Paul Industries designs, supplies, installs and services data center cooling in Wyoming, from evaporative air handlers and air-cooled chiller plants to the hybrid yards that serve dense racks on Cheyenne campuses. Cheyenne sits at roughly 6,100 feet in a semi-arid climate, so most hours of the year are cool, dry and thin-aired. The design work is about using those hours well, sizing air-side equipment for the altitude, and keeping every coil, pipe and pump alive through nights that fall below zero.
Request a quote or call 201-450-8280
Data center cooling in Wyoming: what the Cheyenne climate allows
Data center cooling in Wyoming starts from weather that is cool, dry and thin for most of the year. At Cheyenne Regional Airport, NOAA’s hourly observations from 2021 through 2024 put 89.6 percent of all hours at or below 75 degrees Fahrenheit, and the dew point reached 60 degrees for only about 29 hours a year. In July, the 1991 to 2020 hourly normals run from about 56 degrees before dawn to about 82 degrees in the afternoon, and humid hours are scarce.
Those numbers decide three things for any Wyoming data center. They set how many hours outdoor air or evaporation alone can carry the load. They set how small the mechanical refrigeration can be and still cover the hot afternoons. And they set the cold-weather duty, because the same airport logged a low of minus 25 degrees in that period and spent about 2,088 hours a year at or below freezing. The national data center cooling systems page describes the equipment types; this page applies them to the conditions owners actually face on the high plains.
Cheyenne weather by the hour, 2021 to 2024
Cheyenne’s recorded hourly weather from 2021 to 2024 shows a cooling season that is short, sharp and almost entirely dry. The 1991 to 2020 normals agree: Cheyenne averages about 15 days a year at or above 90 degrees and about 8 mornings at or below zero, and the hourly normal temperature never rises above about 82 degrees.
| Condition | Hours or share of the year | What the cooling plant does |
|---|---|---|
| At or below 60 F | About 70 percent of hours | Outdoor air or dry coolers carry the full load; compressors stay off |
| 60 to 75 F | About 20 percent of hours | Evaporative assist or partial economizer; chillers idle or trimming |
| 75 to 90 F | About 10 percent of hours | Evaporative media or chillers carry the peak, depending on the design |
| Above 90 F | About 48 hours a year | Design-day condition; full chiller or evaporative capacity, with redundancy |
| Wet bulb above about 63.5 F | About 0.4 percent of hours | Upper limit for evaporative performance and cooling tower approach |
| At or below 0 F | About 101 hours a year | Freeze protection, glycol or drained coils, damper and heater checks |
The low wet bulb is the number that sets Wyoming apart from humid markets. Evaporation can pull supply air or condenser water down close to the wet bulb, and in Cheyenne the wet bulb is far below the dry bulb on almost every warm afternoon. A plant that uses evaporation even part of the time can shave the chiller capacity it needs, or skip compressors entirely, depending on the inlet temperatures the IT equipment accepts.
Are there data centers in Wyoming, and how are they cooled?
Wyoming has operating data centers and several large campuses under construction in and around Cheyenne, in Laramie County. The cooling choices already announced for those campuses show the range of answers the climate supports, and they are worth reading as market facts before choosing a design.
| Campus | Status | Published cooling approach |
|---|---|---|
| Microsoft, Cheyenne | Operating since its first datacenter in 2012; expansion announced April 2026 | Direct evaporative cooling; the company states water is used for cooling less than 10 percent of the year |
| Related Digital, Cheyenne Business Parkway | Under construction; first 88 MW building expected late 2026, campus up to 302 MW | High-efficiency air-cooled chillers, with nominal water use |
| Meta, Cheyenne | Under construction; $1.2 billion investment, ground broken in 2024 | Cooling design details yet to be published |
| NCAR-Wyoming Supercomputing Center | Operating since 2012 | Research computing hall with water-cooled systems |
Two of the published approaches sit at opposite ends of the water question. Direct evaporative cooling uses outdoor air most of the year and adds water only on the warmest days. Air-cooled chillers use almost no water at all but carry a compressor and fan energy penalty on hot afternoons. Paul Industries builds both, and the hybrids in between, and helps owners weigh them against the water, power and land at a specific site.
