Paul Industries provides validation and commissioning in Florida for medical device, pharmaceutical, softgel, over-the-counter, supplement and biotech plants, commissioning and qualifying utilities, process equipment, cleanrooms and automated systems from design review through IQ, OQ and PQ support. Florida’s regulated manufacturing leans heavily toward medical devices, and the FDA’s Quality Management System Regulation, in force since February 2, 2026, has changed how device plants frame equipment and process validation. Paul Industries builds, installs and starts up the systems it qualifies, so commissioning evidence and qualification records come from the same team and the same documents.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
Device industry Second largest in the US by establishments, 1,300+ (Select Florida, BLS 2025)
Pharma industry Second largest in the US by establishments, 700+ (Select Florida, BLS 2025)
State permits Drug, OTC, device and cosmetic manufacturer permits under s. 499.01, F.S.
Device rule QMSR, 21 CFR 820 with ISO 13485:2016, effective February 2, 2026
Reviewed November 2026

Why does validation and commissioning in Florida lean toward devices?

Validation and commissioning in Florida leans toward medical devices because the state holds the second-largest medical device manufacturing industry in the country by number of establishments, more than 1,300 of them, according to Select Florida’s 2026 profile drawn from Bureau of Labor Statistics data. The same profile counts more than 700 pharmaceutical manufacturing establishments, also second nationally, and more than 1,000 biotech research and development establishments. A typical Florida qualification program therefore covers molding, machining, cleaning, sterilization and packaging lines, compressed gases and cleanrooms as often as it covers purified water and clean steam, and it may run under device, drug or supplement rules depending on the product.

The methods behind risk-based commissioning, IQ, OQ and PQ are set out on the validation and commissioning page. This page covers the Florida side: the manufacturers that drive demand, the state’s own manufacturer permits, the QMSR transition, and the climate and storm conditions that shape qualification evidence in Florida plants.

Florida regulated manufacturing and the rules each sector qualifies against
SectorFederal ruleFlorida permitTypical systems qualified
Medical devices21 CFR 820 (QMSR) with ISO 13485:2016Device manufacturer permit, s. 499.01(1)(o)Molding, cleaning, sterilization, packaging, compressed air, cleanrooms
Prescription drugs21 CFR 210 and 211Prescription drug manufacturer permit, s. 499.01(1)(a)Purified water, HVAC, process equipment, automation
Over-the-counter drugs21 CFR 210 and 211, OTC monographsOver-the-counter drug manufacturer permit, s. 499.01(1)(n)Softgel and liquid lines, water, packaging
Dietary supplements21 CFR 111Florida Food Safety Act, Chapter 500, F.S. (FDACS)Blending, encapsulation, water, cleaning
CosmeticsFD&C Act, MoCRA facility registrationCosmetic manufacturer permit, s. 499.01(1)(p)Batching tanks, water, filling, CIP

Medical device companies in Florida: Jacksonville, Tampa Bay and beyond

Medical device companies in Florida cluster most visibly in Jacksonville and Tampa Bay, with further plants across South Florida, Central Florida and the Space Coast. Medical device companies in Jacksonville include Johnson & Johnson Vision, Medtronic’s ear, nose and throat business, Zimmer Biomet and KLS Martin, according to the region’s economic development organization. Among medical device companies in Tampa Bay, CONMED keeps its corporate headquarters in Largo, where it runs one of its largest manufacturing sites. Those plants run high-volume molding, precision machining, cleaning and passivation, sterilization and packaging, and each step is a process whose output cannot always be fully verified by inspection, which is exactly what ISO 13485 clause 7.5.6 requires a manufacturer to validate.

A device plant’s validation scope usually reaches the utilities as well: compressed dry air and nitrogen that touch product, purified or deionized water for cleaning, controlled environments for assembly and packaging, and temperature-controlled storage. Paul Industries designs, installs, commissions and qualifies those utilities alongside the production equipment, including the cleanrooms in Florida that device assembly often requires.

