Paul Industries delivers boiler repair in New Jersey for manufacturing plants, hospitals, universities and commercial buildings, planning every pressure-part repair around N.J.A.C. 12:90, the National Board Inspection Code and the inspector who approves the plan before the first cut. Firetube, watertube, cast iron and electric units are covered, along with burners, controls, low-water cutoffs, relief valves and the annual NJDEP combustion adjustment that many larger burners now need. Tubes, refractory, controls and the state paperwork sit under one contract, from North Jersey to Cape May.
Request a quote or call 201-450-8280
Which New Jersey boiler regulations apply to a repair?
The New Jersey boiler regulations that apply to a repair are the Boiler, Pressure Vessel and Refrigeration Law (N.J.S.A. 34:7-14 and following) and its rules at N.J.A.C. 12:90, administered by the Mechanical Inspection Bureau of Boiler and Pressure Vessel Compliance inside the New Jersey Department of Labor and Workforce Development. The Bureau has inspected boilers since 1913, and the rules it enforces decide which boilers are regulated, how often they are inspected, who may weld on them and who may run them afterwards.
What engineers call the NJ boiler code is really that chapter plus the standards it adopts. High pressure boilers are built to ASME Section I and low pressure heating boilers to ASME Section IV, and once a unit is in service its welded repairs and alterations follow the National Board Inspection Code. A unit falls under state jurisdiction once it has 10 square feet or more of heating surface; in dwellings the line is 10 kilowatts or 40,000 Btu per hour where the building serves six or more families or may house 25 or more people. Almost every commercial and industrial unit in the state is therefore inside the program, and the NJ Boiler and Pressure Vessel Compliance office holds its registration number, inspection history and certificate.
| Class under N.J.A.C. 12:90 | Pressure and temperature | Construction code | Certificate inspection | Who may run it |
|---|---|---|---|---|
| High pressure (power) boiler | Steam or vapor above 15 psig | ASME Section I | Internal and external every year, hydrostatic test where needed | A license holder whenever relief valves are set above 15 psig and the plant exceeds 6 boiler horsepower |
| Low pressure steam heating boiler | Steam at 15 psig or less | ASME Section IV | Internal and external every year | A license holder above 100 horsepower, 499 square feet, 4,000,000 Btu input or 1,000 kW while the building is occupied |
| Hot water heating boiler | Water at 160 psig or less and 250 F or less | ASME Section IV | Internal every 24 months, external every 12 months | Same capacity thresholds as low pressure steam |
| High temperature water boiler | Water above 160 psig or above 250 F | ASME Section I | Internal and external every year | High pressure license class |
New Jersey boiler inspection requirements and the certificate on the wall
NJ boiler inspection requirements call for a complete internal and external inspection of steam and hot water boilers at least once each year, with a hydrostatic test where the inspector considers one necessary, under N.J.A.C. 12:90-4.10. Hot water heating boilers are the exception: internal every 24 months and external every 12. An extra external inspection about six months after the annual one may be ordered when conditions warrant, and an unsafe condition can bring that forward.
The rule also says the boiler must be open, clean, cool and ready for the inspector. That one sentence drives the outage plan for most annual work: draining, cooling on a controlled curve, pulling handhole and manhole covers, washing the waterside and brushing the fireside all happen before the inspector arrives. Paul Industries prepares units that way, so findings on tubes, stays, ligaments and refractory can be repaired inside the same shutdown rather than in a second one.
Once the inspection report is satisfactory, the boiler receives a state certificate whose registration number appears in its upper left corner; the same number is attached to the front of the boiler where it can be plainly seen. The certificate is framed and posted in the boiler room, engine room, engineer’s office or plant office. After the first inspection the owner may use either the State or an insurance company inspector authorized by the Bureau, so a NJ state boiler inspection and an insurance inspection carry equal weight for the certificate. Repair findings flow from either one.
How an inspection finding becomes an NJ boiler repair scope
Inspection findings become the first page of the repair scope. Thinned or pitted tubes, cracked tube ends, bulged furnaces, wasted staybolts, leaking handholes, failed low-water cutoffs and relief valves that weep below set pressure all appear in the inspector’s report, and the certificate follows once they are corrected. Paul Industries prices against those listed items, adds what the opened unit shows, and agrees the repair method with the inspector before welding begins.
