating Permit | $25 and $50 |
| Special inspection or nonstandard boiler review | $1,700 |
| Late inspection after the certificate expires | $25 per day, for certificates expiring on or after December 1, 2025 |
| Repair labor and materials | Tube count and material, refractory volume, weld procedures, NDE, testing, access and shift pattern |
Paul Industries gives a budget range from comparable scope once the nameplate data and findings are in hand, then a firm price after the unit is opened and the inspector has seen it. Supply-only parts, design-build replacement and complete installation are all priced the same way.
Who repairs steam and hot water boilers in Texas?
Paul Industries repairs steam and hot water boilers in Texas, including firetube, watertube, cast iron sectional and electric units, at refineries, chemical plants, hospitals, universities, food plants and data centers. Industrial boiler repair companies are judged in Texas on the paperwork as much as the welding: the NBIC report, the inspector’s acceptance, the 90-day filing and a certificate that matches the boiler. Paul Industries plans every repair to that standard, with the inspection date, the outage and the certificate renewal on one schedule.
The same contract covers the systems around it: boiler water treatment programs that support interval extensions, steam trap surveys, condensate return and the process piping in Texas that ties a replacement boiler into the header. Welded repairs on steam piping and supports are covered on industrial welding services in Texas, and chilled water plants that share a central utility building on chiller repair in Texas. The national methods page for boiler repair explains retubing, refractory and burner work in more depth.
Boiler work from Paul Industries for Texas owners
From its headquarters at 256 Shore Drive in Kilmarnock, Virginia, Paul Industries takes boiler work across Texas and in all 50 states as an East Coast contractor, formerly based in northern New Jersey and then Pennsylvania. The boiler repair in Virginia page covers the headquarters state, and owners with plants on both coasts can compare boiler repair in Florida. The Texas overview and the Gulf Coast page show the rest of what Paul Industries builds in the state and region.
For boiler repair in Texas, Paul Industries diagnoses faults, repairs tubes, furnaces, refractory, burners and controls, makes NBIC code repairs, resets safety devices under the right program, supplies replacement boilers and installs them with the installation report and first inspection planned. To start, send the boiler nameplate data, the current certificate and the latest inspection report, and request a quote.
Standards referenced: Texas Health and Safety Code Chapter 755 · 16 Texas Administrative Code Chapter 65 · National Board Inspection Code (NBIC) · ASME Boiler and Pressure Vessel Code Section I · ASME Boiler and Pressure Vessel Code Section IV · ASME Boiler and Pressure Vessel Code Section VIII Division 1 · ASME Section VI and Section VII (care and operation guides) · 30 TAC 106.183 permit by rule · 30 TAC Chapter 117
Frequently asked questions
Who handles boiler repair at Houston, Pasadena and Baytown plants?
Paul Industries handles boiler repair at refineries, chemical plants, hospitals and food plants across Houston, Pasadena, Baytown, Deer Park and La Porte. Ship Channel units are often watertube power boilers and steam drums on extended internal intervals, so the repair is planned with the water treatment records and the next turnaround in view. Inside Houston city limits, plant operators also need the city’s boiler operator permit or stationary engineer license, depending on boiler size.
Does Paul Industries repair boilers in Beaumont and Port Arthur?
Yes. Paul Industries repairs utility boilers, unfired steam boilers and process steam drums at refineries and petrochemical plants in Beaumont, Port Arthur and Orange. Work there is usually tied to turnaround dates, so tube replacement, drum internals, safety valve work and NBIC weld repairs are scoped before the unit comes down and the inspector’s visit is scheduled into the outage.
Who repairs hospital and campus boilers in Dallas-Fort Worth?
Paul Industries repairs hospital, university and campus boilers across Dallas, Fort Worth, Arlington, Denton and Sherman. These are mostly heating and process boilers on two-year and three-year certificate cycles, and the repair is staged so that redundancy carries steam and hot water to patient areas, kitchens and sterile processing while one unit is opened, repaired and inspected.
Does Paul Industries take boiler work in the Permian Basin, El Paso and the Rio Grande Valley?
Yes. Paul Industries takes boiler work in Midland, Odessa, El Paso, McAllen, Harlingen and Brownsville, as everywhere else in Texas. Packaged boilers at gas plants, food processors and manufacturing sites in these regions often face hard feedwater and seasonal peaks, so the repair plan usually includes a scale and water treatment review alongside the tube and burner work.
What does the Texas boiler code require of a new installation?
Texas requires a new boiler to be constructed, inspected and stamped to the applicable ASME Code section, registered with the National Board unless it is a cast iron or cast aluminum sectional unit, installed to the manufacturer’s instructions and the rules, and inspected before it is test fired or operated. The installation report is filed by completion, and a Temporary Boiler Operating Permit allows up to 30 days of operation before the first inspection.
