Paul Industries provides process piping in Wyoming: ASME B31.3 design, spool fabrication, installation, tie-ins and testing for gas processing plants, refineries, oil field facilities, mines, power and utility plants, and campuses and hospitals. Paul Industries builds carbon steel, stainless, alloy and lined piping, documents every weld and test for the plant’s mechanical integrity program, and plans the work around Wyoming winters and outage windows.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
Process safety rule 29 CFR 1910.119 adopted by Wyoming OSHA (effective December 11, 2018)
Building codes 2024 IMC and IFGC adopted statewide June 26, 2024
Fire marshal exemption Mines, oil field operations, refineries and LPG facilities (W.S. 35-9-118)
Refining 127,000 b/cd at four refineries, January 1, 2026 (EIA)
Reviewed November 2026

What does process piping in Wyoming have to meet?

Process piping in Wyoming has to meet ASME B31.3 or the other B31 section the owner specifies, the process safety rules Wyoming OSHA enforces at covered plants, and the state, city or county building codes where the piping sits in a building under their reach. Wyoming has no separate state process piping code and no state license for pipefitters or welders, so the engineering standard, the owner’s specification and the plant’s integrity program carry most of the weight. None of the 41 titles of the Wyoming Statutes contains a licensing provision for plumbers, pipefitters or welders.

The national basics of B31.3 design, materials and spool fabrication are on the process piping service page. This page covers what changes at a Wyoming plant: which rules reach the piping, where the plant boundary meets a regulated pipeline, how Wyoming cold affects materials and testing, and how work is planned in operating units across the state.

Where process piping in Wyoming runs

Process piping in Wyoming runs through gas processing plants, refineries, oil field gathering and treating facilities, carbon dioxide and enhanced oil recovery systems, mines and mineral plants, and the utility plants of towns, campuses and hospitals. Crude capacity at the state’s four operable refineries in Sinclair, Evansville, Newcastle and Evanston totaled 127,000 barrels per calendar day at the start of 2026 by the Energy Information Administration’s count, and the U.S. Geological Survey counts five soda ash plants in the Green River Basin.

Wyoming plant types and the process piping they run
Plant typeWhere in WyomingTypical pipingKey piping concerns
Gas processing and treatingGreen River and Wind River basins, Powder River Basin, southwest WyomingInlet, amine, glycol, cryogenic, compression and flare pipingSour service hardness, low-temperature toughness, vibration at compressors
Refining and renewable fuelsSinclair, Evansville, Newcastle, Evanston, CheyenneUnit piping, exchanger and heater connections, tank farm and loading linesAPI 570 inspection history, turnaround windows, hot work control
Oil field facilitiesPowder River Basin and statewide fieldsBattery, separator, treater, water handling and injection pipingProduced water corrosion, freeze protection, remote sites
Carbon dioxide and enhanced recoverySouthwest and central Wyoming fieldsHigh-pressure carbon dioxide, recycle and injection pipingWater content and corrosion, decompression chilling, pressure class
Mines and mineral plantsPowder River Basin coal, Green River trona, uranium and bentonite districtsWater, fuel, compressed air, reagent and slurry pipingWear, mine safety rules, dust and weather exposure
Utilities, campuses and hospitalsCheyenne, Laramie, Casper, Sheridan and other citiesSteam, condensate, chilled and heating water, fuel gas, medical and lab utilitiesBuilding code review, phased cutovers in occupied buildings

Soda ash liquor and slurry service has its own page on process and slurry piping in Wyoming, which covers scaling, wear and caustic-service materials. This page concentrates on the hydrocarbon, gas and utility piping that makes up most of the rest of the state’s plant piping.

Process safety management mechanical integrity for Wyoming piping

Process safety management mechanical integrity applies to piping at Wyoming refineries, gas plants and other covered processes because Wyoming OSHA, part of the Department of Workforce Services, adopted 29 CFR 1910.101 through 1910.126, including the process safety standard 1910.119, in rules effective December 11, 2018. The standard reaches a process that handles a listed highly hazardous chemical above its threshold quantity, or 10,000 pounds or more of a flammable gas or a flammable liquid with a flashpoint below 100 degrees Fahrenheit, with listed exceptions.

