Paul Industries provides pressure vessel fabrication in Montana, designing and building ASME Section VIII vessels for refineries, renewable fuel plants, malt houses, breweries, mines, hospitals and laboratories, with materials and impact testing chosen for the state’s cold outdoor service. Montana’s boiler law stops at boilers and steam engines, so a vessel’s paperwork, nameplate and inspection plan come from the ASME and National Board codes and from the owner’s own inspection program. Paul Industries is headquartered at 256 Shore Drive, Kilmarnock, Virginia, and builds vessels for plants across Montana, in all 50 states and abroad.
Request a quote or call 201-450-8280
How Montana treats an unfired pressure vessel
Montana treats an unfired pressure vessel differently from a boiler: Title 50, chapter 74 of the Montana Code Annotated, the state’s boiler and steam engine law, sets permits, inspection intervals and operator licenses for boilers, and contains no state permit, certificate or inspection schedule for air receivers, separators, reactors, heat exchanger shells or other unfired vessels. The Department of Labor and Industry’s boiler safety program follows the same scope, describing its work as boilers and steam engines.
That leaves the vessel’s quality in the hands of the construction code and the people who run the plant. Owners, their insurers and refinery inspection programs specify ASME Section VIII construction, National Board registration and a relief device sized to the code, and federal OSHA, which has jurisdiction over private workplaces in Montana because the state has no approved State Plan, holds employers to recognized engineering practice for pressure equipment. Paul Industries builds every Montana vessel as though a state inspector will read its file, because the insurer, the refinery inspector and the next buyer of the plant all will.
What is considered a pressure vessel, and when does one need ASME construction?
What is considered a pressure vessel under ASME Section VIII, Division 1 is a container for the containment of pressure, internal or external, and the division’s scope generally starts above 15 psig internal design pressure, with exclusions for vessels with an inside diameter, width, height or cross-section diagonal of 6 inches or less, and certain small water heaters and hot water storage tanks. Fired equipment such as boilers belongs to Section I or Section IV, and piping belongs to the B31 codes.
When does a vessel need full ASME documentation in a state with no vessel program? Whenever an owner, an insurer or a process safety program asks for it, which in Montana industry is nearly always. A Section VIII Division 1 vessel carries the ASME certification mark with the U designator, a Manufacturer’s Data Report on Form U-1 or U-1A, and, where the purchase order calls for it, registration with the National Board of Boiler and Pressure Vessel Inspectors. Refinery and chemical owners subject to the OSHA process safety management standard need that documentation for their mechanical integrity files.
Who approves pressure vessels in the US? No single federal office approves them. The ASME code sets construction rules, an Authorized Inspector from an accredited inspection agency verifies the design, materials, welding, examination and pressure test during fabrication and signs the data report, and states with vessel laws add their own registration and inspection. Montana relies on the first two steps, plus the owner’s in-service inspection program.
Types of pressure vessels in oil and gas and the rest of Montana industry
The types of pressure vessels in oil and gas service in Montana range from refinery separators and reactors to gas plant scrubbers and terminal receivers, and the state’s other industries add their own list. Billings has two refineries, Laurel one, and Great Falls a refinery alongside the Montana Renewables plant, which reports producing about 30 million gallons of sustainable aviation fuel a year and announced an expansion toward 200 million gallons in September 2026. Malt, sugar, food and brewing plants, mines, hospitals and laboratories round out the market.