Where are data centers in Wyoming outside Cheyenne?
Outside Cheyenne, sites around Laramie, Casper and Gillette hand the cooling designer a different set of numbers for a Wyoming data center. The same NOAA hourly records for 2021 to 2024 show how much the climate shifts across the state.
| Station | Elevation | Hours at or below 75 F | Hours above 90 F per year | Highest and lowest recorded |
|---|---|---|---|---|
| Cheyenne | About 6,130 ft | 89.6% | About 48 | 99 F / minus 25 F |
| Laramie | About 7,270 ft | 92.5% | About 8 | 96 F / minus 26 F |
| Casper | About 5,340 ft | 89.0% | About 136 | 101 F / minus 42 F |
| Gillette | About 4,350 ft | 87.9% | About 187 | 106 F / minus 38 F |
A Laramie Wyoming data center would see the fewest hot hours of the four and the thinnest air. A data center in Casper, Wyoming, or a data center in Gillette, Wyoming, sees more heat in summer and colder extremes in winter, so the mechanical refrigeration and the freeze protection both grow. The design method stays the same; the hour counts and the equipment selections change.
Evaporative, air-cooled chiller or hybrid: which fits a Wyoming hall?
The right cooling arrangement for a Wyoming hall depends on the IT inlet and liquid temperatures, the water the site can count on, and how the owner values water against electricity. The table below sets out the main choices as they apply on the high plains.
| Arrangement | How it uses Wyoming weather | Water | Main design points |
|---|---|---|---|
| Direct evaporative air handlers | Outdoor air most hours; wetted media on warm afternoons | Low, seasonal | Filtration, humidity control in very dry winter air, freeze protection of media and sumps |
| Indirect evaporative units | Air-to-air exchange with evaporation on the scavenger side | Low to moderate | Keeps outdoor air out of the hall; trim refrigeration sized for the 0.4 percent wet bulb |
| Air-cooled chillers with free-cooling coils | Dry coils carry the loop in cold weather; compressors on warm days | Nominal | Altitude derating of fans and condensers; glycol or isolation for winter |
| Water-cooled chillers and towers | Low wet bulb gives cold condenser water and long waterside economizer hours | Highest | Tower freeze protection, blowdown and makeup supply, water rights |
| Dry coolers serving liquid-cooled racks | Warm-water loops run on dry coolers nearly all year | Near zero | Loop temperature class, glycol, trim cooling for the hottest hours |
Many Wyoming owners end up with a hybrid: air or dry coolers for the long cool season, evaporation or a modest chiller plant for the few dozen hot hours, and a separate warm-water loop for liquid-cooled racks. The data center liquid cooling in Wyoming page covers that rack-side loop in detail.
Controls tie a hybrid together. The sequence decides when the plant moves from full economizer to evaporative assist to mechanical cooling, and Wyoming’s fast weather swings, with afternoon thunderstorms and sharp cold fronts, test those transitions often. Paul Industries writes the changeover points from the site’s hourly data, adds hysteresis so equipment holds its mode through a passing cloud, and trends the transitions through the first full year so the setpoints can be tuned against real operation.
What 6,100 feet does to fans, coils and condensers
At Cheyenne’s elevation, air weighs about 83 percent of what it weighs at sea level, by the standard atmosphere, so every fan moves less mass and every coil rejects less heat per cubic foot. A fan wall, air handler or air-cooled condenser selected from sea-level catalog data will fall short unless the selection is corrected for site density.
The correction touches more than capacity. Fan motors draw less power at the same speed in thin air, but the fans must turn faster or grow larger to move the mass of air the load needs, which changes sound levels and motor sizing. Air-cooled chillers lose condenser capacity and may reach high head pressure sooner on a hot afternoon. Generator radiators and combustion air face the same derating. Paul Industries applies the site elevation to every air-side selection, from the rooftop units on a support building to the condensers on a chiller yard, and records the basis in the design documents so a later expansion uses the same numbers. At Laramie’s 7,270 feet the density falls to about 80 percent, so the correction is larger again.
