Paul Industries is a data center mechanical contractor in Nebraska, building central chiller plants, campus chilled water and condenser water loops, liquid cooling piping, generator fuel systems and prefabricated pipe racks for data centers in Omaha, Papillion, Lincoln and across the state. A Nebraska campus is shaped by public power and its large-load rules, by water that natural resources districts and cities allocate, by a 2026 change in state incentive policy, and by winters that set the pace of outdoor work. Paul Industries designs, fabricates, installs, tests and maintains the mechanical scope under one contract.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
Incentives ImagiNE incentives for data centers ended by Executive Order 26-17, July 2026
Large loads 20 MW and up: Large Load Customer Regulation Act (2026)
Pressure vessels Boiler Inspection Act, State Fire Marshal
Winter About 135 nights at 32 F or colder in Omaha (NOAA)
Reviewed November 2026

What does a data center mechanical contractor in Nebraska build?

A data center mechanical contractor in Nebraska builds every piped and rotating system that keeps the halls cool and the generators running: the chillers, cooling towers or dry coolers in the yard, the pumps and plate exchangers in the central plant, the mains that carry chilled and condenser water around the campus, the air handlers and CRAH galleries, the CDU loops and rack manifolds for liquid cooling, the makeup water and water treatment equipment, and the diesel or natural gas fuel systems that feed the emergency generators. On most projects the mechanical scope ranks with the electrical work as a major trade package.

The national view of that scope, its trades and its sequence is on the data center mechanical contractors page. This page focuses on Nebraska: where the campuses are, how the state’s 2026 policy changes and utility rules shape the schedule, which state codes and agencies touch the mechanical systems, and how winter changes field work.

Data centers in Nebraska: operating campuses and announced sites

Data centers in Nebraska cluster in the Omaha metro, with large campuses in Sarpy County, and are spreading to Lincoln and to counties and cities farther west. Taking the operators’ own pages as the record, Google’s Nebraska sites date from 2019 in Papillion and 2022 in Omaha, with a Lincoln site announced in 2023, while Meta broke ground in Papillion for its Sarpy data center in 2017 and in 2021 said it would add close to 1 million square feet there. Enterprise data centers run by banks, insurers, hospitals and the university system add many smaller rooms across Omaha and Lincoln.

Anyone asking where are data centers in Nebraska heading next will find the answer in planning documents more than in press releases. The state’s data center guidance from the Department of Water, Energy, and Environment points to zoning rules adopted by the City of Kearney and by Lincoln County, which surrounds North Platte, specifically for data centers, a sign that sites in central and western Nebraska are being proposed. For the data centers in Papillion, NE and the rest of the metro, the next phases are as much about expansion of existing campuses as about new ones.

Nebraska data center policy after the 2026 executive order

Nebraska data center policy changed in 2026, and the changes reach the mechanical schedule through approvals, utility terms and water. On July 21, 2026, Governor Jim Pillen signed Executive Order 26-17, which ends access to ImagiNE Nebraska Act tax incentives for data centers, requires the departments of Economic Development, Revenue and Water, Energy, and Environment to review proposals together, and set up a data center task force through DWEE. The governor’s office stated that the order is not a moratorium on data centers.

Data Center Task Force: Nebraska’s review of water, power and zoning

The Data Center Task Force Nebraska formed under that order includes utility, county, water district and building trades representatives, and held public meetings on September 22, October 20 and November 19, 2026, adopting a resolution of policy recommendations to the Legislature. Its stated work is to evaluate the effect of data centers on water resources, the power grid and county infrastructure, and to give county officials zoning tools. For a project team, the practical effect is that water supply, power delivery and zoning conditions are examined early and in public, which makes a complete mechanical basis of design, with water use and heat rejection stated plainly, more valuable at the approval stage.

Nebraska data center law and policy in 2026 and what each means for the mechanical scope
MeasureWhat it doesMechanical consequence
Executive Order 26-17 (July 2026)Ends ImagiNE incentives for data centers; joint agency review; task forceSales tax treatment of equipment changes for new applicants; water and power use reviewed at approval
LB1010, Large Load Customer Regulation ActCustomers of 20 MW or more pay for distribution and substation improvements; utilities may set large-load rates and standardsPower delivery dates and costs set by agreement; phasing of chillers matched to energized capacity
LB1010 reportingData center owners report ImagiNE and Nebraska Advantage incentive payments to DWEE each yearOwner recordkeeping; no direct design effect
LB1261Conditions for privately developed generation serving new loads above 1,000 MW, with Power Review Board approvalOn-site generation plants add fuel, cooling water and heat recovery scope
NPPD New Load Process (2024)Evaluation and financial commitments for new loads of 1 MW or more in NPPD territoryIn-service date set after agreements; mechanical milestones tied to it
County and city zoning (for example Kearney and Lincoln County)Conditional use permits; standards for sound, water, air and generators; closed loop or recycled water in Lincoln CountyHeat rejection type, yard layout, sound control and generator selection

