Paul Industries designs, fabricates, installs and tests process piping in Maryland for chemical, biomanufacturing, food, poultry, energy and port-area plants, from Curtis Bay and the Baltimore harbor to Frederick, Hagerstown, Southern Maryland and the Eastern Shore. Maryland packs a heavy chemical complex, a working seaport, an export LNG terminal, a biologics corridor and a poultry economy into one small state, and each of them asks different things of a pipe. Paul Industries builds ASME B31.3 process lines and B31.1 utility lines for all of them under one contract, from the line list through turnover.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
Building code 2021 IBC statewide since May 29, 2023, enforced by counties and municipalities
Air permits MDE permit to construct for new or modified sources (COMAR 26.11.02)
Shoreline rule Chesapeake Bay Critical Area: land within 1,000 feet of tidal water
Public work Prevailing wage at $250,000 with 25% state funding
Reviewed November 2026

What does process piping in Maryland carry, and where?

Process piping in Maryland carries catalyst slurries and caustic in Baltimore’s southern harbor, steam and chilled water through biologics plants in Frederick and Montgomery County, ammonia and sanitation water through poultry plants on the Delmarva Peninsula, coolants and compressed air through engine and transmission lines in Hagerstown, and cryogenic hydrocarbons at the Cove Point terminal in Calvert County. The common thread is the code: most plant lines outside the boiler fall under ASME B31.3, and the boiler, its external piping and high-energy steam fall under ASME B31.1 and the state boiler law.

The national overview of materials, joining and testing sits on the process piping page. This page is about the Maryland side of the job: which industries sit where, which agencies have a say, how the shoreline and the climate change a project, and what a Maryland plant receives when the work is done.

Maryland regions, their process industries and the piping they lean on
RegionIndustry (market facts)Typical fluidsPiping emphasis
Baltimore harbor and Curtis BayCatalyst and silica manufacturing, bulk and break-bulk terminals, older heavy industrySlurries, caustic, acids, steam, compressed air, fuelAbrasion-resistant routing, corrosion allowance, tie-ins during short outages
Frederick and the I-270 corridorBiologics, cell therapy, vaccine and bioscience productionPlant steam, chilled and hot water, process waste, gases, clean utilitiesB31.3 utility piping next to ASME BPE sanitary systems, tight documentation
Salisbury and the Eastern ShoreBroiler processing, feed, food plantsAmmonia, glycol, hot sanitation water, chlorinated water, wastewaterIIAR ammonia piping, washdown-rated supports, stainless in wet areas
Hagerstown and Western MarylandEngine, transmission and axle production, distribution, building productsCoolants, cutting fluids, lube oil, compressed air, process waterCarbon and stainless lines, freeze protection in a colder climate
Southern MarylandLNG export at Cove Point, power generationNatural gas, LNG, nitrogen, cooling waterLow-temperature materials, impact testing, high-pressure gas service

Process piping Baltimore chemical and port plants run

Baltimore’s heavy process industry clusters around the southern harbor, where W. R. Grace has made silica products and catalysts at its Curtis Bay works since 1910, on about 110 acres. The site’s products include fluid cracking catalysts for refineries, polyolefin catalysts for plastics and silica absorbents, and in 2025 the company applied to the Maryland Department of the Environment for a permit to construct a new silica production line. Those are market facts about the harbor, and they show the kind of piping the area demands: wet, abrasive and chemically aggressive service running beside steam, air and water utilities.

Slurry piping is the hardest of these. Particles erode the outside wall of every elbow, the downstream side of every reducer and the seat of every throttling valve, so slurry lines are routed with long-radius bends, as few direction changes as the layout allows, and wear-resistant linings or thicker walls where the flow turns. Velocity is held in a window: fast enough to keep solids moving, slow enough to limit wear. Drains and flush connections sit at the low points so a line can be cleared before solids settle and set up.

Port and terminal piping follows the cargo. The Port of Baltimore handled about 50 million tons in 2025, its second-best year, and ranked first in the country for roll-on, roll-off farm and construction equipment and for forest products. The industrial piping Baltimore terminals depend on carries fuel, fire water, compressed air, steam and wash water through long pipe runs exposed to salt air and wind off the Patapsco, so coatings, insulation jacketing and support corrosion matter as much as the pipe itself.

