Paul Industries works as a data center mechanical contractor in Indiana, building chiller plants, cooling towers and dry cooler yards, campus chilled water and condenser piping, liquid cooling loops and prefabricated pump and valve skids for new campuses and existing halls. Indiana has become one of the busiest data center states in the Midwest, with campuses operating at New Carlisle and Fort Wayne and more under construction in Boone County. Paul Industries takes the mechanical scope from design input through installation, testing and startup, as supply-only, design-build or complete installation.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
Tax exemption Up to 25 years, or up to 50 above $750 million invested (IEDC)
Grid split I&M in PJM; Duke, AES Indiana, NIPSCO and CenterPoint in MISO
Large loads IURC process under HEA 1007, signed May 2025
Wage law Indiana Common Construction Wage repealed July 1, 2015
Reviewed November 2026

What does a data center mechanical contractor in Indiana build?

A data center mechanical contractor in Indiana builds the systems that move heat from the IT equipment to the outdoors and keep that path running through failures: chillers and their machinery rooms, cooling towers, fluid coolers or dry coolers, pumps, heat exchangers, chilled water and condenser water piping, coolant distribution units and rack-level liquid cooling, water treatment and makeup, and the fuel, compressed air and plumbing systems that support the site. On a campus, the work also includes underground and yard piping between plant buildings and halls.

The general picture of the mechanical scope and how it is coordinated is on the national data center mechanical contractors page. This page covers what Indiana adds: where the campuses are, which Indiana approvals touch the mechanical package, how utilities and tax rules shape the equipment schedule, and how Indiana winters change construction.

Data centers in Indiana: where the campuses are and what each region asks

Data centers in Indiana cluster in four areas: St. Joseph County around New Carlisle in the north, Fort Wayne in the northeast, the Indianapolis metro with Boone and Hendricks counties, and a growing list of sites in Northwest Indiana and along the Ohio River. Each area brings its own utility, water source and climate to the mechanical design.

Indiana data center areas and their mechanical emphasis
AreaMarket facts (public sources)Mechanical emphasis
New Carlisle and St. Joseph CountyAWS’s $11 billion campus fully operational since October 2025Cold winters and short summers; dry cooler and economizer heavy plants; I&M service in PJM
Fort Wayne and Allen CountyGoogle campus reported operational December 2025; IDEM approved more generators and towers in 2026Large tower and generator counts under air permits; long freeze season
Lebanon, Boone County and the Indianapolis metroMeta’s 1 gigawatt Lebanon campus under construction since February 2026; enterprise and colocation rooms across IndianapolisClosed-loop liquid cooling at campus scale; retrofit work in occupied buildings
Monrovia and Hendricks CountyIURC approved AES Indiana’s plan to serve a planned 390 MW Google data center in October 2026Phased plant tied to utility delivery dates
Northwest Indiana and the Calumet regionSeveral proposals under county and IDEM reviewLake Michigan climate, brownfield and former industrial sites
Evansville and the Ohio River countiesIndustrial and enterprise rooms, river water sourcesLongest cooling season in the state; more chiller hours

The list changes month by month as proposals move through county zoning, utility filings and IDEM permits, and some have been withdrawn before a vote, as Google’s Franklin Township rezoning request in Indianapolis was in September 2025. Paul Industries plans mechanical work for a site once its utility service and permits are taking shape, because those two items set the equipment schedule more than the announcement date does.

Data center construction in Indiana: the approvals behind the mechanical scope

Data center construction in Indiana runs through state and county approvals that each reach part of the mechanical scope: the construction design release and building permits, pressure vessel operating permits, IDEM air, water and fuel tank requirements, the DNR water registration, and the rules that govern plumbing work. Knowing which mechanical item feeds which approval keeps the schedule from waiting on paperwork.

Indiana rules that apply to the data center mechanical package
SubjectIndiana rule or agencyMechanical items affected
Building and mechanical designIndiana Building Code (675 IAC 13-2.6) and Indiana Mechanical Code (675 IAC 18-1.6); design release from IDHS for Class 1 structuresMachinery rooms, refrigeration safety, ventilation, equipment supports and access
PlumbingIndiana Plumbing Code (675 IAC 16-1.4); plumbing work falls under the Indiana Plumbing Commission’s licensing rules in IC 25-28.5Domestic water, makeup water connections, backflow protection, drains
Pressure vesselsIndiana Boiler and Pressure Vessel Rules, 675 IAC 30Chiller shells, expansion and buffer tanks, air receivers above the volume and relief limits
Generators and cooling towersIDEM air permitsTower count, drift rating and water chemistry; generator fuel and run hours
Underground fuel storageIDEM underground storage tank rules, 329 IAC 9Registration and leak detection for regulated underground diesel tanks
Water withdrawal and dischargeDNR registration under IC 14-25-7-15; IDEM NPDES or treatment-plant noticeMakeup water capacity, blowdown and flush water discharge
Wages on public workCommon Construction Wage repealed July 1, 2015No state wage schedule on state-funded projects; federal Davis-Bacon where federal money applies