For covered piping, paragraph (j) requires written procedures to maintain integrity, trained maintenance personnel, inspections and tests that follow recognized and generally accepted good engineering practice, documentation of each inspection, and correction of deficiencies before further use or in a safe and timely manner. For new piping, (j)(6) requires assurance that materials and fabrication suit the process, and paragraph (i) requires a pre-startup safety review before highly hazardous chemicals enter a new or significantly modified system. Paul Industries builds Wyoming piping with that process safety mechanical integrity file in mind: material test reports traced to heat numbers, positive material identification on alloy, weld maps with welder and procedure for each joint, examination and hardness results, and the test package for every line.

When is ASME B31.3 required in Wyoming?

When is ASME B31.3 required at a Wyoming plant? Whenever the owner’s specification, the insurer, or the plant’s process safety program names it as the recognized engineering practice for the piping, which in practice covers chemical, petroleum, gas processing and most mineral plant piping. No Wyoming statute names B31.3 directly, so the requirement passes through those documents and through the integrity program that later inspects the piping to API 570.

Steam and boiler external piping goes to ASME B31.1, building services piping to the mechanical and fuel gas codes, and cross-country lines to the pipeline codes. Paul Industries confirms the code for each line on the line list before design starts, because the code sets the allowable stress, examination extent and test pressure that follow.

Matching Wyoming fluids to B31.3 fluid service categories

B31.3 fluid service categories decide how much examination, how strict a design and what kind of test a line gets, and the asme b31.3 categories apply to Wyoming fluids in a predictable way.

ASME B31.3 fluid service categories with Wyoming examples
Fluid serviceWhat qualifiesWyoming examplesEffect on the work
Category DNonflammable, nontoxic, not damaging to tissue, design pressure at or below 150 psig, design temperature from -20 F to 366 FUtility water, low-pressure air, cooling waterLighter examination; initial service leak test permitted in place of hydrostatic test
NormalFluids outside the other categoriesNatural gas, hydrocarbon liquids, amine, glycol, produced waterStandard design, examination and hydrostatic or pneumatic test
Category MFluids where a single exposure to a very small quantity can cause serious irreversible harm, as designated by the ownerHigh hydrogen sulfide streams where the owner so designatesAdded design limits, examination and leak testing
High PressureService the owner designates under the high pressure chapterVery high pressure injection or compression systems where designatedSeparate design and examination rules
Elevated TemperatureService at metal temperatures where creep governs, as designated by the ownerRefinery heater and reactor pipingAdded design and examination requirements

The owner designates the category for each line. Paul Industries reviews the designations on the line list, flags lines where the fluid or temperature suggests a different category, and sets examination and testing to match.

What is the difference between ASME B31.3 and B31.4 at a Wyoming site?

The difference between ASME B31.3 and B31.4 at a Wyoming site is the difference between plant piping and pipeline: B31.3 governs piping inside a processing plant, refinery or terminal, while B31.4 governs pipelines that carry liquid hydrocarbons, carbon dioxide and similar liquids between facilities, and B31.8 governs gas transmission and distribution piping. Wyoming has all three, often within a few hundred feet of each other where a gathering line enters a gas plant or a carbon dioxide line leaves one.

The boundary matters because the rules change at it. Pipelines fall under federal pipeline safety regulation, and for Wyoming pipeline safety on jurisdictional intrastate gas systems the Public Service Commission exercises federal authority, with civil penalties under W.S. 37-2-128 of up to $100,000 per day for each violation. Plant piping falls under B31.3, the owner’s integrity program and process safety management where it applies. Paul Industries marks the code break on the drawings, usually at the plant’s isolation valve or a flange, and documents each side to its own code.

