Paul Industries provides boiler repair in Minnesota for plants, hospitals, campuses and commercial buildings, repairing firetube, watertube, cast iron and electric boilers and documenting every pressure part repair for the Department of Labor and Industry or the insurer’s inspector. Minnesota writes its boiler law into Minnesota Statutes chapter 326B and Minnesota Rules chapter 5225, so a repair here carries state notice, inspection and licensing steps that shape the outage as much as the tubes do. Paul Industries is headquartered at 256 Shore Drive, Kilmarnock, Virginia, and takes boiler work across Minnesota and in all 50 states.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
Boiler inspections At least annually after the initial inspection (Minn. Stat. 326B.958)
Welded repairs Prior notice to the Chief Boiler Inspector or insurer; R-1 report (Minn. R. 5225.2600)
State fees $55 annual boiler inspection, $25 yearly registration (Minn. Stat. 326B.986)
Winter design reality Minneapolis January normal low 9 F (NOAA, 1991 to 2020)
Reviewed November 2026

Boiler repair in Minnesota starts with chapter 326B

Boiler repair in Minnesota is governed by sections 326B.95 to 326B.998 of the Minnesota Statutes and by chapter 5225 of the Minnesota Rules, which together set inspection intervals, registration, operator licensing and the standard every welded repair must meet. Section 326B.964 adopts the current ASME Boiler and Pressure Vessel Code, the National Board Inspection Code (NBIC) and NFPA 85 as the engineering standards for boilers in the state, so in practice the Minnesota boiler code is those national documents plus chapter 5225, and section 326B.966 makes the current NBIC and the department’s rules the standard for repairs.

Those two sections decide what a repair crew may do without involving anyone else and what must wait for an inspector. Replacing a burner gasket, a level control or a feedwater pump seal is maintenance. Cutting out and rewelding a tube, plugging tubes in a watertube boiler, patching a shell, replacing a safety valve with one of a different set pressure or changing the fuel train are repairs or alterations in the NBIC sense, and Minnesota attaches notice and inspection steps to them. The national picture of methods and failure modes sits on the boiler repair service page; this page covers what is particular to the Minnesota boiler laws and to the plants and buildings that run boilers here.

The statute draws its first line between high-pressure and low-pressure boilers. Section 326B.95 defines a high-pressure boiler as one making steam above 15 psig, or a water boiler above 160 psig or 250 degrees Fahrenheit, and everything below those limits is low pressure. The line decides which operator license grade the plant needs, how closely a running boiler must be attended, and which ASME section the repair is measured against: Section I for power boilers, Section IV for heating boilers.

Which boilers does section 326B.988 take out of the state program?

Section 326B.988 lists the boilers and vessels that fall outside the Minnesota inspection program, and checking a unit against it is the first step before a repair is planned. An exempt boiler still needs a sound repair to the manufacturer’s data and the applicable ASME section, but it does not carry state notice, registration or a state inspection afterward.

Common boiler exemptions under Minn. Stat. 326B.988 and how a repair is handled
EquipmentExemption limitHow the repair is handled
Hot water heating and other hot liquid boilersHeat input of 750,000 Btu per hour or lessRepaired to the manufacturer’s data and ASME Section IV; no state inspection follows
Hot water supply boilers and potable water heaters200,000 Btu per hour or less, or a water heater of 120 gallons or lessTreated as building service equipment; relief valve and controls checked at each visit
Small steam generators, kettles, cookers and sterilizers100,000 Btu per hour, 25 kW and 15 psig or lessNo engineer license or annual state inspection; the vessel and its relief device are still checked
Electric boilers50 psig, 30 kW or three horsepower or lessInspected as pressure vessels on the two-year cycle; no engineer license to operate
Hot water boilers vented directly to the atmosphereAny sizeOutside the program; the vent and controls are verified after the repair
Boilers in residences of up to five familiesAny sizeOutside the program

Everything above those limits is inspected, which captures most industrial steam boilers, hospital and campus heating plants, and the larger hot water plants in office towers and schools. An electric boiler Minnesota owners use for a clean steam generator or a process heater is a common gray area: below 50 psig and 30 kilowatts it is inspected as a pressure vessel; above either limit it is a boiler with an annual inspection and an operator license requirement.

Annual, 24-month or insurer inspection: which schedule applies to your boiler?

