Paul Industries provides industrial welding services in Michigan for refineries, chemical plants, pharmaceutical and device makers, food plants, automotive and parts plants, hospitals and campuses, welding pipe, pressure equipment, tanks, structures and production equipment to qualified procedures with full records. Paul handles boiler and boiler piping welds with the procedures filed with the state Boiler Division, B31.3 process pipe, orbital stainless tube, structural steel and repair welding, in prefabrication and inside operating plants. Paul Industries is headquartered in Kilmarnock, Virginia, and takes welding work across Michigan and the Midwest.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
Boiler welding Procedures filed with the Michigan Boiler Division before welding (R 339.5216)
Repair code National Board Inspection Code, 2019 edition, adopted May 2023
Shop and field safety MIOSHA Part 12, Welding, Cutting and Brazing
Detroit Boiler welding inside the city follows BSEED, outside the state article
Reviewed November 2026

What is industrial welding at a Michigan plant?

Industrial welding at a Michigan plant is welding done to a code, a procedure and a record, on equipment that carries pressure, load or product: steam and process piping, boilers and pressure vessels, storage tanks, structural steel, platforms and supports, and the frames, chutes and housings of production machinery. What is industrial welding in practice comes down to three questions asked before the arc is struck: which code governs the joint, which qualified procedure and qualified welder will make it, and how it will be examined and documented.

Michigan plants add their own conditions to those questions. A weld on a boiler’s feedwater line triggers the state Boiler Division’s permit and procedure filing rules, a weld inside the city of Detroit meets the city’s boiler program instead, a weld in a refinery unit meets the owner’s hot work and mechanical integrity procedures, and a weld in a Kalamazoo drug plant meets the plant’s quality system. For industrial welding, Michigan owners get smoother outages when those rules are settled during planning rather than discovered on the day of the outage.

Michigan rules for welding on boilers and boiler piping

Michigan regulates welding on boilers and their piping more closely than other plant welding. Under R 339.5216 of the Michigan Boiler Rules, no welding begins on a boiler installation, repair, replacement or alteration until the Section IX procedure specifications and their qualification records sit on file with the Boiler Division, and the inspector can ask on site to see both the procedures and each welder’s qualification test.

The same rules adopt the 2019 National Board Inspection Code. Its standard welding procedures are accepted in Michigan but not required, and a repairer who uses them files the list of procedure numbers with the Boiler Division before welding. Welded repairs to power boilers and high pressure, high temperature water boilers, and alterations to any boiler the rules do not exempt, follow the National Board R program: the inspector reviews the repair method before welding and the finished repair is recorded on the National Board form. R 339.5210 extends the permit requirement to welded boiler external and non-boiler external piping, and to welded repairs on nonwelded piping.

Which code and Michigan rule apply to common plant welds
WeldConstruction or repair codeMichigan stepRecord produced
Boiler tube, shell or header repairNBIC Part 3, ASME Section I or IVPermit to repair; procedures filed before welding; inspector accepts the methodNational Board R-1 report, weld and examination records
Steam, feedwater, condensate and blowoff pipingASME B31.1, or B31.3 at chemical plants and refineriesPermit for welded pipe from the Boiler DivisionWeld map, test record, permit closeout
Pressure vessel repair or alterationNBIC with ASME Section VIIIInspector consulted; boiler-related vessels under the boiler rulesR-1 or R-2 report
Process pipingASME B31.3Owner’s procedures and hot work permitWeld log, NDE reports, leak test record
Structural steel, platforms and supportsAWS D1.1, D1.6 for stainlessSpecial inspection under the 2021 Michigan Building Code where requiredWelder qualifications, inspection reports
Hygienic tube for drug, device and food plantsASME BPE, 3-A practicesPlant quality system and change controlWeld log, coupons, borescope records
Tank shell, bottom or nozzleAPI 650 or API 653Owner’s tank program and spill planRepair record, NDE, test results

Inside Detroit, Article 9 of the Skilled Trades Regulation Act does not apply because the city’s population exceeds 600,000, and boiler permits and inspections run through the city’s Buildings, Safety Engineering and Environmental Department. Paul Industries checks the address of every boiler weld against that boundary before the permit is prepared. The repair side of boiler work is covered on boiler repair in Michigan.

