Paul Industries provides boiler repair in Georgia for pulp and paper mills, poultry and food plants, chemical plants, hospitals, universities and public buildings, repairing firetube, watertube, cast iron and thermal fluid units to the National Board Inspection Code and returning them to service under the state’s boiler and pressure vessel rules. Georgia moved its boiler program from the Department of Labor to the Office of Insurance and Safety Fire Commissioner in 2012, so the inspector’s permission, the repair report and the operating permit now run through the Safety Engineering Section in Atlanta. Paul Industries diagnoses the fault, plans the repair around the plant’s steam load, carries out the work and hands back the records the inspector and the owner need.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
State law O.C.G.A. 25-15-10 et seq.; rules in Chapter 120-3-26
Administered by Safety Engineering Section, Office of Insurance and Safety Fire Commissioner
Power boilers Operating permit inspection every year, internal where construction permits
Heating and hot water boilers Permit inspection every two years
Welded repairs Inspector's permission first; R-1 to the Chief Inspector within 30 days
Reviewed November 2026

Boiler repair in Georgia under Title 25, Chapter 15

Boiler repair in Georgia is governed by Georgia’s Boiler and Pressure Vessel Safety Act, codified from section 25-15-10 in Article 2 of Chapter 15 of Title 25 of the Official Code of Georgia Annotated, and by the Safety Fire Commissioner’s rules in Chapter 120-3-26. Older manuals, insurance files and plant procedures still cite Title 34, Chapter 11 and the Department of Labor, because that is where the Georgia boiler law sat until the Office of Insurance and Safety Fire Commissioner took over the program and its existing rules on July 1, 2012. The exemption section that was once 34-11-7 is now 25-15-16, and the substance of the program carried across.

The Georgia boiler code that a repair must meet is a stack of national documents adopted by Rule 120-3-26-.02: the 2021 edition of the ASME construction code, the 2021 NBIC for inspection, repair and alteration, the 2021 edition of ASME CSD-1 for the controls and safety devices on automatically fired boilers below 12,500,000 Btu per hour, and NFPA 85 for boilers at or above that input. The general mechanical picture of tube failures, burners and controls is on the national boiler repair page; this page follows a Georgia repair from the inspector’s finding to the restored operating permit.

Where each Georgia boiler requirement is written
RequirementSourceWhat it means during a repair
Scope and exemptionsO.C.G.A. 25-15-16Confirms whether the unit sits under state inspection before the repair is planned
Operating permit and inspection intervalsRule 120-3-26-.08Sets when the next certificate inspection falls, which is usually the natural window for repairs
Repairs and alterationsRule 120-3-26-.15Inspector’s permission before welding, NBIC Part 3 methods, R-1 or R-2 report afterward
Certificate of authorityRule 120-3-26-.18Installing, maintaining and servicing boilers is done under a certificate in the class that fits the boiler
Safety and relief valvesRule 120-3-26-.21Valve repair and resetting under the National Board VR program
Accident noticeRule 120-3-26-.10Damaged equipment stays in place until the Chief Inspector gives permission
New and replacement installationsRule 120-3-26-.07Installation permit before work and a Deputy Inspector’s inspection before use

Which boilers sit outside the state program?

Georgia boiler safety rules reach most commercial and industrial boilers, but section 25-15-16 lists units the Act does not cover, and two of those entries matter to large plants. Boilers and pressure vessels operated for the production of electricity, and those operated as part of a manufacturing process, are set aside when the operator carries insurance or self-insurance and the equipment is regularly inspected to the ASME Code’s minimum safety requirements by an inspector holding a certificate of competency from the Commissioner.

The section also leaves out equipment under federal control, small hot water supply boilers that stay within 200,000 Btu per hour, 210 degrees Fahrenheit and 120 gallons and carry approved relief valves, and boilers serving public utilities. Heating boilers in private homes and apartment buildings of fewer than six units are relieved of the inspection and certificate sections. Paul Industries reads the exemption question at the start of a job, because it decides whose inspector approves the repair and whether a state operating permit has to be restored before the boiler carries load.

Georgia boiler inspection requirements by boiler class

Georgia boiler inspection requirements are set by boiler class in Rule 120-3-26-.08: power boilers and high pressure, high temperature water boilers receive a permit inspection every year, internal where the construction allows, while low pressure steam boilers, hot water heating boilers and hot water supply boilers receive one every two years. Pressure vessels on the same system are inspected every three years. Every certificate inspection follows Parts 1 and 2 of the National Board Inspection Code.