| Industry and places | Typical vessels | Design points | Code path |
|---|---|---|---|
| Refining: Billings, Laurel, Great Falls | Separators, knockout drums, accumulators, exchanger shells, coalescers, reactors | Hydrogen and sour service, corrosion allowance, PWHT, impact testing | Section VIII Div. 1 or Div. 2, API 510 in service |
| Renewable diesel and SAF: Great Falls | Feed pretreatment vessels, hydrotreater separators, hydrogen and product drums | Organic acids and chlorides in feed, hydrogen partial pressure, alloy cladding | Section VIII Div. 1 or Div. 2 |
| Malt and grain: Great Falls and the Golden Triangle | Air receivers, steam flash tanks, water heaters, dust collector pulse tanks | Condensate and steam cycling, outdoor receivers in cold | Section VIII Div. 1 |
| Brewing, distilling and food: statewide | CO2 receivers, pressure-rated tanks, CIP heat exchanger shells, deaerators | Sanitary finish, stainless steel, CO2 recovery pressures | Section VIII Div. 1 |
| Mining and metals: Butte, Beartooth front | Air receivers, accumulators, flotation air and reagent pressure tanks | Abrasion, vibration, outdoor cold, remote site handling | Section VIII Div. 1 |
| Pharmaceutical and research: Hamilton, Bozeman, Missoula | Clean steam and WFI vessels, autoclave jackets, filter housings | Electropolish, drainability, ASME BPE fittings | Section VIII Div. 1 with ASME BPE |
| Agriculture: eastern plains and Golden Triangle | Anhydrous ammonia and propane storage, air receivers | NFPA 58 and ANSI K61.1, cold-weather steels | Section VIII Div. 1 |
How cold service shapes a Montana pressure vessel
Cold service shapes a Montana pressure vessel through its minimum design metal temperature, the lowest metal temperature at which the vessel is rated to see its design pressure. Montana’s official record low is minus 70 degrees Fahrenheit, set at Rogers Pass on January 20, 1954, according to NOAA’s State Climate Extremes Committee, and outdoor vessels on the high plains and in the mountain valleys routinely see temperatures well below zero. A receiver, knockout drum or propane tank that can be pressurized at those temperatures needs a design metal temperature that covers them.
ASME Section VIII handles this through UCS-66 and its exemption curves for carbon steel, which tie the allowable minimum design metal temperature to material group and thickness, and through impact testing when a material or weld falls outside the exemptions. A thin carbon steel shell in an older plate grade can be exempt down to modest temperatures; a thick shell or a vessel that must start up cold often needs normalized, fine-grain or impact-tested plate such as SA-516 in a normalized condition, impact-tested weld procedures, or stainless steel, which UHA-51 treats separately. Paul Industries sets the minimum design metal temperature with the owner from the site’s coldest credible condition, whether the vessel can be depressurized during a cold snap, and any autorefrigeration from flashing liquids such as propane or ammonia.
| Service condition | Basis for the design metal temperature | Usual material approach | Testing and records |
|---|---|---|---|
| Indoors in a heated building, never pressurized cold | Lowest temperature the room can reach with heat lost | Common carbon steel plate and pipe, often inside the UG-20(f) or UCS-66 exemptions | Exemption check recorded for every pressure part |
| Outdoors, depressurized during cold snaps | Coincident pressure and temperature under UCS-66, crediting reduced stress when cold | Carbon steel with the coincident-ratio reduction documented | Operating procedure tied to the rating on the data report |
| Outdoors, under pressure all winter | Site’s coldest credible metal temperature, set with the owner | Normalized fine-grain plate, impact-tested weld procedures | Charpy tests on plate, weld metal and heat-affected zone |
| Flashing liquids: propane, ammonia, CO2 | Autorefrigeration temperature on depressurization, often colder than the weather | Impact-tested carbon steel or austenitic stainless | Relief and blowdown scenarios listed with the MDMT basis |
| Stainless steel process vessels | Process minimum or site minimum, whichever is lower | 304L or 316L austenitic stainless under UHA-51 | Weld metal ferrite and impact rules checked per UHA-51 |
Elevation and wind matter too. Butte sits at about 5,506 feet by NOAA’s station record, and vessels at high sites see lower atmospheric pressure, which affects external pressure design for vacuum service and relief valve set points referenced to gauge pressure. Tall columns and stacks are designed for wind and seismic loads from ASCE 7, which Montana’s building codes program directs designers to use through the ASCE 7 Hazard Tool for sites outside cities and counties that run their own code programs.
How pressure vessel fabrication in Montana runs from data sheet to delivery
Pressure vessel fabrication in Montana runs through the same ASME sequence as anywhere, with schedule built around the plant’s outage and the state’s construction season. Paul Industries starts from the owner’s process data sheet, confirms design conditions, MDMT, corrosion allowance and loads, then calculates the vessel and prepares drawings for owner approval before material is ordered.