Power delivery and the order the chillers arrive

Power delivery sets the order in which a Nebraska campus receives and starts its chillers, because a plant cannot be commissioned before its electrical service is energized. Every Nebraska customer is served by public power, and the state takes part in the Southwest Power Pool. Under the 2026 large-load act and utility processes such as NPPD’s, a campus negotiates its capacity, its delivery date and its share of substation and distribution costs before the utility commits to an in-service date.

The mechanical plan follows that agreement. Paul Industries sizes the central plant headers, campus mains and pipe racks for the full build-out where the owner chooses, then sets chillers, towers or dry coolers in phases that match the energized capacity, so the first hall can start on a partial plant without the later phases requiring a shutdown. Valved, capped connections are left at each future equipment position and tested with the rest of the system.

Water, heat rejection and the approval file

Water decisions on a Nebraska campus belong in the approval file, not only in the design, because counties, cities, water utilities and natural resources districts each have a say. DWEE’s guidance explains that groundwater is managed by the 23 natural resources districts, that surface water appropriations and well registration sit with DWEE, and that data centers operating in the state so far take their water from public water utilities. Kearney requires a water and wastewater feasibility study for a data center, and Lincoln County requires a closed loop or recycled water system.

Those rules push many Nebraska designs toward dry coolers or hybrid plants, with evaporative assist on the hottest hours, and toward liquid cooling that lets warm facility water be rejected dry. The cooling plant options and their water use are compared on data center cooling in Nebraska, and the rack-side loops on data center liquid cooling in Nebraska.

Codes and agencies on a Nebraska mechanical scope

Codes and agencies on a Nebraska data center mechanical scope come from both state and county or city levels. The Nebraska State Building Code adopts the 2018 International Building Code and the 2018 Uniform Plumbing Code, and cities, villages and counties may enforce their own codes as long as they conform to it; where a jurisdiction has not kept its code current within two years of a state update, the state code applies. The energy code is the 2018 International Energy Conservation Code.

State rules and agencies that touch data center mechanical systems in Nebraska
SystemRuleAgency or authorityWhat the work must show
Buildings, plumbing and makeup waterState building code (2018 IBC, 2018 UPC) or a conforming city or county codeCity or county building official; state code where none adoptedPermit drawings, backflow protection, inspections
Energy and commissioning2018 IECC, including mechanical systems commissioningBuilding officialEfficiency documentation, commissioning reports
Pressure vesselsBoiler Inspection Act, covering unfired pressure vessels with listed exemptionsState Fire MarshalASME nameplates and data reports; inspection certificates where required
Generator fuel tanksFlammable liquids storage tank rules, aboveground and undergroundState Fire Marshal, Fuels Safety DivisionTank and piping design, installation and testing to the applicable rules
Generators and boilersTitle 129 air quality regulations; construction permit where potential emissions meet thresholdsDWEEEquipment data for the permit application; run-hour logging
Blowdown, flush water and stormwaterWastewater utility pretreatment terms; NPDES and construction stormwater permitsWastewater utility and DWEEDischarge routes, sampling points, erosion control

Generator fuel systems

Generator fuel systems on a Nebraska data center include belly tanks or bulk aboveground storage, transfer pumps, day tanks, polishing systems and the piping between them, all built to NFPA 30 and NFPA 37 and to the State Fire Marshal’s storage tank rules. Paul Industries designs and installs the fuel piping with double-wall or contained sections where required, leak detection, overfill protection and the pressure tests the rules call for, and coordinates the tank and generator data that DWEE needs for the air permit. Paul Industries also fabricates and sets the day tanks and bulk tanks those systems feed from.

Prefabrication and winter work in Nebraska

Prefabrication matters on a Nebraska campus because the outdoor season for yard piping, tower setting and pipe rack erection is shortened by winters that bring about 135 nights a year at or below freezing in Omaha and about 175 in North Platte, according to NOAA’s 1991 to 2020 normals. Work moved into a fabrication facility, where welding, testing and coating happen under cover, is work that a January cold snap cannot stop.

