Paul Industries provides data center commissioning in South Dakota for the mechanical systems of new and expanding halls: flushing and pressure testing, startup, functional and integrated testing of chillers, dry coolers, pumps and liquid cooling loops, and the turnover records owners and building officials keep. South Dakota adds three things to the usual program: a building code edition that changed on July 1, 2026, a water notice that must be settled before a large hall starts operating, and a climate that makes winter and summer tests two separate campaigns. Paul Industries plans the test program around all three from the first schedule.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
Building code 2024 IBC for non-residential buildings (SDCL 11-10-5, amended 2026)
Before operation Water notice to providers for halls of 10 MW or more (SB 135)
Winter test window Aberdeen averages 38.5 nights at or below 0 F (NOAA)
Summer test window Rapid City averages 32.1 days at 90 F or hotter (NOAA)
Reviewed November 2026

Data center commissioning in South Dakota, from permit to integrated test

Data center commissioning in South Dakota runs from factory witness tests through installation checks, startup, functional performance tests and an integrated systems test, the same five levels used across the industry, but the state’s code path, water law and weather decide when each level can happen. The national data center commissioning page explains the levels themselves; this page sets them against South Dakota conditions.

The commissioning team on a typical project includes the owner’s data center commissioning agent, who writes the scripts and witnesses the tests, and the mechanical contractor, who installs, flushes, pressure tests, starts and runs the equipment through those scripts. Paul Industries fills the second role on every project and the full mechanical commissioning role where the owner asks for it, and it writes the data center commissioning plan for the mechanical scope so the agent’s scripts match how the plant was built.

Which building code edition applies to a South Dakota data center permit?

South Dakota statute requires any county or city building code for non-residential buildings to comply with the 2024 edition of the International Building Code, after the Legislature updated SDCL 11-10-5 in 2026, and SDCL 11-10-6 applies the 2024 edition as the design standard to buildings commenced after July 1, 2026 where no ordinance exists. A data hall permitted in Sioux Falls, Rapid City or a rural county is therefore designed to the same base building code, with whatever amendments the city or county adopted.

The mechanical, plumbing, fuel gas and energy codes that sit beside the building code come from the permitting jurisdiction’s ordinance, so the first commissioning task is to list the editions and amendments the permit actually references. Where an adopted energy code includes commissioning provisions, such as section C408 of the International Energy Conservation Code, those become required tests and reports in addition to the owner’s own program. Paul Industries confirms that list with the building department before the commissioning plan is written, because a hydronic test pressure or a duct leakage test written to the wrong edition becomes a retest later.

Data center commissioning steps on a South Dakota schedule

The data center commissioning steps on a South Dakota project follow the industry’s five levels, and the table shows where state conditions change each one. The data center commissioning schedule usually runs from equipment release through the integrated test over several months, with the integrated test placed as late as possible so it exercises the finished plant.

Commissioning levels and what South Dakota changes
LevelWhat is provedSouth Dakota consideration
Level 1, factory testingChillers, CDUs, pump skids and switchgear meet specification before shipmentLow-ambient operation and glycol performance witnessed at the factory if the site will run below zero
Level 2, delivery and installationEquipment arrives undamaged and is installed as designedEquipment delivered in winter is checked for freeze damage before it is set; coils arrive drained
Level 3, startup and pre-functional checksEach system flushed, pressure tested, filled, rotated and startedFlushing water counts toward water use; unheated shells need temporary heat before wet testing
Level 4, functional performance testsEach system meets its sequence and capacity under loadFreeze protection and overcooling tests need cold weather; peak capacity tests need summer
Level 5, integrated systems testThe whole facility rides through utility loss, failures and transfersUtility energization under the data center tariff and any city conditions set the test date

The data center commissioning levels come from industry practice rather than from South Dakota statute, so the owner’s contract and the commissioning agent’s specification decide how deep each level goes. A small enterprise room may stop at Level 4, while a hyperscale hall runs all five with multiple integrated tests. Paul Industries writes the mechanical scripts to whichever depth the owner selects and keeps the evidence for each level in its own section of the turnover file.

Each level ends with signed records, an issues log and a decision to proceed, which is the data center commissioning process every owner expects. What South Dakota adds is a second winter or summer visit for tests that the season at turnover leaves for later, and Paul Industries writes those deferred tests into the plan from the beginning rather than discovering them at the end.

How does commissioning water count toward the SB 135 notice?