| Step | What happens | Record produced | Montana consideration |
|---|---|---|---|
| 1. Design basis | Pressure, temperature, MDMT, corrosion allowance, wind, snow and seismic loads | Design data sheet signed by the owner | MDMT set from site cold, not shop conditions |
| 2. Calculations and drawings | Shell, heads, nozzles, supports, lifting lugs, external loads | Calculation package and approved drawing | Saddles and skirts checked for frozen-ground settlement and wind |
| 3. Materials | Plate, forgings, pipe and fittings bought to Section II | Mill test reports traced to each part | Impact-tested or normalized grades where UCS-66 requires |
| 4. Welding | Qualified procedures and welders under Section IX | WPS, PQR and welder qualification records | Impact-tested procedures for low MDMT |
| 5. Examination | Radiography or ultrasonic testing as the joint efficiency requires, plus visual and surface methods | NDE reports | Full radiography on lethal or high-pressure service |
| 6. Heat treatment | Postweld heat treatment where thickness or service calls for it | Time and temperature charts | Sour and caustic refinery service |
| 7. Pressure test | Hydrostatic test, or pneumatic test where permitted | Test record witnessed by the Authorized Inspector | Test water drained and dried before winter shipment |
| 8. Nameplate and data report | ASME certification mark, U-1 or U-1A, National Board registration when specified | Data report and nameplate rubbing or photo | Nameplate kept visible through insulation for the insurer |
| 9. Delivery and setting | Shipping, rigging, setting, anchoring and connection | Setting and bolt torque records | Oversize loads planned around winter roads and spring load limits |
High pressure vessel fabrication, such as hydrogen service drums, hydraulic accumulators and reactors, moves from Division 1 toward Division 2 when thickness and material savings justify the more detailed design-by-analysis rules. Paul Industries reviews that choice with the owner at the design-basis stage, since Division 2 adds a user’s design specification and a design report signed by a registered engineer but can reduce weight and shipping size for a large vessel bound for a Montana site.
Refinery and renewable fuel vessels in Billings, Laurel and Great Falls
Refinery and renewable fuel vessels in Billings, Laurel and Great Falls are built to the owner’s engineering standards on top of ASME Section VIII, and they enter an API 510 inspection program the day they start up. The Phillips 66 refinery in Billings lists crude distilling, naphtha reforming, fluid catalytic cracking, alkylation, hydrodesulfurization and delayed coking units; Par Montana reports capacity to process 63,000 barrels of crude oil a day at its Billings plant; CHS runs the Laurel refinery; and Great Falls combines a conventional refinery with renewable diesel and sustainable aviation fuel production.
Each of those services pushes vessel design in its own direction. Hydroprocessing separators need hydrogen-resistant steels, chemistry limits on carbon equivalent and postweld heat treatment; alkylation equipment demands careful material selection for acid service; coker drums and fractionator overheads see cycling and corrosion; and renewable feed pretreatment brings free fatty acids, phosphorus and chlorides that are harder on carbon steel than crude. Paul Industries fabricates replacement and new vessels to the refinery’s specifications, delivers data reports and material records in the format its inspection program uses, and schedules delivery to the turnaround window.
Propane and ammonia storage vessels in Montana
Propane and ammonia storage vessels in Montana are pressure vessels when they are stationary: propane storage tanks are ASME pressure vessels built to Section VIII, typically designed for 250 psig, and their installation follows NFPA 58, the liquefied petroleum gas code. Transport tanks and cylinders follow U.S. Department of Transportation rules instead. Anhydrous ammonia storage, common on Montana’s grain farms and at fertilizer dealers, follows ANSI K61.1 and OSHA 1910.111 and is also built as an ASME vessel.
Montana’s cold makes these vessels a special case. A propane or ammonia tank that is filled or vented during a cold snap can chill well below ambient as the liquid boils, so the metal temperature that matters is the autorefrigeration temperature, not the weather. Paul Industries sets the vessel’s minimum design metal temperature with that in mind, chooses impact-tested materials where needed, and fits relief valves, excess flow valves, liquid level gauges and fill connections to the governing standard. For a pressure tank, Montana sites add their own design conditions: a vessel sitting outdoors at a grain elevator, a mine or a remote compressor station is designed for the snow, wind and access at that location.
Can pressure vessels be welded once they are in Montana service?
Pressure vessels in Montana service are welded for repair or alteration when the work or alteration follows the National Board Inspection Code, and in Montana that is the code owners, insurers and refinery inspection programs specify because the state has no vessel program of its own. Repair welding on a vessel proceeds under the National Board R program, with the inspector reviewing the plan before any metal is removed, qualified procedures and welders on the job, and Form R-1 completed at the end; an alteration such as a rerate, a new nozzle or a changed shell section is documented on Form R-2 with a design review.
