Paul Industries provides boiler repair in New Mexico, repairing steam and hot water boilers at food and dairy plants, laboratories, semiconductor and pharmaceutical sites, hospitals and campuses, and returning each one to service with the records the state’s new boiler rule now expects. New Mexico rewrote its boiler rule, 14.9.4 NMAC, with effect from August 1, 2026, so inspection timing, maintenance programs and repair paperwork are all being reset at once. Paul Industries diagnoses, repairs, retubes, rebuilds, relocates and replaces boilers from Albuquerque and Rio Rancho to Santa Fe, Los Alamos, Las Cruces, Roswell, Clovis, Farmington, Hobbs and Carlsbad.
Request a quote or call 201-450-8280
What changed for boiler repair in New Mexico on August 1, 2026?
Boiler repair in New Mexico changed on August 1, 2026, when the Construction Industries Division replaced the 1998 version of 14.9.4 NMAC with a new Boilers rule that covers pressure vessels as well as boilers and ties inspection to a written maintenance program. The New Mexico boiler rules and regulations that owners worked under for almost three decades are gone. The old rule fixed the calendar: high-pressure boilers were inspected internally every year, and low-pressure steam and hot water heating boilers every 24 months. The new rule drops those fixed intervals and points instead to ASHRAE/ACCA 180, with inspections made by a National Board commissioned inspector employed by the owner’s insurance carrier.
Three other changes matter to anyone planning a repair. The rule names the building owner as the responsible party for maintaining and operating existing boilers. It requires that owner to develop and carry out a boiler and pressure vessel maintenance program to ASHRAE/ACCA 180. And it brings city building departments into the text, so a permit for installing or reinstalling a boiler comes either from the Division or from a city that runs its own substantially compliant boiler code. The 2024 New Mexico Mechanical Code, adopted in 14.9.2 NMAC on the same date, deletes the Uniform Mechanical Code’s own boiler inspection and operating permit sections and sends readers to 14.9.4 NMAC instead.
For a plant engineer the practical result is a paperwork shift as much as a technical one. A repair now has to fit the maintenance program on file, the inspector’s report has to show the program is being followed, and the next inspection date comes from that program and from the insurer. The national picture of tube leaks, burner faults and retubing is on the boiler repair service page; this page covers what is particular to New Mexico.
Which boilers and pressure vessels does the New Mexico boiler code cover?
The New Mexico boiler code covers power boilers above 15 psig, steam heating boilers at or below 15 psig, hot water heating and supply boilers, high-temperature water boilers and, under the 2026 text, the pressure vessels at the same sites, unless an exemption in 14.9.4.12 NMAC applies. A boiler in this rule is a closed vessel that heats water or another liquid, or makes or superheats steam or vapor, under pressure, for use outside itself, by fuel, electricity or solar energy. Fired units that vaporize liquids other than water are included, along with the controls and safety devices on the unit.
The exemptions are broad in some industries and narrow in others, and they decide whether a repair involves the state file at all. Refinery processing, gas processing and mining process equipment are exempt, but the administration buildings at those sites are named as covered, so the heating boiler in a gas plant office still falls under the rule. Federally inspected equipment is exempt, which matters at some government sites, while ordinary commercial and industrial owners are fully inside it.
| Exempt item | Limit or condition in the rule | What still applies |
|---|---|---|
| Listed potable water heaters | Up to 120 gallons, 200,000 Btu/h input, 160 psi and 210 F | The 2024 New Mexico Plumbing Code, 14.8.2 NMAC |
| Small unfired pressure vessels | Up to 5 cubic feet and 250 psi in business, factory, hazardous, mercantile, residential, storage and utility occupancies | Manufacturer’s design and the mechanical code |
| Unheated water supply vessels | Including air-cushion tanks and tanks connected to sprinkler systems | Plumbing and fire codes |
| Refrigeration system vessels | Vessels in refrigeration systems | Refrigeration chapter of the mechanical code |
| LP gas, bulk oxygen and medical gas containers | Regulated by the fire code or the LPG statutes | Fire code and LP gas rules |
| Federally inspected equipment | Boilers or vessels under regular federal inspection or federal licensing | The federal program for that site |
| Utility, cooperative, mining, refinery, gas processing and sawmill process equipment | Administration facilities at mining and gas processing sites are named as covered | Owner’s mechanical integrity program and ASME construction |
How often is a boiler inspected in New Mexico after August 2026?