The question of how often do boilers need to be inspected therefore has three answers in one Georgia boiler room, and the operating permit fee follows the same rhythm. The Act defines the classes by pressure and temperature: a power boiler makes steam above 15 psig, a heating boiler stays at or below 15 psig, a hot water heating boiler stays at or below 160 psig and 250 degrees Fahrenheit, and a high pressure, high temperature water boiler runs above either limit.

Georgia permit inspection cycles and operating permit fees, Rules 120-3-26-.06 and .08
Boiler or vessel classDefined byPermit inspectionOperating permit fee
Power boilerSteam or vapor above 15 psigEvery year; internal where construction permits, external under pressure where possible$50 a year
High pressure, high temperature water boilerWater above 160 psig or 250 FEvery year$50 a year
Low pressure steam or vapor heating boilerSteam at 15 psig or lessEvery two years$50 every two years
Hot water heating and hot water supply boilersWater at 160 psig and 250 F or lessEvery two years$50 every two years
Pressure vessel on the boiler systemUnfired vessel within the ActEvery three years; internal at the inspector’s discretion$30 every three years

What does a boiler inspection consist of in Georgia?

A Georgia boiler inspection on a unit due for an internal consists of an opened, cooled and cleaned boiler that the inspector can examine inside and out. Rule 120-3-26-.19 asks the owner to drain and wash the boiler, remove manhole and handhole plates, washout plugs and water column plugs as the inspector requires, cool and clean the furnace and combustion chambers, remove grates and as much insulation or brickwork as needed to see the shell, headers and supports, and take off the pressure gauge for testing. Valves to a common header are closed, tagged and preferably padlocked, and confined space entry follows 29 CFR 1910.146.

The inspector also checks that the controls and safety devices have been tested to the manufacturer’s requirements, witnessing the tests or reviewing the records, with the CSD-1 Appendix C checklist as the model report. Paul Industries prepares boilers for these visits, opens and closes them, runs the control and safety device tests, and makes any repair the inspection finds while the unit is already down, so the plant opens the boiler once.

Black liquor and power boiler internals: the Georgia extension

Georgia lets an industrial plant stretch the annual internal inspection to 18 months for a black liquor recovery boiler and to 24 months for a power boiler, with approval from the Office of Insurance and Safety Fire Commissioner. A person delegated by the plant applies with operator training records, boiler maintenance records, water chemistry data and a letter of approval from an authorized inspection agency, and the in-service inspector’s detailed summary report reaches the office within 30 days of the internal. For a black liquor boiler, the report goes in with the emergency shutdown procedure test.

That provision exists because of the state’s pulp and paper industry. Georgia’s forestry task force reported in January 2026 that seven of the state’s eight remaining pulp mills were built before 1961, so recovery and power boilers at those mills carry decades of service. A longer interval puts more weight on each outage: every tube, header and refractory repair that the internal finds has to be finished, examined and documented inside the shutdown window. Paul Industries plans mill boiler repairs from the inspection plan backward, stages tube, weld and refractory work for the outage, and keeps the water chemistry and maintenance records that support the next extension request. Feedwater and chemistry programs are covered under boiler water treatment.

The Georgia boiler certificate of authority: Class I, II and III

The Georgia boiler certificate of authority is the document Rule 120-3-26-.18 requires of every company that installs, maintains or services boilers in the state, issued in three classes: Class I for power boilers, high pressure hot water boilers and high temperature fluid heaters, Class II for hot water and steam heating boilers, and Class III for hot water supply boilers and lined potable water heaters. The certificate is renewed every two years on or before January 1, and the fee is $50 for the original and each renewal.

The rule defines the work as well as the paper. Installing means connecting piping and electrical circuits to the equipment and setting it up for use, with electrical work from the disconnect to the boiler and piping that is not part of a water supply, sanitary drainage or storm drainage system. Maintenance and servicing covers cleaning, replacing parts with like parts, testing, blowing down, checking operation and testing after service. Operators who only start and stop the boiler, blow it down and test its safety devices are outside the rule. The same classes govern the controls and safety device testing that Rule 120-3-26-.08 now ties to every certificate inspection, so the test record the inspector reviews is part of the service work.