Paul Industries repairs and alters vessels already in Montana service: nozzle replacement, shell and head patch repairs, weld overlay for corrosion, rerates to new pressure or temperature, and conversion of vessels for new duty. Each job begins with the vessel’s data report and inspection history, sets hold points for the inspector, and ends with a pressure test where the code requires one, an additional nameplate where an alteration changes the rating, as the code requires, and the National Board form for the owner’s file.
How often do pressure vessels need to be inspected in Montana?
How often pressure vessels need to be inspected in Montana is set by the owner’s inspection program and its insurer, not by a state schedule, because the state’s boiler law has no unfired vessel interval. Refineries and process plants follow API 510, which sets external inspection at least every five years and internal or on-stream inspection at half the remaining corrosion life or ten years, whichever is less. Other plants commonly follow the insurer’s interval for air receivers and process vessels, with relief valves tested on the plant’s own schedule.
Paul Industries builds vessels so those inspections are easy: inspection openings sized for access, corrosion monitoring points, insulation that can be removed around nozzles, nameplates visible on brackets above the insulation line, and thickness baseline readings recorded at delivery. A good baseline turns the first API 510 inspection into a measured corrosion rate instead of a guess.
Relief devices, drains and outdoor fittings on Montana vessels
Relief devices, drains and outdoor fittings decide whether a Montana vessel keeps its rating through a hard winter. A relief valve that freezes shut, a drain line that splits, or a level gauge that ices over turns a sound vessel into a hazard, and these failures show up first on receivers, knockout drums and storage vessels set outdoors at refineries, grain sites, mines and compressor stations.
Paul Industries sizes each relief device to the vessel’s maximum allowable working pressure and the governing relief scenario, whether blocked outlet, fire exposure, control valve failure or thermal expansion, and routes discharge piping so it drains away from the valve and cannot collect snow or water. Automatic drains on air receivers are heat traced and insulated or replaced with timed electric drains in heated enclosures, because condensate in a compressed air system freezes at the lowest point first. Level gauges, pressure gauges and transmitters get heated enclosures or seal systems suited to the fluid, and nozzles that carry stagnant liquid are kept short or traced.
Supports and foundations need the same attention. Saddles on horizontal vessels allow for thermal movement between a cold shell and warmer piping, anchor bolts are sized for wind and seismic loads under ASCE 7, and vertical vessels on concrete pads are checked against frost heave where the foundation design depends on it. Ladders, platforms and davits are galvanized or coated for freeze and thaw cycling, and nameplates are mounted on standoff brackets so the insurer’s inspector can read them through insulation and snow.
How much does a pressure vessel cost?
How much a pressure vessel costs depends on its size, design pressure and temperature, material, wall thickness, number and size of nozzles, examination level, heat treatment, internals, finish and documentation. A small carbon steel air receiver built to Section VIII Division 1 sits at the low end; a thick-wall alloy or clad reactor with full radiography, postweld heat treatment and Division 2 design sits at the high end, with stainless and duplex vessels between.
Montana adds a few cost drivers. Impact-tested materials and procedures for low minimum design metal temperature raise material and qualification costs. Shipping a large vessel to a Montana site takes oversize permits and route planning, and spring load restrictions on secondary roads affect timing. Refinery work adds the owner’s specifications and inspection witness points. Paul Industries gives a budget range from comparable vessels once it has the data sheet, then a firm price after the design basis and drawings are agreed.
Who fabricates pressure vessels for Montana plants?
Paul Industries fabricates pressure vessels for Montana plants: refinery and renewable fuel separators and drums, air and gas receivers, propane and ammonia storage, brewery and food plant vessels, pharmaceutical and laboratory vessels, and replacement shells for heat exchangers. Paul Industries, formerly based in northern New Jersey and later in Pennsylvania, now has its headquarters at 256 Shore Drive in Kilmarnock, Virginia, and builds vessels for owners in Billings, Laurel, Great Falls, Sidney, Missoula, Hamilton, Bozeman, Helena, Butte and Kalispell.
Vessels rarely stand alone, and Paul Industries delivers the systems around them. Montana work connects to process piping in Montana for the nozzles and headers, tank fabrication in Montana for atmospheric storage, boiler repair in Montana for the steam plant, industrial welding services in Montana for repairs and alterations, and validation and commissioning in Montana for pharmaceutical and food systems. Supporting services include hydrostatic testing and heat exchanger fabrication.
