Paul Industries provides boiler repair in Louisiana for refineries, chemical plants, LNG terminals, sugar factories, hospitals and commercial buildings, repairing firetube, watertube, electric and heat recovery boilers to the National Board Inspection Code and the State Fire Marshal’s rules in LAC 55:V, Chapter 50. Louisiana runs a large share of the country’s process steam, and its boiler law ties inspection intervals to plant shutdowns in a way few states do. Paul Industries diagnoses the failure, plans the repair with the authorized inspector, makes it, tests it and hands back the records the certificate inspection needs.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
Boiler law R.S. 23:531 to 546 and LAC 55:V, Chapter 50
Power boilers Inspected each year; process units at shutdowns, up to five years
Heating boilers Certificate inspection every two years
Refining base 15 refineries, about 3.0 million b/cd (EIA, January 2026)
Reviewed November 2026

What governs boiler repair in Louisiana?

Boiler repair in Louisiana is governed by Part III of Title 23, Chapter 5 of the Revised Statutes (R.S. 23:531 through 546), which gives the Office of State Fire Marshal the exclusive power to make rules for the construction, installation, repair, use, operation and safety of boilers, and by the rules the Fire Marshal adopted under it in LAC 55:V, Chapter 50. The statute directs that those rules follow the ASME Boiler and Pressure Vessel Code as nearly as practicable, and the rules go a step further: the ASME code they adopt is called the Louisiana Boiler Construction Code. In practice the Louisiana boiler law has three working parts for an owner planning a repair: the certificate inspection that finds the problem, the repair method the inspector will accept, and the paperwork that lets the boiler run again at its certificate pressure.

A boiler installed in the state has to be built, inspected and stamped to the ASME code and registered with the National Board, unless it is exempt, an existing installation, or approved in advance as a “Louisiana Special” (LAC 55:V.5006). The ASME or National Board stamping may not be hidden by lagging or paint, so a repair that involves new insulation leaves the nameplate exposed or records where it sits. Every certificate states the maximum pressure the boiler may carry, and running above it, or without a certificate, is a misdemeanor for the owner, user or operator, with each day counted as a separate offense (R.S. 23:537 and 538).

Paul Industries works inside that framework on every job: the national methods for tube work, refractory, burners and controls are described on the boiler repair service page, and this page covers what the Louisiana rules add.

Louisiana boiler inspection requirements by boiler type

Louisiana boiler inspection requirements depend on the boiler’s class, and the class turns on pressure and temperature: steam above 15 psig makes a power boiler, water above 160 psig or 250 degrees Fahrenheit makes a high-pressure, high-temperature water boiler, and anything at or below those limits is a heating boiler (LAC 55:V.5003). The interval then follows from the class, as the table shows.

Certificate inspection intervals under R.S. 23:536 and LAC 55:V.5007
Boiler classDefined byCertificate inspectionInternal inspection
Power boilerSteam above 15 psigEach yearAbout six months from the external, with no more than 14 months between internals
Power boiler serving a continuous processIntegral to, or a necessary adjunct of, continuous operationsAt planned shutdowns of five days or moreAt the first such shutdown after three years, never beyond five years
High-pressure, high-temperature water boilerWater above 160 psig or 250 FExternal each yearEvery six years from the date of manufacture
Steam heating boilerSteam at 15 psig or lessEvery two yearsEvery two years where construction permits
Hot water heating and supply boilersWater at 160 psig and 250 F or lessExternal every two yearsEvery six years where construction permits
Potable water boilers120 gallons or more, or 200,000 Btu or moreExternal every two yearsControls and devices checked at each inspection

Each inspection includes the function of all controls and devices, and the inspector may call for a hydrostatic test at any time to establish whether a boiler is safe (R.S. 23:536(C)). A Louisiana state boiler inspection is made by a deputy inspector on the Fire Marshal’s staff, by a special inspector employed by the company that carries the boiler insurance, or, inside the city of New Orleans, by the city’s own boiler inspectors appointed as special inspectors.

How often is a boiler inspected when it serves a continuous process?