Freeze protection when Cheyenne drops below zero
Freeze protection is the cooling-plant problem that Wyoming adds and most data center climates never test. Cheyenne recorded about 101 hours a year at or below zero from 2021 to 2024, Casper reached minus 42 degrees, and wind across open business parks strips heat from exposed coils and piping far faster than still air.
A Wyoming cooling yard is designed so that no water-filled component can freeze when the plant is idling, starting or running at minimum load. Common measures include propylene glycol in loops exposed outdoors, heat exchangers that separate glycol loops from water loops inside the building, coil drain and vent provisions, heat trace on small exposed lines, low-limit protection on air handlers that bring in outdoor air, and control sequences that hold minimum flow through outdoor equipment. Evaporative media, sumps and makeup lines are drained or heated for winter. Paul Industries designs and installs these measures and proves them at commissioning, which the data center commissioning in Wyoming page describes.
Very dry winter air is the companion issue. When outdoor air at minus 10 degrees is warmed to a hall temperature, its relative humidity falls to a few percent. Halls that bring in outdoor air need humidification or a recirculation strategy that keeps the hall inside the IT equipment’s allowable range, and the water for that humidification needs treatment to avoid scale and mineral dust.
Wyoming data center water usage and where the water comes from
Wyoming data center water usage depends almost entirely on the cooling arrangement, ranging from nominal for air-cooled chillers to substantial for water-cooled chillers with towers. As a physical rule of thumb, evaporating a pound of water absorbs about 1,000 Btu, so rejecting one megawatt purely by evaporation consumes roughly 410 gallons an hour before blowdown. That is the ceiling a fully evaporative plant approaches on the hottest afternoons; a direct evaporative system in Cheyenne evaporates water only during the warm part of the year.
In Cheyenne, the Board of Public Utilities reports that about 70 percent of the city’s water comes from mountain streams, most of it through the Stage I and II trans-basin system, and about 30 percent comes from wells in four well fields west and northwest of the city. Sites that drill their own wells need a permit from the Wyoming State Engineer before construction starts, under W.S. 41-3-930. Paul Industries designs data center cooling with water to fit the supply the owner has secured: makeup treatment, cycles of concentration, blowdown handling and metering for a tower plant, or a closed, nearly waterless loop where the water itself is the constraint. Data center cooling water usage is a design decision made on day one, and changing it after the yard is built is expensive.
Water leaving the site matters as much as water arriving. Tower blowdown and any drained loop water are industrial discharges, and in Cheyenne the Board of Public Utilities runs an industrial pretreatment program that permits, inspects and samples industrial users. Paul Industries plans blowdown metering, sampling points and any neutralization or holding tank into the yard design, so the discharge permit conditions can be met from the first day of operation.
Adding cooling to an operating data center in Cheyenne, Wyoming
Adding cooling to an operating data center in Cheyenne, Wyoming means building new capacity while the existing plant carries live IT load, often through a winter when outdoor work is slow and freeze risk is high. The first task is a survey of what is there: equipment nameplates and their altitude ratings, loop temperatures, glycol strength, valve isolation points, spare connections and the condition of the controls.
From that survey, Paul Industries sets out a tie-in plan. New chillers, dry coolers or evaporative units are set and piped up to isolation valves while the existing plant runs. Hot taps or line stops are used where no isolation exists. Each cutover is written as a method of procedure with a rollback step, scheduled for the coolest available window, and backed by temporary cooling when redundancy is thin. Cold-weather cutovers are planned so that no outdoor section of pipe sits drained and exposed longer than the procedure allows.
Wyoming data centers that began as enterprise or colocation rooms often reach the point where denser racks arrive faster than the original plant can follow. A staged retrofit, with a warm-water loop added for liquid-cooled rows and the air plant left to carry the rest, is usually the least disruptive route. Paul Industries prices each stage separately so the owner can match spending to the racks actually arriving.
Power for the cooling plant and the large-load tariff
Cooling power for a large Cheyenne data center served by Black Hills Energy is typically bought under the utility’s Large Power Contract Service tariff, which the Wyoming Public Service Commission approved in July 2016 for new loads of 13,000 kilowatts or more. The tariff is the foundation for a negotiated service agreement and pairs the load with customer-owned generation on site that the utility can dispatch for backup.