The national pressure vessel fabrication service covers the full range of ASME vessel work, and the Montana overview describes the state’s industries. Owners with plants in several states can keep one vessel standard: Paul Industries builds pressure vessels for its headquarters state of Virginia, vessels for Wisconsin plants and California pressure vessels, and serves western plants through its West Coast work.
Pressure vessels from Paul Industries for Montana plants
Paul Industries designs, fabricates, tests, delivers, sets and connects ASME pressure vessels for Montana owners, and repairs, alters and rerates vessels already in service. Plants can buy a vessel supply-only, order a design-build package with the vessel, its piping and its instruments, or have Paul Industries install a vessel their own engineer has specified. Every vessel arrives with its calculations, drawings, material records, examination and test reports and data report, ready for the insurer and the plant’s inspection program. Send the process data sheet, sketches or the existing vessel’s nameplate and data report, then request a quote or call 201-450-8280.
Standards referenced: ASME Boiler and Pressure Vessel Code, Section VIII, Division 1 and Division 2 · ASME Section II (materials) and Section IX (welding qualifications) · ASME Section VIII UCS-66 and UHA-51 (impact testing and minimum design metal temperature) · National Board Inspection Code (NB-23) · API 510 (pressure vessel inspection) · NFPA 58 (LP-gas) and ANSI K61.1 (anhydrous ammonia) · ASCE 7 (wind, snow and seismic loads) · Montana Code Annotated Title 50, chapter 74
Frequently asked questions
Who builds pressure vessels for refineries in Billings and Laurel, Montana?
Paul Industries builds pressure vessels for refineries in Billings and Laurel: separators, knockout drums, accumulators, exchanger shells, coalescers and reactor vessels to ASME Section VIII and the owner’s specifications. Vessels are delivered with data reports, material records and thickness baselines that drop straight into the refinery’s API 510 program, and delivery is scheduled to the turnaround window so setting and connection fit the outage.
Does Paul Industries fabricate vessels for Great Falls renewable fuel and malt plants?
Paul Industries fabricates vessels for Great Falls renewable fuel, refining and malting plants, including feed pretreatment vessels, hydrotreater separators, product drums, air receivers and steam flash tanks. Renewable feeds carry free fatty acids, phosphorus and chlorides, so material selection and corrosion allowance are settled with the owner’s engineers before plate is ordered.
Who supplies pressure vessels to Bozeman, Missoula and Hamilton laboratories and pharmaceutical plants?
Paul Industries supplies stainless steel vessels to laboratories, pharmaceutical and research facilities in Bozeman, Missoula and the Bitterroot valley, including clean steam and purified water vessels, autoclave jackets and filter housings. These vessels combine ASME Section VIII construction with ASME BPE finish, drainability and documentation, so they support validation as well as pressure safety.
Does Montana require a state permit for a new pressure vessel?
Montana’s boiler and steam engine law, Title 50, chapter 74 MCA, sets permits and inspections for boilers and contains no state permit, certificate or inspection schedule for unfired pressure vessels. New vessels are therefore governed by the ASME construction code, the owner’s insurer and inspection program, and federal OSHA requirements for safe pressure equipment, which Montana plants follow since the state has no OSHA State Plan.
Should a Montana air receiver carry an ASME nameplate?
A Montana air receiver above the Section VIII size and pressure thresholds should carry an ASME nameplate. Insurers ask for it, relief valve sizing depends on the stamped rating, and a buyer of the plant will look for it. Paul Industries supplies receivers that carry the certification mark and data report the code calls for, with a relief valve sized to the compressor output plus a drain arrangement that keeps working in freezing weather.
What minimum design metal temperature should a Montana outdoor vessel have?
The minimum design metal temperature for a Montana outdoor vessel should cover the coldest metal temperature at which the vessel can be under significant pressure. Montana’s record low is minus 70 degrees Fahrenheit at Rogers Pass, and plains and valley sites see well below zero most winters. Vessels holding flashing liquids such as propane or ammonia also need to cover autorefrigeration on depressurization.
When does a Montana vessel need impact-tested steel?