From an unsafe finding to a restored operating permit

An unsafe finding during a Georgia boiler inspection stops the boiler: the inspector tells the owner which repairs or corrective measures are needed, notifies a supervisor or the Chief Inspector, and the certificate in force is suspended until reinspection shows the repairs are done. The Commissioner or an authorized representative can also issue a written cessation order for a hazardous unit, and operation resumes only when the conditions are corrected to the office’s satisfaction.

The statute behind those steps is blunt. Section 25-15-26 makes it a misdemeanor to run a boiler without its inspection certificate or above the pressure the certificate allows, and the rules let a State Deputy Inspector inspect any unit more than six months overdue and bill a special inspection on top of the standard fee. Paul Industries reads the inspection report, opens the unit where needed to confirm the extent of the damage, writes the repair scope, and schedules the reinspection for a day when the boiler is ready for it, so the operating permit comes back on the first visit.

Welded repairs under Rule 120-3-26-.15

Welded repairs to a Georgia boiler follow Rule 120-3-26-.15: permission is obtained from an inspector before the work starts, the repair follows the current National Board Inspection Code, and the work is carried out under a valid National Board “R” certificate of authorization or, for owner-users repairing their own equipment, a jurisdictional approval. The repair organization works under a contract with an approved inspection agency, which is how the inspector who authorizes and accepts the repair is assigned.

The paperwork has a fixed clock. A completed R-1 Report of Repair, signed by the inspector, goes to the Chief Inspector within 30 days of every welded repair, and an alteration such as a rerate or a design change to the pressure boundary is reported on an R-2 within the same period. Both forms are registered with the National Board. Restamping a boiler whose stamping has been lost needs the Chief Inspector’s authorization and proof of the original stamping, and it is done in an inspector’s presence. Welded repairs to cast iron boilers are prohibited outright, so a cracked cast iron section is replaced, not welded.

Common Georgia boiler repairs and the record each one leaves
RepairInspector involvementRecord
Tube replacement or full retube on a firetube boilerPermission before work; hydrostatic test and acceptance afterR-1 to the Chief Inspector within 30 days
Watertube, drum or header weld repairPermission before cutting; examination of the finished weldR-1 to the Chief Inspector within 30 days
Rerate, new nozzle or pressure boundary design changeApproval of the design and the workR-2 within 30 days, registered with the National Board
Cast iron section replacementChecked at the next permit inspectionService record; welding on cast iron is prohibited
Safety or relief valve repair or resettingValve tested in place or on the benchVR nameplate and test record kept with the boiler file
Burner, flame safeguard and control repairControl tests witnessed or reviewed at the next inspectionCSD-1 style test record
Refractory and casing repairSeen at the internal or external inspectionRepair report in the boiler file

A boiler sent out of Georgia for repair needs a permit to install from the Chief Inspector before it comes back, under Rule 120-3-26-.16. Paul Industries plans welded repairs on site wherever the access allows, so the boiler stays in place and the reinstallation step is avoided.

Safety valves, controls and the hydrostatic test

Safety and safety relief valves on Georgia boilers are repaired, reset or recalibrated only under the National Board “VR” program or by an owner-user maintenance organization the Chief Inspector has approved for its own valves, under Rule 120-3-26-.21. No one works on a safety appliance while it is under pressure, apart from setting a valve, and any appliance removed during an outage is reinstalled and working before the boiler returns to service. Electric boilers need at least 3.5 pounds per hour of relieving capacity for every kilowatt of input.

The hydrostatic test after a pressure part repair has its own Georgia limits. A test on a boiler may not exceed one and one-half times the maximum allowable working pressure and has to be controlled within 6 percent of the target, the water is at least 70 degrees Fahrenheit, and the safety valves are removed or held with a test clamp rather than by screwing down the spring. Paul Industries plans the test pressure, temperature and valve arrangement with the inspector before filling, and the test results go into the same file as the R-1.

After an incident: the Chief Inspector’s permission comes first

After a boiler incident in Georgia, Rule 120-3-26-.10 requires the owner or user to report it promptly to the Chief Inspector, by telephone at once where there is a personal injury or an explosion, followed by an emailed detailed report. No part of the boiler or vessel may be removed or disturbed before the Chief Inspector gives permission, except to save life and limit consequential damage.

