Paul Industries provides pressure vessel fabrication in Wyoming: ASME Section VIII separators, scrubbers, contactors, receivers, flash tanks, filters and process vessels for gas plants, refineries, mines, soda ash plants and oil and gas sites, designed for Wyoming cold and delivered with the nameplate, data report and test records the owner’s insurer and inspectors expect. Paul Industries designs, fabricates, supplies and installs new vessels, and repairs, alters and rerates vessels already in service under the National Board Inspection Code.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
Vessel law None; no state registration or state vessel inspector
Mine vessels Inspected by National Board commissioned inspectors (mine rules 56/57.13015)
Well-site vessels API 510 (2023) inspection, rule effective November 7, 2025
Record low -66 F, Yellowstone, 1933 (NOAA State Climate Extremes)
Reviewed November 2026

What does pressure vessel fabrication in Wyoming have to satisfy?

Pressure vessel fabrication in Wyoming has to satisfy the ASME Boiler and Pressure Vessel Code as the owner’s specification, the insurer and the federal and state safety rules call for it, because Wyoming has no general pressure vessel law of its own. A search of all 41 titles of the Wyoming Statutes finds no use of the phrase pressure vessel or the word unfired. There is no state registration number, no state inspector and no certificate to post for an ordinary plant vessel.

Code requirements reach Wyoming vessels through three other doors: the Department of Workforce Services mining rules, which apply ASME and the National Board Inspection Code to every vessel on a mine property; Wyoming OSHA, which runs the state’s occupational safety program and has adopted the federal air receiver and process safety standards; and the owner, whose purchase specification and insurer expect a vessel built and documented to Section VIII. The national design, testing and stamping steps are explained on the pressure vessel fabrication service page. This page covers the Wyoming side.

Wyoming pressure vessel rules by type of site

Wyoming pressure vessel rules depend on whether the vessel sits at a mine, a well site, a process safety covered plant or an ordinary factory, and the table sets out the rule that applies to each.

Rules that reach pressure vessels at Wyoming sites (Wyoming Statutes and Department of Workforce Services rules)
SiteRuleConstructionInspection in service
Surface and underground metal and nonmetal mines, including trona minesMine rules Chapters 2 and 3, sections 56.13001, 56.13015, 57.13001 and 57.13015ASME Boiler and Pressure Vessel CodeCompressed-air receivers and other unfired pressure vessels inspected by National Board commissioned inspectors under the NBIC, records open to the State Mine Inspector
Underground coal minesMine rules Chapter 4, section 75.1730ASME Section VIIIRelief valves, gauges and drains on compressors and receivers
Surface coal minesMine rules Chapter 5, sections 77.411 and 77.412ASME Boiler and Pressure Vessel CodeAutomatic relief valves, pressure gauges and drain valves on receivers
Well drilling, completion and servicing sitesChapter 11 of the Wyoming OSHA well-site rules, in force since November 7, 2025Good engineering practice with the 2023 ASME code as the referenceAPI 510 (2023)
Air receivers in general industryWyoming OSHA General Industry Chapter 13, adopting 29 CFR 1910.169ASME Section VIIIDrains, gauge and safety valves kept working; receiver accessible
Refineries, gas plants and other process safety covered plantsWyoming OSHA General Industry Chapter 8, adopting 29 CFR 1910.119Quality assurance that equipment as fabricated suits the processMechanical integrity program following recognized and generally accepted good engineering practice

Outside those settings, the owner and the insurer decide. Paul Industries builds every Wyoming vessel to Section VIII whatever the site, so a separator first set at a well pad, or a receiver first used in a shop, can move to a mine or a covered process without a gap in its paperwork.

How often do pressure vessels need to be inspected in Wyoming?

How often do pressure vessels need to be inspected in Wyoming has no single state answer: the frequency comes from API 510 at well sites, from the mechanical integrity program at process safety covered plants, from the National Board Inspection Code and the commissioned inspector at mines, and from the insurer everywhere else, which also settles who inspects pressure vessels at each site. API 510, which the new Wyoming oil and gas rule names, sets intervals from the vessel’s corrosion rate and remaining life rather than from the calendar alone, so a vessel losing metal quickly is inspected more often than one in clean service.