Minnesota boiler inspection requirements start with section 326B.958: the owner of a boiler must have it inspected at least annually after its initial inspection, and the owner of a pressure vessel at least every two years. The installer of a new boiler must have it inspected after installation and before it is placed in operation, and pays the fee for that first visit. People asking how often should boilers be inspected in Minnesota get a single answer for most plants: every year, internally and externally, unless the boiler qualifies for the longer interval described below.

A boiler carried on an insurance policy is inspected by the insurance company’s commissioned inspector rather than by a state inspector. Section 326B.99 requires the insurer to inspect each boiler it covers and file the report with the commissioner within 21 days, annually for boilers and every two years for vessels, and the covered object is then exempt from department inspection apart from the initial one. Either way, the inspector who finds a defect writes it to the owner, and section 326B.958 forbids operating an unsafe boiler until the defect has been corrected and verified by the inspector. That written finding is where many Minnesota repair jobs begin.

Minnesota boiler inspection and registration requirements by situation
SituationRequirementSource
New boiler installedInspected after installation and before operation; installer pays; identification tag attachedMinn. Stat. 326B.958, subd. 1 and 1a
Boiler in serviceInternal and external inspection at least annuallyMinn. Stat. 326B.958, subd. 1
Qualifying boiler, 200,000 lb/h or more with approved water treatmentInternal inspection at least every 24 months, external under pressure at least every 18 monthsMinn. Stat. 326B.96, subd. 2
Boiler covered by an insurance policyInsurer’s inspector reports within 21 days; department inspection limited to the initial oneMinn. Stat. 326B.99
Every inspected boilerRegistered at the initial inspection and renewed each year; certificate of registration lists the last inspection date and maximum allowable working pressureMinn. Stat. 326B.958, subd. 2 and 3
Any inspection visitBoiler prepared for inspection with at least 48 hours’ notice to the inspectorMinn. R. 5225.2200
Boiler retired from serviceRemoved from the records on a commissioned inspector’s report, isolated by a means other than a valveMinn. R. 5225.2200, subp. 5

The sticker the inspector attaches is the certificate of inspection; it shows the month and year and the inspection agency, and the electronic certificate of registration shows the same boiler’s last inspection date and maximum allowable working pressure. Paul Industries reads both before quoting, because a boiler whose certificate is near its due date is better repaired and reinspected in one outage than opened twice.

Who must be told before a welded boiler repair in Minnesota?

A welded or riveted repair to the pressure parts of a Minnesota boiler, or any alteration, requires the owner to notify the Chief Boiler Inspector first, or the insurer where an insurance policy covers the boiler, under Minnesota Rules part 5225.2600. The authorized inspector reviews the repair, accepts or rejects any calculation of the safe working pressure, and inspects the finished work. The same part requires that welded repairs and alterations be made under the National Board R program, with a current Repair Certificate of Authorization, and that alterations comply with the NBIC and the ASME section the boiler was built to.

The National Board R-1 form, the Report of Welded Repair or Alteration, is required for every welded repair that is not routine and for every alteration, and a copy goes to the state’s boiler division. Where a welded repair is routine enough to need no R-1, the rule still requires written documentation of the repair and its test results to reach the chief boiler inspector and the owner. Paul Industries plans each Minnesota pressure part repair around those steps: the inspector is consulted before the boiler is opened, the weld procedure and the material records are ready for review, and the hydrostatic test is scheduled for a time the inspector can witness it.

Section 326B.994 adds the construction side: nobody may build a boiler, boiler piping or a pressure vessel below the ASME Code and department rules, and anyone who repairs one by welding or riveting must meet the current NBIC. Boiler external piping and the piping up to the first stop valve are part of the inspected object under part 5225.2200, so a weld on a steam header nozzle is treated with the same care as a weld on a tube sheet. Larger piping changes beyond the boiler are covered on the process piping in Minnesota page, and field welding practice on the industrial welding services in Minnesota page.

Minnesota boiler license classifications and attendance during an outage

Minnesota requires every person who operates a boiler to hold a Minnesota boiler license for the grade that covers that boiler, under section 326B.972, and the license grade sets who may run the plant while one unit is down for repair. Each applicant must pass the Minnesota boiler license exam that the commissioner develops and administers, and the chief engineer grades carry experience requirements sworn under oath.