Welding procedures and welder qualification for Michigan code work

Code welding in Michigan rests on the ASME Section IX system of procedure and welder qualification, which most construction codes reference. A welding procedure specification sets the process, base metals, filler metals, preheat, interpass temperature, heat treatment and technique; a procedure qualification record proves by testing that the procedure makes sound welds; and a welder performance qualification proves that each welder can make them.

A welder’s qualification stays active while the welder uses the process, and lapses after six months without welding in it. For boiler and boiler piping work, the Michigan rule adds filing and site availability, so the procedure package and the welder continuity log stay with the job. Michigan welding companies that work on code equipment are judged by how clean that package is; Paul Industries assembles it before work starts on site, matches each procedure to the joints on the weld map, and keeps the welder continuity log current for every process used.

Structural welding follows AWS D1.1 for carbon steel and D1.6 for stainless, with welder qualification under those codes. Sanitary orbital welding adds procedure qualification on the specific tube, fittings and weld head, and daily sample coupons before production welds on many pharmaceutical projects.

MIOSHA Part 12 and hot work at Michigan plants

MIOSHA’s General Industry Part 12, Welding, Cutting and Brazing, sets the safety rules for welding in Michigan workplaces, from training to cylinder handling and confined spaces. R 408.11222 requires oxygen cylinders in storage to be kept at least 20 feet from fuel gas cylinders and combustible materials, or separated by a noncombustible wall at least 5 feet high with a half-hour fire-resistance rating, and keeps cylinders away from heat above 125 F. R 408.11223 requires cylinders to be restrained against falling and acetylene cylinders to stand valve end up.

Two Part 12 rules matter in a Michigan winter. Frozen or ice-clogged cylinder valves must be thawed with warm air or warm water and dried, never with boiling water or a flame, and cylinders must never become part of the welding circuit or sit where slag or the arc can reach them. In confined spaces such as tanks, vessels and boiler drums, R 408.11213 requires the torch valves and the gas and oxygen supply valves outside the space to be shut off when work stops. Plant hot work permits, gas testing and fire watches sit on top of these rules, and Paul Industries works under each plant’s permit system.

Industrial welding across Michigan’s regions

Paul Industries welds at plants across the Lower and Upper Peninsulas, and the work changes with each region’s industries. The facilities named below are market facts only.

Welding in Detroit, Michigan and the Downriver plants

Welding in Detroit covers Marathon Petroleum’s Detroit refinery area, steel and chemical plants, power and wastewater plants, assembly and stamping plants, and hospitals with central steam. Refinery turnarounds bring alloy pipe welding, post-weld heat treatment and heavy examination, while auto plants bring structural, conveyor and utility welding during changeovers. For welding, Detroit boiler work runs through the city’s boiler program, and the rest follows the plant’s procedures.

Industrial welding, Lansing, MI and mid-Michigan

Industrial welding in Lansing, MI and the surrounding area serves assembly plants, state and university buildings in Lansing and East Lansing, hospitals and food plants. Steam and chilled water piping, structural supports for new equipment and repairs to production equipment are the common jobs, often scheduled into holiday shutdowns.

Welding, Grand Rapids, MI and West Michigan

Welding in Grand Rapids, MI and along the lakeshore serves food and beverage plants, furniture and office products makers, device manufacturers and their utilities. Grand Rapids welding work leans toward stainless: sanitary tube, CIP piping, tanks and hygienic equipment frames, alongside structural and utility welding.

