Paul Industries designs, builds and services ultrapure water systems in South Carolina for pharmaceutical plants, automotive and battery manufacturing, laboratories and research buildings, from pretreatment and double-pass reverse osmosis through electrodeionization, polishing and the distribution loop to each point of use. South Carolina plants draw on very different source waters, from mountain reservoirs in the Upstate to Lake Murray and the Broad River in the Midlands and the Edisto River and Bushy Park Reservoir near Charleston, and each treatment train is built around the water the site actually receives. Paul Industries offers supply-only skids, design-build systems and complete installation through start-up and service.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
Pharma in the Midlands Blow-fill-seal drug makers in Columbia and West Columbia
Lowcountry feedwater Edisto River: high organics and color, low alkalinity
Upstate feedwater Table Rock, North Saluda and Lake Keowee reservoirs
Withdrawal permit Above 3 million gallons in a month, S.C. Code 49-4
Power for RO and EDI 6.84 cents/kWh industrial rate in 2024 (EIA)
Reviewed November 2026

Where are ultrapure water systems in South Carolina used?

Ultrapure water systems in South Carolina are used wherever dissolved salts, organics, particles or bacteria in ordinary water would spoil a product or a measurement: sterile and inhaled drug manufacturing, quality control laboratories, automotive paint and surface treatment lines, battery and electronics production, and research labs at universities and hospitals. The quality needed ranges from deionized rinse water at a few megohm-centimeters to laboratory water near the theoretical limit of 18.18 megohm-centimeters at 25 degrees Celsius.

The state’s demand is spread across industries rather than concentrated in one. The Midlands hold a cluster of blow-fill-seal drug manufacturers; the Upstate holds the automotive base around BMW’s Spartanburg plant and its suppliers; the Lowcountry holds aerospace, automotive and a growing research base; and new electric vehicle and battery investment has reached Blythewood, Woodruff and Florence County. The national design method is on the ultrapure water systems page; this page covers what changes for a South Carolina plant.

South Carolina sectors that use ultrapure and deionized water
SectorSouth Carolina examples (market facts)Where the water goesTypical system
Blow-fill-seal and sterile drugsNephron Pharmaceuticals in West Columbia; The Ritedose Corporation in ColumbiaProduct water, final rinses, QC laboratory waterCompendial generation plus a Type I polishing loop for the labs
Automotive assemblyBMW Plant Spartanburg; Scout Motors in Blythewood; Volvo Cars in RidgevillePaint pretreatment and electrocoat rinses, test labsRO with mixed-bed or EDI polishing, sized for line rinse demand
Battery packs and cellsBMW battery assembly in Woodruff; AESC cell plant in Florence County (construction paused 2025)Process rinses, electrode preparation in cell plants, labsRO and EDI with tight conductivity and particle control
Laboratories and researchUniversity, hospital and corporate research buildingsAnalytical instruments, cell culture, glassware washersCentral loop or point-of-use units to ASTM D1193 Type I
Power and utilitiesGenerating stations across the stateBoiler make-up and cycle chemistryRO, EDI and mixed beds feeding make-up storage

Pharmaceutical companies in South Carolina and the water they run on

Pharmaceutical companies in South Carolina include a Midlands cluster built on blow-fill-seal technology, which forms, fills and seals plastic unit-dose containers in one sterile operation, and those plants run on two classes of water at once. Product water must meet the compendial monographs for Purified Water or Water for Injection, with conductivity and total organic carbon tested under USP chapters 645 and 643, while the quality control laboratories that release each batch need reagent-grade ultrapure water for chromatography, total organic carbon analysis and microbiology.

As market facts, Nephron Pharmaceuticals makes generic inhalation solutions in West Columbia and expanded at the Saxe-Gotha Industrial Park in Lexington County, and The Ritedose Corporation, founded in 1995, makes sterile blow-fill-seal unit doses for inhalation and ophthalmic use in Columbia and added laboratory capacity in 2025. Both are market facts named to show where demand sits, and both run water systems around the clock. The compendial generation side, including the two routes to Water for Injection, is covered on the high-purity water systems in South Carolina page.