Minnesota boiler license classifications under Minn. Stat. 326B.978
License classGradesWhat the grade covers
Chief engineerA, B and CTakes charge of a boiler plant; Grade A adds engines and turbines, Grade C is limited to low-pressure boilers; five years of operating experience sworn under oath
First class engineerA, B and CTakes charge of boilers of not more than 500 horsepower, or works as a shift engineer in a plant of unlimited horsepower; three years of experience
Second class engineerA, B and COperates boilers within the limits of the grade under the plant’s chief or first class engineer
Special engineerOne classEntry level license for smaller boilers, under the fee schedule in 326B.986
Provisional licenseOne plant onlyLets an employee operate boilers over 500 horsepower at a single plant with a designated chief engineer; valid 36 months

Minnesota boiler operator requirements also govern attendance. Minnesota Rules part 5225.1180 requires a high-pressure plant of up to 50 horsepower to be observed at least once every 24 hours, allows a plant of 51 to 500 horsepower to run unattended for no more than two consecutive hours, and requires constant attendance at a plant over 500 horsepower, with a short absence allowed where every boiler has dual pressure controls and dual low-water fuel cutoffs. Part 5225.1110 requires a logbook in the boiler room recording when each check was made, who made it and what was checked.

Repairs change those obligations in practice. A boiler opened for repair is out of the attendance count, but a temporary or rental boiler brought in to carry the load is in it, and the remaining units may run at higher firing rates than usual. Paul Industries sets the repair schedule with the plant’s chief engineer so that attendance, logbook entries and the operating crew’s shifts match the plant as it will actually run during the outage. If an inspector finds a boiler run by an unlicensed person, section 326B.958 stops operation until every operator holds the proper license, with a discretionary allowance of up to 30 days.

When can a boiler come down during a Minnesota heating season?

Minnesota winters decide when a boiler can come down: Minneapolis averages a January high of 24 degrees Fahrenheit and a low of 9, and the low reaches zero or below on about 10 January nights (NOAA normals, 1991 to 2020). A heating plant that loses a boiler on one of those nights has hours, not days, before pipes in air handlers and outdoor coils are at risk, and a hospital or a dairy cannot ride out the loss.

Planned repairs on heating plants therefore move to the shoulder months and the summer, and winter work is planned around redundancy. Before a boiler is isolated in winter, Paul Industries confirms that the remaining boilers can carry the design load with one unit out, checks the condition of their low-water cutoffs and flame safeguards, and arranges a temporary boiler where the margin is thin. Minnesota Rules part 5225.2400 requires a used boiler to be inspected by a commissioned inspector before it is relocated or changes ownership, so a rental unit’s inspection status is confirmed before it arrives, along with its fuel, feedwater and condensate connections.

Cold weather also causes its own failures. Condensate lines that freeze split and send returns to drain, so a boiler suddenly runs on cold makeup water; feedwater that drops in temperature carries more dissolved oxygen into the drum; outdoor combustion air dampers that ice shut starve a burner; and flue gas condensing in a cold stack corrodes breechings and economizers. Paul Industries treats those as root causes, not just symptoms, and pairs the boiler repair with work on steam traps and condensate return, and with boiler water treatment where oxygen pitting or scale shows in the tubes.

Boiler repair across Minnesota: Twin Cities to the Iron Range

Boiler repair across Minnesota spans the Twin Cities commercial and institutional core, the medical and food processing towns of southern Minnesota, the refineries of Dakota and Washington counties, and the mines and mills of the north. Each region brings a different boiler population and a different outage window.

Minnesota regions, the boilers they run and how repairs are planned
RegionTypical boiler plantsRepair planning emphasis
Minneapolis and Saint PaulOffice towers, hospitals, universities and government buildings with steam or hot water heatingShoulder-season outages, redundancy checks, operator license coverage during rental boiler use
Northern suburbs and Fridley; Plymouth and Maple GroveMedical device plants with process steam, humidification and clean steam generatorsRepairs timed to production shutdowns, records for the plant’s quality system
Rosemount and St. Paul ParkRefinery and petrochemical steam plants, waste heat boilersTurnaround windows, larger watertube units, qualifying boiler intervals where approved
Rochester, Austin and southern MinnesotaHospital central plants, meat, dairy and grain processing steam boilersContinuous steam demand, washdown and sanitation loads, condensate return problems
Mankato, Willmar and southwestern MinnesotaFood and feed plants, and fuel ethanol plants from Lake Crystal and Janesville to Atwater, Benson and MarshallHigh steam loads for cooking and distillation, planned outages between production runs
St. Cloud and central MinnesotaManufacturing, hospitals and campus heating plantsWinter redundancy, burner and control upgrades
Duluth, the Iron Range and MoorheadTaconite processing, manufacturing and institutional heatingLongest heating seasons, freeze protection, outdoor and unheated equipment