Downtown and Harbor East buildings add one more Baltimore feature. Vicinity Energy runs a district steam network of about 28 miles of underground pipe serving roughly 193 buildings, and the steam pipes in Baltimore that feed hospitals, labs and commercial buildings meet customer-side piping at a metering and pressure-reducing station. Paul Industries builds that customer-side work: pressure reducing stations, condensate return, and the steam and condensate piping inside the building.

Biomanufacturing utility lines in Frederick and along I-270

Biomanufacturing plants in Frederick, Gaithersburg, Germantown and Rockville need far more process piping than the product lines visitors see. AstraZeneca announced in November 2025 a $2 billion investment to nearly double commercial capacity at its Frederick biologics plant, with the expansion due to run in 2029, and plants of that kind consume plant steam, condensate, chilled water, hot water, cooling water, compressed air, nitrogen, carbon dioxide and process waste in volume.

Process piping in Frederick and the corridor splits into two families. Product-contact and clean utility lines, such as Water for Injection, clean steam and buffer transfer, are built to ASME BPE with orbital welds, borescope records and passivation; that work is covered on the sanitary process piping in Maryland and CIP and SIP systems in Maryland pages. Everything that serves those systems from behind the wall is B31.3 or B31.1 industrial piping: carbon steel steam headers, copper or stainless gases, PVC or polypropylene drain and waste, insulated chilled water, and the kill system or waste neutralization lines in containment buildings.

The utility side still feeds a regulated process, so a biologics owner expects the same paper trail on a steam header as on a sanitary line: material test reports, welder and procedure records, an examination record, a pressure test record and as-built drawings. Paul Industries prepares those records as the work proceeds, so the utility systems can be handed straight into commissioning and the qualification steps described on the validation and commissioning in Maryland page.

Process piping on the Eastern Shore: poultry, food and feed plants

Process piping on the Eastern Shore serves an industry that began on Delmarva in 1923 and still shapes the peninsula’s economy. Perdue, based in Salisbury, opened its first processing plant there in 1968, and broiler processing, feed milling and further processing remain the Shore’s largest industrial users of refrigeration, hot water and wastewater piping.

Ammonia refrigeration is the backbone. Chillers, spiral freezers, blast cells and ice systems are fed by anhydrous ammonia piping designed and tested to IIAR 2 and ASME B31.5 or B31.3 practice, with welded carbon steel or stainless lines, relief headers routed to a safe discharge and insulation sealed against the moisture that corrodes pipe under insulation. Paul Industries builds and repairs that piping as described on the ammonia refrigeration page.

Sanitation water is the second system. Processing rooms are washed down every shift, so hot water headers, chlorinated water lines, chemical feed and drain piping take heavy daily wear. Stainless pipe, sloped and drainable runs, supports that do not trap water, and hangers that stay clear of product zones all reduce microbial harborage and maintenance. Wastewater pretreatment lines, often with dissolved air flotation and pumped sludge, complete the plant.

Hagerstown and Western Maryland plant piping

Hagerstown anchors manufacturing in Western Maryland, and the Volvo Group powertrain facility there, which opened as a Mack Trucks plant in 1961, builds engines, transmissions and axles for Mack and Volvo trucks. Machining and assembly plants of that kind run coolant and cutting-fluid systems, lube oil, wash systems, compressed air and process water through miles of carbon and stainless piping that is modified every time a line is retooled.

Retooling is where piping work concentrates. A new machining cell needs coolant supply and return, chip-laden drain to a central filtration system, air drops and sometimes a new wash station, and each tie-in has to happen during a weekend or a model changeover. Western Maryland’s colder winters add freeze protection: heat tracing on outdoor water and air lines, drains at low points and dry-pipe practice where water can sit.

Which Maryland agencies have a say in a piping project?