Do all pressure vessels need to be inspected? In practice every vessel at a Wyoming mine does, under the mining rules, and every vessel in a covered process does under 29 CFR 1910.119(j), which calls for documented inspections and tests at a frequency consistent with manufacturers’ recommendations and good engineering practice, and more often when operating experience shows the need. Paul Industries designs new vessels with that future inspection in mind: corrosion allowance recorded on the data sheet, thickness monitoring locations marked, manways and inspection openings where an inspector can use them, and a baseline thickness survey handed over with the vessel.

OSHA pressure vessel inspection requirements in Wyoming

OSHA pressure vessel inspection requirements in Wyoming are enforced by Wyoming OSHA, a division of the Department of Workforce Services, which has adopted the federal general industry standards by reference. Chapter 13 of its general industry rules incorporates 29 CFR 1910.166 through 1910.169, including the air receiver standard, and Chapter 8 incorporates 1910.101 through 1910.126, including process safety management. Both chapters have been in force in their current form since December 11, 2018.

Under 1910.119(j), a refinery, gas plant or other covered process has to keep written procedures for the ongoing integrity of its pressure vessels, storage tanks, piping and relief systems, train the people who maintain them, and document each inspection with the date, the inspector, the equipment identifier, the method and the result. Paragraph (j)(6) adds a quality assurance duty for new equipment: the owner must assure that equipment as it is fabricated suits the process. Paul Industries backs that duty with the records it delivers: material test reports traced to each part, weld maps, examination reports, the hydrostatic test record, and the manufacturer’s data report, filed so the plant’s integrity group can load them into its inspection system.

Air receivers: what Wyoming plants and mines need

Air receivers at Wyoming plants and mines carry detailed written rules, because both the general industry standard and the mining rules address them directly. The air receiver tank inspection requirements in 29 CFR 1910.169, as Wyoming OSHA adopted it, call for construction to ASME Section VIII, a drain pipe and valve at the lowest point, an indicating pressure gauge, and spring-loaded safety valves sized so pressure never rises more than 10 percent above the maximum allowable working pressure, with no valve of any kind between the receiver and its safety valve. Drains, handholes and manholes must stay accessible, and a receiver may never be buried.

At mines the rules go further: compressed-air receivers and other unfired pressure vessels are inspected by inspectors holding a National Board commission, and the records are kept to the National Board Inspection Code and made available to the State Mine Inspector. How often should an air receiver be inspected? At a mine, as often as the commissioned inspector and the NBIC direct; elsewhere, as the insurer and the plant program set it, with drains worked often enough to keep water and oil out. Paul Industries supplies receivers with the drain, gauge and relief arrangement the rules describe, and replaces receivers that fail inspection.

Designing vessels for Wyoming cold

Designing vessels for Wyoming cold starts with the minimum design metal temperature, the lowest metal temperature the vessel is stamped for, because carbon steel loses toughness as it cools. Wyoming’s official record low is minus 66 degrees Fahrenheit, set at Riverside Ranger Station in Yellowstone on February 9, 1933, and NOAA’s 1991 to 2020 normals put January average lows at 9.8 degrees at Lander, 10.3 at Laramie and 13.6 at Rock Springs. An outdoor vessel that can sit cold and pressurized through a January night needs a design metal temperature that reflects it.

Cold-service decisions for Wyoming pressure vessels
DecisionWhy it matters in WyomingHow Paul Industries handles it
Minimum design metal temperatureOutdoor vessels at well pads, gas plants and mines see winter lows well below zeroSet from site data and process upsets, including autorefrigeration on blowdown
Material and impact testingCarbon steel below the Section VIII exemption curves needs impact-tested plate, forgings and weld proceduresSelects impact-tested or fine-grain materials and qualifies procedures with impact tests
Freeze pointsWater in drains, level bridles and dead nozzles freezes and splits fittingsSelf-draining nozzles, heat-traced bridles, insulated drain legs
Wind and snowTall columns and skid-mounted vessels on open ground carry wind and drift loadsSupports and anchor bolts checked to ASCE 7 for the site
Hydrostatic test waterWinter test water can freeze in the vessel or chill metal below its rated temperatureTest timing, warmed water or heated enclosures, metal temperature recorded on the test chart

Pressure-reducing service needs the same thought. Gas letting down through a control valve or a relief valve chills the downstream metal, and a vessel that blows down in winter can reach a far lower temperature than the weather alone suggests. Paul Industries checks those cases during design, because a vessel whose design metal temperature is set too warm becomes a repair problem the first cold season.