How Wyoming codes separate process piping from plumbing

Process piping vs plumbing in Wyoming comes down to what the pipe carries and which code covers it: plumbing serves people with potable water and drainage under the plumbing code, while process piping carries the fluids of a manufacturing or utility process under B31.3, B31.1 and the mechanical code. Since June 26, 2024, Wyoming’s state codes have been the 2024 International Building, Fire, Mechanical and Fuel Gas Codes, adopted by the council that oversees fire prevention and electrical safety, with the plumbing code applying through their references.

Where a city or county holds code authority, its building department issues permits and inspects; elsewhere, the State Fire Marshal reviews plans for state and government buildings, larger public buildings and remodels of $40,000 or more. Mines, oil field operations, refineries and liquefied petroleum gas facilities are outside that statute under W.S. 35-9-118. Contractor licensing also sits with counties, cities and towns: those that license contractors must recognize an active license from another Wyoming jurisdiction under W.S. 16-6-1101, so a license issued in one Wyoming city carries to the next. Paul Industries prepares the drawings and test records each reviewer asks for.

Cold-weather design and testing for Wyoming piping

Cold-weather design and testing for Wyoming piping start with material toughness, because carbon steel pipe, fittings and welds below their minimum temperature need impact-tested material under B31.3. Gillette averages a January low of 14.3 degrees Fahrenheit and Laramie 10.3 in NOAA’s 1991 to 2020 normals, the state record is minus 66 degrees, and gas letting down through a valve can chill piping far below the weather.

Paul Industries sets the minimum design temperature for each line with the plant’s process engineers, specifies impact-tested pipe and fittings and qualifies weld procedures with impact tests where required, and designs drains, high-point vents and dead legs so water cannot collect and freeze. Testing in winter needs its own plan. A hydrostatic test at 1.5 times design pressure, adjusted for temperature, uses water that can freeze in a low point or in an instrument tap, so test sections are heated, drained and blown dry promptly. Where water cannot be used, a pneumatic test at 1.1 times design pressure follows B31.3’s added precautions, including a stored-energy review and a controlled pressurization sequence.

Carbon dioxide and enhanced recovery piping

Carbon dioxide piping for Wyoming enhanced oil recovery and gas processing behaves differently from natural gas piping because carbon dioxide at high pressure is a dense fluid that chills sharply when it expands. A release or a fast blowdown can drop metal temperature far below ambient, and dry ice can form at vents and relief outlets, so materials, relief design and blowdown rates are chosen for the cold that decompression produces, not the weather alone.

Water control is the second issue. Dry carbon dioxide is gentle on carbon steel, but free water turns it into carbonic acid that corrodes quickly, so dehydration upstream and dew point monitoring carry as much weight as wall thickness. Elastomers in valves and seals must resist explosive decompression, since carbon dioxide absorbed into a seal expands violently when pressure drops. Paul Industries builds carbon dioxide compression, recycle and injection piping with impact-tested materials for the decompression temperature, seal and valve selections suited to the service, relief and vent systems sized to avoid plugging, and high-point vents and low-point drains placed for commissioning and outages.

Materials for Wyoming gas, hydrocarbon and water piping

Materials for Wyoming plant piping are chosen for the fluid, the minimum design temperature and the corrosion the line will see over its life. Most hydrocarbon and gas piping is carbon steel, with impact-tested grades for low temperature and hardness-controlled welding for sour service; amine regenerator and reboiler lines often move to stainless where carbon steel corrodes in hot, rich amine; glycol and condensate lines are usually carbon steel with corrosion allowance; and produced water lines take coatings, linings, fiberglass or duplex stainless depending on pressure and chemistry.

Paul Industries writes a material specification for each service before fabrication starts, with the pipe, fittings, flanges, bolting, gaskets and valve trims named, and applies positive material identification to alloy components so a wrong-material fitting is caught in the fabrication area instead of in service. Every heat number is traced to its spool on the weld map, which is the record an integrity inspector reaches for when a line shows unexpected corrosion years later.