Paul Industries prefabricates pipe rack modules, pump and plate exchanger skids, header assemblies and spool pieces off site, tests them before shipment, and sets them in sequence so that field welding is limited to tie-ins. In the field, winter work brings preheat for welding on heavy wall pipe, temporary enclosures and heat, freeze protection for anything filled with water, and concrete curing limits that move equipment pad dates. The welding procedures and inspection behind that work are on industrial welding services in Nebraska, and campus process and utility piping on process piping in Nebraska.

Phasing a Nebraska campus against energized power

Phasing a Nebraska campus against energized power means tying each mechanical milestone to the date the utility can deliver the next block of capacity, and leaving the plant ready to grow without disturbing the halls already running. The table shows a common sequence; the actual dates come from the owner’s agreement with the serving utility and the county or city approvals.

Mechanical milestones on a phased Nebraska data center campus
Phase stepMechanical workTied to
Site and approvalsBasis of design with water use, heat rejection, sound and generator dataZoning or conditional use permit; water utility or district review; air permit application
Underground and padsCampus mains, fuel piping sleeves, equipment pads, drainageFrost-free season for excavation and concrete
Central plant shellHeaders sized for build-out, first chillers and pumps, water treatmentBuilding enclosure and temporary power
First hallCRAH galleries or fan walls, CDU loops, first heat rejection cellsPermanent power for the first block of capacity
CommissioningFlushing, tests, startup, integrated testsGenerator permit hours; load bank power
Later hallsAdditional chillers, cells and branches on valved connectionsEach later block of utility capacity

Expanding a running Nebraska campus

Expanding a running Nebraska campus is a different job from building a new one, because the plant that must grow is already holding the temperature of halls under lease. New chillers and heat rejection cells connect to headers that carry load; new halls connect to campus mains that cannot be drained; and every isolation reduces redundancy for its duration. Paul Industries plans those connections from the original as-built drawings and a walkdown, writes a method of procedure for each, confirms the redundant path and the valve seats before isolating anything, and uses line stops or hot taps where draining is out of the question.

Season helps. A Nebraska plant on free cooling in January has chillers available as backup and a light compressor load, so major tie-ins on the chilled water side are often scheduled for winter, while yard work that needs frost-free ground waits for spring. Paul Industries sets that calendar with the operator at the start of each expansion.

Service after turnover on a Nebraska campus

Service after turnover on a Nebraska campus follows the seasons as closely as construction does. Before winter, glycol strength in outdoor loops, heat tracing, basin heaters and economizer sequences are checked; before summer, towers are cleaned and inspected, chiller tubes are cleaned or tested and condenser water treatment is reviewed; through the year, pumps, valves, filters and CDUs are maintained against the manufacturers’ schedules and the coolant specifications. Paul Industries offers that program under a service contract, so the team that built the plant keeps it running; machine-level work is described on chiller repair in Nebraska.

Omaha data center construction inside existing buildings

Omaha data center construction is not limited to new campuses; enterprise rooms and colocation suites are added inside office buildings, warehouses and former plants across the metro and in Lincoln. Those projects bring their own mechanical problems: structure that must carry chillers or dry coolers on a roof, existing chilled water plants that must be extended or replaced, shafts and routes for new mains through occupied floors, and work windows set by building tenants.

Paul Industries surveys the building, sets out what existing equipment can be reused, and plans each tie-in under a method of procedure so that tenants keep their cooling and services. Hot work in occupied buildings follows permits and fire watch, and crane lifts for rooftop equipment are scheduled for low-occupancy hours with the city’s street use permits arranged in advance.

Data center mechanical systems from yard to rack on a Nebraska campus

Data center mechanical systems on a Nebraska campus run in a chain from the yard to the rack, and the contractor that builds the chain end to end can keep each link matched to the next. The yard holds heat rejection and, often, the generator plant and its fuel. The central plant holds chillers, pumps, plate exchangers, water treatment and expansion and air separation. Underground or rack-mounted mains carry water to each building, where CRAH galleries or fan walls serve the air side and CDUs serve liquid-cooled rows.

Each link has a Nebraska design point: freeze protection in the yard, glycol separation at the plate exchangers, vessel inspection status in the plant, insulation and heat tracing on exposed mains, and condensation control in the halls during humid eastern summers. Paul Industries carries that chain from design through testing, with the final acceptance steps described on data center commissioning in Nebraska.

How much does a data center mechanical package cost in Nebraska?

A data center mechanical package in Nebraska costs what its megawatts, redundancy, heat rejection method, liquid cooling share, campus layout, fuel system and schedule make it cost, and those drivers move the number far more than any statewide average could. Dry heat rejection and closed loops required by county rules add equipment but remove water treatment and blowdown; prefabrication adds fabrication cost and saves field hours; winter work adds temporary heat and enclosures; phased plants add headers and valves early but save shutdowns later.

