Paul Industries designs, supplies, installs and services data center cooling in Nevada, from dry cooler yards and air-cooled chiller plants in the Las Vegas Valley to economizer-heavy chilled water plants in Reno, Sparks and the Tahoe-Reno Industrial Center. Nevada splits a cooling decision in two: the north has cool nights and a long free-cooling season, the south has 110 F summer afternoons and a water district that no longer serves new commercial buildings fitted with cooling towers. Paul Industries supplies equipment, builds design-build plants and delivers complete installations, with piping, controls and testing under one contract.
Request a quote or call 201-450-8280
What shapes data center cooling in Nevada?
Data center cooling in Nevada is shaped by three things that change from one valley to the next: dry desert air with very different summer peaks in the north and south, water rules that in the Las Vegas Valley treat every cooling tower as evaporative cooling, and electricity delivered by NV Energy at commercial rates well under the national average. A plant that is right for a hall in Storey County can be the wrong plant in Henderson, even when the IT load and the rack density are the same.
The national picture of air, chilled water and liquid cooling sits on the data center cooling systems page, and the statewide view of Nevada plants is on the Nevada page. This page stays with the questions a Nevada owner or developer faces when choosing, building or expanding a cooling plant: how hot it gets, where the water comes from, what the water district allows and how the plant should be arranged as a result.
How do Reno and Las Vegas compare for a cooling plant?
Reno and Las Vegas differ by about ten degrees Fahrenheit on a July afternoon and by more than twenty degrees on a July night, and that night-time gap is what decides how many hours a plant can run on outdoor air or dry coolers alone. NOAA’s 1991 to 2020 normals put the Las Vegas airport at a 104.5 F July high and an 82.0 F July low, against 93.9 F and 60.4 F at the Reno-Tahoe airport.
| Station | July normal high / low | January normal high / low | What it does to the cooling plant |
|---|---|---|---|
| Las Vegas, Harry Reid airport | 104.5 F / 82.0 F | 58.5 F / 40.5 F | Heat rejection sized for long stretches above 110 F; free cooling concentrated in winter and shoulder months |
| Reno-Tahoe airport | 93.9 F / 60.4 F | 47.7 F / 26.1 F | Night-time economizer hours even in summer; freeze protection for dry coolers and outdoor piping |
Data center cooling: Reno and the Tahoe-Reno Industrial Center
Northern Nevada sits in high desert, and its large day-to-night temperature swing is the main asset for a cooling designer. A Tahoe-Reno Industrial Center data center, or a hall in Reno or Sparks, sees July nights near 60 F, so water-side economizers and dry coolers carry the load for many hours even in summer, and through most of the winter the chillers run at minimum or sit idle. The same climate brings January lows in the mid-twenties, which means every outdoor coil and every exposed run of condenser or economizer piping needs glycol, heat trace or a drain-down plan.
Data center cooling Reno operators have the easier summer of the two regions, but they inherit the opposite design risk: a plant sized only for heat can freeze. Paul Industries selects glycol concentration against the January record rather than the normal, places isolation and drain valves where a frozen coil can be taken out of service without draining a whole loop, and tests freeze protection controls during winter startup.
Data center cooling: Las Vegas, Henderson and North Las Vegas
Southern Nevada is hotter, and its nights stay warm. With July lows above 80 F, a Las Vegas data center gets few summer hours on outdoor air, and the plant has to reject the full IT load through the hottest part of the afternoon. The economizer season still exists in the winter and shoulder months, and it is worth designing for, but data center cooling Las Vegas owners commission is really sized around the summer peak and the water rules covered below.
Why are cooling towers treated as evaporative cooling in the Las Vegas Valley?
Cooling towers are treated as evaporative cooling in the Las Vegas Valley because the Las Vegas Valley Water District’s service rules define evaporative cooling as any technology, device or equipment that uses the evaporation of water as part of the cooling process, and they name cooling towers alongside swamp coolers; only misting systems are left out. The district then limits service to development equipped with evaporative cooling.
Under the current rules, adopted January 1, 2026, the district serves development equipped with evaporative cooling only where the building permit was applied for by September 1, 2023, issued by February 1, 2024, and the certificate of occupancy or completion followed by February 1, 2026. Tenant improvements inside shell buildings that met those dates may still use evaporative cooling. An existing permitted system may be replaced with evaporative cooling if the replacement does not raise the originally permitted evaporative cooling load and the Southern Nevada Water Authority’s Conservation Division approves it before installation.