A power boiler whose operation is an integral part of continuous plant operations is inspected internally, and its certificate renewed, at planned or scheduled shutdowns of the process lasting five days or more, taken at the first such shutdown after three years have passed since the last inspection, and never more than five years apart (R.S. 23:536(A)). The certificate for that period costs $200, against $20 for an annual one (R.S. 23:537). For a refinery, an ammonia unit or a chlorine and caustic plant on the river, that rule turns the boiler inspection into a turnaround activity, and it turns boiler repair into turnaround planning.

Plants that do not qualify for the process interval have a second route. The Fire Marshal may approve stretching the internal inspection on a stationary boiler by up to 24 months when four conditions hold: continuous water treatment under competent supervision since the last internal, records showing boiler water sampled at intervals of no more than 24 hours of operation with the chemistry under control, records of every outage with the nature of each repair, why it was needed and who made it, and a last internal and current external that support the extension (R.S. 23:536(B)). The extended certificate carries double the normal fee.

Both routes reward the same thing: a boiler whose repair history is written down. Paul Industries leaves every Louisiana repair with a report that states what failed, why, what was replaced, the method, the test and the date, in the form the extension request needs, and it plans the repair scope so that work found at one turnaround is finished, inspected and closed before the next window opens.

Which plant steam generators fall outside the Louisiana boiler law?

Steam generators that recover heat from a chemical or petroleum processing system, along with evaporators and heat exchangers, are exempted from jurisdictional inspection by the definitions in LAC 55:V.5003, so a waste heat boiler buried in a reformer or a sulfur recovery train is often outside the Fire Marshal’s certificate program. The statute adds its own list in R.S. 23:540: boilers inspected by a federal agency, vehicle air tanks, steam fire engines brought in for emergencies, portable agricultural boilers, potable water boilers under 120 gallons and under 200,000 Btu, and boilers in private homes.

Outside the state program is not the same as outside a program. Process steam generators inside units covered by process safety management are part of the plant’s mechanical integrity work, and the plant’s inspection department still expects code repairs, documented welding and a pressure test. Paul Industries repairs exempt units to the same NBIC methods it uses on certificated boilers, so the record looks the same whichever inspector reads it, and the decision about jurisdiction stays a decision about paperwork rather than about how the tube is welded.

Unfired vessels are a separate question. The Chapter 50 rules state that they are not designed as an inspection program for unfired pressure vessels, beyond what the Act provides, though the Fire Marshal will inspect one on the owner’s request. The pressure vessel fabrication in Louisiana page covers what that means for drums, separators and receivers.

How is a welded boiler repair made in Louisiana?

A welded boiler repair in Louisiana follows the currently adopted National Board Inspection Code and is made under the National Board R program, by or on behalf of the owner or user, with an authorized inspector consulted on the repair method before the work starts and reviewing and accepting the repair once it is done (LAC 55:V.5034 and 5075). Replacement fittings and appliances meet the requirements for new installations, and on heating boilers the repair of fittings meets ASME Section IV for new construction (LAC 55:V.5033 and 5055).

Two definitions in the rules decide how big the job is. A repair restores the boiler to safe operation with no change from the original design. An alteration changes anything on the original data report that affects pressure-containing capability, and the rules count a non-physical change, such as a higher maximum allowable working pressure or design temperature, as an alteration too. Owners who ask to raise a boiler’s pressure after a repair are asking for an alteration, with the calculations and inspector involvement that come with one.

Some findings end the conversation. A lap seam crack along a longitudinal riveted joint condemns the shell or drum outright, and patching is prohibited (LAC 55:V.5062). Safety appliances are never worked on while under pressure, anything removed during an outage is reinstalled and working before the boiler returns to service, and no safety or relief valve may be adjusted to hold a pressure above the certificate (LAC 55:V.5086).

Paul Industries carries a Louisiana weld repair from inspector consultation through the National Board report: weld procedure and welder qualification records to ASME Section IX, material certificates, nondestructive examination, the pressure test, and the completed repair form the inspector signs. Tube and header welding on a running unit draws on the same methods described for industrial welding services in Louisiana.