Water used during commissioning matters in South Dakota because SB 135 requires every hall whose peak demand reaches 10 megawatts to give each water provider notice of its projected water consumption before it commences operation, and the Board of Water Management issues a written statement once every provider agrees the use is compatible with supply. The notice and the board’s statement belong on the commissioning schedule as a milestone ahead of the integrated test and the first IT load.

Commissioning itself uses water: filling and flushing the chilled water and condenser systems, draining after flushing, refilling with treated water or glycol, and running towers or adiabatic coolers during capacity tests. A single 1,000 foot run of 12 inch pipe holds roughly 5,800 gallons, and a large plant flushes several times its volume. Paul Industries estimates those volumes during planning, meters the fill and drain water during the work, and hands the figures to the owner so the projection in the notice and the first semi-annual water use report rest on measured numbers. Where the site draws from its own well, the water right issued under the state’s appropriation rules covers that construction use as well.

How are freeze protection and overcooling tested in a South Dakota winter?

Freeze protection and overcooling can be proved properly only in cold weather, and South Dakota supplies plenty of it: NOAA’s 1991 to 2020 hourly normals put Sioux Falls at or below freezing for about 2,767 hours a year and Aberdeen for about 3,147, and the 10th percentile hourly values fall to minus 13 degrees in Aberdeen. A hall turned over in July has to come back in January for these tests.

Winter functional tests cover glycol concentration and burst protection, low-ambient head pressure control on air-cooled chillers, dry cooler fan staging at minimum load, mixing valves that keep supply water above the IT vendor’s minimum and above the white space dew point, tower basin heaters and bypass valves, and heat tracing on makeup and sensing lines. The most informative test simulates a pump trip on a subzero night and checks that outdoor coils drain, circulate or stay protected exactly as the sequence intends. Paul Industries scripts these with the commissioning agent and runs them during a cold spell with the IT load present or simulated with load banks.

Summer peak tests and the opposite-season problem

Summer peak tests prove that the plant holds supply temperature at design capacity on the hottest, most humid days, which in South Dakota means humid July afternoons east of the Missouri River and hot, dry ones in the west. Sioux Falls averages about 1,480 hours a year with a normal dew point of 60 degrees or above, while Rapid City averages none, so the latent load in the test differs sharply by site.

Seasonal tests on a South Dakota data center cooling plant
TestSeason neededSouth Dakota reference pointPass condition
Chiller and tower capacity at design wet bulbSummerSioux Falls 90th percentile hourly values near 92 F; humid hours in JulySupply water at setpoint with redundant unit off
Dry cooler or adiabatic capacitySummerRapid City 90th percentile near 98 F; 32.1 days a year at 90 F or moreFacility water within its class with trim plant per sequence
Economizer changeover and partial economizerSpring or fallThousands of hours between 40 and 60 FSmooth transfer with no temperature swing at the racks
Freeze protection on pump tripWinterAberdeen 10th percentile near minus 13 FNo coil or pipe below its protection point
Overcooling and minimum supply temperatureWinterNights at or below 0 F: 24.9 in Sioux Falls, 38.5 in AberdeenSupply held above IT minimum and white space dew point

When the weather at turnover falls short of the test condition, part of the test can be run with false loading, such as load banks, valve positions forced to simulate design flow, or a tower run with fans restricted, but the final proof waits for the real season. Paul Industries records which tests were simulated and schedules the seasonal return visit in the contract, so the owner holds a complete set of results within the first year.

Flushing and pressure testing in an unheated South Dakota shell

Flushing and pressure testing in an unheated shell during a South Dakota winter puts water into pipes that can freeze overnight, so Paul Industries heats the building or the work zone first, or tests sections pneumatically where the piping code and the engineer allow it. A hydrostatic test left full over a cold weekend in an open shell can split pipe and valves, which turns a test into a repair.

The data center commissioning standards that govern this work come from the piping codes and the project specification: ASME B31.9 for building services piping in most chilled water systems, ASME B31.3 where the specification calls for it, and the mechanical code the jurisdiction adopted. Flushing velocity, temporary strainers, bypasses around chillers, CDUs and plate exchangers, and the cleanliness criteria for each loop are written into the plan. After a passing flush, the system is filled with treated water or glycol at the specified concentration, sampled and recorded, and any section that must stay empty until spring is blown down and capped.