Gas processing, carbon dioxide and sour service vessels

Gas processing vessels in Wyoming separate, treat and dry raw gas that often carries carbon dioxide, hydrogen sulfide and water, and each of those changes the vessel specification. Inlet separators and slug catchers take liquids out ahead of treating; amine contactors and regenerators remove acid gas; glycol contactors and molecular sieve dehydrators dry the gas; and high-pressure carbon dioxide service adds its own corrosion risk whenever free water is present.

Sour service vessels are built to NACE MR0175/ISO 15156 hardness limits, with weld procedures qualified for hardness, controlled heat input, post-weld heat treatment where the procedure calls for it, and material traceability through every pressure part. Paul Industries fabricates those vessels with the documentation an integrity group needs to justify inspection intervals later, and builds skid-mounted separator and treating packages for well sites with the vessel, piping, instruments and supports tested as one unit.

Vessels for refineries, soda ash plants and mines

Vessels for Wyoming refineries, soda ash plants and mines are replaced and added on outage schedules, so the fabrication plan follows the turnaround date. The Energy Information Administration’s 2026 capacity survey shows four operable refineries in the state, in Sinclair, Newcastle, Evanston and Evansville outside Casper, and the U.S. Geological Survey counts five soda ash plants run by four companies in the Green River Basin.

Refinery work includes drums, accumulators, separators, exchanger shells and reactor-adjacent vessels replaced in kind or upgraded in material. Soda ash plants run flash tanks, steam separators, pressure filters, condensate receivers and vacuum vessels on evaporator and crystallizer circuits, where external pressure design matters as much as internal. Mines run air receivers, hydraulic accumulators and water treatment vessels. Paul Industries fabricates replacement vessels ahead of the outage, matches nozzle orientation and elevations to the existing piping, and sets them during the shutdown with the tie-in spools already built.

How a Wyoming vessel order runs from data sheet to nameplate

A Wyoming vessel order runs through the same Section VIII steps as anywhere, with site conditions written into the first one. The table shows the sequence and the record each step produces.

Pressure vessel fabrication sequence for Wyoming plants
StepWhat happensRecord produced
Data sheetDesign pressure and temperature, minimum design metal temperature, fluids, corrosion allowance, site elevation, wind and snow loadsApproved data sheet
DesignShell, head and nozzle calculations to Section VIII Division 1 or 2, supports and lifting lugsCalculation package and drawings for owner review
MaterialsPlate, forgings and pipe ordered to ASME Section II, impact tested where requiredMaterial test reports traced to each part
FabricationForming, fit-up and welding with Section IX procedures and qualified weldersWeld map and welder records
Examination and heat treatmentRadiography or ultrasonic examination, hardness tests for sour service, post-weld heat treatment where requiredExamination reports and heat treatment charts
Pressure testHydrostatic test witnessed by the Authorized InspectorTest record
Nameplate and data reportASME certification mark and nameplate applied, manufacturer’s data report signed, National Board registration where specifiedData report and nameplate rubbing
Delivery and settingShipped, set, leveled and connectedTurnover file for the owner and insurer

Repairs, alterations and rerates on Wyoming vessels

Repairs, alterations and rerates on Wyoming vessels follow the National Board Inspection Code, Part 3, and, for vessels in API 510 programs, the repair and rerating rules of that code. Welding on a pressure part is done under the National Board R program, with the inspector consulted first, a qualified procedure, examination suited to the repair, a pressure test where the inspector requires one, and an R-1 or R-2 report at the end. At a mine, the commissioned inspector who examines the vessel also reviews the repair.