Preparing a Louisiana boiler for its internal inspection

Preparation for an internal inspection in Louisiana is the owner’s duty under LAC 55:V.5059, and the inspector gives 14 days’ notice of the internal (LAC 55:V.5058). State inspectors do not inspect on Sundays or legal holidays except after an accident or in an emergency, which matters when a plant wants to fit the inspection into a weekend outage. If the boiler is not properly prepared, or a required pressure test is not set up, the inspector may decline, the certificate is withheld or the right to operate revoked until it is done, and the owner pays the inspection fee for the missed visit (LAC 55:V.5060).

Internal inspection preparation under LAC 55:V.5059 and how Paul Industries handles it
Rule requirementWhat it means on sitePaul Industries scope
Water drawn off and boiler washedDrain, flush, cool the settingDrain and washout with deposits sampled for the water treatment record
Manholes, handholes, washout and inspection plugs removedAs the inspector requires, including water column connectionsRemoval, gasket replacement and closure after acceptance
Furnace and combustion chambers cooled and cleanedGrates out on internally fired boilersFireside cleaning, refractory survey, grate removal
Insulation or brickwork removed where neededEnough to judge headers, furnace and supportsSelective removal and reinstatement, nameplate kept visible
Pressure gauge removed for testingAt the inspector’s requestGauge removal, calibration check, replacement where out of tolerance
Isolation from a common headerNon-return, stop, feed and blowoff valves closed, tagged and padlocked, drains between them openWritten isolation plan and verification before anyone enters

Where jacketing hides the longitudinal seams of shells, drums or domes, enough of it comes off to let the inspector see them, unless the condition can be judged another way (LAC 55:V.5061). If an external inspection shows a leak or crack, covering is removed so the inspector can decide on safety, and the inspector can take the boiler out of service until that is possible (LAC 55:V.5067). Paul Industries prices the preparation, the repair and the reassembly as one scope, so the outage plan has no gap between the people who open the boiler and the people who fix it.

Pressure testing a repaired boiler under the Louisiana rules

A pressure test applied by a Louisiana inspector need not exceed the boiler’s maximum allowable working pressure or the setting of its lowest safety valve, and it is held under control so the test pressure is never exceeded (LAC 55:V.5063). Safety valves are removed for the test, or each disk is held to its seat with a testing clamp; screwing down the compression screw on the spring is not an accepted way to gag a valve. Test water is no colder than ambient and never below 70 degrees Fahrenheit, and no hotter than 120 degrees during the inspection. A tightness test is run at normal operating pressure, again capped at the lowest relief setting.

Paul Industries supplies the pump, calibrated gauges, blanks and clamps, fills and vents the boiler, holds the pressure for the inspector and records the result. Where the NBIC calls for a different examination in place of a hydrostatic test on a particular repair, that choice is agreed with the inspector in the consultation step rather than at the end.

Boiler room rules that surface during a Louisiana repair

Boiler room rules in LAC 55:V, Chapter 50 often come up during a repair, because an inspector who comes to accept a weld also looks at the room around it. The ones that most often turn into work are summarized here.

Louisiana boiler room requirements that commonly add scope to a repair
ItemLouisiana requirementTypical corrective work
Low water fuel cutoffEvery automatically fired steam boiler; hot water heating boilers above 400,000 Btu/h (5071)Cutoff replacement, piping to the gauge glass level, function test
Unattended power boilersAudible alarm plus two independent manual-reset low water devices, or an attendant check at least every 120 minutes; controls checked at each shift start (5083)Second cutoff, alarm wiring, shift test log
Blowdown to a sanitary sewerReduced to no more than 5 psi and 150 F (5073)Blowoff tank or cooling arrangement, inspection openings
Boiler room exitsTwo remote exits for rooms over 500 sq ft holding a boiler of 1,000,000 Btu/h or more (5080)Platform and stair changes when equipment moves
Combustion airPermanent outside air; net louver area from the rule’s table, never under 1 sq ft; fan interlocked with burners where ventilation is mechanical, air through the fan at no more than 500 fpm (5081)Louver resizing, fan interlock, burner permissive wiring
Pressure reducing stationsRelief valve on the low side when downstream piping is not rated for full pressure; gauge on the low side (5072)Relief sizing for a failed-open valve and any bypass

A repair that changes the burner or fuel brings in two more sets of rules. The mechanical side falls under the 2021 International Mechanical Code and International Fuel Gas Code adopted in the Louisiana State Uniform Construction Code, with the 2024 editions taking effect on January 1, 2027, and LDEQ’s air permit rules in LAC 33:III, Chapter 5 apply to any source that emits or has the potential to emit an air contaminant. Paul Industries flags a fuel or firing-rate change at the scoping stage so the permit question is answered before the burner is ordered.