Commercial boiler repair Minneapolis buildings depend on

Office, hospital and campus buildings in Minneapolis and Saint Paul tend to run packaged firetube or watertube boilers serving steam or hot water loops, with burners and controls that have been upgraded several times over the life of the boiler. Boiler maintenance Minneapolis owners schedule in summer usually covers the annual internal inspection opening, tube cleaning, low-water cutoff blowdown and testing, safety valve checks and combustion tuning. When a boiler’s tubes, refractory and controls are all near the end of their life, the repair estimate is set beside a boiler replacement Minneapolis owners can stage in a summer, with the new unit inspected before it carries the building into winter.

Process and plant boilers in greater Minnesota

Plant boilers outside the metro area carry production loads rather than comfort loads. Minnesota had 18 fuel ethanol plants with 1,457 million gallons a year of capacity at the start of 2025 (EIA), each using steam for cooking and distillation, and food and meat processing plants across the south use steam for cooking, sanitation and rendering. Repairs there follow the production calendar, and a planned repair is usually cheaper than an emergency one because spare tubes, gaskets and refractory can be on hand when the boiler opens.

Qualifying boilers and owner repair programs at large Minnesota plants

Large Minnesota steam plants can earn a longer inspection interval under section 326B.96, which defines a qualifying boiler as one of 200,000 pounds per hour or more with an internal continuous water treatment program approved by the department. A qualifying boiler is inspected internally and externally while not under pressure at least every 24 months, and externally under pressure at least every 18 months, rather than every year.

The longer interval comes with records. The owner must log every period the boiler is out of service and why, and keep laboratory analyses of boiler water taken at intervals of not more than 48 hours of operation, and an inspector who finds substantial deficiencies can return the boiler to a 12-month cycle. For repairs, the longer interval raises the stakes of each outage: tube failures found at a 24-month opening have had twice as long to develop, so Paul Industries brings tube inspection, thickness readings and spare material planning into the same window. Minnesota Rules part 5225.2610 also lets an owner of a boiler over 200,000 pounds per hour of steam perform certain boiler and safety relief valve repairs under a written repair program approved by the department; Paul Industries works within such a program where a plant has one, and handles the repairs that fall outside it.

How much do Minnesota boiler repairs and state fees cost?

The cost of a Minnesota boiler repair is set mostly by the repair itself and the outage it needs, with the state’s own charges a small part of the total. Section 326B.986 sets a $55 fee for an annual boiler inspection, $35 for a pressure vessel inspection, $80 an hour for inspections not priced elsewhere, which includes witnessing a hydrostatic test, a $25 yearly registration fee per boiler or vessel and a $100 late fee on an unpaid invoice.

The repair price is driven by the scope the inspection or failure reveals: the number and length of tubes and how they are reached, refractory and casing work, burner and fuel train parts, nondestructive examination to prove a defect is gone, the hydrostatic test, insulation and lagging, and the documentation. Outage cost often exceeds repair cost, which is why temporary steam or heat, operator coverage for a rental boiler and overtime to finish before a cold snap belong in the estimate. Public projects add one more line: section 177.43 requires contracts for state projects to state the prevailing wage rates and hours, and those rates apply to the field labor. Paul Industries gives a budget range from comparable scope once it has the nameplate data, the latest inspection report and photographs, then a firm price once the boiler is open and the scope is fixed.

Who repairs boilers in Minnesota?

Paul Industries repairs boilers in Minnesota, from packaged firetube and cast iron heating boilers in commercial buildings to watertube power and process boilers at refineries, food plants, medical device manufacturers and ethanol plants. Paul diagnoses trips and leaks, replaces and plugs tubes, retubes firetube boilers, rebuilds burners and fuel trains, repairs refractory, replaces safety valves, low-water cutoffs and flame safeguards, tests controls to ASME CSD-1, and installs replacement boilers with their piping and controls.