A New Mexico boiler is now inspected at the method and frequency set by ASHRAE/ACCA 180 and by the owner’s maintenance program, by a National Board commissioned inspector who works for the owner’s boiler insurer, rather than on the fixed one-year and two-year cycle of the 1998 rule. The responsible party obtains the certificate of inspection, and the Mechanical Bureau of the Construction Industries Division may allow variations where documented service conditions justify them.
ASHRAE/ACCA 180 sets inspection and maintenance tasks by equipment type and frequency, so a plant that adopts it is committing to a written schedule of daily, monthly, seasonal and annual checks. When owners ask how often is a boiler inspected under that program, the honest answer is that the schedule is the plant’s own document, reviewed by the insurer’s inspector, and that the inspector can still require an internal inspection or a hydrostatic test at the owner’s expense.
| Item | 1998 rule | 2026 rule |
|---|---|---|
| High-pressure boilers | Internal inspection every year; an external could carry the certificate if the internal followed within six months | Method and frequency per ASHRAE/ACCA 180 |
| Low-pressure steam and hot water heating boilers | Internal and external every 24 months | Method and frequency per ASHRAE/ACCA 180 |
| Who inspects | The Mechanical Bureau or a special inspector | A National Board commissioned inspector employed by the owner’s insurance carrier |
| Maintenance program | Weekly tour logs for many boilers | A written ASHRAE/ACCA 180 program developed and carried out by the owner |
| Install or reinstall permit | From the Mechanical Bureau | From the Division or a city with a compliant boiler code |
| Scope | Boilers | Boilers and pressure vessels |
What does a boiler inspection consist of under the ASHRAE/ACCA 180 program?
An internal boiler inspection under 14.9.4 NMAC consists of opening every manhole, handhole, washout plug and water column connection, washing the waterside, cleaning the furnace, combustion chamber and tubes, and opening the low-water fuel cutoff chamber with its float or probes removed, so the inspector sees the pressure parts directly. The owner prepares the boiler after notice, and the rule lets the inspector decline and withhold the certificate when a boiler has not been prepared.
A New Mexico boiler inspection also reaches the controls and the documents. The inspector checks safety valves, low-water cutoffs, operating and limit controls, the burner management system, and the posted certificate, which must name the owner, location, serial and National Board numbers, maximum allowable working pressure, expiry date and inspector. Where there is evidence of a leak or a crack, enough insulation or casing comes off to let the inspector judge it, and the boiler stays down until that is possible.
Paul Industries prepares boilers for these inspections as part of an outage: draining and cooling, pulling plugs and handhole plates, cleaning the fireside, isolating steam and hot water lines so nothing leaks back into the vessel, and putting everything back with new gaskets once the inspector has finished. Preparing the boiler and making the repairs the inspection turns up in the same outage saves a second shutdown.
From a yellow tag to a red tag: how a New Mexico finding becomes a repair
A New Mexico inspector who finds a boiler out of compliance tags it yellow or red, and the color decides whether the plant keeps running while the repair is arranged. A yellow tag means the boiler has minor deficiencies and may keep operating until they are corrected. A red tag means major deficiencies and an unsafe boiler, which is shut down until the condition is corrected. An owner can appeal a shutdown to the Mechanical Bureau chief and then to the Construction Industries Commission.
Typical yellow-tag items are a minor leak, deteriorating refractory, missing or wrong parts, or a burner out of calibration. Typical red-tag items are a major water, fuel or flue gas leak, refractory bad enough to overheat the boiler, a safety valve that is corroded shut, the wrong type or undersized, missing controls or safety devices, and earlier repairs made with welding or parts that did not meet code. The 2026 rule keeps the requirement that the owner of a red-tagged boiler has the required repairs made by a contractor holding the appropriate New Mexico license classification.
Paul Industries works from the tag and the inspector’s written report. The repair scope lists each finding, the corrective work, who must approve it and what record closes it out, and the plan for a red-tagged boiler includes temporary heat or steam where the process or the building cannot wait.
Welded repairs, safety valves and hydrostatic tests under 14.9.4 NMAC
Welded repairs to New Mexico boilers are made under ASME welding qualifications or the National Board R program, and no repair or alteration by welding is made without the approval of a National Board commissioned inspector. If that inspector decides a hydrostatic test is needed, it follows the completed repair. A lap seam crack along a longitudinal riveted joint takes a boiler out of service permanently; the rule prohibits repairing it.