For the cooling designer, that arrangement matters in two ways. Wyoming data center power consumption includes every kilowatt the chillers, fans and pumps draw, so cooling efficiency feeds straight into the negotiated energy cost. And the on-site generation that backs up the IT load also backs up the cooling, so pumps, controls and the compressors needed on a hot afternoon must restart in a planned sequence after a transfer. For comparison, the EIA reports that Wyoming’s average commercial electricity price was 9.53 cents per kilowatt-hour in 2025, against 13.37 cents nationally, which is part of why the state draws large loads.
Does the Wyoming data center sales tax exemption cover cooling equipment?
Wyoming’s sales tax exemption for data processing services centers reaches specialized heating and air conditioning equipment used to control the computer environment, along with uninterruptible power supplies, backup generators and air quality control equipment. Under W.S. 39-15-105, that tier applies when the qualifying purchases exceed $2 million in a calendar year and the purchaser has made a capital investment of at least $50 million at a physical location in Wyoming.
The exemption also involves a certification from the Wyoming Business Council on jobs, and the Department of Revenue decides whether a purchaser qualifies. Paul Industries prepares equipment schedules and invoices that separate the cooling equipment from installation labor and piping materials, so the owner’s tax advisers can apply the exemption cleanly to the items it covers.
Codes and refrigerant rules for a Wyoming cooling plant
Codes for a Wyoming data center cooling plant come from the city or county that issues the permit and, for buildings within its plan review authority, from the State Fire Marshal. The State Fire Marshal’s plan review page states that submissions from June 28, 2024 must comply with the 2024 International Building, Fire, Fuel Gas, Mechanical and Existing Building Codes. Wyoming leaves the energy code to home rule, so whether ASHRAE 90.4 or an IECC edition applies depends on the jurisdiction.
Federal refrigerant rules apply statewide. Under the EPA Technology Transitions rule, new data center and computer room cooling equipment, including IT equipment cooling, must use a refrigerant with a global warming potential below 700 from January 1, 2027, and new stand-alone comfort cooling chillers have carried the same limit since January 1, 2025. Paul Industries checks the refrigerant on every chiller and computer room unit against the installation date before equipment is released for order.
What does data center cooling in Wyoming cost to run?
The running cost of data center cooling in Wyoming is driven by the cooling share of power usage effectiveness, the negotiated or tariff electricity price, and water and treatment where evaporation is used. A worked example shows the scale. On a 20 megawatt IT load, cutting power usage effectiveness by 0.10 saves 2 megawatts continuously, or 17.52 million kilowatt-hours a year; at Wyoming’s 2025 commercial average of 9.53 cents, that is about $1.67 million a year.
Capital cost depends on the arrangement, the redundancy level, the altitude corrections, freeze protection and the schedule. Paul Industries prices Wyoming cooling work in two steps: a budget range drawn from comparable plants while the design is forming, then a fixed proposal once the equipment, the piping routes and the tie-ins are settled. Supply-only, design-build and complete installation routes are all available, and the related chiller repair in Wyoming service keeps the plant running after turnover.
Who installs data center cooling in Wyoming?
Paul Industries installs data center cooling in Wyoming: chiller plants, evaporative and indirect evaporative air handling, dry coolers, cooling towers, chilled water and condenser water piping, glycol systems, coolant distribution for liquid-cooled racks, controls integration and the water treatment that protects all of it. The company was formerly based in northern New Jersey and then Pennsylvania and is headquartered at 256 Shore Drive, Kilmarnock, Virginia; it is an East Coast contractor that takes work across Wyoming and in all 50 states.
The same standard Paul Industries applies to a data center cooling plant in Virginia, its headquarters state, goes into a Cheyenne yard, with the weather and altitude inputs changed. Owners comparing markets can also read the Texas data center cooling page, where heat and humidity drive the design in the opposite direction. For the broader mechanical package on a new campus, see data center mechanical contractors in Wyoming, and for statewide plant work, the Wyoming hub. Projects farther west are summarized on the West Coast page.