The district explains the reason plainly: evaporative cooling is Southern Nevada’s second largest consumptive use of water, consuming nearly 10 percent of the region’s Colorado River allocation each year, and the valley draws about 90 percent of its water from the Colorado River. The Southern Nevada Water Authority also offers incentives to replace evaporative cooling. For a data hall in the district’s service area, that settles the first design question: a new plant is designed without towers or wetted media, and an existing tower plant is maintained and replaced inside its permitted load.
The rule is set by the water purveyor, so a site’s water provider matters as much as its address. Storey County, Washoe County and the rest of northern Nevada fall outside the Las Vegas Valley district, and a Henderson or North Las Vegas site should be checked against its own purveyor’s rules. Paul Industries confirms the purveyor and its current service rules before any plant layout is drawn.
Can a Las Vegas hall run data center cooling without water?
A Las Vegas hall can run data center cooling without water by rejecting all of its heat to dry air, through air-cooled chillers, closed-circuit dry coolers or pumped refrigerant economizers, and the cost of doing so is more fan and compressor power on the hottest days and a larger equipment yard. Adiabatic coolers that wet a pad or spray a coil at peak still evaporate water, so in the district’s service area they fall under the same evaporative cooling definition as a tower.
Waterless data center cooling works best when the loop it serves runs warm. A chilled water plant supplying 55 F water to air handlers needs compressors running for most of a Las Vegas summer, while a liquid-cooled hall supplying facility water in the high 80s to coolant distribution units lets dry coolers do much more of the work, as the data center liquid cooling in Nevada page explains. Raising supply air and chilled water temperatures within the ranges in the ASHRAE thermal guidelines is an inexpensive way to cut the compressor hours a dry plant needs.
| Heat rejection | Water use | Status in the LVVWD service area | Where it fits in Nevada |
|---|---|---|---|
| Air-cooled chillers with integral free cooling | None for heat rejection | Outside the evaporative cooling definition | Las Vegas and Henderson halls with chilled water air handlers |
| Closed-circuit dry coolers | None | Outside the definition | Warm-water liquid loops statewide; economizer duty in Reno |
| Pumped refrigerant economizers on DX units | None | Outside the definition | Smaller enterprise rooms and edge sites |
| Adiabatic or hybrid coolers | Water at peak only | Counted as evaporative cooling | Northern Nevada sites where the purveyor allows it |
| Open cooling towers with water-cooled chillers | Continuous evaporation and blowdown | Limited to permitted existing load; replacements need SNWA approval | Existing southern plants; northern sites with secured water |
How many free cooling hours does northern Nevada give?
Northern Nevada gives a data hall far more free cooling hours than the Las Vegas Valley, because Reno’s normal low stays near 60 F even in July and sits in the twenties through the winter. A water-side economizer that can carry the full load whenever the outdoor dry bulb sits a few degrees below the return water temperature runs for a large share of the year, and an air-side economizer gains even more hours where the operator accepts outdoor air into the hall.
The engineering that makes those hours real is in the controls and the piping. A plate heat exchanger or a dry cooler economizer needs a changeover sequence that moves between economizer, partial and full mechanical cooling without a swing in supply temperature, valves that close tight enough that the chillers are not fighting the economizer, and glycol strength that protects the outdoor side without starving the heat transfer. Paul Industries writes and programs those sequences, pipes the economizer so it can be isolated for service with the chillers carrying the hall, and proves the changeover at commissioning, which the data center commissioning in Nevada page covers.
Air-side economizers in the north also have to deal with dry air. Very low outdoor humidity can pull the hall below the lower dew point limit a designer sets for static control, so an air-side scheme in Reno or Sparks is paired with humidification or a mixing strategy, and filtration sized for desert dust on windy days.
Sizing heat rejection for 120 F afternoons
Heat rejection for a southern Nevada data hall has to be sized for afternoons well above the normal July high, because the Las Vegas airport reached 120 F on July 7, 2024 and logged 36 days at or above 110 F that year, against 8 to 21 such days a year from 2015 through 2023 in NOAA’s daily record. An air-cooled chiller or dry cooler loses capacity as the entering air temperature climbs, so a unit selected at a 105 F rating will fall short on days like those unless the selection carries the margin.
Paul Industries selects heat rejection at an ambient above the published design condition, applies the manufacturer’s capacity corrections for the hot end of the curve, and adds an allowance for the warmer air the units draw when they sit in rows on a roof or in a walled yard. The same discipline applies to the electrical side: fan and compressor power peaks on those afternoons, so the plant’s maximum draw is checked against the feeder and generator capacity at that ambient, not at the rating point.