That rule sets the first days after a low-water event, a furnace explosion or a ruptured tube. The plant makes the area safe and arranges temporary steam while the investigation runs. Paul Industries records the condition of the equipment as found, prepares the repair or replacement scope during the investigation, and starts work once permission is given. Steam and condensate lines damaged in the same event are covered by process piping in Georgia.

The Georgia boiler installation permit for a replacement unit

The Georgia boiler installation permit is obtained by the company responsible for the installation before any work is performed, using a Request to Install a Boiler or Pressure Vessel with the fee and the ASME data report; a unit that is ASME stamped and registered with the National Board needs only its data report. A Deputy Inspector inspects new packaged boilers before they are used, and the installer tells the Safety Engineering Section when the unit is ready. A permit with no action expires 24 months after issue.

Room design rules come with the permit. Steam boilers over 15 psi and over 10 boiler horsepower are installed in a two-hour fire-rated room, except in Group F factory occupancies, and heating boilers in assembly or hazardous occupancies need the same rating. Installations meet ASME, the NBIC and CSD-1, units of 12,500,000 Btu per hour and above also meet NFPA 85, and thermal fluid heaters meet NFPA 87. Secondhand boilers need an approved permit to install and a Deputy Inspector’s certificate inspection, and a non-code unit that changes owners needs a Georgia State Special permit before reinstallation. Paul Industries supplies code boilers with ASME stamping and National Board registration, or installs an owner-furnished unit, and carries the work from setting through piping, burner commissioning, the control tests and the Deputy Inspector’s visit. Deaerators, blowdown tanks and receivers on the same system are covered under pressure vessel fabrication in Georgia.

Burner work and Georgia EPD air permits

Georgia EPD air permits enter a boiler repair when a burner retrofit, a fuel change or a replacement unit changes the combustion equipment, because Rule 391-3-1-.03(6)(b) exempts only fuel-burning equipment under 10 million Btu per hour that burns only natural gas, LPG or low-sulfur distillate oil, equipment under 5 million Btu per hour burning wood or a fossil fuel, and any unit of 2.5 million Btu per hour or less. Larger units, and wood or biomass units above 5 million Btu per hour, are assessed for a permit before the change.

The same rule exempts temporary boilers that stand in for main equipment during maintenance or repair, for up to 180 consecutive days, which is the route most plants use to keep steam during a retube. Paul Industries sizes burner and fuel train work against those thresholds, gathers the burner data, emission rates and stack details a permit file needs, and tunes the burner at startup so the combustion records match the permitted basis. Where the boiler is healthy and steam is lost downstream, a steam trap survey is often the faster gain.

Boiler repair across Georgia’s regions

Boiler repair across Georgia follows the shape of each region’s industry: hospital, campus and office steam plants in metro Atlanta, poultry processing in Gainesville and Hall County and across north and south Georgia, pulp, paper and chemical steam on the coast and along the Savannah River, and food, textile and flooring plants in the middle and northwest of the state. The state law is the same everywhere, but the duty and the outage windows are not.

Typical boiler plants and repair priorities by Georgia region
RegionTypical boiler plantsRepair and service priorities
Atlanta and metro AtlantaHospital and university steam plants, office towers, government buildings, light manufacturingHeating boiler permit cycles, sterilizer and humidification steam, control and CSD-1 testing
Gainesville, Hall County and north GeorgiaPoultry processing, rendering and feed plantsFiretube retubes, scale damage, steam and hot water for sanitation on every shift
Savannah, Brunswick and the coastPulp and paper, chemical and port-related plantsPower and recovery boiler internals, extension records, watertube and header weld repairs
Augusta and the Savannah River corridorPulp, chemical and medical campus steamAnnual internals on power boilers, safety valve programs, outage planning
Macon, Columbus and middle GeorgiaFood, paper products, hospitals and military installationsHeating and process boilers, burner work under EPD thresholds
Dalton, Rome and northwest GeorgiaCarpet, flooring and textile plantsProcess steam and hot water for dyeing and finishing, feedwater and blowdown repairs
Albany, Valdosta and south GeorgiaFood processing, poultry and agricultural plantsSeasonal load peaks, retubes timed to slower production months

Boiler repair, Atlanta, GA: hospitals, campuses and plants

Boiler repair Atlanta owners plan is mostly heating and process steam work in buildings that cannot go cold: hospitals with sterilizers and humidification, universities with district steam, and government and office towers with hot water heating plants on the two-year permit cycle. The boiler service Atlanta hospitals buy has to keep at least one unit on line through every repair, so Paul Industries stages the work one boiler at a time, confirms the remaining units can carry the load, and books the inspector for the permission and the return to service.