Paul Industries and Wyoming cooling plants
Paul Industries designs, supplies, installs, tests, starts up and services cooling plants for data halls in Cheyenne, Laramie, Casper, Gillette and anywhere else in Wyoming, from a single computer room retrofit to a campus yard built in phases as power arrives. Plants that also need high-purity makeup or loop fill water can add ultrapure water systems in Wyoming to the same contract. Send the IT load, the inlet or liquid temperature class, the site location and the water source, and request a quote.
Standards referenced: ASHRAE Thermal Guidelines for Data Processing Environments · ASHRAE 90.4 · 2024 International Mechanical Code · 2024 International Building Code · EPA Technology Transitions rule (40 CFR Part 84) · W.S. 39-15-105 (data processing services center exemption) · W.S. 41-3-930 (underground water permits) · W.S. 35-9-108 (state plan review)
Frequently asked questions
Who installs data center cooling in Cheyenne, Wyoming, for new campuses and expansions?
Paul Industries installs cooling for Cheyenne campuses and expansions: air-cooled and water-cooled chiller plants, evaporative and indirect evaporative air handlers, dry coolers, glycol systems and the chilled water piping that ties them to the halls. Each selection is corrected for Cheyenne’s roughly 6,100 foot elevation, and freeze protection is designed for below-zero nights. Paul Industries works under the owner’s phasing so new buildings connect without disturbing operating halls.
Does Paul Industries build data center cooling in Laramie, Casper and Gillette?
Paul Industries builds data center cooling in Laramie, Casper, Gillette and the rest of Wyoming. Each town shifts the inputs: Laramie has the thinnest air and the fewest hot hours, while Casper and Gillette see more summer heat and colder extremes, with Casper recording minus 42 degrees and Gillette 106 degrees in 2021 to 2024. Paul Industries sizes refrigeration, air-side equipment and freeze protection to the specific airport records nearest the site.
How many hours a year can a Cheyenne data center cool without compressors?
The answer depends on the supply air or water temperature the IT equipment accepts. At Cheyenne, NOAA’s 2021 to 2024 hourly records put about 70 percent of hours at or below 60 degrees and 89.6 percent at or below 75 degrees, so a hall built for warm inlet air or warm-water liquid cooling can run without compressors for most of the year, with evaporation or trim refrigeration carrying the rest. Paul Industries runs the count against the actual design temperatures.
Is direct evaporative cooling practical in Wyoming winters?
Direct evaporative cooling works well in Wyoming because the winter air that would freeze wet media is the same air that needs no evaporation at all. In cold months the system runs as an air economizer, mixing return air to temper the supply, and the media, sumps and water lines are drained or heated. The design challenge is very low humidity, which is managed with recirculation and treated humidification.
Do air-cooled chillers lose capacity at Cheyenne's elevation?
Air-cooled chillers lose condenser capacity at Cheyenne’s elevation because air at about 6,100 feet carries roughly 83 percent of sea-level density, so each fan moves less mass. Manufacturers provide altitude correction factors, and the selection must use them, along with the site’s design dry bulb. Paul Industries applies the correction and checks head pressure margins at the hottest recorded hours before equipment is ordered.
What glycol mix does a Wyoming dry cooler loop need?
The glycol concentration for a Wyoming dry cooler loop is set by the lowest temperature the outdoor coil can see with the loop idle, plus a margin. With Cheyenne at minus 25 and Casper at minus 42 in recent records, outdoor loops typically use propylene glycol at a concentration chosen for burst and slush protection, or isolate the outdoor loop through a heat exchanger. Paul Industries specifies the mix, the inhibitor package and the test schedule.
How much water does a cooling tower plant use in Cheyenne?
A cooling tower plant in Cheyenne evaporates roughly 410 gallons an hour for each megawatt rejected by evaporation, before blowdown, and the low wet bulb lets the tower make cold water most of the year. Total use depends on load, hours on the tower versus dry cooling, and cycles of concentration. Paul Industries estimates annual water against the owner’s supply agreement before the arrangement is chosen.