Pharmaceutical manufacturers in South Carolina: laboratory water beside product water

For pharmaceutical manufacturers in South Carolina, the ultrapure side of the plant is often the part that grows piecemeal: a new HPLC suite, a microbiology lab expansion or an added glassware washer each gets its own point-of-use unit, until the site runs a dozen small systems with a dozen maintenance schedules. On the pharmaceutical side of its work, Paul Industries designs a central laboratory loop when the count justifies it, fed from the plant’s pretreated water and polished to Type I at the loop, so the lab has one system to sanitize, monitor and qualify.

An ultrapure water system for laboratory buildings

An ultrapure water system for laboratory buildings in South Carolina is usually either a central loop serving many outlets or a set of point-of-use polishers fed from a building deionized or reverse osmosis loop. The central loop costs more up front but gives one place for sanitization, resistivity and total organic carbon monitoring, and alarms; point-of-use units are simpler to add one at a time. Paul Industries compares both on the lab’s outlet count, daily volume and growth plan.

Ultrapure water for South Carolina automotive and battery plants

Automotive and battery plants in South Carolina use deionized and ultrapure water in surface treatment, rinsing and laboratory testing, where dissolved salts left on a part become spots under paint or contamination in a cell. Woodruff hosts the BMW battery plant South Carolina’s Spartanburg factory will draw on for iX5 high-voltage packs; it has built test packs since 2025 and is scheduled for series production in December 2026, and Scout Motors began building validation vehicles in Blythewood in 2026 ahead of production expected in 2027.

Cell manufacturing asks more of water than pack assembly. The cell-making battery plant South Carolina recruited to Florence County, AESC, paused construction in June 2025 citing policy and market uncertainty, and any restart there or at a similar site brings water demand for electrode preparation, equipment cleaning and dry-room support systems. In a paint shop, the final rinses after phosphate or zirconium pretreatment and after electrocoat use deionized water so that no dissolved salt dries on the body before paint, and conductivity at those stages is watched as closely as any line speed. Paul Industries sizes systems for automotive and battery lines on peak rinse demand and on the storage needed to ride through a regeneration or membrane cleaning without starving the line.

Lake Murray water quality, the Edisto and the Upstate reservoirs

Feedwater for ultrapure water systems in South Carolina depends on which utility serves the site, and the state’s main systems draw from very different sources. Columbia Water treats water from the Broad River Diversion Canal and from Lake Murray at two plants serving Richland and Lexington counties, so Lake Murray water quality and Broad River conditions both reach Midlands plants depending on which plant serves the site. Charleston Water System draws primarily from the Bushy Park Reservoir in Berkeley County and also from the Edisto River in Dorchester County, whose water is high in organics and color with low turbidity and alkalinity.

Upstate sources come from higher ground. Greenville Water draws from the Table Rock and North Saluda reservoirs in the Blue Ridge foothills and from Lake Keowee, and Spartanburg Water uses Lake Bowen, Lake Blalock and Municipal Reservoir No. 1. South Carolina water treatment plants deliver water that meets drinking water standards, but an ultrapure system cares about what drinking water rules ignore: silica, total organic carbon, the form of the disinfectant residual and how all of these swing with the seasons.

South Carolina source waters and what they ask of ultrapure pretreatment
Region and utilityRaw water sourcesWhat to watchPretreatment emphasis
Charleston region, Charleston Water SystemBushy Park Reservoir (primary) and the Edisto RiverEdisto organics and color; seasonal algae in the reservoir; source blend shifts in droughtOrganics removal ahead of RO, carbon sized for taste and odor events, TOC destruction by UV
Columbia and the Midlands, Columbia WaterBroad River Diversion Canal and Lake MurrayDifferences between the two plants’ water; storm-driven turbidity on the riverMedia or ultrafiltration before RO, silt density index trending
Greenville, Greenville WaterTable Rock and North Saluda reservoirs; Lake KeoweeWhich plant serves the site; low-mineral water that changes RO chemistryAntiscalant and pH control matched to the actual water, chlorine removal
Spartanburg, Spartanburg WaterLake Bowen, Lake Blalock and Municipal Reservoir No. 1Seasonal lake turnover and algaeRobust filtration, carbon, frequent TOC trending
Coastal plain wellsPrivate or municipal groundwaterIron, hardness, sodium and fluoride vary by aquiferFull water analysis before design; softening or oxidation and filtration as needed

Why the Edisto matters to a Lowcountry ultrapure plant

Edisto River water matters because natural organic matter is the hardest load on an ultrapure train to remove completely: it fouls membranes, consumes carbon and shows up as total organic carbon at the point of use. When Charleston Water System leans on the Edisto, or shifts toward its reservoirs in a drought, the organic load entering a plant can change without warning to the plant. Paul Industries designs Lowcountry systems with organics removal ahead of reverse osmosis, ultraviolet oxidation at 185 nanometers in the polishing loop, and online total organic carbon monitoring that shows a feedwater change before it reaches the product.