Welding, Kalamazoo, Portage and Allegan

For welding, Kalamazoo and its neighbors bring pharmaceutical and medical device work: Pfizer’s Kalamazoo operation is, by Pfizer CentreOne’s own account, the biggest site in that manufacturing network, and Stryker is based in Portage. These sites call for orbital welding with full documentation, borescope inspection and passivation, covered on passivation services in Michigan.

Welding, Midland, MI and the Great Lakes Bay region

Welding in Midland, MI, Bay City and Saginaw serves chemical plants, where Dow is headquartered, with alloy and stainless pipe, vessel repairs and tank work under strict material verification and examination. Flint, Traverse City and the Upper Peninsula add manufacturing, food processing, paper and mining equipment repairs, where cold weather shapes every field job.

Welding processes for plant work

Welding processes for Michigan plant work are chosen by material, position, thickness, access and the quality the joint needs, and the procedure qualification fixes the choice for each joint type. Field pipe welding favors processes that handle all positions and wind, while shop spool work favors higher deposition and repeatability.

Welding processes used at Michigan plants
ProcessTypical useStrengthLimit
Shielded metal arc (stick)Field pipe, structural repairs, outdoor workPortable, tolerant of windSlower; low-hydrogen electrodes need dry storage
Gas tungsten arc (TIG)Root passes, stainless and alloy pipe, thin wallHighest control and cleanlinessSlow; shielding gas protected from drafts
Orbital gas tungsten arcHygienic tube for pharmaceutical, device and food plantsRepeatable welds with recorded parametersNeeds square, clean tube ends and purge control
Gas metal arc (industrial MIG welding)Shop spools, structural steel, equipment framesHigh deposition, fastShielding gas needs wind protection in the field
Flux cored arcStructural and heavy wall work, field fill passesHigh deposition, works outdoors with self-shielded wireSlag removal and fume control
Submerged arcLong seams on tanks and vesselsVery high deposition and qualityFlat or horizontal positions on prepared seams

Industrial fabrication, Michigan projects show, often splits the same assembly between processes: a stainless spool gets TIG roots and orbital welds in prefabrication, then stick or TIG closure welds in the field. Paul Industries plans that split in the procedure package so every joint has a qualified process before work starts.

Structural welding and special inspection under the 2021 Michigan Building Code

Structural welding on Michigan building projects falls under the 2021 Michigan Building Code. Michigan built that code on the 2021 International Building Code and kept its chapter 17 special inspection requirements for structural steel. Platforms, pipe racks, equipment supports, mezzanines and building additions at plants are welded to AWS D1.1 or D1.6, and where special inspection applies, the owner’s special inspector verifies welder qualifications, procedures and completed welds against the approved drawings.

Plant structures outside the building permit, such as many equipment supports and pipe racks inside process units, are welded to the same standards under the owner’s engineering requirements. Paul Industries fabricates structural assemblies off site where possible, welds the field connections, and supplies the welder qualifications and inspection records with the work. Larger steel packages are described under structural steel fabrication.

How are welds examined at operating Michigan plants?

Welds at operating Michigan plants are examined by the method the code and the owner’s specification call for, chosen for the defect type, the material and the conditions on site. Radiography inside a running unit needs exclusion zones and scheduling, so ultrasonic methods have taken over many applications where radiation would interrupt work around the joint.

Weld examination methods at Michigan plants
MethodFindsTypical application
Visual examinationSurface profile, undercut, porosity, misalignmentEvery weld, before and after other methods
Liquid penetrantSurface-breaking cracks on any metalStainless and alloy welds, root and final passes
Magnetic particleSurface and near-surface cracks in carbon steelStructural welds, nozzle and attachment welds
RadiographyVolumetric defects such as porosity and lack of fusionPressure piping and vessel seams where access allows
Ultrasonic and phased arrayVolumetric and planar defects, recorded scansThick welds and joints inside operating units
BorescopeInternal weld profile, discoloration, crevicesHygienic tube in pharmaceutical and food plants

In-service welding and hot taps on live Michigan lines

In-service welding lets a Michigan plant add a branch, a sleeve or a reinforcing pad to a line that stays in operation, and it carries risks that ordinary welding does not. Two failure modes govern the plan: burn-through, when the remaining wall is too thin for the heat input, and hydrogen cracking, when flowing product cools the weld too fast and hardens the heat-affected zone. Both are controlled by measuring the actual wall thickness at the weld location, limiting heat input, using low-hydrogen processes and a procedure qualified for in-service conditions, and checking the flow rate the line will carry during welding.