Insulation and jacketing are part of the material choice in Wyoming as well. Wind strips heat from bare and poorly jacketed lines, and wind-driven snow finds every gap in a jacket seam, which is where corrosion under insulation starts. Paul Industries specifies insulation thickness for the wind speed and the fluid’s freeze or hydrate point, uses sealed and banded metal jacketing with seams lapped to shed water, coats carbon steel under insulation, and adds inspection ports at the low points and supports where water collects. Heat tracing circuits are laid out with the insulation so the tracing, the jacketing and the drains all work together through a January cold snap.

Testing Wyoming piping before startup

Testing Wyoming piping before startup follows the method B31.3 assigns to each fluid service, chosen with the plant’s isolation points and the season in mind. The table compares the methods used at Wyoming plants.

B31.3 leak test methods and how they suit Wyoming conditions
TestWhen it is usedTest pressureWyoming considerations
HydrostaticDefault method for most process lines1.5 times design pressure, adjusted for temperatureFreeze risk in low points and taps; heated sections, warmed water and prompt draining in winter
PneumaticWhere water would harm the system or cannot be supported or removed1.1 times design pressureStored-energy review, exclusion zones and staged pressurization; avoids winter freezing
HydropneumaticWhere part of a system can hold water and part cannotPer the pneumatic limitsSame precautions as pneumatic for the gas-filled part
Initial service leak testCategory D fluid service, at the owner’s optionOperating pressure with the fluid in serviceSuits utility water and low-pressure air in occupied buildings
Sensitive leak testCategory M service and where specifiedPer the code’s sensitive leak methodAdded to the hydrostatic or pneumatic test for toxic service

Each test is recorded with the gauge serial numbers and calibration dates, the test medium and temperature, the hold time and the result, signed by the inspector, so the test package can stand on its own in the plant’s records.

How Wyoming plants inspect piping after startup

Wyoming plants inspect piping after startup under API 570, the in-service piping inspection code that refinery and gas plant integrity programs generally adopt as recognized practice. Piping is grouped into circuits with similar service and corrosion behavior, thickness measurement locations are set where corrosion is expected, and each circuit is assigned a class that reflects the consequence of a leak, which drives how often it is inspected.

New piping inspects more efficiently when the first readings exist before service begins. Paul Industries records baseline wall thickness at agreed locations, marks injection points, mixing points and dead legs where corrosion concentrates, and supplies isometrics that the plant can number into circuits. Where an inspection later finds thinning, Paul Industries replaces the affected spools during the next outage with the same traceability as the original work.

Tie-ins, turnarounds and work in operating Wyoming plants

Tie-ins and turnarounds at Wyoming plants are planned around short outage windows, so the piping is prefabricated and tested before the plant shuts down. Paul Industries builds spools to field-verified dimensions, hydrotests them before shipment where the system allows, and stages them by tie-in so the outage is spent setting, bolting and making closure welds.

Live work follows the plant’s permits for hot work, isolation, confined space and, at sour gas plants, hydrogen sulfide. Hot work on or near a covered process needs a permit under 1910.119(k) documenting the fire prevention measures of 1910.252(a). Hot taps, line stops and temporary bypasses are planned with the plant’s operations and integrity staff. Piping changes that add or modify an emission unit are checked against the plant’s air permit, since Wyoming DEQ rules require a construction permit before any actual work on a modified source.

What does process piping in Wyoming cost?

Process piping in Wyoming costs what the line sizes, materials, fluid service, examination, testing and access make it cost, with outage timing a large factor at refineries and gas plants. Sour service hardness testing, impact-tested materials, alloy or lined pipe, heat tracing and insulation, and winter protection each add cost; prefabrication and good tie-in planning reduce it by shortening the time spent inside an operating plant.

Paul Industries prices Wyoming piping in two steps: a budget figure from comparable scope while the line list is forming, then a fixed price when every line, material, test and tie-in is defined. Spool supply, design-build and complete installation are all available.

Who installs process piping in Wyoming?