A Montana vessel needs impact-tested steel when its minimum design metal temperature falls below what ASME UCS-66 allows for the chosen material and thickness without testing. Thick shells, older plate grades and vessels rated for very low temperatures usually cross that line. Paul Industries checks every part, including nozzles, flanges and welds, against the exemption curves and orders impact-tested material and procedures where needed.
What does API 510 require of a refinery vessel in Montana?
API 510 requires a refinery vessel in Montana to be inspected externally at least every five years and internally or on-stream at intervals set by corrosion rate, generally half the remaining life up to ten years, with repairs and alterations made under an authorized inspector. Paul Industries supplies new vessels with thickness baselines and repairs existing ones under the National Board Inspection Code so the API 510 file stays complete.
Can an existing Montana vessel be rerated for a higher pressure?
An existing Montana vessel can be rerated when calculations using actual measured thicknesses, the original material and the current code edition show it can carry the new rating. A rerate is an alteration documented on National Board Form R-2, usually with a new pressure test and an additional nameplate. Paul Industries reviews the data report and inspection history, measures thickness and prepares the rerate package.
Do Montana breweries need ASME vessels for CO2 recovery and bright tanks?
Montana breweries need ASME vessels wherever pressure exceeds the code’s threshold, which includes CO2 recovery receivers, CO2 storage and some pressure-rated bright and serving tanks. Fermenters and bright tanks operating at low pressure can fall outside Section VIII, but their relief devices and ratings still need checking. Paul Industries designs brewery vessels and their piping so ratings and relief settings match how the brewery runs.
How are large vessels shipped to Montana sites?
Large vessels shipped to Montana sites move as oversize loads with state permits and route checks for bridges, overpasses and seasonal road restrictions. Vessels that exceed practical shipping size are built in sections with field closure welds made under the code. Paul Industries plans the shipping envelope at the design stage, so diameter and length are set with the route in mind.
Which pressure vessels do Montana mines use?
Montana mines and mills use air receivers for compressed air systems, accumulators for hydraulic equipment, reagent and flotation air pressure tanks, and filter and heat exchanger shells in water treatment and concentrator circuits. Paul Industries builds these vessels for vibration, abrasion and outdoor cold, with lifting points, skids and supports suited to remote installation and replacement.
What records should a Montana plant keep for each pressure vessel?
A Montana plant should keep the Manufacturer’s Data Report, National Board registration where applicable, design calculations and drawings, material test reports, the pressure test record, relief valve data and every repair or alteration form. With no state vessel registry, the owner’s file is the vessel’s history. Paul Industries delivers that file with every new vessel and updates it after every repair.
Can pressure vessels be built in stainless or duplex for Montana food and water service?
Pressure vessels can be built in 304L or 316L stainless steel, duplex or super duplex for Montana food, beverage, water treatment and corrosive process service. Stainless steels are tested for low temperature under UHA-51 rather than UCS-66, which often simplifies cold service design. Paul Industries selects the alloy from the fluid, chlorides, temperature and cleaning chemistry, then specifies finish and passivation.
Is Division 2 worth it for a large vessel going to Montana?
Division 2 is often worth it for a large, thick or high-pressure vessel going to Montana, because its design-by-analysis rules and higher allowable stresses can cut wall thickness and weight, which lowers material cost and eases oversize shipping. It adds a user’s design specification and an engineer-signed design report. Paul Industries compares both divisions at the design-basis stage and recommends the lower total cost.
Are propane tanks pressure vessels when they sit at a Montana farm or fuel dealer?
Stationary propane tanks at Montana farms, grain elevators and fuel dealers are ASME pressure vessels, normally built to Section VIII for 250 psig and installed under NFPA 58, the liquefied petroleum gas code. Delivery trucks and cylinders follow federal transportation rules instead. Paul Industries builds and installs stationary propane and anhydrous ammonia vessels with relief valves, excess flow valves and gauges suited to cold-weather filling.
What should a Montana plant send to get a pressure vessel quoted?
Send the process data sheet with fluid, design pressure and temperature, minimum design metal temperature, corrosion allowance, size, nozzle list and supports, plus the site location and whether the vessel sits indoors or outdoors. For a replacement, add the existing nameplate and data report. Paul Industries returns a budget range, then a firm price once the design basis and drawings are agreed.
Ordering a code vessel for a Montana plant?
Send the data sheet, site conditions and any existing nameplate or data report. Call 201-450-8280 or request a quote.