Can a Wyoming data center drill its own well for cooling makeup water?
A Wyoming data center can pursue its own well, but W.S. 41-3-930 requires a permit from the State Engineer before construction of the well begins. The permit, the yield and the water quality all shape the treatment train and the cooling arrangement. Paul Industries designs makeup treatment for well water or city supply and sizes storage so the plant rides through supply interruptions.
Which refrigerants can a new data center cooling unit in Wyoming use?
From January 1, 2027, the EPA Technology Transitions rule limits new data center, computer room and IT equipment cooling systems to refrigerants with a global warming potential below 700, and stand-alone comfort cooling chillers have carried that limit since January 1, 2025. Equipment installed in Wyoming follows the same federal dates as everywhere else. Paul Industries confirms the refrigerant and installation date on every unit in the schedule.
Does Wyoming have a statewide energy code for data center cooling?
Wyoming leaves the energy code to home rule, according to the U.S. Department of Energy, so the city or county issuing the permit decides which energy standard applies to a data center. Where ASHRAE 90.4 or an IECC edition has been adopted, its mechanical efficiency limits govern the plant. Paul Industries confirms the adopted code with the permitting office before the design is fixed.
How should cooling restart after a generator transfer on a Wyoming campus?
Cooling restarts after a generator transfer in a planned order: controls and pumps first on uninterruptible power, then fans, then compressors in steps, so the generators are not hit with every motor at once. Large Cheyenne loads served under the Black Hills Energy LPCS tariff pair with on-site generation, which makes this sequence part of normal operation. Paul Industries programs and tests the restart sequence at commissioning.
What happens to a cooling plant in a Wyoming blizzard?
A Wyoming blizzard brings wind-driven snow, very low temperatures and possible power interruptions together. Air intakes need snow louvers and access for clearing, outdoor coils need hail and snow guards where drifting is likely, and freeze protection must hold through a power transfer. Paul Industries lays out intakes, yards and service paths with drifting in mind and verifies the low-limit and freeze sequences before the first winter.
Is an air-cooled chiller plant or a tower plant cheaper to run in Wyoming?
A tower plant usually uses less electricity, because Cheyenne’s low wet bulb makes cold condenser water, while an air-cooled plant uses far less water and avoids tower treatment and winter freeze risk. The comparison depends on the electricity price under the owner’s agreement, water cost and supply, and the hours on free cooling. Paul Industries models both on the site’s hourly weather and the owner’s rates.
Does Paul Industries supply cooling equipment for Wyoming projects without installing it?
Paul Industries supplies cooling equipment for Wyoming projects as a supply-only order when the owner has its own installation plan: chillers, dry coolers, air handlers, pump skids, coolant distribution units and prefabricated piping modules, each selected for the site elevation and winter temperatures. Design-build and complete installation are available on the same project when the owner prefers one contract.
How dry does a Cheyenne data hall get in winter, and does it matter?
A Cheyenne data hall that takes in outdoor air can see very low relative humidity in winter, because cold air holds little moisture and warming it drops the relative humidity to a few percent. Most IT equipment tolerates low humidity within its allowable range, but static control and the range limits still apply. Paul Industries designs recirculation and treated humidification so the hall stays inside the specified envelope.
How long does a data center cooling plant take to build in Wyoming?
Build time for a Wyoming data center cooling plant is set by long-lead equipment, the power delivery date and the season. Chillers, switchgear and large air handlers often carry the longest lead times, and outdoor work in a Cheyenne winter benefits from prefabricated modules that arrive tested. Paul Industries builds the schedule around equipment deliveries and the energization date the utility commits to.
What should a Wyoming owner send to price a data center cooling plant?
Send the IT load by phase, the inlet air or liquid temperature class, the redundancy target, the site address and elevation, the water source and any supply limits, the electric service arrangement and the planned energization dates. Drawings of the building and yard help. Paul Industries returns a budget range first and a fixed proposal once the design is settled. Call 201-450-8280 or request a quote.
Planning a cooling plant for a Wyoming data hall?
Send the IT load, the temperature class, the site elevation and the water source for the Wyoming campus. Call 201-450-8280 or request a quote.