Safety valves and safety relief valves are repaired only under an ASME V, HV, UV or NV certificate or a National Board VR program, and the rule forbids repairing or altering them in any other way. A relief valve taken off during an outage has to be back in place and working before the boiler returns to service, and no one works on a safety appliance while it is under pressure. The hydrostatic test pressure, when one is required, is set at no more than the maximum allowable working pressure at the inspector’s discretion, and the rule says the test pressure may never be exceeded by more than six percent.
Alterations are a separate category. Any change to the item on the manufacturer’s data report that affects its pressure-containing capacity is an alteration, and so is a paper rerating to a higher pressure or temperature. Paul Industries plans welded repairs, rerates and alterations with the inspector before the outage, so the procedures, materials and test plan are agreed in advance and the National Board repair or alteration report is ready when the work is done.
Altitude and the New Mexico boiler room
Altitude changes how a New Mexico boiler behaves, because the air at Albuquerque’s airport, about 5,310 feet up, sits near 12.1 pounds per square inch absolute instead of 14.7, and at Los Alamos, about 7,420 feet, near 11.2. Water boils near 202 degrees Fahrenheit in Albuquerque. Gauges, relief valve settings and the boiler’s maximum allowable working pressure are all in gauge pressure, so those do not change, but the steam temperature at a given gauge pressure does: 15 psig steam in Albuquerque saturates near 244.5 degrees, about five degrees cooler than at sea level.
That shift matters in three places. Burners and forced draft fans move less oxygen per cubic foot of air, so combustion settings, flame safeguard tuning and fan capacity are checked against site elevation rather than sea-level data. Condensate and feedwater systems flash and cavitate sooner, so deaerator pressure, pump net positive suction head and return temperatures need attention after any change. And processes that depend on a steam temperature, such as sterilizers, jacketed kettles and heat exchangers, may need a slightly higher gauge pressure to reach the same temperature, which in turn has to stay inside the boiler’s rating and the relief valve set point.
| Station | Elevation | Heating degree days a year | Nights at or below 32 F a year | What it means for boilers |
|---|---|---|---|---|
| Los Alamos | About 7,420 ft | 5,929 | 150 | Long heating season, coldest air for combustion, freeze protection on idle units |
| Santa Fe | About 6,340 ft | 5,385 | 153 | Campus and hospital heating plants run from autumn into late spring |
| Farmington | About 5,500 ft | 5,268 | 149 | Similar season to Santa Fe; gas field and municipal plants |
| Albuquerque | About 5,310 ft | 3,996 | 93 | Moderate heating season; process steam runs all year |
| Roswell | About 3,650 ft | 2,876 | 87 | Shorter heating season; cheese plant steam year round |
| Carlsbad | About 3,230 ft | 2,756 | 69 | Lightest heating load; process and building boilers in the Permian |
The table explains the repair calendar. Heating boilers in Los Alamos, Santa Fe and Farmington carry load for most of the year and are best repaired in the short summer window, while plants in the south and east run process steam year round and plan repairs around production, not weather. Many New Mexico nights fall below freezing even where days are mild, so a boiler left drained or idle during a repair needs freeze protection on its feedwater, gauge and control lines.
Steam at New Mexico cheese plants, labs and fabs
New Mexico’s steam users are a distinctive mix: large cheese and whey plants on the eastern plains, a pharmaceutical fill-finish campus and semiconductor packaging fabs in the Albuquerque area, and federal laboratories in Los Alamos and Albuquerque. Leprino Foods operates a cheese plant in Roswell, Southwest Cheese processes more than 5.1 billion pounds of milk a year in Clovis, Curia opened an expanded aseptic fill-finish campus in Albuquerque in September 2026, and Intel opened Fab 9 in Rio Rancho in January 2024. These are market facts about the state, and each sector asks something different of a boiler repair.
Dairy plants use steam for pasteurizing, cooking, evaporating whey and cleaning in place, so a boiler outage stops production and CIP at once, and repairs are scheduled around milk receipts that do not stop. Sterile drug and laboratory sites feed clean steam generators and sterilizers from plant steam, so feedwater quality and pressure stability matter as much as uptime. Semiconductor sites use boilers and hot water for humidification, space heating and process heating in buildings that run every hour of the year.
Department of Energy sites add a federal layer. Under 10 CFR 851, DOE contractors must ensure that boilers, pressure vessels, air receivers and their piping conform to the ASME Boiler and Pressure Vessel Code, the ASME B31 piping codes and the strictest applicable state and municipal codes, so a repair at a laboratory site is documented to both sets of rules. Paul Industries builds that documentation into the repair package from the start.