The fluid matters as much as the metal. Lines carrying oxygen, hydrogen, some chemicals or products that decompose with heat are poor candidates, and many plants prohibit hot tapping on them entirely. For acceptable services, Paul Industries reviews the plant’s hot tap procedure, the line data and the isolation plan with operations, welds the fitting, tests it, installs the valve and makes the tap. Where the risk review points the other way, the connection is planned for the next shutdown instead.

Tank and vessel weld repairs at Michigan plants

Tank and vessel weld repairs at Michigan plants start from the inspection findings and the construction code. A corroded tank bottom, a cracked nozzle weld, a thinned shell course or a damaged roof on an API 650 tank is repaired under API 653, with the repair designed, welded, examined and, where the standard calls for it, hydrotested before the tank returns to service. Pressure vessel repairs follow the National Board Inspection Code, with the inspector involved before the work and the result recorded on the National Board form.

Confined space entry, ventilation, gas testing and rescue planning come with most of this work, along with the MIOSHA Part 12 rule that gas supply valves outside the space are shut whenever welding stops. Paul Industries plans the entry with the plant’s permit system, sets up ventilation and lighting, and coordinates cleaning so welding starts on a gas-free, prepared surface.

Repair and wear welding on Michigan production equipment

Repair and wear welding keeps Michigan production equipment running between replacements. Cracked machine frames, conveyor structures, hoppers, chutes, fan housings, press beds and mill equipment are repaired by excavating the crack, checking its full extent with penetrant or magnetic particle testing, and welding to a procedure that matches the base metal, which on older cast and high-carbon parts often calls for controlled preheat and slow cooling. Wear surfaces on chutes, scrapers and mixer blades are rebuilt with hardfacing alloys chosen for abrasion or impact.

Repairs on equipment that carries pressure or structural load are designed before welding, not improvised, and repairs that change a part’s strength are checked by an engineer. Paul Industries documents each repair with its procedure and inspection results so the plant has a record if the part is examined again.

Welding through a Michigan winter

Winter field welding in Michigan is planned around temperature, moisture and wind. Base metal is preheated to the procedure’s minimum and to drive off moisture when steel is cold, shelters and windbreaks protect the arc and shielding gas, low-hydrogen electrodes are kept in heated ovens, and post-weld cooling is slowed on hardenable materials. AWS D1.1 and the ASME codes set limits for welding on cold or wet base metal, and the procedure package states how they are met on each job.

Cylinder valves that freeze are thawed only with warm air or water under MIOSHA Part 12, and heated enclosures are ventilated so fume and gas do not collect. Paul Industries prices winter conditions into field work from the start so the schedule holds when the temperature drops.

How much do industrial welding services in Michigan cost?

The cost of industrial welding services in Michigan depends on the code and documentation level, the material, the number and size of joints, preheat and heat treatment, the examination required, access and working height, the outage schedule, and winter protection. A structural repair priced in welder hours is a different basis from a boiler repair that carries a permit, filed procedures, the National Board report and examination.

Shop welding of spools and assemblies usually costs less per joint than field welding, so moving work off site reduces both cost and outage hours. Covered public work adds the state’s prevailing wage schedules under the 2023 act. Paul Industries sets a budget range from drawings, photos or a walkdown, then fixes the price when the joints, codes and examination are defined.

Who provides industrial welding services in Michigan?