Florida regions and the qualification work their plants bring
RegionTypical manufacturersCommon qualification scope
Jacksonville and Northeast FloridaContact lens, ENT, orthopedic and surgical device makersMolding, cleaning, packaging, compressed gases, cleanrooms
Tampa Bay and Pinellas CountySurgical device, softgel, OTC and nutraceutical plantsMachining and cleaning lines, drying rooms, purified water
Miami-Dade and BrowardTransdermal, generic, packaging and device plantsSolvent handling, dust collection, HVAC, water systems
Orlando, Gainesville and the Space CoastDevice makers, university research and scale-up, hospitalsClean utilities, cold storage, autoclaves, laboratory systems

Calibration and metrology behind every Florida qualification

Calibration and metrology sit behind every qualification in a Florida plant, because a temperature, pressure, conductivity or particle reading is only evidence if the instrument that produced it was calibrated against a traceable standard and within its interval. ISO 13485 clause 7.6 and 21 CFR 211.68 both expect controlled calibration of monitoring and measuring equipment, and an IQ verifies that each critical instrument has a current certificate, an assigned interval and a defined tolerance. Paul Industries calibrates or verifies the instruments on systems it installs, labels them, and enters them in the plant’s calibration program before OQ testing begins, so calibration status is settled before any test result is recorded.

Pharmaceutical companies in Florida and the plants behind them

Pharmaceutical companies in Florida run plants that range from transdermal patches and softgels to generic solid doses and over-the-counter liquids, and the state’s manufacturing base is broad rather than dominated by a few biologics campuses. Readers asking about the top pharmaceutical companies in Florida by manufacturing footprint will find Catalent’s St. Petersburg softgel site, which the company describes as its primary North American softgel location, Noven Pharmaceuticals’ transdermal manufacturing in Miami, and Apotex’s planned Miramar facility, part of a $184 million US expansion that also houses Aveva Drug Delivery Systems packaging. Lists of the largest pharmaceutical companies in Florida mix headquarters with plants, so the useful question for a qualification program is where manufacturing happens; many smaller pharmaceutical manufacturers in Florida make OTC, nutraceutical and cosmetic products under the same federal rules.

Pharmaceutical companies in Tampa, Florida and Pinellas County

Pharmaceutical companies in Tampa, Florida and across Pinellas County include softgel, OTC, nutraceutical and contract manufacturing plants, and Catalent moved its global headquarters to Tampa in 2025. Softgel and liquid-fill lines bring their own qualification needs: gelatin melters and medicine tanks with temperature and agitation control, encapsulation machines, tumble and tray dryers held at controlled humidity, and purified water for gel preparation and cleaning.

Pharmaceutical companies in South Florida and Miami

Pharmaceutical companies in South Florida include transdermal, generic, OTC and packaging operations in Miami-Dade and Broward, and the pharmaceutical companies in Miami and Miramar operate inside the High-Velocity Hurricane Zone, where rooftop air handlers and outdoor utility equipment are built to the zone’s added wind provisions. Transdermal coating and drying lines need validated solvent recovery or oxidizer systems, dryer temperature profiles and room humidity control, and generic solid-dose plants need qualified dust collection and containment.

Biotech companies in Florida: research depth and the step to production

Biotech companies in Florida are concentrated in research, with Florida ranked fourth nationally for biotech research and development establishments, and much of the qualification work they need comes when a research program moves into clinical or commercial manufacturing. That step brings first-time qualification of bioreactors, buffer and media preparation, clean utilities, cold chain storage and laboratory systems that were never designed to a GMP standard. A small biotech plant needs the same evidence a large one does: approved requirements, a risk assessment, commissioning records, IQ and OQ protocols, and a traceable link between each requirement and the test that proves it.

Scale-up plants also face a sequencing problem that larger sites solve with dedicated staff: equipment is often bought before procedures exist, and qualification has to wait for the documents it tests against. A practical order is to fix user requirements and the risk assessment first, commission each utility as it is completed, and write IQ and OQ protocols in parallel with installation so execution can begin the week a system is mechanically complete. Paul Industries works to that order on the systems it builds, which keeps a small company’s first GMP campaign on its planned date.

Florida’s own permits: drug, device and cosmetic manufacturer permits

Florida’s own permits for manufacturers come from the Florida Drug and Cosmetic Act, Chapter 499, Florida Statutes, administered by the Department of Business and Professional Regulation’s Division of Drugs, Devices and Cosmetics. Section 499.01 provides separate permits for prescription drug manufacturers, over-the-counter drug manufacturers, device manufacturers and cosmetic manufacturers, and a permit is valid only for the establishment it was issued to. For device makers, s. 499.01(2)(o)2. requires compliance with all appropriate state and federal good manufacturing practices and quality system rules, which ties the state permit to the same qualified equipment and validated processes the FDA expects. A new plant or a move to a new building in Florida therefore puts qualification records and the state permit on the same schedule.