Permits for a replacement, relocated or used boiler in New Mexico
Installing or reinstalling a boiler in New Mexico requires a permit from the Construction Industries Division or from a city that enforces its own compliant boiler code, and the organization planning the installation is responsible for the permit, inspection, documentation and certification of the work. Plans and specifications may be required with the application. An emergency installation may go ahead outside business hours if the permit is requested on the next business day.
A relocated boiler, with or without a change of owner, is installed, permitted and inspected as a new installation, and a hydrostatic test may be required. A used boiler from inside New Mexico, another state or another country needs approval before installation and must carry ASME stamping and a National Board registration number. A boiler built without ASME stamping may not be installed or reinstalled at any pressure. New boilers, apart from cast iron boilers and exempt units, are registered with the National Board.
Air permits are a separate track. The New Mexico Environment Department’s construction permit rule, 20.2.72 NMAC, applies when a source could emit more than 10 lb an hour or 25 tons a year of any regulated contaminant, and projects in Bernalillo County, which includes Albuquerque, apply to the joint Albuquerque-Bernalillo County air program instead. A burner change on a large boiler or a new boiler in a plant that already holds an air permit is checked against both before the equipment is ordered.
Weighing boiler repair or replacement in a New Mexico plant
Boiler repair or replacement in New Mexico comes down to the condition of the pressure parts, the cost and lead time of a new unit, and what the new rule and the air program require of a replacement. A sound shell or drum with failed tubes, refractory or controls is usually worth repairing. A boiler with widespread wastage, repeated tube failures, a cracked tubesheet or a burner that cannot meet its air permit is a candidate for replacement, especially if the plant’s steam demand has changed.
Owners also ask how often do boilers need to be replaced, and the answer depends far more on water treatment, cycling and maintenance than on age alone. Firetube boilers with good water chemistry and steady loads run for decades, while poorly treated or heavily cycled units fail much sooner. Paul Industries supplies replacement boilers, installs owner-furnished units, and handles rigging, piping, controls, startup and the permit and registration records, so the same firm that diagnosed the old boiler carries the replacement through to its first inspection.
Boiler repair across New Mexico’s regions
Boiler repair across New Mexico follows the state’s industrial map: process and building steam in the Albuquerque metro, laboratory and institutional plants in the north, food and dairy plants on the eastern plains, and oil and gas sites in the southeast and the Four Corners.
Boiler repair, Albuquerque, Rio Rancho and the Middle Rio Grande
Albuquerque and Rio Rancho combine pharmaceutical, semiconductor and laboratory steam with hospital and university heating plants. For commercial boiler repair, Albuquerque hospitals, offices and campuses often have a city permit route and an air program that differs from the rest of the state, so both are confirmed when a boiler is replaced.
Boiler repair, Santa Fe, NM and Los Alamos
Santa Fe and Los Alamos have the longest heating seasons on this list and the thinnest air. Government, hospital and campus plants there depend on their boilers from autumn into late spring, so retubing and major repairs are planned for summer.
Las Cruces and southern New Mexico
Las Cruces, the Mesilla Valley and the border industrial parks run food processing, university and commercial boilers with a mild winter, so process steam drives most repairs there.
Roswell, Clovis and the eastern plains
Roswell and Clovis host large cheese and whey plants whose steam systems run around the clock, and boiler work there is staged so that one unit is repaired while another carries the plant.
Farmington, Hobbs and Carlsbad
Farmington, Hobbs and Carlsbad serve the oil and gas fields of the San Juan and Permian basins. Gas processing equipment is exempt from 14.9.4 NMAC, but office, shop and camp heating boilers at those sites are covered, and repairs there follow the state rule.
What does boiler repair in New Mexico cost?
The cost of boiler repair in New Mexico depends on the boiler type and size, the failed component, whether welding and an inspector’s approval are involved, how much access and rigging the boiler room allows, and whether temporary steam or heat is needed during the outage. Tube replacement, refractory, burner rebuilds and control upgrades each price differently, and a red tag adds the cost of the down time.
Boiler inspection cost sits mostly with the insurer’s inspection program, but the owner pays for preparing the boiler, any hydrostatic test the inspector requires, and the repairs the inspection finds. Paul Industries prepares a budget range from comparable scope once the boiler data and the inspector’s report are in hand, and a firm price after a site review of access, outage timing and the records the repair needs.