Recovery after an outage is the other hot-weather risk. A dry plant restarting at 115 F has little spare capacity to pull a warm hall back down, so chilled water or warm-water storage that carries the load through a chiller restart, and fast-restart chillers on generator power, earn their cost in Las Vegas in a way they do not in a milder climate.
Which data center cooling regulations apply in Nevada?
The data center cooling regulations that apply in Nevada come from four places: the water purveyor’s service rules, the mechanical and energy codes adopted by the county or city that issues the permit, the state energy code adopted by the Governor’s Office of Energy, and federal refrigerant rules from the EPA.
| Rule | Who sets it | What it touches on the cooling plant |
|---|---|---|
| Service rules on evaporative cooling | Las Vegas Valley Water District, with SNWA approval of replacements | Whether towers, adiabatic coolers or swamp coolers may be served at all |
| 2024 Uniform Mechanical Code with Southern Nevada amendments | Clark County, for new permit applications from January 11, 2026 | Equipment installation, refrigerant machinery rooms, ductwork and hydronic piping |
| 2024 ICC codes, including the International Mechanical Code | Washoe County, effective July 1, 2025 and required for all submittals from January 1, 2026 | The mechanical permit for Reno-area projects in the county’s jurisdiction |
| 2024 International Energy Conservation Code | Governor’s Office of Energy under NRS 701.220, effective August 18, 2024 | Equipment efficiency, economizer and commissioning provisions for buildings in its scope |
| Technology Transitions rule | EPA under the AIM Act | New comfort cooling chillers use refrigerant with a GWP below 700 from January 1, 2025 |
Storey County, Carson City and the other jurisdictions adopt their own editions, so the code basis is confirmed with the building department that will issue the permit. Paul Industries lists the adopted editions in the submittal set and builds to them.
Power cost and the cooling share of a Nevada hall
Power cost in Nevada favors cooling efficiency less than in many states, but it still pays: the EIA’s 2025 figures put Nevada’s average commercial rate at 9.21 cents per kilowatt-hour against a US average of 13.37, and the industrial rate at 8.09 cents against 8.51. Sierra Pacific Power Company and Nevada Power Company, both regulated by the Public Utilities Commission of Nevada and doing business as NV Energy, serve the major data center areas.
At 9.21 cents, every 100 kW of cooling power that runs around the clock costs about $80,680 a year, so a plant change that removes 300 kW of average compressor and fan draw is worth roughly $242,000 a year before demand charges. In Las Vegas the savings come mostly from higher loop temperatures and better dry cooler selection; in Reno they come from extending economizer hours.
The market itself is large on both ends of the state. Switch operates its Citadel campus at Tahoe Reno and The Core campus in Las Vegas, which the company says will have up to 495 MW of power upon completion, and Google lists operating data centers in Henderson and in Storey County. Each new Las Vegas data center hall or northern campus phase adds heat rejection that must fit the rules above.
Keeping a dry cooling plant efficient in desert conditions
A dry cooling plant in Nevada stays efficient when its coils stay clean, its fans run at the speeds the controls intend, and the air entering each unit is outdoor air rather than discharge from its neighbor. Desert dust and wind-blown debris build up on condenser and dry cooler fins, and every degree of extra approach that a dirty coil adds shows up as compressor power on the next hot afternoon.
Paul Industries sets up a maintenance plan for each plant that follows the desert calendar: coil inspection and cleaning before the summer peak and after windy spells, fan and motor checks in the spring, verification of variable speed drive settings, and a review of trend data each quarter to catch rising approach temperatures before they become alarms. In the north, the plan adds glycol testing each autumn and a check of heat trace and freeze protection controls before the first hard frost.
Layout decides the rest. Units placed too close together, against a parapet or downwind of a generator exhaust breathe warmer air than the weather station reports, and that penalty grows with every unit added in a later phase. Paul Industries models airflow around the yard when a plant is extended, spaces new units against the original layout, and, where the yard is already tight, raises units on frames or adds discharge extensions so the plant keeps its rated capacity as the campus grows.
What does data center cooling cost in Nevada?
The cost of data center cooling in Nevada depends less on the state and more on the heat rejection choice, the loop temperature and how the plant is phased, so a reliable figure comes from the load, the site and the purveyor’s rules rather than from a rate per megawatt. The items that move a Nevada price most are listed below.
- Heat rejection type and the ambient it is selected for: a dry plant sized for 120 F carries more units and more fan power than one sized for a 105 F rating.