Maryland piping projects touch several agencies, and which ones apply depends on the building, the fluid, the emission source and the location. The table sets out the main Maryland rules and what each one asks of a process piping job.

Maryland rules that apply to process piping work
RuleWho administers itWhat brings piping under itWhat the job delivers
Maryland Building Performance Standards (2021 IBC)Adopted statewide; county and municipal building departments enforceNew buildings, additions, structural supports, pipe racks attached to structurePermit drawings, structural calculations for racks and supports
Boiler and Pressure Vessel Safety Act, COMAR 09.12.01Division of Labor and Industry, Chief Boiler InspectorBoilers, pressure vessels and the boiler external piping attached to themInstallation notice 30 days ahead, ASME code construction, inspection records
Air quality permit to construct, COMAR 26.11.02Maryland Department of the EnvironmentNew, modified, replaced or relocated emission sources and their connected linesPiping built to the permitted design, ready for the permit to operate
Chesapeake Bay Critical AreaCounties and municipalities under state criteriaWork within 1,000 feet of tidal water or tidal wetlandsSite plan, stormwater controls, laydown and spill planning
Miss Utility one-call lawMaryland Underground Facilities Damage Prevention AuthorityExcavation for buried lines, foundations and supportsTicket with a start date 3 to 12 business days out, marked utilities respected
MOSH process safety managementMaryland Occupational Safety and HealthLines in processes holding highly hazardous chemicals above threshold quantitiesManagement of change, pre-startup safety review, mechanical integrity records
State Fire Prevention Code (NFPA 1, 2024)State Fire Marshal and county fire officialsHot work, flammable and combustible liquid piping, fire protectionHot work permits and fire watch, code-compliant flammable liquid systems
Prevailing Wage LawMaryland Department of LaborPublic works of $250,000 or more with 25% or more state fundingPayroll records and posted wage rates on covered work

Code status inside a Maryland plant

Maryland’s building code is the 2021 International Building Code, adopted statewide with an effective date of May 29, 2023 and enforced by counties and municipalities that may amend it. Baltimore County’s adoption took effect on September 3, 2024 and Montgomery County’s commercial adoption on December 10, 2024, so the edition and amendments in force depend on the address. Process piping inside an industrial plant is normally designed to the ASME B31 codes the owner specifies, while the building department reviews the structure that carries it, the penetrations through rated walls and the building systems around it.

The boiler law is the second layer. Maryland requires boilers and pressure vessels to be built to the ASME Boiler and Pressure Vessel Code and registered with the National Board, the installer to notify the Chief Boiler Inspector at least 30 days before installation, and each object to hold a valid certificate of inspection. The boiler external piping, from the boiler to the first stop valve and beyond on high-pressure systems, is built to B31.1, and a new boiler or deaerator installation is planned with the inspection in the schedule. Vessels in the process, such as receivers, separators and filter housings, come under the same law; the pressure vessel fabrication in Maryland page covers that side.

Piping near tidal water: the Chesapeake Bay Critical Area

The Chesapeake Bay Critical Area is the land within 1,000 feet of tidal waters and tidal wetlands, protected under a program Maryland enacted in 1984. Much of Baltimore’s industrial harbor, the shoreline plants on the Patapsco and the Bay, and facilities on Eastern Shore rivers sit inside it. Land there is mapped as an Intensely Developed Area, a Limited Development Area or a Resource Conservation Area, and existing industrial sites are generally Intensely Developed Areas, where new development has to cut stormwater pollutant loads.

For a piping job the Critical Area changes the site work more than the pipe. New pipe rack foundations, sleepers, containment pads and laydown areas count as disturbance and impervious surface, so they go through the county’s Critical Area review with the rest of the project. Hydrotest water, flushing water and chemical cleaning solutions are captured and disposed of under a written plan instead of reaching storm drains that run to the harbor. Paul Industries plans those details into the work package so a waterfront project moves through review without surprises.

When does a piping change need an MDE air permit?