What does N.J.A.C. 12:90-4.8 require of a welded boiler repair?
New Jersey’s welded repair rule, section 12:90-4.8 of the state code, requires a welded boiler repair to meet the original construction standard, or one no less stringent, and to follow the National Board Inspection Code, with the repair plan approved by a qualified inspector before work starts and the finished work accepted by that same inspector. The welding itself must be done under a valid National Board or New Jersey repair authorization, and the rule adds a detail many owners miss: holding an ASME construction stamp does not by itself authorize a firm to make repairs.
| Requirement | What the rule says | How Paul Industries plans for it |
|---|---|---|
| Standard of the repair | Original construction standard or an equal one, plus the NBIC | Material, procedure and examination matched to the boiler’s data report |
| Authorization | Valid National Board or New Jersey repair authorization; ASME stamp alone is insufficient | Repair organization and its inspection agency named in the plan the owner signs |
| Plan approval | Qualified inspector approves the repair plan before work begins | Written plan with hold points, issued to the inspector before cutting |
| Acceptance | The same inspector accepts the completed work | Examination results and pressure test scheduled with the inspector present |
| Piping inside the Code boundary | Section I limits on high pressure units; the required stop valve on low pressure heating units | Boundary marked on the drawing so piping repairs are treated correctly |
| Alterations | Design changes need a National Board Alteration Certificate holder, an alteration report and the original data report on file | Rerates and new openings handled as alterations from the start |
| Records | Repair record filed with the Bureau when requested | Repair record, weld map and test record kept with the boiler file |
New Jersey also issues its own “R” repair authorization under N.J.A.C. 12:90-4.9. A firm applies to the Bureau with a New Jersey location and an outside inspection agency, the Bureau and the agency review its quality system together, and welded repairs made under it keep the boiler’s original construction standard valid while the unit stays in New Jersey. National Board authorized organizations are not barred and face no extra qualification, so either authorization satisfies the rule.
Relief valves, low-water cutoffs and the devices around the pressure boundary
Relief valve work is regulated separately: anyone who disassembles, inspects or repairs a pressure relief valve in New Jersey must hold a National Board “VR” authorization or be a registered owner-user inspection organization, under N.J.A.C. 12:90-7.2. Relief devices must be set to discharge at the rated relieving capacity and pressure the ASME Code assigns. Automatically fired hot water boilers above 400,000 Btu per hour need a low-water fuel cutoff designed for hot water service. Paul Industries replaces cutoffs, flame safeguards and relief valves as complete devices, with set pressure, capacity and device data recorded for the next inspection.
NJ boiler license requirements after a repair
NJ boiler license requirements decide who may operate a boiler once the repair is accepted, and they are tied to the equipment rather than to the building. Under N.J.S.A. 34:7-1 and N.J.A.C. 12:90-3, steam equipment with relief devices set above 15 psig and rated above 6 boiler horsepower may not run without a license holder in charge, and low pressure steam or hot water heating plants need one above 100 horsepower, 499 square feet of heating surface, 4,000,000 Btu of input or 1,000 kW while the building is occupied.
| License and seal | Classification under N.J.A.C. 12:90-8.3 | Role around a repair outage |
|---|---|---|
| Black seal | Boiler operator; the low pressure license covers low pressure boilers of any horsepower | Restarts heating plants after the work and keeps the shift log |
| Black seal stamped “in-charge” | Operator in charge of a high pressure boiler | Takes a repaired high pressure unit back into service |
| Blue seal, grade C | Third grade steam engineer; requires the in-charge high pressure license first | Runs steam stationary boiler and prime mover plants at that grade |
| Red seal, grade B | Second grade steam engineer | May be designated chief engineer where several license holders are needed |
| Gold seal, grade A | First grade steam engineer | Top engineer grade for steam stationary plants |
The NJ low pressure boiler license covers low pressure boilers of unlimited horsepower; it is the NJ black seal boiler license without the in-charge stamp, while the NJ high pressure boiler license adds that stamp and opens the engineer grades. Where more than one license holder is needed, management designates a chief engineer under N.J.A.C. 12:90-3.9, and an emergency allows operation without a license holder for no more than 15 days unless the commissioner extends it in writing. Fines for running without one reach $5,000 per day under N.J.S.A. 34:7-6.