Common Wyoming scopes include nozzle replacements and additions, corroded shell and head sections cut out and replaced, weld overlay on thinned areas, new internals in separators, and rerates when a gas plant raises operating pressure or a process changes temperature. Paul Industries calculates the rerate, plans the repair with the inspector, prefabricates the parts, and completes the work in the outage window with the nameplate and records updated.

Relief protection for Wyoming vessels

Relief protection for a Wyoming vessel has to keep working in weather that freezes water in a discharge line and packs snow into an open outlet. Section VIII requires overpressure protection on every vessel it covers, and the air receiver rule adds that no valve may sit between a receiver and its safety valve. A relief valve that is correctly sized and set but sits under a frozen plug of condensate gives the same result as no valve at all.

Paul Industries designs relief systems for Wyoming conditions from the start. Discharge lines slope back to a drain or are fitted with weep holes and drains at the low point, outlets are turned and capped against snow and rain without restricting flow, and valves in wet or sticky service are protected with heat tracing or a rupture disk upstream where the code permits the combination. Relief loads are calculated for fire, blocked outlet, control valve failure and thermal expansion, and the valve set pressure is stamped at or below the vessel’s maximum allowable working pressure. Each valve arrives tagged with its set pressure and capacity, and the relief device list goes into the turnover file so the plant’s inspection program can schedule testing from the first day of service.

How Wyoming compares on pressure vessel requirements by state

Pressure vessel requirements by state run from full programs with registration, certificates and state inspectors to Wyoming’s approach, which leaves general industry to federal safety standards, insurers and owners and writes its specific rules for mines and well sites. The practical result is that a Wyoming vessel faces fewer state forms and the same engineering expectations. Insurers still ask for the ASME nameplate and data report, process safety audits still ask for quality assurance records, and a vessel sold or moved to another state still needs them.

The MSHA pressure vessel inspection requirements reach a large share of Wyoming industry because so much of it is mining: coal in the Powder River Basin, trona in the Green River Basin, and uranium, bentonite and other minerals elsewhere. The state mining rules adopt the federal text, so a mine vessel meets one standard for both the federal and the state mine inspector.

How much does a pressure vessel cost for a Wyoming plant?

How much does a pressure vessel cost for a Wyoming plant depends on its diameter, length, design pressure and temperature, material, nozzle count, internals, examination and heat treatment requirements, and the cold-service choices described above. Impact-tested carbon steel, sour service testing and post-weld heat treatment each add cost, and stainless or alloy construction adds more. Freight and setting of large vessels to remote mine and well sites also figure in the price. Oversize loads need routing and permits for highway transport, and a column or large separator may arrive in sections with closing welds made in the field, which adds examination, heat treatment and a field hydrostatic test to the scope. Winter delivery to a mountain or basin site can also call for crane mats, snow removal and heated enclosures for field welding, each of which is priced with the vessel rather than discovered on arrival.

Paul Industries prices Wyoming vessels in two steps: a budget figure from comparable vessels while the data sheet is still moving, then a fixed price once the design conditions, materials and nozzle schedule are settled. Supply-only, design-build and complete installation with the connecting piping are all available.

Who fabricates pressure vessels in Wyoming?

Paul Industries fabricates pressure vessels for Wyoming plants: separators, scrubbers, contactors, receivers, accumulators, flash tanks, filters, columns and process vessels to ASME Section VIII, for gas plants, refineries, soda ash plants, mines, power plants and oil and gas sites around Casper, Gillette, Green River, Rock Springs, Cheyenne, Sinclair and Evanston. Among ASME pressure vessel fabricators and custom pressure vessel manufacturers serving the state, Paul Industries carries the design, fabrication, testing, delivery and installation on one contract and repairs and rerates vessels already in service.

The same contract covers the systems around the vessel: process piping in Wyoming to tie it in, tank fabrication in Wyoming for atmospheric storage, industrial welding services in Wyoming for repairs and alterations, boiler repair in Wyoming for the steam side, and commissioning in Wyoming for startup records. Plants with caustic service will find the cracking mechanisms on the caustic cracking and passivation page, and the Wyoming overview lists every Paul Industries service in the state.