Who repairs boilers in New Mexico?
Paul Industries repairs boilers in New Mexico, taking steam and hot water boiler work across the state from its headquarters at 256 Shore Drive, Kilmarnock, Virginia. The firm, formerly based in northern New Jersey and then Pennsylvania, works in all 50 states and at plants outside the United States, and does the same boiler work in its home state, described on the boiler repair in Virginia page, and in neighboring markets such as boiler repair in Texas.
In New Mexico, Paul Industries repairs firetube, watertube, cast iron and electric boilers, rebuilds burners and controls, retubes and replaces pressure parts under the inspector’s approval, and supplies and installs replacement boilers. Related New Mexico work includes pressure vessel fabrication in New Mexico, process piping in New Mexico, industrial welding services in New Mexico and validation and commissioning in New Mexico, together with boiler water treatment, steam trap surveys and deaerator repairs. The wider state picture is on the New Mexico page and the regional one on the Southwest page.
Boiler repair from Paul Industries for New Mexico plants
Paul Industries diagnoses and repairs boilers, prepares them for inspection, makes welded repairs with the inspector’s approval, rebuilds burners and controls, and supplies, installs and starts up replacement boilers for New Mexico plants, laboratories, hospitals and campuses. Every job closes with the National Board forms, test records and maintenance program updates the 2026 rule calls for. Send the boiler nameplate, the inspector’s report or tag, and your outage window, and request a quote for the repair.
Standards referenced: 14.9.4 NMAC, Boilers (effective August 1, 2026) · 14.9.2 NMAC, 2024 New Mexico Mechanical Code (2024 Uniform Mechanical Code) · ASHRAE/ACCA 180 · ASME Boiler and Pressure Vessel Code Sections I, IV and IX · National Board Inspection Code · 20.2.72 NMAC, air quality construction permits · 10 CFR 851 Appendix A, pressure safety
Frequently asked questions
Who handles boiler repair for Albuquerque plants and Rio Rancho fabs?
Paul Industries handles boiler repair in Albuquerque, Rio Rancho, Los Lunas and Bernalillo for pharmaceutical, semiconductor, laboratory, hospital and university boilers. Steam and hot water boilers in the metro run all year for process and humidification loads, so repairs are staged around redundancy and production. Send the boiler data, the inspector’s report and the outage window, and Paul Industries scopes the repair and the records the 2026 rule expects.
Does Paul Industries provide boiler repair in Santa Fe, NM and Los Alamos?
Yes. Paul Industries repairs boilers in Santa Fe, Los Alamos, Espanola and Taos, where heating seasons are the longest in the state and the air is thinnest. Government, laboratory, hospital and campus plants there are repaired in the summer window where possible, and work at Department of Energy sites is documented to both the ASME codes and the state rule, as 10 CFR 851 requires.
Who repairs boilers at Roswell and Clovis dairy and cheese plants?
Paul Industries repairs boilers at food and dairy plants in Roswell, Clovis, Portales and across the eastern plains. Cheese and whey plants depend on steam for pasteurizing, evaporating and cleaning in place, so one boiler is repaired while another carries the load, and feedwater, condensate return and blowdown are checked at the same time because they cause most tube failures in hard-working process boilers.
Who inspects boilers in New Mexico now that the rule has changed?
Since August 1, 2026, boilers covered by 14.9.4 NMAC are inspected by a National Board commissioned inspector employed by the owner’s boiler insurance carrier, at the method and frequency set by ASHRAE/ACCA 180. The Mechanical Bureau of the Construction Industries Division and city building departments that run a compliant boiler code may still inspect any covered boiler, and the inspector issues or withholds the certificate of inspection.
When is a boiler inspection required in New Mexico beyond the routine schedule?
Outside the routine program, an inspection is needed before a new, relocated or used boiler goes into service, after a welded repair or alteration the inspector has approved, after an accident, and whenever the inspector calls for one under the maintenance program. A relocated boiler is treated as a new installation, and the inspector may require a hydrostatic test at the owner’s expense.
Do existing New Mexico boilers need a written maintenance program under the new rule?
Yes. 14.9.4 NMAC requires the responsible party, which the rule defines as the building owner, to develop and implement a boiler and pressure vessel maintenance program in accordance with ASHRAE/ACCA 180. Automatic boilers need no constant attendance but are maintained and inspected under that program. Paul Industries helps owners turn their existing logs and service records into a program that matches the equipment actually installed.