The NJ boiler operator requirements matter to a repair for a second reason: the records they create. Low pressure plants must be checked at least twice in every 24 hours, no less than seven hours apart, and plants over 100 horsepower keep a log that every operator on the shift reviews and signs. That log, with blowdown entries, water readings and cutoff tests, is usually the clearest evidence of why a tube overheated or a cutoff failed, and Paul Industries reads it before deciding whether a failure is a pressure-part problem, a controls problem or a water problem.
What must be reported after a boiler incident in New Jersey?
A boiler incident in New Jersey must be reported promptly to the Chief of the Bureau of Boiler and Pressure Vessel Compliance with a detailed written report under N.J.A.C. 12:90-3.11, and where anyone is injured or an explosion occurs, notice goes immediately by telephone, fax or another fast electronic method. The equipment may not be removed or disturbed before the Chief gives permission, except to save life or limit further damage.
That rule shapes the first hours after a failure. Paul Industries isolates fuel, proves the flame out, lets an overheated unit cool on its own, and photographs the gauge glass, water column, cutoff and any distortion before anything moves. Operating logs, the last cutoff test, controller history and water treatment records are collected while memories are fresh. Only after the Bureau has released the unit does the repair plan go to the inspector, along with the call on whether the damaged boiler deserves repair at all. Plants that want those steps agreed in advance can set them up under an emergency repair service agreement.
NJDEP combustion adjustment and air permits during a burner repair
NJDEP’s combustion adjustment rule at section 7:27-19.16 of the state code requires an annual adjustment of industrial, commercial and institutional boilers with a maximum gross heat input of 5 million Btu per hour or more, so a burner repair on those units is usually planned so the adjustment and the repair close together. Units of 20 million Btu per hour and up came under the rule in 2009, those from 10 to 20 million in 2010, and those from 5 to 10 million in 2012.
The adjustment itself has a defined sequence: inspect the burner and clean or replace components, adjust the flame pattern to the manufacturer’s specification, inspect and calibrate the air-to-fuel ratio control, minimize NOx and CO, and measure NOx and CO in parts per million and oxygen in percent both before and after. The report goes to NJDEP electronically within 45 days, and the records are kept for at least five years.
Air permits are the other boundary. Commercial fuel burning equipment with a maximum rated heat input of 1,000,000 Btu per hour or more is a significant source under N.J.A.C. 7:27-8.2, so replacing a burner, changing fuel or swapping in a different boiler is checked against the unit’s permit before parts are ordered. Paul Industries performs the burner and fuel train work, the combustion tuning and the before-and-after readings, and the owner submits a report built from them.
Boiler repair, New Jersey region by region
Boiler repair work across New Jersey answers to one Bureau and one rulebook, but the boiler population changes from region to region. Paul Industries takes repairs in every county and in all 50 states, and plans each outage around the building it serves.
North Jersey: Newark, Jersey City, Paterson, Elizabeth and the Meadowlands
North Jersey carries a dense stock of older steam heating plants in hospitals, schools, municipal buildings and large apartment buildings, alongside process boilers at plants around Newark, Elizabeth and the Meadowlands. Older steam plants bring cracked sections on cast iron units, wasted stays and leaking handholes on firetube boilers, and condensate return problems that start in the building rather than the boiler room. For boiler repair, Jersey City and Hudson County buildings often need the repair staged around tight mechanical rooms, so rigging paths and tube pull clearances are surveyed first.
Central Jersey: New Brunswick, Edison, Princeton and the Route 1 corridor
Central Jersey’s pharmaceutical and research campuses run boilers that feed process steam, clean steam generators, autoclaves and humidification, so a boiler outage is planned with every steam user downstream. Paul Industries carries that downstream scope under the same contract, including CIP and SIP systems in New Jersey and the process piping in New Jersey that connects them, so a tube repair and a clean steam tie-in can share one shutdown.
South Jersey: Trenton, Camden and the Delaware River plants
South Jersey boiler rooms serve food processing, chemical and packaging plants, hospitals and state facilities from Trenton down through Camden and Gloucester counties. Process steam units there often run long seasons with heavy makeup water, which makes waterside deposits, tube overheating and feedwater equipment the recurring repairs, and ties the repair to boiler water treatment and a deaerator check.