Pressure vessels from Paul Industries for Wyoming sites

Headquartered at 256 Shore Drive in Kilmarnock, Virginia, Paul Industries is an East Coast contractor that accepts vessel work across Wyoming, the western states and all 50 states. The method matches its headquarters state work on the pressure vessel fabrication in Virginia page and its Gulf Coast work on the Texas pressure vessel page: a complete data sheet, a Section VIII design, traceable materials, documented welding and testing, and a turnover file the insurer and inspectors accept. Send the data sheet or a sketch with design conditions, fluids, site location and required date, and request a quote for pressure vessel fabrication in Wyoming.

Standards referenced: ASME Boiler and Pressure Vessel Code, Section VIII, Divisions 1 and 2 · ASME Section IX · ASME Section II · National Board Inspection Code, Part 3 · API 510 · 29 CFR 1910.169 and 1910.119 as adopted by Wyoming OSHA · Wyoming mine rules (30 CFR 56.13015, 57.13015, 75.1730, 77.411 as adopted) · Wyoming OSHA oil and gas well rules, Ch. 11 (effective November 7, 2025) · NACE MR0175/ISO 15156 · ASCE 7

Frequently asked questions

Who builds separators and scrubbers for Casper and Powder River Basin gas operations?

Paul Industries builds separators, scrubbers, slug catchers and treating vessels for gas gathering and processing operations around Casper, Gillette and the Powder River Basin. Each vessel is designed to ASME Section VIII with a minimum design metal temperature set for Wyoming winters and blowdown chilling, and sour service vessels meet NACE MR0175/ISO 15156 hardness limits. Skid packages arrive with piping and instruments tested as one unit.

Does Paul Industries fabricate vessels for Green River and Rock Springs soda ash plants?

Paul Industries fabricates flash tanks, steam separators, condensate receivers, pressure filters and vacuum vessels for soda ash plants around Green River and Rock Springs. Vessels at those mines are covered by the state’s metal and nonmetal mining rules, calling for ASME construction and inspection by National Board commissioned inspectors. Replacement vessels are built ahead of the outage with nozzle orientation matched to existing piping.

Who supplies pressure vessels for Cheyenne and Laramie plants and campuses?

Paul Industries supplies pressure vessels for plants, campuses and utilities around Cheyenne and Laramie: air receivers, expansion and buffer tanks, deaerator and condensate vessels, filter housings and process vessels, all to ASME Section VIII. Laramie’s airport station averages a January low of 10.3 degrees Fahrenheit in NOAA’s 1991 to 2020 normals, so outdoor vessels are specified with a design metal temperature to match.

Which inspector examines a pressure vessel at a Wyoming site?

The inspector who examines a pressure vessel at a Wyoming site depends on where it sits: National Board commissioned inspectors at mines, under the mining rules; the owner’s API 510 inspectors at well sites and refineries; the plant’s mechanical integrity staff at process safety covered plants; and the insurer’s inspector at most other facilities. No state agency inspects ordinary plant vessels. Paul Industries supplies records that every one of those inspectors can use.

Is there a Wyoming registration number for a new pressure vessel?

A new pressure vessel in Wyoming needs no state registration, because the state has no pressure vessel statute or registry. Owners and insurers still expect the ASME certification mark, a signed manufacturer’s data report and, where the purchase order calls for it, National Board registration, and mine vessels are built to the ASME code under the mining rules. Paul Industries delivers each vessel with that documentation.

What is an unfired pressure vessel under the Wyoming mine rules?

An unfired pressure vessel is one that holds pressure without being heated by direct firing, such as an air receiver, separator, accumulator or filter housing, in contrast to a boiler. Wyoming’s metal and nonmetal mine rules name compressed-air receivers and other unfired pressure vessels together and require them to be inspected by National Board commissioned inspectors under the National Board Inspection Code. Paul Industries builds and repairs them to ASME Section VIII.

How often should an air receiver be inspected at a Wyoming mine?

At a Wyoming metal or nonmetal mine, an air receiver is inspected by an inspector holding a National Board commission, at the frequency the National Board Inspection Code and that inspector set, and the inspection records are kept available to the State Mine Inspector. Drains are opened often enough to keep water and oil from collecting. Paul Industries replaces receivers that fail inspection and repairs those that can be returned to service.