Ultrapure water vs RO water: what the polishing stages add

Ultrapure water vs RO water is a difference of several orders of magnitude in purity: reverse osmosis removes most dissolved salts, organics and particles, but RO permeate still carries ions, dissolved gases and traces of organics that electrodeionization, ultraviolet oxidation, mixed-bed ion exchange and final filtration remove. Double-pass RO followed by EDI typically delivers water in the megohm range, and the polishing loop takes it to the resistivity, total organic carbon and particle levels the use requires.

Ultrapure water standards set those levels by industry. Laboratories commonly specify ASTM D1193 Type I reagent water; electronics and semiconductor users work to ASTM D5127 and SEMI F63; pharmaceutical product water follows the USP monographs, with USP chapter 1231 as guidance. Paul Industries writes the specification against the use, rather than defaulting to the purest grade on the market, because every step up in purity adds equipment, monitoring and operating cost.

Matching the water grade to the use in a South Carolina plant
UseTypical specificationParameters that drive the design
Laboratory analytical waterASTM D1193 Type IResistivity near 18 megohm-centimeters, low total organic carbon, bacteria control
Pharmaceutical product waterUSP Purified Water or Water for InjectionConductivity under USP 645, total organic carbon under USP 643, microbial limits
Automotive paint and electrocoat rinsePlant specification, often in conductivityFlow at peak rinse demand, conductivity at the rinse stage
Battery and electronics processesASTM D5127 or SEMI F63 grades, or the owner’s ownParticles, metals, silica, dissolved oxygen
Boiler and turbine make-upCycle chemistry limits set by the plantSilica, sodium and conductivity

Designing the treatment train for South Carolina plants

A treatment train for a South Carolina ultrapure plant starts with a year of feedwater data where the utility publishes it, then a site sample, because seasonal swings decide the pretreatment more than any single analysis. The usual sequence is multimedia or ultrafiltration, carbon or sodium bisulfite to remove the disinfectant residual, antiscalant or softening, double-pass reverse osmosis, electrodeionization, a storage tank with a vent filter, and a polishing loop with ultraviolet oxidation, mixed-bed polishers and final filters.

Summer heat matters as well. Warmer feedwater raises membrane flux and salt passage, so RO systems in South Carolina are designed for the warmest feed temperature they will see as well as the coldest, and storage and loop temperatures are controlled so that heat from pumps and the building does not invite bacterial growth. Equipment rooms in the Lowcountry also need humidity control to protect instruments and electrical panels.

Water supply, discharge and pressure equipment rules in South Carolina

South Carolina regulates large water withdrawals by volume: anyone withdrawing more than 3 million gallons of surface water in any month from a single intake, or intakes within a one-mile radius under common ownership, is a surface water withdrawer under Title 49, Chapter 4, and groundwater users inside designated Capacity Use Areas need permits while those outside register above the same monthly volume. Most ultrapure plants buy water from a utility and stay well under those thresholds, but large automotive and battery sites with their own wells or intakes plan for them.

Reverse osmosis reject, regeneration waste and cleaning solutions usually go to sewer under the receiving utility’s industrial pretreatment permit, and since July 1, 2024 the state’s environmental permits come from the South Carolina Department of Environmental Services, which took over that work from DHEC. RO housings, filter vessels and storage tanks are pressure vessels or atmospheric tanks, and South Carolina’s Boiler Safety Act exempts all pressure vessels under Section 41-14-60(C), so they are built to ASME Section VIII where required and inspected under the owner’s insurance program. Process piping work above $10,000 falls under the state’s Pressure and Process Piping license classification.

Loops, materials and installation in operating South Carolina plants

Loop materials for an ultrapure system follow the use: PVDF or high-purity polypropylene for laboratory and electronics loops that must not leach ions or organics, and electropolished 316L stainless steel to ASME BPE for pharmaceutical loops that are sanitized with hot water or steam. Loops run continuously at a velocity high enough to discourage biofilm, with no dead legs at outlets and with sample valves placed where the qualification plan needs them.