- Loop temperature: warm-water liquid loops shrink the chiller plant and enlarge the dry cooler yard.
- Freeze protection in the north: glycol, heat trace and drain-down valving on outdoor equipment.
- Electrical capacity for peak fan and compressor draw on the hottest afternoons.
- Phasing: headers, valves and pads installed for later phases while the first phase runs.
- Thermal storage, if used to ride through chiller restarts.
Paul Industries gives a budget range from comparable scope once the load, loop temperatures and site are known, and a firm price when the design is fixed.
Who installs data center cooling in Nevada?
Paul Industries installs data center cooling in Nevada, taking a plant from design and equipment supply through fabrication, installation, startup and service for operators, developers and general contractors. Headquartered at 256 Shore Drive in Kilmarnock, Virginia, Paul Industries is an East Coast contractor that takes work across Nevada, in all 50 states and at plants outside the United States.
When owners compare data center cooling contractors for a Nevada hall, the questions worth asking are about the conditions above: what ambient the heat rejection was selected for, how the plant behaves on a 115 F restart, how freeze protection is handled in Reno, and how the design answers the water purveyor. Paul Industries answers each in the proposal. The same chillers, piping and controls are serviced after turnover through chiller repair in Nevada, and campus-scale packages are covered on the data center mechanical contractor in Nevada page. Owners who know the Virginia market will find the headquarters-state view on data center cooling in Virginia, and the arid comparison on data center cooling in Texas.
Paul Industries on Nevada data center cooling plants
For Nevada data halls, Paul Industries designs heat rejection around the purveyor’s rules and the real ambient, supplies chillers, dry coolers, pumps and heat exchangers, fabricates and installs the process piping and headers, integrates controls, flushes and tests the loops, starts up the plant and services it afterward. The work extends to the data center chillers themselves and to retrofits that move an existing hall to warmer water or dry heat rejection. The wider regional picture is on the Southwest page. To price a Nevada cooling plant, send the IT load and phasing, the site and its water purveyor, and the target loop temperatures, then request a quote.
Standards referenced: LVVWD Service Rules (evaporative cooling, 2026 edition) · 2024 Uniform Mechanical Code with Southern Nevada amendments · 2024 International Mechanical Code (Washoe County) · 2024 International Energy Conservation Code (NRS 701.220) · ASHRAE Thermal Guidelines for Data Processing Environments · ASHRAE 90.4 · EPA Technology Transitions rule (40 CFR Part 84)
Frequently asked questions
Who designs data center cooling for halls in Las Vegas and Henderson?
Paul Industries designs and installs data center cooling for halls in Las Vegas, Henderson and North Las Vegas, with heat rejection selected for afternoons above 115 F and arranged around the Las Vegas Valley Water District’s evaporative cooling rules. The scope covers air-cooled chillers, dry coolers, pumps, piping, controls integration, testing and startup, delivered as supply, design-build or complete installation.
Which contractor designs cooling plants for halls in Reno, Sparks and Storey County?
Paul Industries builds cooling plants for data centers in Reno, Sparks and Storey County, where cool nights favor water-side economizers and dry coolers. Northern Nevada designs add freeze protection for January lows in the mid-twenties, and Paul Industries sets glycol strength, drain-down valving and heat trace as part of the installation.
Does the Las Vegas evaporative cooling rule apply to adiabatic coolers?
The Las Vegas Valley Water District defines evaporative cooling as any equipment that uses the evaporation of water as part of the cooling process, so an adiabatic cooler that wets a pad or sprays its coil falls within it, even if it runs wet for a few hundred hours a year. Misting systems are the stated exception. A waterless design in the district therefore uses fully dry heat rejection.
Can an existing Las Vegas data center replace its cooling towers?
The district’s service rules allow a permitted evaporative cooling system to be replaced with evaporative cooling, provided the replacement does not increase the originally permitted evaporative cooling load and the Southern Nevada Water Authority’s Conservation Division approves it before installation. Paul Industries documents the existing permitted capacity, sizes the replacement inside it and prepares the information for that approval.
Is water-cooled or air-cooled better for a Nevada data center?
The answer depends on the valley. In the Las Vegas Valley Water District, new commercial buildings cannot be served with cooling towers, so air-cooled chillers and dry coolers are the starting point. In northern Nevada, where towers remain an option subject to the purveyor and water rights, the comparison turns on power cost, water cost and economizer hours, and Paul Industries prices both arrangements for the site.
What chilled water temperature suits a dry cooling plant in southern Nevada?