The same contract covers the paperwork that a Minnesota repair generates: the notice before a welded repair, the R-1 or written repair documentation, hydrostatic test records, updated drawings and a repair report the chief engineer can file with the logbook. Owners who run a boiler service Minnesota plants can rely on year after year get scheduled inspections opened and closed by one team, with findings repaired in the same outage. As a steam boiler repair service, Paul Industries also covers the deaerator, feedwater pumps, condensate return and steam distribution that so often cause the boiler’s problems, along with pressure vessel fabrication in Minnesota for receivers, blowdown tanks and deaerator vessels that need replacement. Chilled water plants that share a central plant with the boilers are covered on the chiller repair in Minnesota page.

Paul Industries is headquartered in Kilmarnock, Virginia, where it repairs boilers across its home state (see boiler repair in Virginia); it was formerly based in northern New Jersey, then Pennsylvania, and its boiler repair in Pennsylvania and boiler repair in New York pages describe the rules in those states. Minnesota work sits within the same East Coast contract structure that covers the Midwest and all 50 states.

Boiler repair from Paul Industries for Minnesota owners

Paul Industries repairs, rebuilds, retubes and replaces boilers for Minnesota owners, supplies replacement boilers and parts on a supply-only basis, and takes design-build and complete installation scopes for boiler plant upgrades. Every pressure part repair is planned around the Minnesota notice, inspection and documentation steps, and every outage around the weather and the plant’s operator coverage. For plant-wide context, see the Minnesota page. To plan a repair, send the nameplate data, the latest inspection report or insurer finding, the fault history and photographs, and request a quote.

Standards referenced: Minnesota Statutes 326B.95 to 326B.998 · Minnesota Rules chapter 5225 · ASME Boiler and Pressure Vessel Code Sections I, IV, VI and VII · ASME CSD-1 · National Board Inspection Code · NFPA 85 · Minnesota Statutes 177.43

Frequently asked questions

Who handles boiler repair for hospitals and plants in Rochester and southern Minnesota?

Paul Industries repairs boilers for hospital central plants, meat and dairy processors and grain plants in Rochester, Austin, Owatonna, Albert Lea and the rest of southern Minnesota. Those plants run steam for sterilization, sanitation and cooking around the clock, so repairs are staged one boiler at a time with the remaining capacity confirmed first. Paul handles the tube, burner and control repairs, the notice to the inspector before welded work and the hydrostatic test afterward.

Who repairs boilers in Duluth, on the Iron Range and in Moorhead?

Paul Industries repairs boilers in Duluth, Hibbing, Eveleth, Grand Rapids, the rest of the Iron Range and in Moorhead, at taconite processing plants, hospitals, schools and manufacturing plants. Northern Minnesota has the longest heating season in the state, so planned outages move to June through August and winter repairs depend on redundancy and temporary heat. Freeze damage to condensate lines, feedwater systems and outdoor equipment is a frequent part of the scope.

Who provides boiler service in St. Cloud, Mankato and Willmar?

Paul Industries provides scheduled boiler service and repair in St. Cloud, Mankato, Willmar and the farm and ethanol towns of western and central Minnesota. Service visits cover the annual inspection opening, low-water cutoff and safety valve testing, combustion tuning and water treatment review, and findings are repaired in the same outage where possible. Ethanol and feed plants with steam-driven processes are scheduled between production runs.

How often should a steam boiler be serviced in a Minnesota plant?

A steam boiler should get daily checks and logbook entries from its operating engineer, low-water cutoff testing on the manufacturer’s schedule, a combustion and controls check at least once a year, and an annual internal inspection opening to match the state’s inspection cycle. Plants with long heating seasons often add a fall startup service before the first cold weeks, so burner, refractory and condensate problems are found before the boilers are needed most.

Does a Minnesota boiler covered by insurance still get a state inspection?

A boiler covered by an insurance policy gets its initial inspection from the department, then periodic inspections from the insurance company’s commissioned inspector instead of the state. Section 326B.99 requires the insurer to inspect each covered boiler annually and file the report with the commissioner within 21 days. The exemption holds while the policy stays in force, stays on the inspection schedule and the owner keeps an unexpired certificate of registration.

Who is the Minnesota state boiler inspector for a plant without boiler insurance?

Boilers without insurance coverage are inspected by the Department of Labor and Industry. Section 326B.95 defines a Minnesota state boiler inspector as a National Board commissioned inspector holding a current Minnesota certificate of competency and a current chief grade A boiler operator’s license. Boilers under an insurance policy are inspected by the insurer’s commissioned inspector, who also holds a Minnesota certificate of competency.