Adding a point of use or a new building to a running loop is common in South Carolina plants that expand in phases. Paul Industries prefabricates loop sections off site, plans the tie-in for a scheduled sanitization window, installs and flushes the new section, and returns the loop to service with resistivity and total organic carbon trends showing it recovered. Stainless loops are passivated after welding, as described on the passivation services in South Carolina page, and sanitary loop piping is covered on the sanitary process piping in South Carolina page. Qualification of pharmaceutical systems is set out on the validation and commissioning in South Carolina page.

Monitoring, sanitization and records at South Carolina sites

Monitoring on a South Carolina ultrapure system tracks the parameters that move first when something goes wrong: resistivity or conductivity after each treatment stage, total organic carbon on the loop return, flow and pressure across each membrane bank, temperature in storage and on the loop, and, for pharmaceutical and laboratory loops, scheduled microbial samples at defined outlets. Trends matter more than single readings, because a slow rise in conductivity after the second RO pass or a creeping pressure drop across a cartridge filter warns of a problem days before the water at the outlet goes out of specification.

Sanitization follows the loop material and the use. Stainless pharmaceutical loops are sanitized with hot water or steam on a fixed schedule; plastic laboratory and electronics loops use ozone, peracetic acid or hydrogen peroxide blends that the materials tolerate. Storage tanks carry vent filters and are kept turning over, since stagnant water in a warm South Carolina equipment room is where bacteria gain a foothold. Paul Industries sets alarm limits, sanitization intervals and sampling points during design, programs them into the controls, and hands the owner a record set that shows each reading, each alarm and each sanitization, which is what an auditor or a quality group asks for first.

Service and maintenance for ultrapure water systems

Service for an ultrapure water system in South Carolina covers the consumables that wear out on a schedule and the components that fail without one: cartridge and final filters, carbon, membrane cleaning and replacement, EDI stack checks, mixed-bed polisher exchange, UV lamp and sleeve replacement, instrument calibration, and pump and valve repair. Feedwater changes, such as a utility switching sources or a seasonal rise in organics, shorten carbon and membrane life, so service intervals in the Lowcountry and on lake-fed Upstate systems are set from the data rather than from a calendar alone.

Paul Industries offers service agreements that combine scheduled consumable changes, membrane cleaning, calibration and trend review with repair of skids and loops, so pharmaceutical plants in South Carolina and laboratory operators keep the same contractor responsible from installation through the life of the system.

Who installs ultrapure water systems in South Carolina?

Paul Industries installs ultrapure water systems in South Carolina, together with the water purification systems in South Carolina that feed them: pretreatment, reverse osmosis, electrodeionization, storage, polishing loops, monitoring and the piping to every outlet. The company designs the system, supplies or installs owner-purchased skids, tests and starts it up, and services it after handover. From its headquarters at 256 Shore Drive in Kilmarnock, Virginia, the company (formerly based in northern New Jersey, then Pennsylvania) takes work in all 50 states.

Owners comparing sites will find the headquarters-state version on the ultrapure water systems in Virginia page, and the neighboring North Carolina ultrapure water page covers Triangle laboratories and biomanufacturing across the state line, while the Georgia ultrapure water page covers plants across the Savannah River. Storage vessels for ultrapure and compendial water are covered on the tank fabrication in South Carolina page.

What does an ultrapure water system cost in South Carolina?

Ultrapure water cost in South Carolina is driven by the flow rate and quality required, the feedwater the site receives, loop length and material, the number of points of use, redundancy, monitoring, and the qualification documentation a regulated plant needs. The ultra pure water system price for a single laboratory loop is a small fraction of a plant-wide system serving a paint shop or a sterile filling line, so useful budgets start from the outlet list and daily demand.

Operating cost belongs in the comparison. As an illustration, a reverse osmosis and EDI system drawing 40 kilowatts around the clock uses 350,400 kilowatt-hours a year, about $23,967 at South Carolina’s 2024 industrial rate of 6.84 cents per kilowatt-hour (EIA). Membranes, resin, filters, UV lamps, sanitization chemicals and laboratory testing add to that. Paul Industries gives a budget range from comparable systems early and a firm price once the specification, flow and site conditions are settled.