Boiler repair, Savannah, GA, Brunswick and the coast

Coastal Georgia carries the state’s heaviest steam duty, with pulp and paper mills, chemical plants and port industries running power and recovery boilers on annual or extended internal cycles. Salt air and humidity add casing, stack and burner corrosion to the usual tube and refractory list. Paul Industries plans coastal boiler work around the mill outage schedule, stages the materials and weld procedures before the boiler comes down, and keeps the extension records the next internal will be judged on.

Poultry plants in Gainesville and across the state

Georgia was the top broiler-producing state in the country in 2024, according to USDA figures, and its processing plants use steam and hot water for scalding, cleaning and sanitation on every shift. A boiler outage in a poultry plant stops a line, so retubes and burner repairs are staged around production and backup units, and hard water scale is a common finding that is fixed together with the feedwater treatment. Plant systems beyond the boiler house are covered on the meat and poultry industry page.

Repair or replace an older Georgia boiler

The repair or replace decision for an older Georgia boiler turns on the condition of the pressure parts, what the inspector will accept, whether the unit is cast iron that cannot be welded, and what a replacement would trigger: an installation permit, a Deputy Inspector’s inspection, a two-hour rated room for larger steam boilers, current CSD-1 or NFPA 85 controls, and possibly an EPD air permit. A boiler with sound shell and tube sheets and a repairable fault usually earns its repair; a riveted unit with a lap seam crack along a longitudinal joint is removed from use, and Georgia prohibits patching it.

Paul Industries prices both routes side by side: the repair with its likely remaining life and inspection history, and the replacement with its permit, room, controls and air permit steps, so the owner compares complete projects. Commercial boiler repair in Georgia office buildings and schools often favors a staged replacement with condensing hot water units, while industrial boiler repair in Georgia mills and process plants more often favors retubing, header repairs and burner upgrades on large watertube units that would take a year or more to replace.

What does boiler repair in Georgia cost?

The cost of boiler repair in Georgia is set mostly by the repair itself: tube count and access for a retube, the length and position of a weld repair, refractory area, burner and control parts, rigging, temporary steam, and whether the work runs on overtime to protect production. Georgia’s state charges are modest and published in advance. Under Rule 120-3-26-.06, the state inspection fee runs from $30 for a boiler up to 30 boiler horsepower to $150 for one over 200 boiler horsepower, a special inspection or witnessed hydrostatic test is $100 an hour, and the operating permit is $50 per cycle.

Boiler inspection cost rises when a unit is not ready: the rules charge $100 an hour when the boiler is inaccessible, unprepared or unattended at the scheduled time, and unpaid fees suspend the operating permit after 60 days. A replacement adds an installation permit fee of $100 to $500 by size, doubled if the unit was installed without one. Georgia has no state prevailing wage law, so private and most state and municipal boiler work is priced at market rates, while federally funded work follows the federal Davis-Bacon rates in the contract. Paul Industries prepares a budget range from comparable scope once it knows the type, size, age, inspection history and fault, and a firm price after the boiler is opened or the inspector’s report is reviewed.

Who repairs boilers in Georgia?

Paul Industries repairs boilers in Georgia, handling both commercial boiler repair in Georgia for hospitals, schools, campuses and offices and industrial boiler repair in Georgia for pulp and paper, poultry, food, chemical and manufacturing plants. Paul Industries, formerly based in northern New Jersey and then Pennsylvania, is headquartered at 256 Shore Drive, Kilmarnock, Virginia, and accepts boiler work throughout Georgia, the rest of the 50 states and industrial sites abroad. Paul Industries also handles boiler repair in Virginia, the headquarters state, and boiler repair in North Carolina, and the wider Southeast market.

A steam plant rarely fails in one place. Welded repairs to headers and steam lines are covered by industrial welding services in Georgia, condensate return and fuel oil tanks by tank fabrication in Georgia, and plants running absorption or steam-driven cooling will find that side under chiller repair in Georgia. Paul Industries carries those connected repairs under one contract, one schedule and one set of records.