A piping change needs a Maryland Department of the Environment permit to construct when it is part of installing, modifying, replacing or relocating an air emission source that is not on the exempt list in COMAR 26.11.02.10. New reactors, dryers, kilns, tanks with vents, scrubbers and boilers usually qualify, and the piping that feeds them, vents them and connects their controls is built to the permitted design. Rerouting a utility line rarely touches the permit, while adding a solvent line to a coating line or a new vent header to a scrubber often does.

Timing matters because construction of a permitted source starts only after the permit to construct is issued, and the source then runs under the conditions of its permit to operate. Paul Industries prepares the piping scope, material lists and drawings early enough to be included in the owner’s application, then fabricates and installs once the permit is in hand.

Industrial piping Maryland plants specify, by fluid service

Industrial piping Maryland plants specify follows the fluid and the conditions, not the state, but Maryland’s mix of industries puts an unusually wide range of services within one small territory. The table sets out the combinations Paul Industries builds most often across the state.

Fluid services, materials and test methods on Maryland piping jobs
ServiceUsual materialCode and joiningTypical test
Plant steam and condensateCarbon steel, A106 or A53 pipeB31.1 at the boiler, B31.3 or B31.9 in the plant; butt and socket weldsHydrostatic at 1.5 times design pressure
Caustic, acids and slurriesCarbon steel with allowance, stainless, alloy, lined or HDPEB31.3 normal or Category M; welded or flanged lined spoolsHydrostatic, plus sensitive leak test where specified
Anhydrous ammoniaCarbon steel or stainlessIIAR 2 with B31.5 or B31.3; weldedPneumatic with nitrogen and leak check
LNG and cryogenic nitrogen304L or 316L stainless, 9 percent nickel in some servicesB31.3 with low-temperature impact rules; weldedPneumatic or hydrostatic per design, then dry-out
Compressed air and gasesCarbon steel, stainless, aluminum, copperB31.3 or B31.9; welded, brazed or pressPneumatic at 1.1 times design pressure
Coolant and process waterStainless, carbon steel, PVC or CPVCB31.3 or B31.9; welded, grooved or solventHydrostatic with chloride-controlled water on stainless
Clean utilities next to sanitary systems316L stainless tubeASME BPE; orbital weldsHydrostatic or pneumatic, borescope, passivation

Low-temperature and gas service in Southern Maryland

Southern Maryland is home to cryogenic gas service on an industrial scale: the Cove Point LNG terminal near Lusby in Calvert County began producing liquefied natural gas in January 2018 and was the first LNG export facility on the East Coast. LNG runs near minus 260 degrees Fahrenheit, so the piping that carries it, the vapor return lines and the nitrogen systems around it are built from austenitic stainless or nickel steels that keep their toughness at that temperature.

ASME B31.3 sets the low-temperature rules: materials and welds below their listed minimum design metal temperature are impact tested, welding procedures are qualified with impact tests where required, and thermal contraction is designed into the routing with loops and supports that let the pipe move. The same logic, on a smaller scale, applies to liquid nitrogen and carbon dioxide lines at biologics plants and to cold glycol in food plants.

Pipe fabrication Maryland projects move off site

Pipe fabrication Maryland projects can move off site cuts the hot work, fire watch and congestion inside an operating plant, so Paul Industries prefabricates as many spools as the layout allows. Spools are cut, fitted, welded, examined and pressure tested before they arrive, then set and joined at a small number of field welds or flanges. The approach suits Baltimore’s older plants with tight aisles, biologics buildings where cleanliness matters, and poultry plants where every hour of a sanitation window counts.

Spool size is set by the route in. A spool for a Curtis Bay pipe rack can be long and heavy if a crane can reach it, while a spool for a mezzanine in a Rockville lab building has to pass through doors, elevators and corridors. Field welds are placed where a welder can reach them and where an examiner can see them. Each spool carries a tag that ties it to its isometric drawing, weld map and test record, which keeps the turnover package straight. The welding behind those spools is covered on the industrial welding services in Maryland page.