Installing, moving or replacing a boiler in Louisiana

Installing, moving or reinstalling a power, steam heating or hot water heating boiler in Louisiana requires a firm holding a boiler installer license from the Fire Marshal, issued after a written examination given by the chief boiler inspector, and a permit from the chief boiler inspector before the work, everywhere except the city of New Orleans (R.S. 23:543 through 545). The Louisiana boiler permit application lists the boiler’s location, the date installation will be complete, its trade name and type, and its manufacturer’s and National Board numbers, with a $25 fee. Work without one carries a fine of up to $1,000, up to a year in jail, or both, for each violation.

Once installed, the boiler is inspected by an inspector commissioned in Louisiana before it runs, and it receives a decal with its state serial number, which may not be defaced or covered by insulation (LAC 55:V.5007 and 5009). A boiler moved to a new setting is reported to the chief inspector and inspected before it is fired at the new location (5085). A second-hand boiler, one that changes both owner and location, has its fittings and appliances brought up to the ASME requirements for new installations (5008). A boiler that cannot carry ASME and National Board stamping for a valid reason may be approved as a Louisiana Special, on details approved by a registered professional engineer experienced in boiler design and submitted by the owner before construction begins (5006).

When repair stops making sense, Paul Industries supplies the replacement boiler, or installs an owner-furnished one, and carries the job through removal, rigging, setting, piping, burner and controls, startup and the first certificate inspection. Supply-only, design-build and complete installation are all available, and the new unit’s records start the clean history that a future interval extension depends on.

Boiler repair across Louisiana’s industrial regions

Boiler repair across Louisiana follows the shape of its industry: refineries and chemical complexes on the Mississippi, LNG and petrochemicals in the southwest, sugar factories in Acadiana, and institutional heating plants in every city. EIA counted 15 operable refineries in Louisiana on January 1, 2026, with about 3.0 million barrels per calendar day of crude distillation capacity, second among the states after Texas.

Baton Rouge and the river parishes

Boiler repair in Baton Rouge and along the river from Ascension and Iberville down through St. James, St. John the Baptist and St. Charles parishes is dominated by large watertube boilers, heat recovery steam generators and package boilers feeding process headers. Most of those units sit on the continuous-process interval, so repairs are scoped months ahead around the turnaround, and Paul Industries plans the retube, header or burner work so the internal inspection, the repair and the inspector’s acceptance land in the same shutdown.

New Orleans, Jefferson Parish and the lower river

Boiler repair in New Orleans has its own inspection path: the city’s boiler inspectors serve as special inspectors for every boiler inside city limits, owners there pay no state inspection fees, and the state installation permit requirement excepts the city (R.S. 23:535 and 544). Hospitals, hotels, universities and office towers make up much of the heating and hot water boiler population in Orleans and Jefferson parishes, while Plaquemines and lower St. Bernard add refinery and LNG steam.

Lake Charles, Calcasieu and Cameron parishes

Southwest Louisiana combines refining and petrochemical steam around Lake Charles with LNG export terminals in Cameron Parish; EIA lists Sabine Pass, Cameron and Calcasieu Pass in commercial operation. Utility boilers and steam systems at those sites support amine regeneration, fuel gas conditioning and building heat, and they face the same salt air and storm exposure as the process equipment around them.

Lafayette, Acadiana and the sugar belt

Louisiana’s sugarcane is processed in 11 factories, according to the American Sugar Cane League, and their boilers run hard through the harvest and sit through the rest of the year. Off-season is when Paul Industries opens those boilers for tube replacement, refractory and grate work, so they are inspected, repaired and accepted before the next crop arrives.

Houma, Thibodaux and the bayou parishes

Terrebonne and Lafourche parishes carry fabrication yards, seafood plants and the support base for offshore work, with smaller industrial boilers and steam generators that see heavy salt and moisture exposure.