Paul Industries provides industrial welding services in Michigan, covering boiler and pressure equipment welding, B31.1 and B31.3 pipe, orbital stainless tube, tank work, structural steel and repair welding, with procedures, welder qualifications, examination and records under one contract. The welding connects directly to Paul’s other Michigan work: process piping in Michigan, pressure vessel fabrication in Michigan and tank fabrication in Michigan.

The national scope is described under industrial welding services, and shutdown work under shutdown and turnaround services. Other Michigan services are on the Michigan page.

Plants often start with a single repair and then move larger work to Paul once the records prove out: a cracked header weld becomes a condensate system replacement, or a platform repair becomes a mezzanine for new equipment. Each job keeps the same procedure package, weld map format and examination reporting, so the plant’s files read the same from the first job to the last, and auditors, inspectors and insurers find what they need in one place.

Welding from Paul Industries at Michigan plants

From its headquarters at 256 Shore Drive in Kilmarnock, Virginia, Paul Industries delivers welding at Michigan plants as prefabricated welded assemblies supplied to the plant, design-build packages that include engineering, and complete field installation through examination and turnover. The same approach runs at industrial welding services in Virginia, Paul’s headquarters state, and at Pennsylvania industrial welding plants. To start, request a quote with drawings, photos and the code that applies.

Standards referenced: ASME Section IX · ASME Section I and Section VIII · National Board Inspection Code, 2019 edition · ASME B31.1 and B31.3 · ASME BPE · AWS D1.1 and D1.6 · API 650 and API 653 · Michigan Boiler Rules, R 339.5203, R 339.5210 and R 339.5216 · MIOSHA Part 12, Welding, Cutting and Brazing (R 408.11201 et seq.) · 2021 Michigan Building Code, chapter 17

Frequently asked questions

Who welds at refineries, steel plants and auto plants in Detroit and Wayne County?

Paul Industries welds at refineries, steel and chemical plants, assembly and stamping plants and hospitals in Detroit, Dearborn and the Downriver communities. Work includes turnaround pipe welding with heat treatment and examination, structural and conveyor welding during changeovers, and boiler welding that follows the city’s program inside Detroit and the state Boiler Division outside it.

Which jobs do plants give welding companies in Grand Rapids?

Plants in Grand Rapids and West Michigan send welding companies sanitary tube and CIP piping for food and beverage lines, stainless tanks and equipment frames, structural supports for new machinery, utility piping and repairs to production equipment. Paul Industries handles all of these, with orbital welding and documentation where the plant’s quality system calls for it.

Does Paul Industries weld at chemical plants in Midland, Bay City and Saginaw?

Paul Industries welds alloy and stainless pipe, vessel nozzles and repairs, tank shells and structural steel at chemical plants around Midland, Bay City and Saginaw. These plants expect positive material identification, procedures matched to each alloy, post-weld heat treatment where required and thorough examination records, and Paul’s procedure packages and turnover files are built around them.

How do Michigan welding companies document code welds?

Code welds are documented with the welding procedure specification and its qualification record, the welder’s performance qualification and continuity log, a weld map linking every joint to the welder who made it and the procedure used, examination reports and pressure test records. For boiler work, Michigan adds filing the procedures with the Boiler Division before welding. Paul Industries hands all of it over at turnover.

Do welding procedures have to be filed with the state before boiler welding in Michigan?

Michigan’s R 339.5216 makes filing a condition of starting: Section IX procedures and their qualification records go to the Boiler Division ahead of any boiler welding, whether for installation, repair, replacement or alteration. On site, the inspector may review the procedures and each welder’s qualification record at any time. Paul Industries files them during planning.

Can National Board standard welding procedures be used in Michigan?

The Michigan Boiler Rules accept the standard welding procedures referenced in the National Board Inspection Code but do not require them. A repairer that chooses to use them files the list of standard procedure numbers with the Boiler Division before any repair or alteration that involves welding. Procedures qualified by the welding organization’s own testing remain the common route.

What does MIOSHA require for oxygen and fuel gas cylinders during welding?