Tie-ins, testing and turnover at operating Maryland plants

Tie-ins at an operating Maryland plant are planned weeks before the outage: isolation points are confirmed, lines are drained and purged, hot work is permitted, and every connection that can be made in advance is made, so the outage covers only the final cut and weld or the final flange. Hot taps on live lines are used where an outage is impossible and the line conditions allow one. Under Maryland’s fire code, which adopts the 2024 edition of NFPA 1, welding in a plant carries a hot work permit, a fire watch and housekeeping rules that the job plan builds in.

Testing follows B31.3: a hydrostatic leak test at 1.5 times design pressure, adjusted for temperature, or a pneumatic test at 1.1 times design pressure where water cannot be used. Stainless lines are tested with low-chloride water and drained and dried promptly to prevent pitting. In Western Maryland and in unheated buildings statewide, winter tests use heated water, glycol mixtures where the owner allows them, or pneumatic tests with added safety distance. The hydrostatic testing page covers test planning in more depth.

Turnover closes the job. A Maryland plant receives the as-built isometrics, weld maps, welder and procedure qualification records, material test reports, examination and test reports, and, for lines in a PSM-covered process, the records its management of change and pre-startup safety review require.

How a Maryland process piping project runs
StageMain tasksMaryland checkpoint
Scope and designLine list, fluid service categories, materials, routing, supportsAir permit scope, Critical Area review, building permit drawings
FabricationSpools cut, welded, examined and tested off siteWeld procedures and material records ready for the boiler inspector where boiler piping is involved
Site preparationSupports, foundations, rack steel, buried crossingsMiss Utility ticket, stormwater controls near tidal water
Installation and tie-insSpools set, field welds made, tie-ins during planned outagesHot work permits under NFPA 1, management of change for PSM processes
Testing and startupLeak tests, flushing, drying, insulation and tracingPre-startup safety review, permit to operate conditions where a source changed
TurnoverAs-builts, weld maps, records packageRecords filed for inspection, insurance and the plant’s integrity program

How is process piping in Maryland priced?

Process piping in Maryland is priced from the line list and the site, because the cost of a pipe run depends far more on material, size, fluid service, examination level, access and outage constraints than on its length alone. Buyers often ask how much does piping cost per foot, and the honest working answer is a budget range from comparable scope, followed by a firm price once routing, materials and tie-in points are fixed.

The main drivers are the material (stainless and alloys cost several times carbon steel, and lined pipe more again), the size and schedule, the share of work that can be fabricated off site, the examination required by the fluid service, the number of tie-ins and the outage windows they need, insulation and heat tracing, and the access route. Maryland adds a few cost items of its own: Critical Area site controls on waterfront jobs, air permit timing on modified sources, winter protection in the west, and wage rules on public work. Under the Maryland prevailing wage law, public works contracts of $250,000 or more with at least 25 percent state funding pay the state’s prevailing rates, which a wastewater authority, university or hospital project with state money may trigger.

Who installs process piping in Maryland?

Paul Industries installs process piping in Maryland as a single contractor responsible for design, fabrication, supply, installation, testing, startup and turnover, at chemical, biomanufacturing, food, poultry, energy and port-area plants across the state. The company was formerly based in northern New Jersey and then Pennsylvania, is headquartered at 256 Shore Drive, Kilmarnock, Virginia, and takes work throughout Maryland, in all 50 states and at plants outside the United States.

Paul Industries offers three routes on Maryland work: complete installation from design to turnover, design-build packages that start from the owner’s process data, and supply-only orders of fabricated, examined and tested spools. The same scope is described for the headquarters state on the process piping in Virginia page, and for neighboring markets on the process piping in Pennsylvania and process piping in New Jersey pages.

Process piping from Paul Industries in Maryland

Paul Industries brings Maryland plants one contract for their process lines: the routing and design, the Maryland permits and reviews the line touches, spools prefabricated and tested off site, tie-ins made inside planned outages, and a records package the plant’s inspectors, insurers and quality staff can use. Piping projects often include tanks and vessels as well, described on the tank fabrication in Maryland page, and the full list of Maryland services is on the Maryland page. To price a Maryland piping project, send the line list or drawings and request a quote.