What does the New Mexico boiler operator license cover?
A New Mexico boiler operator license, which the rule calls a certificate of competence, is required for operators at publicly owned places of public assembly such as public schools and hospitals. The classes are trainee, BO1 for low-pressure steam to 15 psi and hot water to 160 psi, and BO2, which adds high-pressure boilers. A non-automatic boiler at such a site needs a full-time operator who leaves the floor for no more than ten minutes.
Can a New Mexico boiler keep running with a yellow tag?
Yes. A yellow tag under 14.9.4 NMAC means the boiler does not meet code but has minor deficiencies, and it may keep operating until they are corrected. A red-tagged boiler stays shut down until its major deficiencies are put right. Paul Industries repairs yellow-tag items during a planned outage and plans red-tag repairs with temporary heat or steam where the process needs it.
What has to happen before a welded repair on a New Mexico boiler?
A welded repair or alteration on a New Mexico boiler needs the approval of a National Board commissioned inspector before it starts, and the work is done under ASME welding qualifications or the National Board R program. Paul Industries sends the inspector the repair method, materials, weld procedure and test plan before the outage, so the approval is in place when the boiler is opened.
Are gas plant and refinery boilers covered by the New Mexico boiler code?
Refinery processing, gas processing and mining process equipment are exempt from 14.9.4 NMAC, as are public utilities, rural electric cooperatives and sawmills. The rule states that administration facilities at mining and gas processing sites are covered, so office and shop heating boilers at those sites follow the state rule. Process boilers at exempt sites are repaired to ASME and National Board practice under the owner’s own integrity program.
Does a used boiler from Texas or Arizona need approval in New Mexico?
Yes. A used boiler from inside New Mexico, another state or another country must be approved by the Mechanical Bureau or the city with jurisdiction before installation, and it must carry ASME stamping and a National Board registration number. It is then installed, permitted and inspected as a new installation, and a hydrostatic test may be required. Paul Industries assembles the data report and history the approval needs.
What should an owner do after a boiler accident in New Mexico?
After a boiler accident, whether a fireside explosion or a waterside failure, the owner notifies the insurance company immediately. No parts or appurtenances may be removed or moved, except to protect life or limb, until the state or a National Board commissioned inspector has investigated. Paul Industries makes the site safe, then plans the repair or replacement once the investigation releases the boiler.
Does altitude change the relief valve setting on a New Mexico boiler?
The setting stays the same, because relief valves, gauges and the maximum allowable working pressure are all stated in gauge pressure. What changes is the steam temperature at that gauge pressure: 15 psig steam in Albuquerque saturates near 244.5 F instead of about 250 F at sea level. Burner combustion air and pump suction margins also need checking against site elevation after a repair.
How often do boilers need to be replaced in New Mexico's climate?
Boiler life in New Mexico depends above all on water treatment, cycling and maintenance rather than climate alone. Hard, high-solids source water in parts of the state makes softening, blowdown control and condensate return important, and long heating seasons in the north add cycles. A well-treated firetube boiler often runs for decades, while scale, oxygen pitting or thermal shock shorten its life sharply.
Does a burner change on a New Mexico boiler need an air permit?
It may. The New Mexico Environment Department’s construction permit rule, 20.2.72 NMAC, covers sources able to emit over 10 lb hourly or 25 tons annually of a contaminant with an ambient standard, and modifications at permitted facilities are reviewed too. In Bernalillo County, applications go to the Albuquerque-Bernalillo County air program. Paul Industries checks the burner data against the plant’s permit before ordering equipment.
Which records does a New Mexico owner receive after a boiler repair?
After a boiler repair, Paul Industries provides the scope and findings, the inspector’s approval and any National Board repair or alteration report for welded work, weld and test records, hydrostatic test results where one was required, replaced safety device data, and an update to the ASHRAE/ACCA 180 maintenance program. The certificate of inspection itself comes from the inspector or the insurer and is posted in the boiler room.
What should a New Mexico plant send to get a boiler repair priced?
Send the boiler nameplate and National Board number, the inspector’s report or tag, photographs of the failed area, recent water treatment and operating logs, and the dates the boiler can be out of service. Note any air permit and whether temporary steam is needed. Paul Industries returns a budget range from comparable scope and a firm price after reviewing access and outage timing.
Boiler tagged, leaking or due for inspection in New Mexico?
Send the nameplate, the inspector’s report and your outage window. Call 201-450-8280 or request a quote.