What the QMSR changes for device validation in 2026

The Quality Management System Regulation, effective February 2, 2026, rewrote 21 CFR Part 820 to incorporate ISO 13485:2016 by reference, so Florida device plants now meet validation expectations framed in ISO terms. Clause 7.5.6 covers validation of processes whose output cannot be fully verified, clause 7.5.7 covers sterilization and sterile barrier validation, clause 6.4 covers the work environment and contamination control, clause 7.6 covers monitoring and measuring equipment, and clause 4.1.6 requires validation of software used in the quality system. For equipment and utility qualification the practical change is documentation: risk-based rationale for what is validated and to what depth, revalidation criteria written down in advance, and software validation proportionate to risk.

How a Florida commissioning and qualification program runs
PhaseMain deliverablesFlorida considerations
Requirements and riskUser requirements, system impact and criticality assessmentsWhich rule applies: drug, device, OTC or supplement
Design reviewDesign qualification or design review record, traceability matrixWind design of rooftop and outdoor utilities, generator coverage
Factory and site acceptanceFAT and SAT records, punch listsShipping protection for humid, salt-air arrival
CommissioningInstallation checks, startup, functional tests, turnover packageBuilding permits and inspections under the code edition in force
Installation qualificationVerified drawings, materials, calibration, software versionsBoiler certificate of operation where Chapter 554 applies
Operational qualificationAlarms, interlocks, ranges, data integrity testsWorst-case summer conditions for HVAC and cooling
Performance qualificationProcess or system performance over timeSeasonal sampling through Florida’s wet season
Release and lifecycleSummary report, requalification and change control planStorm outage impact assessment written in advance

Commissioning and qualification of Florida utilities and clean spaces

Commissioning and qualification of Florida utilities starts with the systems that touch product or control the environment: purified and deionized water, compressed air and nitrogen, clean steam, HVAC for classified rooms, and process cooling. Commissioning proves that each system is built and works as designed; qualification documents that the GMP-critical functions perform to specification, and good engineering practice lets commissioning tests be leveraged into the IQ and OQ when they are planned, witnessed and documented to the right standard. The water systems are built and handed over on the high-purity water systems in Florida scope, and the piping that feeds them on process piping in Florida.

Key qualification tests for Florida plant utilities
SystemIQ focusOQ focusPQ focus
Purified or deionized waterMaterials, slope, weld and passivation records, instrument calibrationSanitization cycle, alarms, flow and conductivity controlSampling at every point across seasons
Compressed air and nitrogenFilters, dryers, piping materials, drawingsDew point, pressure, alarm responseParticles, moisture, oil and microbial limits at use points
Cleanroom HVACFilters, dampers, sensors, balancing reportPressure cascade, air changes, recovery, filter leak testsClassification to ISO 14644-1 and environmental monitoring
Clean steamGenerator, piping, traps, sample pointsPressure control, condensate samplingSteam quality and endotoxin at use points
Warehouses and cold roomsSensors, controls, alarm wiringAlarm and recovery testsTemperature mapping in summer and winter
Sterilizers and washersUtilities, chamber, controls, softwareCycle functions, interlocks, data captureLoad patterns, biological indicators, cleaning results

Cleaning, sterilization and packaging validation at Florida device plants

Cleaning, sterilization and packaging validation at Florida device plants is where most of the process validation effort sits, because residues, bioburden and seal integrity cannot be confirmed by inspecting each finished part. Parts washers and ultrasonic cleaning lines are qualified for temperature, detergent concentration, rinse water quality and drying, then validated against residue and cleanliness limits on worst-case parts. Ethylene oxide, gamma, electron beam and steam sterilization each follow their own ISO standards, and the plant’s own steam sterilizers and washer-disinfectors need installation and operational qualification of utilities, chambers and controls before cycle development starts. Heat sealers and form-fill-seal packaging lines are qualified for temperature, pressure and dwell time, with seal strength and integrity testing across the operating window. Paul Industries qualifies the equipment and utilities behind those steps and supplies the data the plant’s process validation relies on.