Commercial boiler repair: NJ hospitals, campuses and offices
Hospitals, universities and office campuses need heat and steam around the clock in winter, so repairs there are staged one unit at a time with remaining capacity checked against the outdoor design condition for the outage window. Sterilizers, kitchens and humidification are mapped before a steam unit is isolated, and temporary boilers are connected only where the remaining plant cannot carry the load.
Boiler repair or replacement: what a new unit triggers in New Jersey
Choosing boiler repair or replacement in New Jersey changes the paperwork as much as the price, because a new or replacement boiler becomes a new registration. The owner has 30 days to notify the Bureau, and the initial inspection and registration of new or replacement equipment are performed only by the Bureau, not by an insurance inspector.
Boiler replacement, NJ permits and registration
The installation itself falls under the Uniform Construction Code, N.J.A.C. 5:23, which municipal construction officials enforce, and a unit of 1,000,000 Btu per hour or more needs its air permit in order.
Signals that point to a repair or to a new unit
A sound boiler with a repairable fault usually earns its repair. A unit with a cracked tubesheet, repeated tube failures, an obsolete burner that cannot meet its permit after adjustment, or a capacity that no longer matches the load is usually a candidate for replacement. Boiler replacement in NJ then moves through supply, rigging, piping, electrical, controls, startup, combustion setup and the Bureau inspection, and Paul Industries carries each of those steps.
| Factor | Points toward repair | Points toward replacement |
|---|---|---|
| Pressure parts | Isolated tube leaks, handhole gaskets, a single cracked section | Repeated tube failures, cracked tubesheet ligaments, a bulged furnace |
| Burner and emissions | Burner tunes to its permit at the annual adjustment | Burner cannot hold NOx and CO after adjustment, or parts are no longer made |
| Load match | Capacity still fits the plant or building | Oversized unit short-cycling, or new process steam demand beyond rating |
| Inspection history | Clean certificate history with routine findings | The same findings return at each annual inspection |
| Outage tolerance | Repair fits a weekend or planned shutdown | A planned replacement costs less downtime than recurring failures |
What does boiler repair in New Jersey cost?
Boiler repair in New Jersey costs what the scope, the boiler type and the outage window make it cost: tube count and access, refractory, burner and control parts, examination and pressure testing, temporary heat or steam, and night or weekend work in an occupied building all move the number. Paul Industries prepares a budget range from comparable scope once the make, model, inspection report and failure history are in hand, and a firm price once the unit has been opened and the inspector has agreed the method.
State fees are a small, fixed part of the total. Under N.J.A.C. 12:90-4.13, a State annual internal and external inspection costs $160 for 10 to 60 square feet of heating surface, $220 for 60 to 1,000 square feet and $300 above that, an additional external inspection costs $200, and an insurance company’s annual inspection carries a $100 state fee per boiler. Work at a public building also brings the New Jersey Prevailing Wage Act into the price: municipal contracts above $19,375, a threshold set on July 1, 2024, and contracts with other public bodies above $2,000 are covered.
Who provides boiler repair in New Jersey?
Paul Industries provides boiler repair in New Jersey for industrial plants, hospitals, campuses and commercial buildings statewide. The company was formerly based in northern New Jersey and moved through Pennsylvania to its headquarters at 256 Shore Drive, Kilmarnock, Virginia, and it is an East Coast contractor that takes work across New Jersey, in all 50 states and at plants outside the United States through its international projects. For industrial boiler repair, NJ owners get the diagnosis, the inspector-approved repair plan, the welding, testing and restart, and the records the Bureau expects, under one contract.
The national scope of tube, refractory, burner and control repair is set out on the boiler repair page, and the same service in the headquarters state is on boiler repair in Virginia. Pressure tests are run under hydrostatic testing, and vessels sharing the boiler room, such as blowdown tanks and receivers, are covered by pressure vessel fabrication in New Jersey. Welded casing, breeching and support steel work is handled through industrial welding services in New Jersey, and the chilled water side of a combined central plant through chiller repair in New Jersey.
Boiler repair from Paul Industries for New Jersey facilities
Paul Industries repairs, retubes, rebuilds, tunes and replaces firetube, watertube, cast iron and electric boilers across New Jersey, supplies replacement units or installs owner-furnished ones, and offers supply-only, design-build and complete installation routes. Every code repair is planned with the inspector’s approval up front and closed with the inspector’s acceptance, the test record and the repair file. For a wider view of what Paul Industries does in the state, see New Jersey. To start, send the inspection report or failure description and request a quote.