Paul Industries prices the mechanical scope from the basis of design and the phasing plan, offering supply-only prefabricated modules and equipment, design-build plants and complete installation through commissioning. A budget range from comparable scope comes first, followed by a firm price once drawings and the utility delivery schedule are fixed.

Operating cost belongs in the same comparison, because the mechanical design decides the cooling plant’s share of the power bill for decades. The U.S. Energy Information Administration puts Nebraska’s 2025 average commercial electricity price at 8.50 cents per kilowatt-hour and the industrial price at 8.05 cents. At the commercial figure, each megawatt of mechanical load running around the clock costs about $744,600 a year, so a design choice that removes a few hundred kilowatts of pumping, fan or compressor power repays a meaningful share of its first cost within a few years. Paul Industries runs that comparison with the owner’s actual tariff before the plant configuration is fixed.

Who builds data center mechanical systems in Nebraska?

Paul Industries builds data center mechanical systems in Nebraska, from central plants and campus mains to liquid cooling loops and generator fuel piping, for projects in Omaha, Papillion, La Vista, Lincoln, Kearney, Grand Island, North Platte, Norfolk and Columbus. Kilmarnock, Virginia, at 256 Shore Drive, is the company’s headquarters, and Nebraska campuses are part of a project list that runs across all 50 states. The home-state counterpart is data center mechanical contractor in Virginia, and a Midwest counterpart is data center mechanical contractor in Indiana.

Data center mechanical contractors are judged by owners on schedule certainty, weld and test quality, and accountability after turnover. Paul Industries answers for all three under one contract: one team designs, prefabricates, installs, tests and maintains the scope, so a problem found in commissioning or in year three goes back to the party that built the system. The broader industry view is on data centers, and fabrication capacity on pipe fabrication.

Mechanical work from Paul Industries on Nebraska campuses

Paul Industries designs, prefabricates, installs, tests and maintains data center mechanical systems in Nebraska, from a single enterprise room to a multi-building campus. To price a phase, send the IT load and phasing, the redundancy target, the basis of design or drawings, the heat rejection method, the site and its county or city conditions, the utility delivery schedule and the generator and fuel arrangement. Call 201-450-8280 or request a quote. Other work in the state is listed on the Nebraska hub, and neighboring states on Midwest.

Standards referenced: Nebraska State Building Code (2018 IBC, 2018 Uniform Plumbing Code) · 2018 International Energy Conservation Code (Nebraska energy code) · Nebraska Boiler Inspection Act (Neb. Rev. Stat. 81-5,165 to 81-5,189) · Title 129, Nebraska Air Quality Regulations · ASME B31.9 · ASME B31.3 · ASME Section VIII · NFPA 30 · NFPA 37 · ASHRAE 15

Frequently asked questions

Who builds the mechanical plant for a Lincoln, Nebraska data center?

Paul Industries builds the mechanical plant for a Lincoln, Nebraska data center, including chillers or dry coolers, pumps, plate exchangers, campus mains, CRAH and CDU piping and generator fuel systems. Lincoln Electric System serves the city, so the plant phasing follows the capacity and delivery terms agreed with the utility. Paul Industries also extends and services existing enterprise rooms in Lincoln.

Does Paul Industries take data center mechanical work in Omaha and Sarpy County?

Yes. Paul Industries takes data center mechanical work in Omaha, Papillion, La Vista, Bellevue and across Sarpy and Douglas counties, from new central plants and campus loops to expansions of operating halls and rooms inside existing buildings. Work beside an operating campus is planned under a method of procedure for every tie-in, with redundancy confirmed before any isolation.

Who builds the mechanical scope for a data center in Kearney, Nebraska?

Paul Industries builds the mechanical scope for a data center in Kearney, Nebraska, including heat rejection, central plant, piping and generator fuel systems. Kearney’s code sets data center standards for site development, sound, water and sanitary sewer, air quality and emergency generation, and requires a water and wastewater feasibility study, so the mechanical basis of design is prepared to answer those points at approval.

Can Paul Industries build a data center plant around North Platte or in western Nebraska?

Yes. Paul Industries builds data center mechanical systems in North Platte, Lincoln County and the rest of western Nebraska. Lincoln County’s zoning includes data center facility requirements and development standards that call for a closed loop or recycled water system, which points the design toward dry coolers and warm-water liquid cooling. Colder winters there also shape prefabrication and freeze protection plans.

Where are data centers in Nebraska located today?