Shreveport, Bossier City, Monroe and north Louisiana

North Louisiana’s boiler population is weighted toward hospitals, universities, government buildings and manufacturing plants, many with heating and hot water boilers on the two-year cycle and a smaller number of power boilers on the annual one.

Returning boilers to service after a Louisiana hurricane

Hurricane recovery is part of boiler repair in coastal Louisiana: Hurricane Ida made landfall at Port Fourchon on August 29, 2021 as a category 4 storm with 130-knot winds, and the National Hurricane Center rates it tied with Laura in 2020 and the Last Island hurricane of 1856 as the strongest landfalls on record in Louisiana west of the mouth of the Mississippi. Ida’s eye crossed southeastern Louisiana between Houma and New Orleans, an area thick with industrial and institutional boilers.

Flooded boilers need more than a dry-out. Burner management systems, flame safeguards, low water cutoffs and motor starters that have been under water are replaced rather than dried and reused, refractory soaked with brackish water is inspected for spalling and salt, and casings and stacks are checked for wind damage and blockage. Where a boiler has suffered an accident, the owner sends the chief inspector a detailed report within seven calendar days, and any personal injury or explosion is reported within 12 hours, with the boiler left undisturbed until the chief inspector allows otherwise, except to save life or limit further damage (LAC 55:V.5070). An inspector who finds a boiler presents an imminent hazard orders it out of service at once (5068).

Paul Industries builds storm restart plans for Louisiana steam plants before the season: shutdown and lay-up steps, the inspection list after the storm, spare controls to hold, and the order in which boilers, deaerators and feedwater return so the process can follow.

What does boiler repair in Louisiana cost?

Boiler repair in Louisiana costs what the failure, the boiler type, the access and the outage window make it, so a firm price follows inspection; the state’s own fees are fixed by statute and shown below for planning. Owners whose boilers are inspected by an insurance company’s special inspector, or by the city of New Orleans, are exempt from the state inspection fees (R.S. 23:535).

Louisiana boiler certificate and inspection fees (R.S. 23:537, 541 and 544)
ItemState feeBasis
Inspection certificate$20Valid up to 14 months
Certificate for an extended internal interval$40Extension under R.S. 23:536(B); inspection fees doubled
Certificate for a continuous-process boiler$200Valid up to five years
Heating boiler inspection$35Per inspection
Power boiler, over 1,000 sq ft heating surface$70 external, $150 internalPer inspection
Power boiler, 100 sq ft or less$20 external, $50 internalPer inspection
Electric boiler$30 external, $50 internalPer inspection
Installation, moving or reinstallation permit$25Outside New Orleans

Inspection fees unpaid after 30 days carry a 25 percent penalty. The repair itself is driven by the number of tubes, the extent of refractory, whether the work is a repair or an alteration, scaffolding and access inside the setting, how much nondestructive examination the method needs, temporary steam during the outage, and whether parts are in stock for an older boiler. Paul Industries gives a budget range from comparable work at the first conversation and a firm price once the boiler has been opened and seen.

Who provides boiler repair in Louisiana?

Paul Industries provides boiler repair in Louisiana as an East Coast contractor headquartered at 256 Shore Drive in Kilmarnock, Virginia, taking boiler work across the state, in all 50 states and at plants outside the United States. Plants looking for a boiler company in Louisiana that carries the whole job under one contract get it from Paul Industries, which repairs, retubes, rebuilds and replaces steam and hot water boilers, heat recovery units, deaerators and feedwater systems, with the welding, piping, controls and records under the same scope. Owners comparing states will find the same approach on the boiler repair in Texas and boiler repair in Florida pages, and at the headquarters state page for boiler repair in Virginia.

Boiler work rarely ends at the boiler. Steam and condensate lines tie into process piping in Louisiana, blowdown and condensate tanks into tank fabrication in Louisiana, and a replacement boiler’s startup into validation and commissioning in Louisiana. Plants that share a utility plant between steam and cooling also use chiller repair in Louisiana, and owners running sites across the region can plan the work through the Gulf Coast page.