The building code itself is changing. The rules in force adopt the 2012 International Building Code and the 2012 International Mechanical Code, and the Fire Prevention and Building Safety Commission has had a 2024-based Indiana Building Code in rulemaking. A campus permitted in phases over several years can straddle an edition change, so the mechanical design records which edition each phase is permitted under. From July 1, 2026, the Department of Homeland Security also allows self-certification by experienced design professionals and release without review for some plans.

What do tax breaks for data centers in Indiana mean for mechanical equipment?

Tax breaks for data centers in Indiana reach the mechanical budget mainly through the state’s data center sales and use tax exemption under IC 6-2.5-15, which the Indiana Economic Development Corporation awards to operators of qualified data centers for qualifying equipment and energy. Terms run up to 25 years for investments under $750 million and up to 50 years above that, and counties may add a personal property tax exemption on enterprise IT equipment for investments of at least $25 million.

For the mechanical contractor, the practical question is the purchasing route. Chillers, dry coolers, CDUs and other major equipment can be owner-furnished, bought by the contractor and resold, or bought under the operator’s exemption, and the right route depends on how the owner’s exemption is written. Paul Industries sets up its supply to match: owner-furnished equipment received, set and installed by Paul Industries, contractor-furnished equipment with exemption certificates handled as the owner directs, or a split by equipment type. Settling this before the first order avoids reissuing purchase orders once equipment is already in production.

Utilities, large loads and the order the chillers arrive

Indiana utilities set the pace of a data center’s mechanical work, because no hall can carry IT load until the utility can deliver the power, and the cooling plant is phased to match each delivery date. Indiana Michigan Power, serving the South Bend and Fort Wayne areas, operates in PJM; Duke Energy Indiana, AES Indiana, NIPSCO and CenterPoint operate in MISO. Since May 2025, House Enrolled Act 1007 has given the IURC a defined approval path, with financial assurance standards, for utility projects built to serve large-load customers.

The mechanical effect is a staged plant. The first phase usually brings the central headers sized for the full build, enough chillers and heat rejection for the first halls, and the controls framework; later phases add machines and cells as power arrives. Paul Industries plans each phase so that new equipment ties into live headers through valves and connections installed in phase one, and supplies the mechanical load data the utility needs for each step. Indiana’s 2024 average industrial power price of 8.15 cents per kilowatt-hour (EIA) is close to the national average, so efficiency upgrades are judged on their own payback instead of being forced by high prices.

Generators, fuel and cooling towers under IDEM permits

Generators, fuel systems and cooling towers on an Indiana data center are built under IDEM permits, because IDEM’s guidance lists data center backup generators and cooling towers among the sources that need air permits, and underground diesel tanks fall under the state’s underground storage tank program. Mechanical work on those systems starts from the permit conditions.

For towers, the permit is built on the tower count, circulation rate, drift eliminator efficiency and water chemistry, so the towers installed must match the towers permitted, including the drift rating. For fuel, the mechanical scope covers day tanks, transfer pumps, fuel piping, polishing systems and the leak detection that regulated underground tanks need, with registration of regulated tank systems under 329 IAC 9. Aboveground belly tanks and day tanks follow the Indiana Fire Code. Paul Industries installs and tests the fuel system with the generators so the integrated tests start with clean fuel and proven transfer controls.

Water, hard supplies and the DNR registration

Water for an Indiana data center comes from a municipal utility, a private well field, or surface water, and each source carries different treatment and registration needs. A site able to pull over 100,000 gallons daily, counting every source it has, must register as a significant water withdrawal facility with the Department of Natural Resources within three months of completion and report its use every year.

Most Indiana water is very hard, which pushes evaporative plants toward softening or high-performance treatment and pushes many new campuses toward dry coolers and closed loops. The mechanical contractor’s part is the makeup system, softeners or reverse osmosis where specified, chemical feed, blowdown and the meters that produce the numbers the DNR report and the IDEM discharge permit need. Paul Industries builds that metering into the makeup and blowdown piping so the owner’s reporting comes straight from measured flows. The plant-level heat rejection choice is discussed on data center cooling in Indiana.

Campus chilled water: underground, tunnel or pipe rack?