Vendor equipment and factory acceptance on Florida projects

Vendor equipment on Florida projects arrives from builders across the United States, Europe and Asia, and the factory acceptance test is the earliest chance to catch problems before a skid crosses the ocean or the interstate. A useful FAT runs the approved test scripts on the real control software, checks materials and weld documentation against the specification, and records results in a format the site’s quality unit has agreed to accept as qualification evidence. The site acceptance test then repeats the tests that shipping, humidity or installation could affect, such as instrument calibration, alarm wiring and leak tightness. Equipment that sits in a Florida warehouse before installation is kept sealed, dry and climate-controlled, since condensation inside panels and on stainless surfaces is common in humid storage.

Deviations and change control during Florida qualification runs

Deviations during Florida qualification runs are recorded at the moment a test result misses its acceptance criterion, investigated for root cause, and closed with a documented correction and retest before the protocol is approved. Typical causes are instrument calibration drift, drawings that no longer match the field, alarm setpoints changed during commissioning, and environmental excursions on hot afternoons. Changes made after a system is qualified pass through change control, which decides whether the change needs a partial retest, a full requalification or only a document update. Paul Industries closes deviations on the systems it qualifies with field corrections as well as paperwork, since it installed and can modify the equipment.

Heat and humidity in Florida qualification evidence

Heat and humidity shape Florida qualification evidence because the wet season runs from late spring into autumn, and a cleanroom, warehouse or encapsulation suite that holds specification in February may drift in August. HVAC operational qualification for humidity-controlled rooms is best scheduled, or repeated, under summer design conditions, with dehumidification capacity, reheat and coil condensate drainage checked under real latent load. Warehouses holding temperature-sensitive product are mapped in the hottest months as well as the coolest, with sensors near roller doors, rooftops and exterior walls. Softgel drying rooms and tumble dryers, which depend on dry supply air, are qualified with the room’s dehumidification running at its summer duty.

Storm outages and requalification decisions

Storm outages in Florida raise a qualification question as well as a recovery task: after power, pressurization or temperature control is lost, the plant has to decide which qualified states were lost and what evidence restores them. The decision is far easier when the requalification rules are written in advance: which loss durations require sanitization only, which require resampling, which rooms need recovery tests or reclassification, and who approves release. Paul Industries writes those criteria into the qualification summary and change control plan before hurricane season, so a post-storm restart follows a pre-approved protocol rather than an improvised one.

Boilers, steam and Florida’s boiler law in an IQ

Florida’s boiler law, Chapter 554, Florida Statutes, applies its inspection requirements to boilers in public assembly locations, which include hospitals and nursing homes, and those boilers need a certificate of operation renewed every 12 months. A hospital sterile processing department or a research hospital with a GMP cell therapy suite therefore lists the boiler’s current certificate in the installation qualification of the steam system it feeds. Plant boilers outside that definition still go into the IQ with their ASME data reports, nameplate data and inspection history, and the boiler repair in Florida page covers keeping them in service.

Computerized systems and data integrity in Florida plants

Computerized systems in Florida plants are qualified to 21 CFR Part 11 for drug makers and to the QMSR’s software validation clause for device makers, usually following the risk-based approach of GAMP 5 Second Edition. OQ tests cover audit trails, user access and roles, electronic signatures, alarm acknowledgement, time synchronization, backup and restore, and data transfer between the control system and historians or batch records. Paul Industries configures, tests and documents the controls it installs, and supplies the configuration specifications and test scripts that quality reviewers expect.

What does validation and commissioning in Florida cost?

The cost of validation and commissioning in Florida is set by the number and criticality of systems, how much commissioning evidence can be leveraged into qualification, the quality of the design and turnover documents, and the number of protocol reviews the site’s quality unit requires. A single compressed air system with clean drawings qualifies in a fraction of the time of a purified water system with sampling across seasons, and a greenfield plant costs more per system when requirements are still changing. Paul Industries gives a budget range from comparable work once it sees the system list and the site’s validation master plan, then a firm price for protocols, execution and reports.

Who performs validation and commissioning in Florida?

Paul Industries performs validation and commissioning in Florida for device, pharmaceutical, softgel, OTC, supplement, cosmetic and biotech plants from Jacksonville and Alachua to Tampa Bay, Orlando, the Space Coast and Miami. With its head office on Shore Drive in Kilmarnock, Virginia, and formerly based in northern New Jersey and then Pennsylvania, this East Coast company qualifies systems for Florida sites and for plants in all 50 states. Plants looking for validation services in Florida get a single contract that can include design, supply, installation, commissioning and qualification, or qualification of systems already installed; CIP and SIP systems in Florida and ultrapure water systems in Florida are built and qualified the same way.