Standards referenced: ASME B31.3 Process Piping · ASME B31.1 Power Piping · ASME Boiler and Pressure Vessel Code Section IX · ASME BPE · IIAR 2 · Maryland Boiler and Pressure Vessel Safety Act (COMAR 09.12.01) · Maryland Building Performance Standards (2021 IBC) · COMAR 26.11.02 air quality permits · Chesapeake Bay Critical Area Protection Program · Maryland State Fire Prevention Code (NFPA 1, 2024 edition) · OSHA 29 CFR 1910.119 process safety management · Maryland Prevailing Wage Law (State Finance and Procurement Article, Title 17, Subtitle 2)

Frequently asked questions

Who builds process piping for chemical plants in Curtis Bay and around the Baltimore harbor?

Paul Industries builds process piping for chemical, catalyst and terminal facilities in Curtis Bay, Fairfield, Hawkins Point and the rest of the Baltimore harbor. The work covers slurry and caustic lines with wear and corrosion allowances, steam and air utilities, vent headers to scrubbers and tank farm piping, with tie-ins scheduled into planned outages and records prepared for the plant’s process safety and mechanical integrity programs.

Does Paul Industries take process piping work in Frederick, Gaithersburg and Rockville?

Yes. Paul Industries builds utility and process piping for biologics, cell therapy and bioscience plants in Frederick, Gaithersburg, Germantown and Rockville: steam and condensate, chilled and hot water, gases, process waste and kill system lines. Those systems are documented to the standard a regulated plant expects, so they move directly into commissioning and qualification alongside the sanitary systems they serve.

Who installs process piping at poultry and food plants around Salisbury and the Eastern Shore?

Paul Industries installs ammonia refrigeration piping, hot sanitation water headers, chemical feed lines, glycol loops and wastewater pretreatment piping at poultry, feed and food plants around Salisbury and across the Eastern Shore. Work in processing rooms is scheduled into sanitation shifts and weekend shutdowns, and stainless, sloped and drainable runs are used where washdown would otherwise corrode or contaminate the system.

Does Paul Industries pipe manufacturing plants in Hagerstown and Western Maryland?

Yes. Paul Industries builds coolant, cutting fluid, lube oil, compressed air, wash and process water piping for manufacturing plants in Hagerstown, Cumberland and the rest of Western Maryland. Retooling projects are planned around weekends and model changeovers, and outdoor lines in the colder western counties get heat tracing, insulation and low-point drains so a January freeze does not split them.

Does process piping inside a Maryland plant need a county building permit?

Process equipment piping inside an industrial plant is generally governed by the ASME B31 codes the owner specifies, but the work around it often needs a county or municipal permit: new pipe racks and supports tied to the structure, foundations, penetrations through fire-rated walls, and changes to building plumbing, fuel gas or fire protection. Paul Industries confirms permit scope with the building department early and prepares the drawings and calculations it asks for.

When does a piping change need a permit to construct from MDE?

A permit to construct from the Maryland Department of the Environment is needed when the piping is part of a new, modified, replaced or relocated air emission source that is not exempt under COMAR 26.11.02.10, such as a new dryer, reactor, scrubber, vented tank or boiler. Construction of that source waits for the permit. Utility reroutes rarely need one. Paul Industries supplies the piping drawings and material data the owner’s application needs.

What does the Chesapeake Bay Critical Area mean for piping work near the water?

Projects within 1,000 feet of tidal water or tidal wetlands go through the county’s Critical Area review. For a piping job that mostly affects the site work: rack foundations, containment pads, laydown areas and stormwater controls, plus a written plan for capturing hydrotest, flushing and cleaning water. Paul Industries builds those items into the project plan so review and construction stay on schedule.

Is boiler external piping in Maryland covered by the state boiler law?

Boiler external piping is built to ASME B31.1 and belongs to the boiler installation, which Maryland regulates under the Boiler and Pressure Vessel Safety Act and COMAR 09.12.01. A new installation is reported to the Chief Boiler Inspector at least 30 days before it is installed, and the boiler must carry a valid certificate of inspection to operate. The boiler repair in Maryland page covers in-service boilers.

Which Maryland piping projects owe prevailing wage?