Boiler repair in Louisiana from Paul Industries

Paul Industries opens, inspects, repairs, retubes, tests and returns Louisiana boilers to service, from a hospital’s hot water boiler on the two-year cycle to a refinery’s watertube boiler on the five-year turnaround interval. It consults the authorized inspector before welded repairs, makes them under the National Board R program, prepares boilers for internal inspection, supplies and installs replacements, and leaves the records that support the next certificate and any interval extension. The Louisiana page covers Paul Industries’ wider process work in the state. Send the boiler type, pressure, the inspector’s report or the symptoms, and the outage window, and request a quote or call 201-450-8280.

Standards referenced: Louisiana R.S. 23:531 through 23:546 (Regulations affecting boilers) · LAC 55:V, Chapter 50, Boiler Construction, Maintenance, Inspection and General Use · ASME Boiler and Pressure Vessel Code, Sections I, IV, VI and VII · National Board Inspection Code (NBIC) · ASME CSD-1 · NFPA 54 National Fuel Gas Code · Louisiana State Uniform Construction Code (2021 IMC and IFGC) · LAC 33:III, Chapter 5 (LDEQ air permits)

Frequently asked questions

Who handles boiler repair in Baton Rouge and the river parishes?

Paul Industries handles boiler repair in Baton Rouge and the river parishes, from Ascension and Iberville down through St. James, St. John the Baptist and St. Charles. Most power boilers there serve continuous processes, so their internal inspections fall at shutdowns of five days or more, up to five years apart. Paul Industries scopes the repair ahead of the turnaround so the inspection, the repair and the inspector’s acceptance close inside the same window.

Does Paul Industries repair boilers in Lake Charles and Calcasieu Parish?

Yes. Paul Industries repairs boilers in Lake Charles, Sulphur, Westlake and across Calcasieu and Cameron parishes, at refineries, petrochemical plants and LNG terminals. Utility boilers there face salt air and storm exposure, so repairs cover casing, stack and burner corrosion as well as the pressure parts. Send the boiler data and the inspection report, and Paul Industries plans the repair around the plant’s outage schedule.

Who repairs boilers in Shreveport, Bossier City and Monroe?

Paul Industries repairs boilers in Shreveport, Bossier City, Monroe and the rest of north Louisiana, for hospitals, universities, government buildings and manufacturing plants. Many of those are heating and hot water boilers on the state’s two-year certificate cycle, where the repair often follows an inspector’s finding on a low water cutoff, a safety valve or combustion air. Paul Industries corrects the item and documents it for the next inspection.

Who repairs boilers in Houma, Thibodaux and Lafayette?

Paul Industries repairs boilers in Houma, Thibodaux, Lafayette, New Iberia and across Acadiana, including fabrication yards, seafood plants and the sugar factories that grind cane through the harvest. Sugar factory boilers are best opened in the off-season, when tube, grate and refractory work can be inspected, repaired and accepted before the next crop. Coastal units also get a storm-readiness review of controls and electrical gear.

What is the Louisiana boiler law?

The Louisiana boiler law is Part III of Title 23, Chapter 5 of the Revised Statutes, R.S. 23:531 through 546. It gives the Office of State Fire Marshal exclusive rulemaking power over boilers, sets certificate inspection intervals, fees and exemptions, and requires installers to hold a license and a permit. The Fire Marshal’s rules under it are in LAC 55:V, Chapter 50. Paul Industries works every Louisiana boiler repair to both.

What does the Louisiana Boiler Construction Code mean?

The Louisiana Boiler Construction Code is the name LAC 55:V.5003 gives to the ASME Boiler and Pressure Vessel Code, including addenda and code cases, as adopted by the Fire Marshal. When the rules refer to the Louisiana boiler code, they mean ASME construction rules plus National Board registration. A repair or replacement that keeps a boiler inside that code is what the state inspector accepts.

Does installing a boiler require a Louisiana boiler license?

Installing, moving or reinstalling a power, steam heating or hot water heating boiler requires a firm license from the State Fire Marshal under R.S. 23:543, issued after a written examination, plus a permit from the chief boiler inspector before the work under R.S. 23:544. The city of New Orleans is excepted from the state permit. Paul Industries plans the permit, the installation and the first inspection as one sequence.

Where is a Louisiana boiler certificate posted, and how long does it last?

The inspection certificate is posted under glass in the room that contains the boiler, and it states the maximum pressure the boiler may carry. A standard certificate is valid for no more than 14 months. A boiler serving a continuous process can hold a certificate valid up to five years, and an approved extension of the internal interval produces a new certificate for the extended period (R.S. 23:537).