Campus chilled water on an Indiana data center runs underground, in a utility tunnel, or on an elevated pipe rack, and the choice is driven by frost depth, site soils, future expansion and how much excavation the site can accept. Indiana’s frost penetration means buried water lines go below the frost line or carry insulation and heat tracing, while racks expose pipe to winter air and need freeze protection of their own.

Buried pre-insulated piping keeps the yard clear and protects the pipe from weather, but every later connection means digging. Tunnels cost more up front and give permanent access for inspection and added mains. Pipe racks are fastest to build and easiest to extend, and on brownfield sites they avoid disturbing caps and barriers, but they need glycol or heat tracing in winter and supports designed for snow, ice and wind. Paul Industries prices the three against the campus master plan, because a route that saves money in phase one can cost more by the time phase four connects.

Machinery rooms and refrigerant under the Indiana Mechanical Code

Chiller machinery rooms on Indiana data centers follow the refrigeration chapter of the Indiana Mechanical Code, which adopts the 2012 International Mechanical Code and works with ASHRAE 15 on refrigerant safety. The rules decide room ventilation, refrigerant detection and alarm, relief discharge locations and the separation of combustion equipment, and they become heavier as refrigerant charges grow.

New chillers increasingly use lower global warming potential refrigerants, some of them classed as mildly flammable, and the safety class of the refrigerant changes what the room needs. Paul Industries lays out machinery rooms from the selected chillers’ refrigerant type and charge, installs the detection, ventilation and relief piping with the chillers, and keeps refrigerant records under the EPA’s rules from the first charge. Plants that place air-cooled chillers outdoors avoid a machinery room entirely, which is one more factor in the heat rejection choice.

Brownfields and former industrial sites

Brownfields and former industrial sites appear on Indiana’s data center map because they bring heavy power connections, flat land and industrial zoning, and Northwest Indiana in particular has decades of industrial land. IDEM notes that some proposed data center sites carry historical contamination and may already have Environmental Restrictive Covenants under Indiana’s Brownfields Program, with obligations such as soil management, stormwater controls and preserving protective barriers.

Those obligations land on the mechanical scope wherever piping goes underground. Yard piping, tower basins, fuel tanks and utility tunnels all cut through soil, and a site with a protective cap or barrier needs routes, bedding and restoration that keep the barrier intact. Paul Industries routes underground piping with the site’s environmental plan in hand, favors above-grade pipe racks where excavation would disturb a cap, and records the soil handling for the owner’s covenant file.

Prefabrication and winter construction in Indiana

Prefabrication matters more on Indiana data centers than in milder states, because a large part of the construction year is cold enough to slow field welding, coating and outdoor pressure testing. January normal highs at Indianapolis sit near 36 degrees Fahrenheit and lows near 21, and the north is colder still, so moving fabrication indoors moves schedule risk with it.

Prefabricated assemblies for Indiana data center campuses
AssemblyTypical contentsWhy it helps on an Indiana schedule
Pump skidsPumps, suction diffusers, strainers, check and isolation valves, gauges, drainsWelding and alignment done indoors; skids set in a day
Chiller connection spoolsFlanged spools with valves, flow meters, thermowells and ventsShort field window per chiller during cold-weather construction
Header modulesHeader sections with capped, valved branches for future phasesLater phases tie in without draining live headers
Multi-trade racksChilled water, condenser water, fuel and cable tray on one frameFewer lifts and fewer outdoor work hours in winter
Makeup and treatment skidsSofteners or reverse osmosis, chemical feed, meters, blowdown controlHard-water treatment arrives tested, with metering for state reports

Paul Industries prefabricates pump skids, valve stations, header sections, chiller connection spools and multi-trade racks off site under controlled conditions, then sets them on Indiana campuses as modules. Welds are made and examined in the shop environment, pieces arrive cleaned and capped, and field work narrows to bolting, a limited number of tie-in welds and testing. In winter, field welds get heated enclosures and preheat as the procedure requires, and outdoor hydrostatic tests use heated enclosures, an approved glycol medium or prompt draining. The testing and turnover side is covered on data center commissioning in Indiana.

Expanding a running Indiana data hall

Expanding a running Indiana data hall means adding cooling capacity, piping or liquid cooling while the existing load stays cooled, which turns the mechanical work into a sequence of planned outages and protected tie-ins. The plan starts with the redundancy that exists today and the minimum the owner will accept during work.

Paul Industries installs new chillers, towers or dry coolers beside the running plant, pre-tests them, and connects them in short windows using valves left for the purpose or hot taps and line stops where draining a header is ruled out. Indiana’s cold season helps, because economizers carry much of the load from November through March and leave chillers free for work. Liquid-cooled rows added to air-cooled halls are covered on data center liquid cooling in Indiana, and chiller repair or overhaul found during expansion on chiller repair in Indiana.