MIOSHA Part 12 requires oxygen cylinders in storage to be at least 20 feet from fuel gas cylinders and combustibles, or behind a noncombustible wall at least 5 feet high with a half-hour fire rating. Cylinders must be restrained, acetylene cylinders kept upright, cylinders kept out of the welding circuit, and frozen valves thawed only with warm air or water.

Does structural welding at a Michigan plant need special inspection?

Structural steel welding under a building permit falls under the 2021 Michigan Building Code, based on the 2021 International Building Code with its chapter 17 special inspections. Where special inspection applies, the owner’s special inspector verifies welder qualifications, procedures and completed welds against the approved drawings. Paul Industries provides the records that inspection needs.

Can stainless pipe be welded inside an operating Kalamazoo or Portage drug plant?

Stainless tube is welded inside operating pharmaceutical plants under the site’s change control, gowning and hot work procedures, with orbital welding, inert gas purging, sample coupons and borescope inspection. Work areas are isolated from production rooms. Paul Industries plans the sequence with the plant’s quality and engineering staff so qualification of the modified system follows smoothly.

How are welds examined inside a running Michigan refinery or chemical unit?

Visual examination and surface methods such as penetrant and magnetic particle testing are used on every accessible weld, and volumetric examination is chosen by code and conditions. Radiography needs exclusion zones, so phased array ultrasonic testing is often used inside operating units. Paul Industries schedules examination with the plant’s permit and operations teams.

Can a hot tap be welded onto a live steam or water line at a Michigan plant?

Hot taps are welded onto live steam, water, air and many process lines when the wall thickness, pressure, temperature and flow support a safe in-service weld. The wall is measured at the weld location, heat input is limited and a low-hydrogen procedure qualified for in-service welding is used. Paul Industries reviews each tap with operations and moves risky connections to a shutdown.

How does welding work during a Michigan winter?

Winter field welding uses preheat to the procedure minimum and to remove moisture, windbreaks and heated shelters, heated storage for low-hydrogen electrodes and slower cooling on hardenable steels. Codes set limits for welding on cold or wet metal, and the procedure package shows how they are met. Paul Industries builds winter protection into the field plan and price.

Does a weld repair change a Michigan boiler's paperwork?

A welded repair to a Michigan boiler needs a permit to repair, and on power and high temperature water boilers it follows the National Board R program, so the inspector agrees the method first. On completion, a copy of the permit application and the National Board report go to the Boiler Division, and the repair becomes part of the boiler’s permanent record.

How does Michigan's 2023 prevailing wage law affect welding bids?

Michigan brought back prevailing wage with 2023 PA 10, in force since February 13, 2024. Bids for state projects carry the area wage and fringe schedule the Department of Labor and Economic Opportunity sets for each class of construction mechanic, and welding labor is priced at those rates. Paul Industries prices covered public work on that basis.

Does Paul Industries prefabricate welded spools, frames and platforms for Michigan plants?

Paul Industries builds pipe spools, equipment frames, platforms, stairs and supports off site, welded and examined under controlled conditions, and ships them ready for installation. Off-site work reduces hot work inside the plant, keeps welding out of the weather and shortens outages, leaving field connections and closure welds for the site.

What do industrial welding services in Michigan cost per hour?

Hourly cost depends on the code and documentation level, materials, preheat and heat treatment, examination, access, shift and winter conditions. Code welding with filed procedures and examination costs more per hour of arc time than general repair welding. Paul Industries quotes by the job from drawings, photos or a walkdown, starting with a budget range and fixing the price when joints and codes are defined.

What should a Michigan plant send for a welding quote?

Send drawings or sketches, photos of the work area, the materials and sizes, the governing code, the examination and documentation the plant requires, access and height details, and the outage window. For boiler work, include the boiler data and the inspector’s report. Paul Industries returns a priced scope and schedule.

Need code welding at a Michigan plant?

Send drawings or photos, the materials, the governing code and when the plant can stop. Call 201-450-8280 or request a quote.