Utility energization, load banks and the data center tariff

Utility energization fixes the date of the integrated test, and in South Dakota a data center of 10 megawatts or more is served under separate terms and conditions that SB 135 requires each provider of electricity to keep, with HB 1038 allowing the Public Utilities Commission to charge the data center the actual cost of reviewing its service agreement. Permanent power at full capacity may arrive in stages under those agreements, so the commissioning plan must match test loads to the capacity actually available on each date.

Load banks stand in for IT equipment during functional and integrated tests, and their heat must be placed where the racks will be so that air and water temperatures reflect the real layout. Liquid-cooled rows need water-cooled load banks or heater skids on the technology loop, and Paul Industries pipes those connections as part of the CDU installation. Generators run during the integrated test under the transfer scenarios the owner chooses, and the fuel system, cooling and exhaust are part of the mechanical checks. The adjacent pages on data center cooling in South Dakota and data center liquid cooling in South Dakota describe the plants being tested.

Boilers and other state inspections before operation

Boilers serving a data center campus in South Dakota, for building heat, humidification or generator jacket water heating where a boiler is used, fall under SDCL chapter 34-29A, the Boiler Safety law administered by the Department of Public Safety, which requires a certificate before a covered boiler operates. That inspection belongs on the commissioning schedule ahead of the heating season and before any functional test that depends on boiler heat.

The chapter’s definitions address boilers, power boilers, heating boilers and hot water supply boilers, so chiller shells, expansion tanks and air separators are handled through their ASME construction records and the project specification. Paul Industries collects the manufacturer’s data reports, relief valve settings and nameplate photographs for every pressure-retaining item and files them in the turnover package. Boiler startup and repair work is covered on the boiler repair in South Dakota page.

A data center commissioning checklist for South Dakota turnover

A data center commissioning checklist for a South Dakota turnover combines the industry’s standard records with items the state and its climate add. The table lists what Paul Industries assembles for the mechanical scope.

Mechanical turnover checklist for a South Dakota data hall
RecordContentsSouth Dakota addition
Code and permit filePermit, approved drawings, inspection sign-offsCode editions and amendments the city or county adopted under the 2024 IBC requirement
Pressure test reportsTest medium, pressure, hold time, witness, result per sectionNotes on temporary heat or pneumatic testing used in cold weather
Flushing and fill recordsVelocity, strainer checks, cleanliness, fill water qualityMetered fill and drain volumes for the SB 135 water notice and first report
Startup reportsManufacturer startup for chillers, CDUs, pumps, coolersLow-ambient settings and glycol concentration confirmed
Functional test resultsScripts, readings, issues log, retestsList of deferred winter or summer tests with dates
Integrated test reportUtility loss, transfers, failures, recovery timesCapacity available under the data center service agreement on the test date
Pressure equipment fileData reports, nameplates, relief valve settingsBoiler certificates under SDCL 34-29A where boilers exist
Operations packageAs-builts, sequences, maintenance schedules, trainingWinterization and spring restart procedures

How to commission a data center that is already running?

How to commission a data center that is already running comes down to testing new equipment without risking the live load, which in South Dakota often means adding a liquid cooling loop, a chiller or a dry cooler bank to an operating hall. The new system is commissioned to Level 4 in isolation behind closed valves, then tied in under a written method of procedure during a planned window, and finally retested as part of the whole plant.

Each tie-in is reviewed for what redundancy remains while it happens, what the rollback is, and which alarms will be suppressed and restored. Paul Industries runs those steps for the plants it installs and for existing plants whenever the owner wants a fresh recheck of the sequences, and it recommissions aging plants whose controls have drifted. The data center mechanical contractor in South Dakota page covers building those additions.

What separates one data center commissioning company from another?

One data center commissioning company differs from another in how close it sits to the equipment: writing scripts and witnessing tests is one role, and installing, flushing, starting and running the plant through those scripts, then fixing what the tests find, is another. Owners commissioning data centers in South Dakota benefit when the second role sits with the firm that built the mechanical systems, because a failed test then leads straight to a correction.

Paul Industries brings that installer’s view to every program. Its test records show the valve positions, flow readings and setpoints behind each result, so the agent and the owner can see why a test passed, and its technicians stay on the plant through the seasonal return visits. Where the owner’s agent prefers to run all scripts personally, Paul Industries prepares readiness checklists, operates the equipment during each test and closes issues on the systems it built within the same visit whenever parts are on hand.