The same program runs at headquarters state plants, described on validation and commissioning in Virginia, and at Southeast plants on validation and commissioning in Georgia and validation and commissioning in North Carolina. Florida also sits within the Southeast region.

Commissioning and qualification from Paul Industries in Florida

Paul Industries offers pharmaceutical validation in Florida and device equipment qualification as part of the systems it builds or as a standalone scope: requirements and risk assessments, commissioning, IQ, OQ and PQ protocols, execution, deviation handling, summary reports and requalification plans. Send the system list, drawings and the site’s validation approach, and request a quote; every Paul Industries service in the state is listed on the Florida page.

Standards referenced: 21 CFR Part 211 · 21 CFR Part 820 (Quality Management System Regulation) · ISO 13485:2016 · 21 CFR Part 11 · 21 CFR Part 111 · FDA Guidance: Process Validation, General Principles and Practices (2011) · ASTM E2500 · ISPE Baseline Guide Volume 5, Commissioning and Qualification · GAMP 5 Second Edition · ISO 14644-1:2015 · Chapter 499, Florida Statutes · Chapter 554, Florida Statutes

Frequently asked questions

Who qualifies equipment and utilities for device plants in Jacksonville?

Paul Industries qualifies equipment and utilities for medical device plants in Jacksonville and Northeast Florida, including compressed air and nitrogen, purified water, cleanroom HVAC, cleaning and packaging lines. Protocols are written to the QMSR and ISO 13485:2016, with risk-based rationale for depth of testing. Paul Industries also designs and installs the systems it qualifies, so the turnover package supports the IQ directly.

Does Paul Industries provide CQV for softgel and OTC plants in St. Petersburg and Tampa?

Paul Industries provides commissioning and qualification for softgel, OTC and nutraceutical plants in St. Petersburg, Tampa, Largo and Clearwater, covering gelatin preparation, encapsulation, drying rooms, purified water and HVAC. Drying rooms are qualified with dehumidification at summer duty, and water systems are sampled across seasons. Call 201-450-8280 to discuss a Tampa Bay program.

Who handles validation for pharmaceutical plants in Miami, Miramar and Fort Lauderdale?

Paul Industries handles validation for pharmaceutical, transdermal, generic and packaging plants in Miami, Miramar, Fort Lauderdale and the rest of Miami-Dade and Broward. Programs cover utilities, process equipment, solvent handling, dust collection and automation, and they include storm outage requalification criteria written before hurricane season. Supply, installation and qualification can be combined under one contract.

Does Paul Industries qualify systems in Orlando, Alachua and the Space Coast?

Paul Industries qualifies systems in Orlando, Alachua and Gainesville, Melbourne and the Space Coast, for device makers, biotech scale-up plants, research hospitals and laboratories moving into GMP production. Typical scopes are clean utilities, cleanrooms, cold storage, autoclaves and bioreactor support systems. Send the system list and the site’s validation approach to start a proposal.

Which are the top pharmaceutical companies in Florida by manufacturing footprint?

Florida’s manufacturing footprint in pharmaceuticals includes Catalent’s St. Petersburg softgel site, Noven Pharmaceuticals’ transdermal plant in Miami and Apotex’s planned Miramar facility, alongside hundreds of smaller drug, OTC and supplement plants. Select Florida counts more than 700 pharmaceutical manufacturing establishments in the state, second nationally. Paul Industries qualifies utilities and process systems for plants of every size.

Is there a list of medical device companies in Florida that manufacture in the state?

Florida counts more than 1,300 medical device manufacturing establishments, second nationally, and manufacturers with a plant in the state hold a device manufacturer permit under s. 499.01. Jacksonville’s group includes Johnson & Johnson Vision, Medtronic ENT, Zimmer Biomet and KLS Martin, and CONMED’s headquarters and a major plant are in Largo. Paul Industries qualifies equipment and utilities for device plants across the state.

Does a Florida device plant need a state permit as well as FDA registration?

A Florida device plant needs a device manufacturer permit from the Department of Business and Professional Regulation under s. 499.01, in addition to FDA establishment registration. The statute requires device makers in the state to follow all appropriate state and federal good manufacturing practices and quality system rules, so qualified equipment and validated processes support both the permit and FDA inspections.