Maryland’s prevailing wage rules apply to public works contracts of $250,000 or more that carry at least 25 percent state funding, including school construction. Piping at a privately funded plant is normally outside the law unless state money is part of the project. Wastewater, university, hospital and other public projects can qualify, so Paul Industries confirms the funding sources and prices covered work at the posted rates.

How much notice does Miss Utility need before digging for buried process lines in Maryland?

Maryland’s one-call system sets a start date between 3 and 12 business days after the ticket is opened, so excavation for buried process lines, duct banks, foundations or pipe supports is ticketed well before the dig. Owner-operated private lines inside a plant are often unmarked by the utilities, so Paul Industries also reviews the plant’s own drawings and uses locating equipment before excavation begins.

Does MOSH enforce process safety management on Maryland piping changes?

Maryland Occupational Safety and Health runs the state plan that covers most private workplaces, and it enforces the process safety management standard at plants holding highly hazardous chemicals above threshold quantities, including many ammonia refrigeration systems. A piping change in a covered process needs management of change, updated process safety information and a pre-startup safety review. Paul Industries prepares the piping records each step requires.

How are process lines pressure tested in a Western Maryland winter?

Winter testing in Western Maryland, and in unheated buildings anywhere in the state, is planned around freezing. Options include heated test water, temporary enclosures, glycol mixtures where the owner’s specification allows them, and pneumatic testing at 1.1 times design pressure with added safety distances where water cannot be used. Lines are drained and blown dry immediately after the test so no water is left at low points.

What piping does a biologics plant need besides its sanitary product lines?

A biologics plant relies on plant steam and condensate, chilled and hot water, cooling water, compressed air, nitrogen, carbon dioxide and oxygen, process waste and drain lines, and in containment buildings a kill or inactivation system. Those are built to ASME B31.3 or B31.1 with full records, while product-contact and clean utility lines follow ASME BPE. Paul Industries builds both families on one schedule.

Which materials handle LNG and other cryogenic service in Southern Maryland?

Cryogenic service such as LNG near minus 260 degrees Fahrenheit, or liquid nitrogen colder still, uses austenitic stainless steels such as 304L and 316L, and in some services 9 percent nickel steel, because they stay tough at those temperatures. ASME B31.3 requires impact testing where materials and welds operate below their listed minimums, and routing includes loops and guides for thermal contraction. Paul Industries designs and builds low-temperature piping to those rules.

How are catalyst and silica slurries piped without wearing through the elbows?

Slurry lines are laid out with long-radius bends and few direction changes, run at a velocity that keeps solids moving without excess wear, and protected with thicker walls, hardened fittings, or rubber, ceramic or polyurethane linings where the flow turns. Flush and drain connections at low points let operators clear the line before solids settle. Paul Industries also adds inspection points so wall loss can be measured before a leak.

Which documents go into the turnover package for a Maryland piping job?

A Maryland turnover package holds the as-built isometrics, weld maps, welding procedure and welder qualification records, material test reports, examination reports, pressure test records, flushing and cleaning records, and the punch list closeout. For PSM-covered lines it adds what the plant’s management of change and pre-startup review need, and for boiler piping the records the boiler inspector expects.

Does Paul Industries supply fabricated spools to Maryland plants as a supply-only order?

Yes. Paul Industries supplies fabricated, examined and pressure tested spools to Maryland plants as a supply-only order, each tagged to its isometric with material certificates, weld maps and test records. Spools for sanitary or high-purity service can be cleaned, capped and bagged. Installation, tie-ins and testing can be added to the same order at any point.

What should a Maryland plant send to get process piping quoted?

Send the line list or piping and instrument diagrams, design pressures and temperatures, fluids and fluid service categories, material specifications, tie-in locations and photos, the site address, outage windows, and whether the site is within 1,000 feet of tidal water or uses state funds. Paul Industries uses that package to scope the design, fabrication and installation and returns a priced proposal.

Planning new process lines at a Maryland plant?

Send the line list or drawings, fluids, design conditions, tie-in points, outage windows and the site address. Call 201-450-8280 or request a quote.