Pricing commissioning work on a South Dakota hall

Commissioning work on a South Dakota hall is priced from the number of systems and tests, the depth of the program the owner chooses, the number of phases, and the seasonal return visits the climate requires. A single-phase hall with air-cooled chillers needs fewer scripts than a campus with chilled water, dry coolers, liquid cooling and heat recovery, and each additional phase repeats much of the integrated test.

Load bank rental, temporary heat for winter testing, extra visits for opposite-season tests, trend logging hardware left in place through the first year, temporary pumps and strainers for flushing, water for filling and flushing, and the time of the owner’s operators all add to the total. Paul Industries prices the mechanical commissioning scope from comparable projects once it has the drawings and the schedule, then fixes the figure after reviewing the commissioning agent’s scripts. Commissioning can be bought with the installation or as a separate scope.

Who tests and starts up data center cooling in South Dakota?

Paul Industries tests and starts up data center cooling in South Dakota: it flushes and pressure tests the piping, starts chillers, dry coolers, towers, pumps and CDUs with the manufacturers’ procedures, runs functional and integrated tests with the commissioning agent, and returns for the seasonal tests the turnover date left for later. The same team that installed the plant answers for its performance, which shortens the issues log.

Owners comparing data center commissioning companies for a South Dakota hall should ask how each one handles winter flushing, deferred seasonal tests and the water records SB 135 now asks for, as well as the usual question of experience with the five levels. Paul Industries answers those questions in the commissioning plan itself, before the first test.

Paul Industries commissioning work on South Dakota data halls

Paul Industries provides data center commissioning services in South Dakota as part of a complete mechanical installation, as a stand-alone commissioning scope for existing systems, or as recommissioning of an operating plant. Its data center commissioning in Virginia work runs from the company’s headquarters at 256 Shore Drive in Kilmarnock, Virginia, and Paul Industries accepts projects across South Dakota, throughout the United States and abroad. Cold-weather lessons from data center commissioning in Wisconsin carry directly into South Dakota winter test plans.

Chillers found faulty during testing are repaired under the same contract, as described on the chiller repair in South Dakota page, and pharmaceutical and laboratory qualification work is covered on the validation and commissioning in South Dakota page. The South Dakota and Midwest pages describe the wider plant work. Send drawings, the schedule and the commissioning agent’s requirements, or request a quote.

Standards referenced: SDCL 11-10-5 and 11-10-6, 2024 International Building Code · South Dakota SB 135 (2026) · South Dakota HB 1038 (2026) · SDCL chapter 34-29A, Boiler Safety · ASHRAE Guideline 0 · ASHRAE Standard 202 · ASME B31.9 · ASME B31.3 · NFPA 110

Frequently asked questions

Who handles data center commissioning in Sioux Falls and Lincoln County?

Paul Industries handles data center commissioning in Sioux Falls, Lincoln County and Minnehaha County for the mechanical systems: flushing, pressure testing, startup, functional and integrated tests. Sioux Falls has a council committee reviewing data center ordinances, due to report by January 12, 2027, so the commissioning plan checks the city conditions in force at permit. Send drawings and the schedule to begin.

Does Paul Industries provide data center commissioning in Rapid City?

Paul Industries provides data center commissioning in Rapid City and across the Black Hills region. Rapid City averages about 32 days a year at 90 degrees or hotter with very dry air, so summer capacity tests there focus on dry cooler and adiabatic performance rather than humid latent load. Winter tests still cover freeze protection and overcooling before the hall carries full load.

How are data halls in Aberdeen, Watertown and Brookings tested for winter?

Paul Industries tests data halls in Aberdeen, Watertown, Brookings and northeastern South Dakota. The region’s long subzero stretches make the winter functional tests the most important part of the program: glycol strength, pump trip behavior, mixing valve control and heat tracing. Those tests are scheduled for a real cold spell and recorded alongside the summer results.

What is commissioning a data center expected to prove in South Dakota?

Commissioning proves that every system was built as designed, starts and runs as its sequences intend, meets capacity under load, and keeps the facility running through failures and utility loss. In South Dakota it also proves freeze protection and winter overcooling control, and records the water volumes the SB 135 notice relies on. Paul Industries documents each of those results for the owner.

What does the data center commissioning process look like on a South Dakota project?

The process runs from the commissioning plan through factory tests, installation checks, flushing and pressure testing, startup, functional tests and an integrated systems test, with an issues log closed at each step. South Dakota projects add a scheduled return visit for opposite-season tests and a milestone for the water notice before operation. Paul Industries keeps the mechanical records current throughout.