Service and maintenance after an Indiana campus opens

Service after an Indiana data center opens covers the chillers, heat rejection, pumps, water treatment, fuel systems and liquid cooling loops the mechanical contractor built, and in Indiana it follows a strong seasonal rhythm. Spring brings tower and dry cooler cleaning after winter, condenser tube inspection and a check of chiller readiness before the humid months. Autumn brings glycol testing, heat tracing and freeze sequence checks, basin heater tests and the changeover to economizer operation.

State and federal items run on their own clocks: pressure vessel operating permits come up for inspection on their permit cycle, refrigerant leak rate records follow the EPA’s rules for systems of 15 pounds or more of HFC refrigerant, generator run hours are logged against permit limits, and the DNR water report is due each year. Paul Industries offers that work under service contracts that keep the records together with the maintenance, so the owner’s compliance file and the plant’s condition are tracked in one place.

How is an Indiana data center mechanical package priced?

An Indiana data center mechanical package is priced from the cooling capacity and redundancy by phase, the heat rejection choice, the extent of liquid cooling, the campus piping length and size, the prefabrication share, the fuel system and the water treatment. Indiana factors include freeze protection and heat tracing, winter construction measures, hard-water treatment, ASME vessels above the 675 IAC 30 limits, and the equipment purchasing route under the sales tax exemption.

Once the load, phasing and site plan exist, Paul Industries prices a budget range from comparable work, then a firm figure when the design is set. Equipment-only, design-build and complete installation are priced separately so the owner can compare routes on the same basis.

Who builds data center mechanical systems in Indiana?

Paul Industries builds data center mechanical systems in Indiana: chiller plants, heat rejection yards, campus and hall piping, liquid cooling, fuel systems and prefabricated skids. Paul Industries has its headquarters at 256 Shore Drive, Kilmarnock, Virginia, and takes Indiana work statewide, as part of work in all 50 states and abroad.

When owners compare mechanical contractors, Indiana campuses tend to weigh three things: the ability to carry the whole plant under one contract, prefabrication capacity that takes work out of the winter, and records that satisfy state vessel permits and IDEM conditions. Paul Industries answers all three on one schedule. Water systems for sites that also need high-purity water are on ultrapure water systems in Indiana. The headquarters-state version of this page is data center mechanical contractor in Virginia, and the Pennsylvania version is data center mechanical contractor in Pennsylvania.

Data center mechanical contractors: Indianapolis, Lebanon and statewide

Owners searching for mechanical contractors, Indianapolis and Lebanon especially, often need two kinds of work at once: retrofits in occupied downtown and suburban buildings and new plants on greenfield campuses. Paul Industries covers both, along with South Bend and New Carlisle, Fort Wayne, Northwest Indiana, Lafayette, Kokomo, Columbus, Evansville and Jeffersonville.

Mechanical work from Paul Industries on Indiana campuses

Paul Industries designs, supplies, prefabricates, installs, tests and starts up the mechanical systems for Indiana data centers, and services them after turnover. Equipment can be supplied alone, built design-build, or installed complete with commissioning support. The Indiana page gives the state picture and the Midwest page the region. Send the load by phase, the site plan, utility and water information and the target dates, then call 201-450-8280 or request a quote.

Standards referenced: Indiana Mechanical Code, 675 IAC 18-1.6 · Indiana Building Code, 675 IAC 13-2.6 · Indiana Plumbing Code, 675 IAC 16-1.4 · Indiana Fire Code, 675 IAC 22-2.5 · Indiana Boiler and Pressure Vessel Rules, 675 IAC 30 · IDEM underground storage tank rules, 329 IAC 9 · IC 6-2.5-15 data center sales tax exemption · ASME B31.9 · ASME B31.1

Frequently asked questions

Where are data centers in Indiana being built?

The main areas are New Carlisle and St. Joseph County, Fort Wayne, the Indianapolis metro with Lebanon and Boone County, Hendricks County around Monrovia, Northwest Indiana and the Ohio River counties. Paul Industries takes mechanical work in all of them.

Who builds data center mechanical systems in Lebanon and Boone County?

Paul Industries builds chiller plants, dry cooler yards, liquid cooling loops and campus piping for data centers in Lebanon, Boone County and the corridors around Indianapolis. Campus work there is phased with utility delivery, so the first phase installs headers sized for the full build.

Does Paul Industries take data center mechanical work in Fort Wayne and Allen County?