Can a repaired boiler run above the pressure on its data plate in Minnesota?

Running a boiler or pressure vessel above the pressure on its data plate is a gross misdemeanor under section 326B.998. Raising a boiler’s allowable pressure is an alteration under the NBIC, which needs calculations accepted by the authorized inspector, notice before the work and an updated nameplate. Paul Industries treats any request for more pressure as a rerating project, not a setting change.

Which hot water boilers fall below the Minnesota inspection threshold?

Hot water heating and other hot liquid boilers with a heat input of 750,000 Btu per hour or less are outside the program under section 326B.988, as are hot water supply boilers up to 200,000 Btu per hour and hot water boilers vented directly to the atmosphere. Larger hot water boilers in schools, offices and plants are registered and inspected every year, so their pressure part repairs go through the inspector.

Is an electric boiler in Minnesota inspected as a boiler or as a pressure vessel?

An electric boiler of 50 psig or less and 30 kilowatts or three horsepower or less is inspected as a pressure vessel, on the two-year cycle, and needs no engineer license to operate. Larger electric boilers are inspected every year and need an operator holding the right license grade. Repairs to elements, contactors and controls are electrical work, while repairs to the pressure vessel follow the same notice and inspection steps as any other boiler.

What happens if an inspector finds an unlicensed operator at a Minnesota boiler?

Section 326B.958 requires operation to stop until every operator holds the proper license under section 326B.978, although the inspector can allow continued operation for a set period of up to 30 days where circumstances warrant it. During a repair outage, when shifts change and a rental boiler adds equipment to the plant, the operating roster deserves a check against the plant’s horsepower and pressure before the work starts.

What does the inspection sticker on a Minnesota boiler show?

The sticker is the certificate of inspection. It shows the month and year of the inspection and the name of the inspection agency, and it is attached when the boiler meets the inspection standards. A newly installed boiler also receives a tag with a unique identification number. The certificate of registration, available electronically, lists every registered boiler at the site with its last inspection date and maximum allowable working pressure.

Can a rental boiler be brought into a Minnesota plant during a repair?

Rental boilers are common during Minnesota repairs, especially in winter. Minnesota Rules part 5225.2400 requires a used boiler to be inspected by a commissioned inspector before it is relocated or changes ownership, and the temporary unit needs an operator holding the right license grade, fuel and feedwater connections, and a safe discharge for its blowdown and relief valves. Paul Industries plans the connections so the rental unit and the repaired boiler change over without a cold building.

What records must the owner of a qualifying boiler keep?

Section 326B.96 requires the owner of a qualifying boiler to keep records of the dates and times the boiler is out of service and why, and laboratory analyses of boiler water samples taken at intervals of not more than 48 hours of operation that show corrosive or scale-forming conditions. Those records support the 24-month internal interval, and they help a repair crew find the cause of tube failures before the boiler is closed again.

Does Minnesota adopt NFPA 85 for boiler combustion safety?

Section 326B.964 names NFPA 85, the Boiler and Combustion Systems Hazards Code, together with the ASME Code, the NBIC and Minnesota Rules chapter 5225, as the engineering standards for boilers in Minnesota. Burner management, purge timing, flame safeguards and fuel train safety shutoffs on larger boilers are therefore measured against NFPA 85, and smaller automatically fired boilers against ASME CSD-1.

How is a boiler removed from Minnesota's inspection records?

A boiler leaves the state’s records only when a commissioned inspector reports on the division’s forms that it is permanently out of service and why. Minnesota Rules part 5225.2200 requires the boiler to be isolated from the common header or discharge piping by a means other than a valve, with its electrical and fuel supply disconnected. Putting it back into service needs a new inspection first.

Do Minnesota boiler laws apply to boilers on farms?

Boilers and pressure vessels on farms used solely for agricultural or horticultural purposes are outside the Minnesota program under section 326B.988. Boilers at processing plants, grain elevators, creameries and ethanol plants are commercial or industrial and are inspected, registered and operated by license holders like any other plant boiler.

Have a Minnesota boiler with an inspector's finding or a winter trip?

Send the nameplate data, the latest inspection report or insurer letter, the fault history and photographs of the problem area. Call 201-450-8280 or request a quote.