Standards referenced: New Jersey Boiler, Pressure Vessel and Refrigeration Law, N.J.S.A. 34:7-14 and following · N.J.A.C. 12:90 (boilers, pressure vessels and refrigeration) · N.J.A.C. 12:90-4.8 welded repairs and alterations · N.J.A.C. 12:90-8 operator and engineer licenses · National Board Inspection Code (NBIC) · ASME Boiler and Pressure Vessel Code, Section I and Section IV · N.J.A.C. 7:27-19.16 combustion adjustment · N.J.A.C. 7:27-8 air permits · New Jersey Uniform Construction Code, N.J.A.C. 5:23 · New Jersey Prevailing Wage Act
Frequently asked questions
Who handles boiler repair in Newark, Jersey City and the rest of North Jersey?
Paul Industries handles boiler repair in Newark, Jersey City, Paterson, Elizabeth, Hoboken and the Meadowlands towns. Work there is weighted toward older steam heating plants in hospitals, schools and large residential buildings, plus process boilers at industrial sites. Each code repair runs on a plan the inspector approves before work and accepts afterwards, with rigging paths and tube clearances surveyed first in tight mechanical rooms. Call 201-450-8280 or request a quote.
Who repairs boilers in New Brunswick, Edison, Princeton and along the Route 1 corridor?
Paul Industries repairs boilers across Central Jersey, including New Brunswick, Edison, Piscataway, Princeton and the plants and campuses along Route 1. Many of those units feed process steam, clean steam generators, autoclaves and humidifiers, so each outage is planned with every downstream steam user and, where needed, combined with tie-ins on the steam and process piping in the same shutdown.
Does Paul Industries take boiler work in Trenton, Camden and South Jersey?
Yes. Paul Industries takes boiler repair and replacement work in Trenton, Camden, Cherry Hill, Gloucester County, Vineland and the rest of South Jersey. Food, chemical and packaging plants there run process steam through long seasons, so the recurring repairs are waterside deposits, overheated tubes and feedwater equipment, and each repair is paired with a review of water treatment and blowdown so the failure does not return.
What does a code boiler repair NJ inspectors will accept look like?
A code repair New Jersey inspectors accept starts with a written plan the qualified inspector approves before any cutting: the defect, the repair method, materials, welding procedure, examination and the pressure test. The work is done under a National Board or New Jersey repair authorization, examined, tested with the inspector present and accepted by that same inspector. The owner then keeps the repair record, which the Bureau may request at any time.
Can a firm with an ASME construction stamp make a boiler repair in New Jersey?
An ASME construction stamp on its own does not authorize repairs in New Jersey. N.J.A.C. 12:90-4.8 says so directly: repairs require a valid National Board or New Jersey repair authorization, and design changes require a National Board Alteration Certificate. The distinction matters when a manufacturer or vessel shop is asked to weld on a boiler already in service, and Paul Industries sets out the authorization in the repair plan the owner signs.
What is the difference between a repair and an alteration on a New Jersey boiler?
A repair restores a boiler to its original design, such as replacing tubes, welding a crack or renewing a section of furnace. An alteration changes the design: a higher pressure rating, a new or larger nozzle, or a different heating surface. New Jersey requires alterations to be made by a National Board Alteration Certificate holder, with an alteration report and a copy of the original data report filed with the National Board or, for unregistered units, the Bureau.
What do I need ready for a New Jersey boiler inspection after a repair?
The inspector expects the boiler open, clean, cool and ready, which is the wording of N.J.A.C. 12:90-4.10. Handhole and manhole covers are off, the waterside is washed, the fireside brushed and the unit isolated and drained. Repair records, the weld map, examination results and the planned test pressure are on hand. Paul Industries prepares the unit to that standard so the inspector’s visit goes into examination.
Which boilers are under the NJ Bureau of Boiler and Pressure Vessel Compliance?
Boilers with 10 square feet or more of heating surface fall under the Bureau, along with units of 10 kilowatts or 40,000 Btu per hour that serve six or more families or buildings that may house 25 or more people. That covers almost every industrial, institutional and commercial boiler in the state. Water heaters reaching 200,000 Btu per hour, 200 F or 120 gallons are also regulated where they serve similar buildings.