Ultrapure water systems from Paul Industries in South Carolina

Paul Industries designs, fabricates, supplies, installs, tests, starts up and services ultrapure water systems across South Carolina, from Midlands pharmaceutical plants and Upstate automotive lines to Lowcountry laboratories and battery sites, and builds each system around the water the serving utility delivers. The South Carolina overview lists the other process systems Paul builds in the state. Send the use, the quality specification, daily demand and a recent water analysis, and request a quote.

Standards referenced: USP <1231> Water for Pharmaceutical Purposes · USP <645> Water Conductivity · USP <643> Total Organic Carbon · ASTM D1193 Standard Specification for Reagent Water · ASTM D5127 Standard Guide for Ultra-Pure Water Used in the Electronics and Semiconductor Industries · SEMI F63 · ASME BPE · ASME Section VIII · S.C. Code Title 49 Chapter 4 and R.61-119 (water withdrawal) · South Carolina Boiler Safety Act, S.C. Code 41-14-60(C)

Frequently asked questions

Which contractor builds ultrapure water systems for plants in West Columbia, Lexington County and Columbia?

Paul Industries builds ultrapure water systems for plants and laboratories in West Columbia, Lexington County and Columbia, including pharmaceutical sites that need compendial water and Type I laboratory water side by side. Midlands feedwater comes from the Broad River and Lake Murray, so pretreatment is sized for both sources. Send the use, outlet list and a water analysis to start the design.

Does Paul Industries install ultrapure water systems in Charleston, North Charleston and Summerville?

Yes. Paul Industries installs ultrapure water systems in Charleston, North Charleston, Summerville and the surrounding Lowcountry. Charleston Water System draws from the Bushy Park Reservoir and the Edisto River, and Edisto water carries organics and color that load carbon and membranes, so Lowcountry systems get stronger organics removal and online total organic carbon monitoring.

Who builds ultrapure water systems in Greenville, Spartanburg and the Upstate?

Paul Industries builds ultrapure and deionized water systems in Greenville, Spartanburg, Greer and across the Upstate for automotive suppliers, laboratories and manufacturing plants. Greenville Water and Spartanburg Water draw from mountain and lake reservoirs, and Paul Industries matches antiscalant, pH control and filtration to the water analysis for the specific plant that serves the site.

Does Paul Industries supply deionized water systems for plants in Blythewood and Fairfield County?

Paul Industries supplies and installs deionized and ultrapure water systems for automotive plants, suppliers and laboratories in Blythewood, Fairfield County and the northern Midlands. Paint pretreatment and electrocoat rinses need steady flow at peak demand, so Paul Industries sizes storage to ride through membrane cleaning and regeneration without interrupting the line.

Does Paul Industries take ultrapure water work in Florence, Aiken and Rock Hill?

Paul Industries takes ultrapure water work in Florence and the Pee Dee, Aiken and the Savannah River area, and Rock Hill and York County, at manufacturing plants, laboratories and power facilities. Each design begins with the serving utility’s water report and a site sample, because source water and treatment differ from one South Carolina system to the next.

Which pharmaceutical companies in Columbia, South Carolina run blow-fill-seal plants?

As market facts, The Ritedose Corporation makes sterile blow-fill-seal unit doses for inhalation and ophthalmic use in Columbia, and Nephron Pharmaceuticals makes generic inhalation solutions in neighboring West Columbia. Plants of that kind run compendial water for product and ultrapure water for their quality control laboratories, and Paul Industries designs, installs and services both kinds of system for Midlands manufacturers.

Why does Lake Murray and Broad River water matter to a Columbia ultrapure system?

Columbia Water treats Broad River water at its canal plant and Lake Murray water at a second plant, and a site’s feedwater depends on which plant serves it and how the system is operated. River water can carry storm-driven turbidity, and lake water changes with seasonal turnover, so a Midlands ultrapure plant is designed for the range of both rather than for one sample.

What happens to a Charleston-area ultrapure plant when Charleston Water shifts sources in a drought?

In drought, Charleston Water System moves its supply away from the Edisto River toward the Bushy Park and Goose Creek reservoirs, which changes the organic and mineral content reaching customers. A well-designed ultrapure plant absorbs that change through pretreatment margin and online monitoring, and Paul Industries sets alarm points on total organic carbon and conductivity that show the shift early.