What does the new Wyoming oil and gas rule change for well site vessels?

The Wyoming OSHA oil and gas well rules effective November 7, 2025 point vessel construction to good engineering practice with the 2023 ASME Boiler and Pressure Vessel Code as the reference, require installation, operation, maintenance and repair to follow the manufacturer’s recommendations, and set pressure vessel inspection to API 510, 2023 edition. Paul Industries builds and repairs well site vessels to those references.

Which vessels at a Wyoming refinery fall under process safety mechanical integrity?

At a Wyoming refinery or gas plant with a covered process, 29 CFR 1910.119(j), adopted by Wyoming OSHA, applies mechanical integrity to pressure vessels and storage tanks, piping, relief and vent systems, emergency shutdown systems, controls and pumps in that process. The plant inspects and tests them to recognized engineering practice and documents each result. Paul Industries supplies new vessels with the quality assurance records paragraph (j)(6) expects.

What minimum design metal temperature should a Wyoming outdoor vessel have?

A Wyoming outdoor vessel needs a minimum design metal temperature that covers the coldest metal temperature it can see while pressurized, including winter ambient lows and chilling from gas letdown or blowdown. The state record is minus 66 degrees Fahrenheit, and January lows average near 10 degrees at Lander and Laramie. Paul Industries sets the value with the plant’s process engineers and selects impact-tested materials where Section VIII requires them.

Can a Section VIII vessel moved in from Colorado or Utah go into Wyoming service?

A vessel built to ASME Section VIII and moved in from Colorado, Utah or any other state can be used in Wyoming without a state permit, provided the owner and insurer accept its records and its design conditions suit the new service, including Wyoming’s colder minimum metal temperatures. Paul Industries reviews the data report, inspects the vessel, checks the design metal temperature, and repairs or rerates it under the National Board Inspection Code if the new duty requires it.

Can Paul Industries rerate a gas plant vessel for higher pressure?

Paul Industries rerates gas plant vessels when the original design margin, current thickness and materials support the higher pressure or temperature. The work includes a calculation to the current Section VIII rules, a thickness survey, a pressure test where required, and an R-2 report of alteration with a new nameplate, all made under the National Board Inspection Code with the inspector consulted before the work starts.

What does a sour service vessel need for Wyoming gas fields?

A sour service vessel for Wyoming gas fields needs materials and welds that resist sulfide stress cracking under NACE MR0175/ISO 15156: hardness limits on base metal, welds and heat-affected zones, weld procedures qualified with hardness surveys, post-weld heat treatment where specified, and traceable materials. Paul Industries fabricates and documents those vessels so the plant’s integrity group can verify each requirement.

How does Paul Industries hydrotest a vessel in a Wyoming winter?

Paul Industries hydrotests vessels in Wyoming winters by controlling metal temperature: testing indoors or in a heated enclosure, warming the test water, recording metal temperature on the test chart, and draining and drying the vessel promptly so no water freezes in nozzles or internals. The test is witnessed by the Authorized Inspector and the record goes into the turnover file.

How much does a pressure vessel cost for a Wyoming gas plant?

A pressure vessel for a Wyoming gas plant costs according to its size, design pressure, material, nozzle count and internals, plus sour service testing, impact-tested materials, heat treatment and freight to the site. Paul Industries gives a budget figure from comparable vessels early and a fixed price once the data sheet is final. Call 201-450-8280 or request a quote.

What should a Wyoming plant send to price a custom pressure vessel?

Send the data sheet or a sketch with design pressure and temperature, minimum design metal temperature, fluid and contaminants such as hydrogen sulfide or carbon dioxide, dimensions, nozzle list, material preference, code division, inspection requirements and the date the vessel is needed on site. Paul Industries returns a budget figure, then a firm price. Call 201-450-8280 or request a quote.

Need a code vessel built or rerated for a Wyoming site?

Send the data sheet, design conditions, fluids, site location and the date you need it. Call 201-450-8280 or request a quote.