Warmer is better for a dry plant. Supplying chilled water in the mid-60s F to air handlers sized for it, or facility water in the high 80s F to liquid-cooled racks, cuts the hours that compressors must run through a Las Vegas summer. The supply temperature is set against the IT equipment’s thermal class and the air handler or coolant distribution unit selection.
How does Reno's winter affect a data center cooling plant?
Reno’s January normal low is 26.1 F, so dry coolers, outdoor coils and exposed piping need protection. Paul Industries uses propylene glycol at a concentration set against record cold, heat trace on lines that hold water when idle, and controls that keep minimum flow through outdoor coils. Freeze protection sequences are tested at startup and before the first winter.
How much does cooling power cost a Nevada data center each year?
At the 2025 Nevada average commercial rate of 9.21 cents per kilowatt-hour reported by the EIA, each 100 kW of cooling equipment running continuously costs about $80,680 a year before demand charges. That figure is why loop temperature, economizer hours and fan selection pay back even at Nevada’s below-average rates.
What do data center cooling contractors need from a Nevada owner to price a plant?
Send the IT load by phase, the rack densities and any liquid cooling, the site and its water purveyor, target supply temperatures, redundancy level, the electrical capacity available for mechanical load, and the building department that will issue the permit. With those, Paul Industries returns a plant arrangement and a budget range, then a firm price once the design is set.
Is waterless data center cooling more expensive to run in Las Vegas?
On the hottest afternoons a dry plant draws more power than a tower plant, because air-cooled condensing runs at a higher pressure. Over a year the gap narrows when the loop runs warm and the plant uses free cooling through the winter. The trade is power against water, and in the Las Vegas Valley the water side of that trade is set by the district’s rules.
How is a Nevada data hall kept cool during a chiller restart in summer?
A hall stays within limits through a restart when the plant holds enough stored cooling to carry the load until the chillers are back. Chilled water storage tanks, fast-restart chillers on generator power and pumps on uninterruptible power are the usual measures. Paul Industries sizes storage for the restart time at peak ambient and proves it in integrated testing.
Do dust storms affect air-cooled equipment in Nevada?
Desert dust loads condenser and dry cooler coils, raising condensing temperature and fan power, and it clogs filters on air-side economizers. Coil cleaning schedules, inlet screens where the manufacturer allows them, and filter monitoring are part of a Nevada maintenance plan. Paul Industries includes coil cleaning and filter checks in service agreements for these plants.
Can an air-cooled hall in Nevada be converted to liquid cooling?
An air-cooled hall can take liquid cooling by adding coolant distribution units, a facility water loop and dry coolers or a connection to an existing chilled water plant. In Las Vegas the warm facility water that direct-to-chip cooling accepts suits dry heat rejection well. Paul Industries surveys the hall, designs the loop and installs it in phases while the hall stays in service.
What redundancy do Nevada data center cooling plants use?
Nevada halls commonly use N+1 chillers or dry coolers, with N+1 or 2N pumps and piping arranged so any component can be isolated without losing cooling. In southern Nevada the redundant unit also has to deliver its capacity at peak ambient, so redundancy is checked at the hot-day selection rather than the catalogue rating.
Does Nevada's energy code apply to a data center cooling plant?
Nevada’s Governor’s Office of Energy adopted the 2024 International Energy Conservation Code under NRS 701.220, effective August 18, 2024, and counties apply their adopted editions through the building permit. Equipment efficiency, economizer and commissioning provisions apply to buildings within the code’s scope, and Paul Industries confirms the edition with the permitting jurisdiction before submittals.
Which refrigerants are used in new chillers for Nevada data centers?
Under the EPA Technology Transitions rule, new chillers for comfort cooling installed from January 1, 2025 use refrigerants with a global warming potential below 700, such as HFO refrigerants and HFO blends, depending on the machine. Paul Industries confirms the refrigerant, its safety classification and any machinery room requirements under the adopted mechanical code before the chiller is ordered.
Where should a Nevada operator start when the cooling plant runs short in summer?
Start with the data from the last hot spell: supply and return temperatures, condensing pressures, fan speeds and alarms. Shortfalls often trace to fouled coils, hot air recirculation or controls rather than missing capacity. Paul Industries reviews the trends, tests the equipment on site and recommends repair, rearrangement or added capacity.
Planning a cooling plant for a Nevada data hall?
Send the IT load and phasing, the site and its water purveyor, and the loop temperatures you want. Call 201-450-8280 or request a quote.