How do I get the NJ high pressure boiler license for a plant operator?
The high pressure license is a black seal license with the in-charge stamp, issued by the Department of Labor after an application, the required experience and an examination under N.J.A.C. 12:90-8. It is needed where steam equipment has relief valves set above 15 psig and exceeds 6 boiler horsepower. Larger steam plants move up through the blue, red and gold seal engineer grades. Paul Industries works alongside the plant’s license holders at every restart.
Does a low pressure heating plant in New Jersey need a license holder on duty?
A low pressure steam or hot water heating plant needs a license holder in charge when it exceeds 100 boiler horsepower, 499 square feet of heating surface, 4,000,000 Btu of input or 1,000 kW and the building is occupied. The black seal license covers low pressure boilers of any horsepower. Operators check the plant at least twice every 24 hours and, above 100 horsepower, keep a signed shift log.
What must be done first after a boiler explosion or low-water failure in New Jersey?
The first step is making the plant safe: shut off fuel, prove the flame out and let the unit cool on its own. The owner reports the occurrence to the Chief of the Bureau, immediately by phone or electronic means if anyone is hurt or there was an explosion, and leaves the equipment undisturbed until the Chief permits otherwise. Paul Industries documents the as-found condition and prepares the repair plan once the unit is released.
Does a burner repair trigger the NJDEP annual combustion adjustment?
The annual adjustment applies to boilers of 5 million Btu per hour gross heat input and up whether or not a repair happens, and a burner repair is usually the right moment to do it. The sequence covers burner cleaning, flame pattern, air-to-fuel ratio control calibration and NOx, CO and oxygen readings before and after. The report reaches NJDEP within 45 days and records stay on file five years.
Who services relief valves on New Jersey boilers?
Relief valve disassembly, inspection and repair in New Jersey must be done by an organization holding a National Board VR authorization or by a registered owner-user inspection organization, under N.J.A.C. 12:90-7.2. Paul Industries removes and reinstalls relief valves, and supplies new valves sized to the ASME relieving capacity, with set pressure and capacity recorded for the next inspection; reconditioning of an existing valve is done under the VR authorization the rule names.
What goes into the boiler replacement cost NJ facility owners budget for?
Replacement cost covers the new boiler, removal of the old one, rigging, piping and electrical connections, controls, the burner and its permit review, startup and combustion setup, and the Bureau inspection and registration. Access through the building, the stack and breeching condition, temporary heat during the changeover and prevailing wage on public work move the total. Paul Industries prepares a budget range from comparable scope, then a firm price after a site survey.
Does a replacement boiler need a construction permit in New Jersey?
A new or replacement boiler installation falls under the Uniform Construction Code, N.J.A.C. 5:23, enforced by the municipal construction official, and separately must be reported to the Bureau within 30 days so the Bureau can inspect and register it. Units of 1,000,000 Btu per hour or more also need their NJDEP air permit status confirmed. Paul Industries assembles the drawings and equipment data each of those reviews needs.
Does New Jersey prevailing wage apply to boiler work at a school or municipal building?
Public boiler work is covered by the New Jersey Prevailing Wage Act once the contract crosses the threshold. For municipalities the threshold has been $19,375 since July 1, 2024; for counties, school boards, utility authorities and other public bodies it is $2,000. Paul Industries prices public work on that basis and provides the payroll records the public owner requires.
What does routine boiler service NJ plants schedule between repairs include?
Boiler service in New Jersey between repairs combines the owner’s statutory duties with good practice: the annual inspection preparation, low-water cutoff and flame safeguard tests, relief valve checks, burner tuning and the NJDEP combustion adjustment where it applies, water treatment review and log review. Paul Industries runs those visits on a schedule agreed with the plant so findings are fixed in planned outages.
Can Paul Industries supply the boiler and install it as well as repair the old one?
Yes. Paul Industries supplies new boilers, installs owner-furnished units or delivers the whole plant on a design-build basis, including burners, controls, feedwater and condensate equipment, piping, startup and the Bureau inspection. Keeping the repair diagnosis and the replacement under one contractor means the findings that justified replacement also set the scope of the new installation.
Boiler down or facing an inspection finding in New Jersey?
Send the boiler make, model and size, the latest inspection report or failure description, and the outage window you can work with. Call 201-450-8280 or request a quote.