Yes. Allen County and the rest of Northeast Indiana are part of Paul Industries’ Indiana work, covering chillers, towers, dry coolers, pumps, fuel systems and campus piping. Campuses in the area run big tower and generator fleets under IDEM air permits, so each installed unit is checked against the permitted unit.

Which contractor builds data center plants around South Bend, New Carlisle and Northwest Indiana?

Paul Industries builds mechanical plants across St. Joseph, LaPorte, Porter and Lake counties. Northern Indiana’s long winters make prefabrication and freeze protection central to the plan, and former industrial sites in the Calumet region bring brownfield obligations to underground piping.

Are there new data centers in Indiana under construction now?

Yes. Meta’s Lebanon campus has been under construction since February 2026, the AWS campus at New Carlisle has kept adding buildings since it opened in October 2025, and the IURC approved AES Indiana’s plan to serve a planned Google data center in Monrovia in October 2026. Other proposals are moving through county and state review.

What happens to proposed data centers in Indiana before construction starts?

Proposed data centers in Indiana pass county zoning, utility service agreements and, for large loads, IURC proceedings, then IDEM air and water permits, a DNR water registration where it applies, and the state design release. Some proposals have been withdrawn along the way. Mechanical design firms up once utility service and permits are in view.

How do Indiana mechanical contractors handle data center work through the winter?

By moving fabrication indoors and protecting what stays outside. Pump skids, valve stations and header spools are prefabricated off site, field welds get heated enclosures and preheat, and outdoor pressure tests use heated enclosures, an approved glycol medium or prompt draining. Paul Industries plans winter measures into the schedule from the start.

Does a data center chiller in Indiana need a pressure vessel permit?

When its shells exceed the volume and relief limits in 675 IAC 30, yes, and it may not operate until the operating permit is issued. Small chambers, chambers relieved at 15 psig or less, and liquid-full vessels at 180 degrees Fahrenheit or less are excluded. Paul Industries keeps a vessel register so permits are in hand before startup.

Does the Indiana data center sales tax exemption cover cooling equipment?

The exemption under IC 6-2.5-15 covers qualifying data center equipment and energy bought by the operator of a qualified data center, as awarded by the IEDC. Whether a given chiller or CDU qualifies depends on the owner’s award, so Paul Industries routes purchases as the owner directs, owner-furnished or contractor-furnished.

Do diesel tanks on an Indiana data center need IDEM registration?

Regulated underground storage tank systems must be registered with IDEM under 329 IAC 9 and carry leak detection. Aboveground belly and day tanks follow the Indiana Fire Code. Paul Industries installs fuel piping, transfer pumps and detection to the design and the applicable rule.

Is there prevailing wage on Indiana data center construction?

The state’s Common Construction Wage law was repealed as of July 1, 2015, which leaves public projects without a state wage schedule, and private data centers never carried one. Federally funded work still follows Davis-Bacon, and owners can set wage terms by contract.

How does the utility change the mechanical schedule in Indiana?

The utility’s delivery dates set when each hall can carry load, so chillers and heat rejection are installed in phases to match. PJM covers Indiana Michigan Power’s territory and MISO covers Duke Energy Indiana, AES Indiana, NIPSCO and CenterPoint, and large loads go through the IURC path HEA 1007 created.

Can a warehouse or plant in Indiana become a data hall?

Often, if the structure carries the equipment loads, the roof or yard can hold heat rejection, and the power can be brought in. Former industrial sites may carry brownfield covenants that limit excavation, which shapes underground piping routes. Paul Industries surveys the building and site before the mechanical layout is fixed.

Who installs fuel systems for Indiana data center generators?

Paul Industries installs day tanks, transfer pumps, fuel piping, polishing systems and leak detection for Indiana data center generators, and tests them with the generators so integrated tests begin on clean fuel with proven transfer controls.

What records does an Indiana owner get when the mechanical work is complete?

Pressure test and flushing records, weld and examination records for prefabricated and field piping, ASME data reports and the vessel register with operating permits, equipment startup reports, water and fuel system test records, and as-built drawings that match the released design.

Who registers an Indiana data center's water withdrawal with the DNR?

The registration belongs to the facility owner, and it applies when the site can withdraw more than 100,000 gallons a day from all sources combined. Paul Industries supplies the makeup capacity and metering that the registration and annual report draw on.

What should an owner send to price an Indiana data center mechanical package?

Send the IT load by phase, redundancy level, site plan, utility and water source, preferred heat rejection, liquid cooling plans and target dates. Call 201-450-8280 or use the quote form.

Building a data hall or campus in Indiana?

Send the load by phase, site plan, utility and water details and target dates. Call 201-450-8280 or request a quote.