Paul Industries installs process piping in Wyoming: gas plant, refinery, oil field, carbon dioxide, mine and utility piping in carbon steel, stainless, alloy and lined materials, designed to ASME B31.3 or B31.1, fabricated as spools, installed, tested and documented, around Casper, Gillette, Cheyenne, Laramie, Rock Springs, Green River, Sinclair and Evanston. Among process piping contractors and piping contractors serving the state, Paul Industries carries design, fabrication, installation, testing and turnover on one contract, with repairs and replacements of industrial piping in operating units.

The same contract reaches the equipment the piping connects: pressure vessel fabrication in Wyoming, tank fabrication in Wyoming, industrial welding services in Wyoming, boiler repair in Wyoming for the steam side, and validation and commissioning in Wyoming for flushing, testing and startup records. Every other Paul Industries service in the state is listed on the Wyoming page.

Plant piping from Paul Industries for Wyoming

Paul Industries is headquartered at 256 Shore Drive, Kilmarnock, Virginia, and as an East Coast contractor takes piping work across Wyoming, the West and all 50 states. Its piping method is the one described for its headquarters state on the process piping in Virginia page and for Gulf Coast plants on the Texas process piping page: a verified line list, the right code for every line, traceable materials, documented welding and testing, and a turnover package the integrity program can use. Send the line list or P&IDs, isometrics, fluid data, materials and outage dates, and request a quote for process piping in Wyoming.

Standards referenced: ASME B31.3 · ASME B31.1 · ASME B31.4 · ASME B31.8 · API 570 · ASME Section IX · NACE MR0175/ISO 15156 · 29 CFR 1910.119 as adopted by Wyoming OSHA · 2024 International Mechanical Code and International Fuel Gas Code (as adopted June 26, 2024) · W.S. 35-9-118 · W.S. 16-6-1101

Frequently asked questions

Who installs gas plant and refinery piping around Casper and Evansville?

Paul Industries installs gas plant and refinery piping around Casper and Evansville: unit piping, exchanger and heater connections, tank farm and loading lines, and gathering and treating piping for the surrounding gas facilities. Spools are fabricated before the outage, every weld is recorded on a weld map, and the test packages are built for the plant’s API 570 and process safety files. Call 201-450-8280 to discuss a scope.

Does Paul Industries build piping for Gillette and Powder River Basin oil and gas facilities?

Paul Industries builds piping for oil field batteries, compressor stations, water handling and injection facilities, and gas treating plants around Gillette and the Powder River Basin. Produced water lines get corrosion-resistant materials or internal protection, outdoor piping is designed with drains and heat tracing for winter, and skid-mounted packages are built and pressure tested before they reach the site.

Which of the mechanical contractors Cheyenne, WY campuses and plants call handles process piping?

Paul Industries handles steam, condensate, heating and chilled water, fuel gas and process piping for campuses, hospitals, state buildings and manufacturers around Cheyenne and Laramie. Building piping follows the 2024 International Mechanical and Fuel Gas Codes adopted statewide, or the city’s adopted codes where it holds authority, and work in occupied buildings is phased so services stay on during cutovers.

Who pipes gas plants and carbon dioxide facilities in southwest Wyoming?

Paul Industries pipes gas processing and carbon dioxide facilities in southwest Wyoming, around Rock Springs, Green River and Evanston: inlet, amine, glycol and compression piping, flare systems, and high-pressure carbon dioxide piping. Sour lines meet NACE MR0175/ISO 15156 hardness limits, and carbon dioxide lines are designed for decompression chilling and kept dry to control corrosion.

Does Wyoming require a permit for new process piping inside a plant?

New process piping inside a Wyoming plant needs a building permit only where a city, county or the State Fire Marshal has jurisdiction over the building and the work falls under the adopted codes. Mines, oil field operations, refineries and LPG facilities fall outside the fire marshal’s statute. Piping that adds or modifies an emission source may need a DEQ air construction permit. Paul Industries checks each path before work starts.

Is there a Wyoming license for pipefitters or welders?

Wyoming statutes contain no state license for pipefitters or welders; qualification comes from the codes, with welders and procedures qualified under ASME Section IX for B31.3 and B31.1 work. Counties, cities and towns that license contractors must recognize active licenses from other Wyoming jurisdictions under W.S. 16-6-1101. Paul Industries documents each welder’s qualification on the weld map for every joint.