What is the difference between ultrapure water and RO water for a lab?

RO water has had most dissolved salts and organics removed, but still contains enough ions and organics to interfere with sensitive analytical work. Ultrapure water adds electrodeionization or ion exchange, ultraviolet oxidation and final filtration to reach resistivity near 18 megohm-centimeters and very low total organic carbon. Many labs use RO water for washers and ultrapure water at instruments.

Which ultrapure water standards apply to a South Carolina plant or lab?

The standard follows the use: ASTM D1193 for laboratory reagent water, ASTM D5127 and SEMI F63 for electronics and semiconductor processes, and the USP monographs with USP chapters 645 and 643 for pharmaceutical product water. Many manufacturers add their own specifications. Paul Industries writes the system specification to the strictest requirement that actually applies to the use.

Does South Carolina's boiler law reach RO housings, filter vessels and storage tanks?

The state’s boiler statute stops at boilers: its Section 41-14-60(C) lifts every pressure vessel out of the program. Membrane housings and cartridge filter vessels rated for higher pressures are built under ASME Section VIII when the code’s size and pressure limits call for it, and insurance carriers usually set their inspection schedule. Atmospheric storage tanks are built to the owner’s specification and ASME BPE for pharmaceutical service.

Does a South Carolina plant need a permit to withdraw water for an ultrapure system?

A permit is needed when surface water withdrawals exceed 3 million gallons in any month, and groundwater users inside designated Capacity Use Areas need permits while others register above the same volume. Most ultrapure systems buy utility water and stay below those thresholds, but large plants with their own intakes or wells include the permit in the project schedule.

Can an ultrapure water system for laboratory use share pretreatment with a plant system?

Sharing pretreatment is common and often saves cost: one set of filters, carbon and reverse osmosis can feed a plant deionized loop and a laboratory polishing loop, with the lab loop adding EDI, ultraviolet oxidation and final filtration. The design keeps the lab loop’s sanitization and monitoring separate so a plant upset does not reach the instruments.

What does ultrapure water cost to run in South Carolina?

Running cost combines electricity, membranes, resin, filters, UV lamps, sanitization chemicals, testing and labor. As an example, a system drawing 40 kilowatts continuously uses about $23,967 of electricity a year at South Carolina’s 2024 industrial rate of 6.84 cents per kilowatt-hour. Paul Industries estimates the full operating cost alongside the capital price so owners compare designs on both.

What sets the price of an ultrapure water system for a South Carolina plant?

Price is set by flow and quality, feedwater, the number of outlets and loop length, loop material, redundancy, instrumentation and the qualification package a regulated plant needs. A single laboratory loop and a plant-wide system for a paint shop sit far apart. Paul Industries gives a budget range early and a firm price once the specification and site survey are complete.

Who installs water purification systems that feed ultrapure loops in South Carolina?

Paul Industries installs the whole chain in South Carolina: pretreatment filters, carbon and softening, reverse osmosis, electrodeionization, storage, polishing and the distribution loop. Keeping the feed system and the ultrapure loop under one contractor puts responsibility for final water quality in one place, from the incoming utility water to the last outlet.

How is reverse osmosis reject handled at a South Carolina ultrapure plant?

RO reject usually goes to sanitary sewer under the receiving utility’s industrial pretreatment permit, and some plants reuse it for cooling tower make-up or other non-critical uses to cut water purchases. Cleaning solutions and regeneration waste are neutralized before discharge. Paul Industries designs the drain, neutralization and any reuse piping as part of the system.

How long does it take to deliver an ultrapure water system to a South Carolina plant?

Schedule depends on size, specification and equipment lead times: a point-of-use laboratory system can be installed quickly, while a plant-wide system with prefabricated skids, a new loop and qualification takes many months from design to release. Paul Industries prefabricates skids and loop sections off site to shorten the time spent inside an operating plant.

What should a South Carolina site send to start an ultrapure water design?

Useful inputs are the uses and their quality specifications, the outlet list with flows, daily and peak demand, a recent water analysis or the utility’s report, available space and utilities, and any qualification requirements. Paul Industries takes them by phone at 201-450-8280 or through the quote request form on this page.

Planning ultrapure water for a South Carolina plant or lab?

Send the uses and quality specifications, the outlet list, daily demand and a recent water analysis. Call 201-450-8280 or request a quote.