Does the State Fire Marshal inspect commercial water heaters?

Commercial potable water boilers of 120 gallons or more, or 200,000 Btu or more, fall under the boiler law; smaller ones are exempt under R.S. 23:540. Covered units get an external certificate inspection every two years, including the function of every control and safety device. Hotels, hospitals and laundries with large storage water heaters often find their units on the state cycle, and Paul Industries repairs and replaces them to that standard.

Can a Louisiana boiler with a lap seam crack be repaired?

A lap seam crack along a longitudinal riveted joint condemns the shell or drum under LAC 55:V.5062, and patching is prohibited. Older riveted boilers that show one leave service. Paul Industries removes the condemned boiler, supplies and installs a replacement to the ASME code, and handles the permit, setting and first inspection, so the plant returns to steam on a boiler with a clean record.

How quickly must a boiler explosion or injury be reported in Louisiana?

Notice of a boiler accident involving personal injury or an explosion goes to the chief inspector within 12 hours, and a detailed written report of any boiler accident is due within seven calendar days (LAC 55:V.5070). The boiler and its parts stay undisturbed until the chief inspector gives permission, except to save life or limit further damage. Paul Industries begins the repair once the inspector releases the boiler.

Can a power boiler run unattended in Louisiana?

A power boiler in active service may be left unattended longer than its water level takes to fall from normal to unsafe only when it has an audible alarm and two independently connected low water devices that need manual reset, or when an attendant checks it at least every 120 minutes (LAC 55:V.5083). Automatic controls are checked at the start of every shift. Paul Industries installs and tests the second cutoff and alarm.

Do heat recovery units in a chemical plant need a state boiler certificate?

Evaporators, heat exchangers and vessels that generate steam from the heat of a chemical or petroleum processing system are exempted from jurisdictional inspection by the definitions in LAC 55:V.5003. They remain within the plant’s mechanical integrity program, which still expects documented code repairs. Paul Industries repairs them to the same National Board methods used on certificated boilers, so the records satisfy the plant’s inspectors.

What is a Louisiana Special boiler?

A Louisiana Special is a boiler approved by the chief inspector when a valid impediment keeps it from carrying the required ASME and National Board stamping (LAC 55:V.5006). The owner submits construction details, material specifications and calculations approved by a registered professional engineer experienced in boiler design, in English and US customary units, and approval comes before construction begins.

Does an insurance company inspection replace the state inspection in Louisiana?

Boilers inspected by an insurance company’s special inspector are inspected by that inspector instead of a state deputy, and their owners are exempt from the state inspection fees (R.S. 23:535). The insurer files each annual internal report with the Fire Marshal within 30 days. A certificate issued on a special inspector’s inspection lapses if the insurance ends, so a change of carrier needs planning.

Can boiler blowdown go to a sanitary sewer in Louisiana?

Blowdown that enters a sanitary sewer, or that would endanger people or property, passes through blowoff equipment that brings it down to no more than 5 psi and 150 degrees Fahrenheit (LAC 55:V.5073). The equipment needs openings for cleaning and inspection and follows National Board blowoff recommendations. Paul Industries sizes and installs blowoff tanks and aftercoolers when a boiler change or inspector finding calls for one.

How often is a boiler inspected in a Louisiana hospital or school?

Heating boilers in hospitals and schools get a certificate inspection every two years. Steam heating boilers are opened internally every two years where construction permits, and hot water heating and supply boilers get an external every two years with an internal every six years. A hospital running high-pressure steam for sterilizers is on the annual power boiler cycle instead.

What state fees come with a Louisiana boiler inspection?

The certificate costs $20, or $200 for a five-year continuous-process certificate. Inspection fees run $35 for a heating boiler and, for power boilers, from $20 external and $50 internal up to $70 and $150 above 1,000 square feet of heating surface. A permit to install or move a boiler is $25. Paul Industries prices the repair after inspection, with a budget range first.

Is a Louisiana boiler down or due for repair?

Send the boiler type, pressure, the inspector’s report or symptoms and the outage window you are working to. Call 201-450-8280 or request a quote.