The hyperscale campuses operating today are in the Omaha metro, especially Sarpy County, where Google reports data centers built in Papillion in 2019 and Omaha in 2022 and Meta reports its Sarpy data center in Papillion. Google also announced a Lincoln development in 2023. Enterprise data centers run by banks, insurers, hospitals and universities sit across Omaha and Lincoln, and Kearney and Lincoln County have adopted rules for proposed sites.

Are there new data centers being built in Nebraska after the 2026 executive order?

Executive Order 26-17 ended ImagiNE Nebraska Act incentives for data centers, and the governor’s office said it is not a moratorium. Projects can still proceed under county and city zoning, utility large-load agreements and environmental permits, with joint review by three state departments. Expansions of existing campuses and enterprise rooms continue to need mechanical work, which Paul Industries builds.

What happened to Nebraska data center incentives in 2026?

On July 21, 2026, the governor signed Executive Order 26-17, which ends access to ImagiNE Nebraska Act tax incentives for data centers. Separately, LB1010 requires data center owners and operators to report ImagiNE and Nebraska Advantage incentive payments to DWEE each year. Owners with existing agreements should confirm their own terms with the Department of Revenue, since the order addressed new approvals.

Which Nebraska data center law affects the mechanical scope most?

The Large Load Customer Regulation Act in LB1010 (2026) has the most direct effect, because customers with 20 megawatts or more of peak demand pay for the distribution and substation improvements that serve them, and utilities set large-load terms. That sets when and how much power arrives, which sets when chillers can start. County and city zoning rules on water and sound come next.

Is there a data center moratorium in Nebraska?

The governor’s office described Executive Order 26-17 as not a moratorium on data centers. The order ends ImagiNE incentives for data centers, requires joint agency review of proposals and created a task force through DWEE to study water, power and county infrastructure. Counties and cities decide land use through zoning and conditional use permits, so conditions vary from one jurisdiction to another.

Do chiller plant vessels on a Nebraska data center need state inspection?

Some do. Nebraska’s Boiler Inspection Act, administered by the State Fire Marshal, includes unfired pressure vessels in its scope, while section 81-5,172 exempts small vessels and certain refrigerant vessels built and repaired to ASME standards. Expansion tanks, air separators and filter housings are checked against those limits by volume and rated pressure. Paul Industries lists each vessel’s ASME data and flags those within the act.

Who installs fuel systems for Nebraska data center generators?

Paul Industries installs generator fuel systems for Nebraska data centers, including bulk and day tanks, transfer pumps, polishing systems, double-wall or contained piping, leak detection and overfill protection, built to NFPA 30 and NFPA 37 and the State Fire Marshal’s storage tank rules. Tank and generator data are prepared for the DWEE air permit application.

How do Nebraska winters affect data center mechanical construction?

Winters shorten the season for yard piping, tower setting and pipe rack erection, with about 135 freezing nights a year in Omaha and about 175 in North Platte. Prefabricated modules, temporary enclosures and heat, welding preheat and freeze protection for filled systems keep work moving. Paul Industries plans the outdoor sequence so that equipment pads and underground mains are complete before the hardest months.

Should a Nebraska campus build its central plant for the full build-out on day one?

Many owners build the headers, mains and pipe racks for the full build-out while setting chillers and heat rejection in phases matched to energized power. That avoids shutting down a live plant to enlarge a header later, while spreading equipment spending across phases. Paul Industries compares both approaches against the utility delivery schedule and the owner’s leasing plan.

What does the mechanical turnover file contain on a Nebraska data center?

The file contains as-built drawings, weld maps and inspection records, pressure test certificates, flushing and water chemistry reports, ASME vessel data and any inspection certificates, equipment startup reports, balancing reports, fuel system test records, operating and maintenance manuals and the commissioning results. Paul Industries assembles it as each system passes its tests.

Can Paul Industries supply prefabricated skids and pipe racks without installing them?

Yes. Paul Industries supplies prefabricated pump and plate exchanger skids, header assemblies, pipe rack modules and spool pieces on a supply-only basis for Nebraska projects, tested before shipment with records. The same scope is also offered as design-build or as complete installation through startup and commissioning.

What should an owner send to price a Nebraska data center mechanical package?

Send the IT load and phasing, redundancy target, basis of design or drawings, heat rejection method, site location with any county or city conditions, water source, utility delivery schedule, generator and fuel arrangement, and the target dates. Paul Industries uses that to prepare a budget range, then a firm price once the design and schedule are fixed.

Building a data center campus or hall in Nebraska?

Send the IT load and phasing, the basis of design, the site, the heat rejection method and the utility delivery schedule. Call 201-450-8280 or request a quote.