Do you need a boiler license in Texas to operate a plant boiler?
Chapter 755 regulates the boiler itself through registration, inspection and a certificate of operation, and the state program sets no separate Texas boiler operator license. Cities can add their own rules: inside Houston, operators need a city Boiler Operator Permit for low-pressure and power boilers up to 1,676,000 Btu and a stationary engineer license for larger high pressure steam boilers. Plants elsewhere follow their insurer’s and their own qualification requirements.
Who inspects boilers in Texas?
Units covered by an insurance policy are inspected by the Authorized Inspection Agency that issued the policy, using inspectors who hold a TDLR commission. All others are inspected by TDLR’s chief inspector or deputy inspectors. Either way, the report goes to TDLR, which issues the certificate of operation. TDLR can also order a joint inspection at any reasonable time if it believes a boiler may be unsafe.
What happens if a Texas boiler certificate expires before the inspection?
Continued operation after expiration is presumed unless the owner can show the boiler was shut down. For certificates expiring on or after December 1, 2025, a late inspection fee of $25 a day applies to the owner, and to the inspection agency if it was responsible for the inspection. A boiler whose certificate has expired must pass both internal and external inspections before a new certificate is issued.
Can a Texas boiler keep running while a repair is pending?
Sometimes. An inspector can order a boiler out of use until unsafe conditions are corrected, but the chief inspector can also issue a temporary certificate of operation for up to 30 days while repairs or a replacement are completed. Paul Industries scopes the repair against that window and orders long-lead tubes, valves or refractory as soon as the findings are known.
How soon must a boiler repair report reach TDLR?
Rule 65.84 requires the repair or alteration report to be filed with TDLR within 90 days after the work is completed, by the organization that made the repair. Late or missing reports are an enforcement item, and a report that does not match the nameplate or certificate data causes trouble at the next certificate inspection, so the report is checked against the boiler records before it is filed.
Which steam generators at a refinery fall under the Texas boiler law?
Power boilers and unfired steam boilers at a refinery are registered and inspected as boilers. Process steam generators, which make steam from the heat of a processing system, are exempt except for their steam collection or liberation drums, which get annual certificate inspections and can be extended to 120 or 144 months. Evaporators and heat exchangers are excluded from the unfired steam boiler definition.
Are autoclave and sterilizer boilers still inspected in Texas?
Since September 1, 2025, Senate Bill 1185 has exempted boilers that are a component of an FDA-regulated medical device and stay within set limits: 16 inches inside shell diameter, 20 square feet of heating surface unless electric, five cubic feet of gross volume and 100 psig. Unfired pressure vessels in an autoclave are also exempt. Larger steam generators serving sterilizers remain in the program.
What does a Texas boiler room need after a replacement boiler goes in?
For installations made on or after September 1, 2020 with fuels that can produce carbon monoxide, the room needs a manually reset CO detector with a ppm display, interlocked to shut down the burners at 50 ppm, calibrated at least every 18 months. The room must also be free of stored flammables and gasoline-powered equipment, have outward-opening exit doors, adequate drainage and clearance for operation and inspection.
Can the inspection interval on a Texas power boiler be stretched to a turnaround?
Yes, within limits. Section 755.026 lets the internal interval on a power boiler reach 60 months in total with the approval of TDLR and the inspection agency, provided continuous water treatment has been maintained and records support it. Each request covers up to a year past the certificate expiry, is filed at least three business days before expiry and costs $100, with an external inspection made before the certificate runs out.
Does a burner retrofit on a Texas boiler need a TCEQ permit?
It needs an air authorization. Units up to 40 million Btu per hour on sweet gas, LPG or low-sulfur fuel gas often qualify for permit by rule 106.183, with a 0.1 lb per million Btu NOx design limit above 10 million Btu per hour. Larger units, other fuels or emission increases use a standard permit or a Chapter 116 permit, and Houston and Dallas-Fort Worth plants also meet the Chapter 117 NOx rules.
What records should be on hand when the Texas boiler inspector arrives?
Keep the current certificate posted at the boiler, the last inspection report, NBIC repair and alteration reports, the National Board data report, safety valve repair records, low-water cutoff test logs, water treatment logs and, for extended intervals, daily water sampling records. The CO detector calibration record belongs at the boiler as well. Missing records are a common reason an extension request is refused.
What should a Texas plant send to get a boiler repair priced?
Send the boiler make, model, National Board and Texas boiler numbers, the current certificate, the latest inspection report or preliminary order, photos of the damage, water treatment logs and the outage window available. Paul Industries uses that to give a budget range, then a firm price once the boiler is opened and the inspector has seen it.
Boiler down or flagged at its Texas certificate inspection?
Send the nameplate data, the Texas boiler number, the latest inspection report or order and your outage window. Call 201-450-8280 or request a quote.