Which data center commissioning standards apply in South Dakota?

The owner’s program usually follows ASHRAE Guideline 0 and ASHRAE Standard 202 for the process, with the industry’s five commissioning levels. Piping tests follow ASME B31.9 or B31.3 as specified, generator testing follows NFPA 110, and the building code is the 2024 International Building Code with any city or county amendments. Paul Industries maps each test to its governing document in the plan.

Does a South Dakota data center need a water notice before commissioning tests?

SB 135 ties the water notice to the start of operation, so construction and commissioning come first, but the notice, each provider’s written determination and the Board of Water Management’s statement must be in hand before the hall commences operation. Placing that milestone before the integrated test avoids a finished hall waiting on paperwork. Paul Industries supplies the measured fill and flush volumes for the notice.

Can a South Dakota cooling plant be commissioned in January?

A plant can be commissioned in January, and winter is the right time for freeze protection, overcooling and economizer tests. Summer capacity tests then return in July or August. Wet testing in January needs a heated building or heated enclosures, because piping full of water in an open shell will freeze overnight. Paul Industries plans temporary heat into the schedule.

Which energy code governs commissioning on a South Dakota data center?

South Dakota statute sets the building code edition, the 2024 International Building Code, while energy code requirements come from the city or county ordinance under which the permit is issued. Where that ordinance adopts an energy code with commissioning provisions, those tests and reports become mandatory. Paul Industries confirms the adopted editions with the building department before writing the commissioning plan.

How does the data center electric tariff affect the integrated systems test?

Under SB 135, providers serve data centers of 10 megawatts or more under separate terms and conditions, and capacity may be delivered in stages. The integrated test can use only the capacity energized on the test date, so the plan matches load bank steps to that capacity and may repeat the test as more power arrives. Paul Industries sequences mechanical tests to each energization stage.

Do boilers on a South Dakota data center campus need a state certificate?

Boilers within the scope of SDCL chapter 34-29A, the Boiler Safety law, need a certificate of inspection before they operate, under the program run by the Department of Public Safety. Heating boilers, power boilers and larger hot water supply boilers on a campus are typical examples. Paul Industries schedules that inspection ahead of any functional test that relies on boiler heat.

What should a data center commissioning agent receive from the mechanical contractor?

The agent should receive submittals, the mechanical commissioning plan, flushing and pressure test reports, startup reports, a points list and sequences, and a readiness notice before each functional test. In South Dakota, the agent should also receive glycol concentration records and the list of deferred seasonal tests. Paul Industries delivers those records as each system reaches readiness.

How long does mechanical commissioning take on a South Dakota hall?

Mechanical commissioning on a single hall usually spans the last few months of construction, from first flushing to the integrated test, and seasonal return visits extend final completion into the following summer or winter. Phased campuses repeat the cycle for each phase. Paul Industries sets the duration in the data center commissioning schedule once the equipment delivery dates are known.

Can a liquid cooling loop be commissioned before the servers arrive?

A liquid cooling loop is usually commissioned before servers arrive, using water-cooled load banks or heater skids connected at the rack manifolds. The loop is flushed, filled with the approved coolant, sampled, pressure tested and run at design flow and heat load. Paul Industries pipes the load bank connections and records the coolant analysis so the server vendor sees a clean loop at first connection.

What happens when a test fails during South Dakota commissioning?

A failed test goes on the issues log with its cause, corrective action and retest date. Mechanical faults such as a valve stroking the wrong way, a sensor offset or a pump at the wrong speed are corrected and retested; equipment faults go to repair under warranty. Paul Industries closes the issues on its systems before the next level starts, so the integrated test begins with a clean log.

Can Paul Industries commission an existing data center plant?

Paul Industries commissions existing plants, starting with a document review, a walkdown against the drawings, and pressure, flow and sequence checks before functional tests. Gaps in earlier records are closed by retesting where possible. The result is a complete commissioning file the owner can rely on. Send the drawings and existing records to scope the work.

What should a South Dakota owner send to price data center commissioning?

Send the mechanical drawings and specifications, equipment list, construction schedule, utility energization dates, the commissioning agent’s requirements if one is appointed, and the number of phases. Paul Industries returns a scope and price for the mechanical commissioning work. Call 201-450-8280 or request a quote.

Commissioning a data hall in South Dakota?

Send drawings, the equipment list, the construction schedule and the energization dates. Call 201-450-8280 or request a quote.