Boiler repair from Paul Industries for Georgia facilities

Paul Industries repairs, retubes, rebuilds and replaces steam and hot water boilers across Georgia, from cast iron heating boilers in Atlanta office buildings to recovery and power boilers at coastal mills. The work covers diagnosis, inspection preparation, the repair plan for the inspector’s permission, welded repairs under the National Board R program with the R-1 or R-2 filed on time, VR valve work, burner and control repair, CSD-1 control testing, startup and the records for the operating permit. Owners can order parts or a boiler on a supply basis, a design-build replacement, or a complete installation. Send the boiler type, size, state serial or National Board number, the latest inspection report and the fault, and request a quote to start the scope.

Standards referenced: Georgia Boiler and Pressure Vessel Safety Act, O.C.G.A. 25-15-10 et seq. · Rules of the Safety Fire Commissioner, Chapter 120-3-26, Boilers and Pressure Vessels · National Board Inspection Code (NBIC), 2021 edition, Parts 1, 2 and 3 · ASME Boiler and Pressure Vessel Code, 2021 edition, Sections I and IV · ASME B31.1 · ASME CSD-1 · NFPA 85 · Georgia EPD Rule 391-3-1-.03, Permits · OSHA 29 CFR 1910.146, permit-required confined spaces

Frequently asked questions

Who handles boiler repair in Atlanta and the metro counties?

Paul Industries handles boiler repair in Atlanta, Fulton, DeKalb, Cobb and Gwinnett counties and the rest of metro Atlanta, where hospitals, universities, government buildings and offices run heating and process steam plants. Most of those boilers are on Georgia’s two-year permit cycle, and hospital units are repaired one at a time with the remaining capacity confirmed first. Send the boiler data and the latest inspection report, and Paul Industries scopes the repair and the inspector’s visits.

Does Paul Industries repair boilers at pulp mills near Savannah, Brunswick and Augusta?

Paul Industries repairs power and recovery boilers at pulp and paper, chemical and port-related plants around Savannah, Brunswick, Augusta and along the Savannah River. Those boilers run on annual internals or the extended 18 and 24 month intervals Georgia allows, so tube, header and refractory repairs are staged for the outage and documented for the next extension request. Paul Industries plans the materials, weld procedures and examinations before the boiler comes down.

Who repairs poultry plant boilers in Gainesville, Hall County and south Georgia?

Paul Industries repairs firetube and watertube boilers at poultry processing, rendering and feed plants in Gainesville, Hall County, Albany, Valdosta and across Georgia. Those boilers feed scalders and sanitation on every shift, so work is staged around production and backup units. Scale and feedwater damage are common findings, and the repair is paired with changes to softening and chemical treatment so the same tubes do not fail again.

Is boiler repair in Macon, Columbus, Dalton or Rome handled the same way?

The law is the same across the state, so a repair in Macon, Columbus, Dalton or Rome follows the same permission, NBIC repair and R-1 reporting steps as one in Atlanta. What changes is the duty: food and paper plants in middle Georgia, and carpet, flooring and textile plants in the northwest that use steam and hot water for dyeing and finishing. Paul Industries plans each repair around that plant’s production schedule.

What is the Georgia boiler law called today?

The Georgia boiler law is the Boiler and Pressure Vessel Safety Act, found in Article 2 of Chapter 15 of Title 25 and beginning at section 25-15-10; the Commissioner of Insurance and Safety Fire runs it through a Safety Engineering Section. Before July 1, 2012 the same program sat in Title 34, Chapter 11 under the Department of Labor, which is why older documents cite that chapter. The rules are in Chapter 120-3-26.

Where are the Georgia boiler and pressure vessel rules published?

The Georgia boiler and pressure vessel rules are Chapter 120-3-26 of the Rules of the Safety Fire Commissioner, published in the Georgia Administrative Code by the Secretary of State and on the Commissioner’s website. They adopt the ASME construction code, the NBIC, ASME CSD-1 and NFPA 85, and add Georgia’s own requirements for permits, fees, repairs, valves and the certificate of authority.

What is a Georgia boiler license, and who needs one?