Which piping at a Wyoming gas plant falls under process safety management?

Piping in any process at a Wyoming gas plant that holds 10,000 pounds or more of flammable gas or flammable liquid, or a listed highly hazardous chemical above its threshold, falls under 29 CFR 1910.119 as Wyoming OSHA adopted it, with listed exceptions. That piping, including valves, is part of the mechanical integrity program. Paul Industries supplies the material, weld and test records the program needs.

Where does a gas plant's B31.3 piping end and a pipeline begin?

A gas plant’s B31.3 piping usually ends at the plant’s inlet or outlet isolation valve or flange, where B31.8 gas pipeline or B31.4 liquid pipeline rules take over, as set by the operator’s documented boundary and federal pipeline rules. Paul Industries marks the code break on the drawings and builds and tests each side to its own code, so the records match the boundary the regulators see.

What keeps a winter piping hydrotest in Wyoming from freezing?

A winter piping hydrotest in Wyoming stays clear of freezing when Paul Industries controls it by testing in sections that can be heated and drained, warming the test water where needed, recording metal and water temperatures, removing water from low points and instrument taps immediately after the test, and blowing lines dry. Where water cannot be used, a pneumatic test at 1.1 times design pressure follows B31.3’s added safety precautions.

What materials suit produced water piping in Wyoming oil fields?

Produced water piping in Wyoming oil fields carries salts, dissolved gases and solids that attack bare carbon steel, so common choices include internally coated or lined carbon steel, fiberglass-reinforced pipe where pressure and temperature allow, duplex stainless in demanding service, and carbon steel with added corrosion allowance and chemical treatment. Paul Industries selects material from the water analysis and operating conditions.

Can Paul Industries hot tap a live line at a Wyoming plant?

Paul Industries plans hot taps on live lines at Wyoming plants with the plant’s operations and integrity staff: wall thickness and flow checks at the tap location, a welding procedure suited to welding on an operating line, the fitting and valve design, the hot work permit, and a pressure test of the fitting before the cut. The tap lets a new branch connect without shutting the header down.

What records does a Wyoming plant receive when new piping is turned over?

A Wyoming plant receives isometrics marked as built, material test reports traced by heat number, positive material identification records for alloy, weld maps with welder and procedure for each joint, examination and hardness reports, heat treatment charts where applicable, test packages with gauges and pressures, and flushing records. Paul Industries organizes them by line for the plant’s mechanical integrity and API 570 files.

Why do sour gas lines in Wyoming cost more to install?

Sour gas lines in Wyoming cost more to install because NACE MR0175/ISO 15156 limits hardness in base metal and welds, which brings hardness-tested welding procedures, heat input control, post-weld heat treatment where required, added examination and full material traceability. Paul Industries builds those requirements into the price from the start so the plant sees the full cost before work begins.

Does Paul Industries supply fabricated spools for a Wyoming plant to install?

Paul Industries supplies fabricated spools for Wyoming plants on a supply-only basis as well as installing them: spools built to the plant’s isometrics or field measurements, welded and examined, hydrotested where specified, painted or insulated as required, tagged by line and tie-in, and shipped with their records. Plants that prefer a complete installation get the same spools installed and tested by Paul Industries.

Which drawings and data start a Wyoming piping estimate?

Send the line list or P&IDs, isometrics or a site walk request, fluid and design conditions, material and code requirements, fluid service designations, insulation and tracing needs, tie-in locations and the outage dates. A budget figure comes back first and a fixed price follows once the lines are defined. Call 201-450-8280 or request a quote.

How are compressor station lines protected from vibration damage in Wyoming?

Compressor station lines in Wyoming are protected from vibration by a piping design that keeps natural frequencies away from the compressor’s pulsation frequencies, with support spacing, clamp design and small-bore branch bracing checked against the machine data. Paul Industries builds supports and bracing to that design and checks small-bore connections, where most vibration fatigue failures start, during installation.