What does the QMSR mean for equipment qualification at a Florida device plant?

The QMSR, effective February 2, 2026, means equipment qualification at a Florida device plant is now judged against ISO 13485:2016 as incorporated into 21 CFR 820. Plants need documented risk-based rationale for what is qualified, process validation for outputs that cannot be fully verified, software validation proportionate to risk, and written revalidation criteria. Existing qualification packages are often updated to that framing.

How is a softgel drying room qualified in Florida's climate?

A softgel drying room in Florida is qualified by proving its supply air dew point, room temperature and humidity hold specification under summer latent load, with the dehumidifier and reheat running at full duty. OQ covers alarms, control loops and recovery after door openings; PQ follows capsule moisture and hardness over full drying cycles. Repeating key tests in the wet season gives the strongest evidence.

When should a Florida warehouse be temperature mapped?

A Florida warehouse holding temperature-sensitive product should be mapped in the hottest months, typically July through September, and again in the coolest period, with sensors placed near roller doors, exterior walls, the roof deck and high racks. Remapping follows changes to racking, HVAC or building envelope. Paul Industries plans sensor layouts, executes the study and reports hot and cold spots for monitoring placement.

What should a Florida plant's requalification plan say about hurricane outages?

A Florida plant’s requalification plan should define, before hurricane season, which outage durations require only sanitization, which require resampling, which cleanrooms need recovery tests or reclassification, how cold storage excursions are assessed, and who approves release. Writing those rules in advance turns post-storm restart into executing an approved protocol, which shortens downtime and keeps decisions consistent.

Does a hospital boiler's Florida certificate matter for a steam system IQ?

A hospital boiler’s Florida certificate matters for a steam system IQ because Chapter 554 applies inspection requirements to boilers in public assembly locations, including hospitals, and those boilers need a current certificate of operation renewed every 12 months. Hospital sterile processing and GMP cell therapy suites list that certificate among the installation records for the steam they use.

How long does qualification take for a new system at a Florida plant?

Qualification of a new system at a Florida plant usually takes weeks for a single utility such as compressed air and several months for a purified water system, because water PQ runs through sampling phases that often extend across seasons. Schedules depend on document quality, review cycles and how much commissioning evidence the quality unit accepts for leverage into IQ and OQ.

Can Paul Industries qualify systems already installed at a Florida plant?

Paul Industries qualifies existing systems at Florida plants, starting with a walkdown against drawings, a gap assessment of turnover records, and field verification of materials, welds, instruments and software versions. Missing records are recreated where possible through inspection and testing, and the IQ documents what was verified and how. Paul Industries also corrects gaps found during the walkdown.

How much does validation and commissioning cost for a Florida plant system?

Validation and commissioning for a Florida plant system is priced from the system’s complexity and criticality, the protocol format and review cycles the site requires, how much commissioning evidence can be leveraged, and the length of PQ sampling. Paul Industries gives a budget range from comparable systems once it sees the system list and validation master plan, then a firm price for each phase.

Which records support an IQ at a Florida plant?

An IQ at a Florida plant relies on as-built drawings, material certificates, weld logs and borescope records for hygienic piping, passivation reports, instrument calibration certificates, software and firmware versions, equipment manuals, and building inspection sign-offs under the Florida Building Code edition in force. Where a boiler serves the system in a public assembly location, its certificate of operation is listed too.

Do cosmetic and supplement plants in Florida need formal qualification?

Cosmetic and supplement plants in Florida benefit from documented commissioning and qualification even where the rules are lighter than for drugs: 21 CFR 111 requires supplement makers to calibrate, maintain and clean their equipment and keep records of it, and cosmetic makers need a Florida cosmetic manufacturer permit. Paul Industries scales protocols to the rule and the risk, so the evidence fits the product.

What should a Florida site send to start a validation and commissioning proposal?

A Florida site should send the list of systems in scope, P&IDs and layouts, the validation master plan or site procedures, existing turnover documents, the protocol template if one is required, and the target release date. Call 201-450-8280 or request a quote, and Paul Industries returns a budget range followed by a phased proposal.

Qualifying new or existing systems at a Florida plant?

Send the system list, drawings, the site’s validation approach and the target release date. Call 201-450-8280 or request a quote.