Two Georgia documents answer most questions about a Georgia boiler license. Inspectors hold a certificate of competency, earned by passing the National Board examination, and a Georgia commission. Companies that install, maintain or service boilers hold a certificate of authority under Rule 120-3-26-.18, in Class I, II or III by boiler type, renewed every two years. Plant operators who only start, stop, blow down and test safety devices are exempt from the certificate.

What happens at a state of Georgia boiler inspection?

A state of Georgia boiler inspection checks the boiler’s condition, safety valves, low-water cutoffs, gauges and controls, the records of control and safety device tests, and the operating permit on display. Power boilers are opened for an internal each year where the construction allows. If the unit is unsafe, the inspector lists the needed repairs, the permit is suspended, and the boiler stays off until reinspection confirms the work.

Who is the Georgia state boiler inspector for a plant?

A Georgia state boiler inspector can come from the Safety Engineering Section itself, from an insurance company authorized to write boiler and pressure vessel insurance in Georgia, or from an owner-user inspection agency for the plant’s own pressure vessels. Each holds a National Board commission and a Georgia commission renewed every year. Units more than six months overdue are inspected by a State Deputy Inspector with a special inspection charge.

When are Georgia boiler operating permits issued and renewed?

Georgia boiler operating permits are issued after a certificate inspection and the fee are complete, and renewed on the inspection cycle: every year for power and high temperature water boilers, every two years for heating and hot water supply boilers, and every three years for pressure vessels. Fees unpaid for 60 days suspend the permit until they are paid and the unit is reinspected. The Commissioner can extend a permit’s expiration on a written request.

Does every Georgia boiler permit come from the same office?

The certificate side does: installation permits, operating permits and State Special permits all come from the Commissioner’s Safety Engineering Section in Atlanta. A Georgia boiler permit for air emissions is separate and comes from Georgia EPD when the unit is above the exemption thresholds in Rule 391-3-1-.03(6)(b). Building and fuel gas permits for the boiler room come from the city or county building department.

Can a cracked cast iron boiler section be welded in Georgia?

Georgia prohibits welded repairs to cast iron boilers, so a cracked or leaking cast iron section is replaced with a new section, or the boiler is replaced. Cast iron and cast aluminum boilers are also exempt from National Board registration. Paul Industries checks section availability for the model before recommending repair, because an obsolete casting usually turns a section replacement into a boiler replacement.

Who may reset a boiler safety valve in Georgia?

Resetting, recalibrating, repairing or altering a safety or relief valve on a Georgia boiler is done under the National Board VR program, or by an owner-user maintenance organization approved by the Chief Inspector for its own valves. No one works on a valve under pressure except to set it, and a valve removed during an outage is back and working before the boiler returns to service. Paul Industries replaces or sends valves for VR service and keeps the test records.

How long can a power boiler run between internal inspections in Georgia?

The standard interval is one year. With approval from the Office of Insurance and Safety Fire Commissioner, a power boiler can move to a 24 month internal interval and a black liquor recovery boiler to 18 months. The plant applies with operator training records, maintenance records, water chemistry data and a letter from its authorized inspection agency, and sends the in-service inspector’s summary report within 30 days of each internal.

Does a temporary rental boiler need a Georgia EPD air permit?

Georgia EPD Rule 391-3-1-.03(6)(b) exempts temporary fuel-burning equipment that replaces main equipment during maintenance or repair, for up to 180 consecutive days, subject to the rule’s conditions. A temporary boiler is still a pressure-retaining unit, so Paul Industries plans its connection, fuel, water treatment and inspection with the repair and removes it once the repaired boiler is back on line.

How much does a Georgia boiler inspection cost?

Rule 120-3-26-.06 sets state inspection fees by size: $30 up to 30 boiler horsepower, $50 from 31 to 50, $75 from 51 to 100, $100 from 101 to 200 and $150 above 200, charged for each inspection trip. Operating permits are $50 per cycle for boilers. Special inspections and witnessed hydrostatic tests are $100 an hour, and the same hourly rate applies when a boiler is not ready at the scheduled time.

Which boiler details help Paul Industries price a Georgia repair?

Send the boiler’s make, model, type, size and fuel, its National Board or state number, the latest inspection report or the inspector’s list of required repairs, photos of the fault, the operating pressure, and the dates the plant can take the boiler off line. With that, Paul Industries prepares a budget range and a schedule covering the repair, the inspector’s permission, any hydrostatic test and the return to service.