Paul Industries designs, fabricates, installs and tests process piping in West Virginia for gas processing plants, Ohio River and Kanawha Valley chemical sites, steel and aluminum mills, and consumer products plants. The scope runs from rich gas inlet headers and natural gas liquids lines to chlorine, caustic, steam, cooling water and compressed air, built to ASME B31.3 or B31.1 and handed over with weld maps, examination reports and test records. Paul Industries, headquartered at 256 Shore Drive, Kilmarnock, Virginia, takes piping work at plants across West Virginia as supply-only spools, design-build packages or complete installation.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
Gas output Fifth among states, nearly 3.2 trillion cubic feet in 2023 (EIA)
Tank piping Covered by the AST Act up to the first point of isolation (W. Va. Code 22-30-3)
Contractor law Piping contractor class includes process, power plant, air, oil and chemical piping (W. Va. Code 30-42-3)
Industrial power 7.81 cents/kWh, against a US average of 8.13 (EIA, 2024)
Reviewed November 2026

What does process piping in West Virginia carry?

Process piping in West Virginia carries a mix of fluids that few states combine in one economy: wet and dry natural gas, ethane, propane and butane from the shale fields; chlorine, caustic soda and hydrogen at Ohio River chlor-alkali plants; solvents, intermediates and specialty chemicals in the Kanawha Valley; and steam, hot water, nitrogen and compressed air in every mill and assembly plant from Weirton to Martinsburg. Each line in the industrial piping WV plants depend on carries its own B31.3 fluid service category, material and test, and many plants run several of these services side by side.

The general picture of codes, materials and fabrication methods is set out on the process piping page. This page covers what is particular to West Virginia: where the plants sit, which state laws reach a piping job, how gas liquids and chlorine change material choices, and how a mountain winter affects testing. For anyone weighing process piping West Virginia owners will sign off on, the useful starting point is the boundary each state rule draws around the pipe, because that boundary decides who inspects which weld and which records the plant keeps.

Industrial piping, West Virginia basin by basin

Industrial piping in West Virginia follows the rivers and the gas fields. Gas processing sits in the north central counties over the Marcellus and Utica shales, chemical manufacturing lines the Kanawha River around Charleston and the Ohio River from the Northern Panhandle to Parkersburg, and newer manufacturing has grown in the Eastern Panhandle along Interstate 81. The table below sets out what each area tends to put through its pipe.

West Virginia plant areas and the piping work they generate
AreaPlant typesTypical linesWhat shapes the job
Doddridge, Harrison, Wetzel and Marshall countiesGas processing, compression, condensate handlingInlet gas, residue gas, NGL product, condensate, glycol, fuel gasLow-temperature service, high pressure, plant expansions tied to producer volumes
Charleston and the Kanawha ValleySpecialty and intermediate chemicals, research parksSolvents, acids, caustics, monomers, steam, nitrogenProcess safety management, older plant layouts, multi-tenant sites
Ohio River, Wheeling to ParkersburgChlor-alkali, polymers, isocyanates, powerChlorine, caustic, hydrogen, brine, steam, cooling waterCorrosive and toxic service, river water cooling, tight turnaround windows
Huntington and the Tri-StateMetals, chemicals, terminalsProcess water, compressed air, fuel gas, hydraulic oilBrownfield tie-ins, flood elevation, rail and barge access
Morgantown, Fairmont and ClarksburgResearch, light manufacturing, gas compressionLaboratory utilities, chilled water, compressed air, natural gasOccupied buildings, mixed code boundaries
Martinsburg and the Eastern PanhandleConsumer products, distribution, food and packagingLiquid raw materials, product transfer, purified water, steam, airHigh-speed lines, frequent changeovers, sanitary and utility work side by side

Gas processing over the Marcellus and Utica shales

West Virginia was the fifth-largest producer of marketed natural gas among the states in 2023, with a record of nearly 3.2 trillion cubic feet, about 95 percent of it from shale wells, according to the Energy Information Administration. Much of that gas is wet, so it passes through processing plants that strip out ethane, propane, butane and natural gasoline before residue gas enters the transmission system. The Sherwood complex in Doddridge County, which went into service in October 2012, was processing 2.2 billion cubic feet a day before a 2019 expansion added another 400 million.

Piping in these plants runs at pipeline pressures on the inlet side and at cryogenic and refrigerated temperatures through the expanders and liquids sections. Expansions arrive as new trains beside running ones, so tie-ins to common headers, flare lines and product pipelines have to be planned around a live plant. Related vessel work for these plants is covered on the pressure vessel fabrication in West Virginia page, and more on the sector sits under oil and gas.

Process piping, Charleston, WV and the Kanawha Valley

Process piping Charleston, WV plants rely on sits inside some of the oldest chemical sites in the country. Dow’s West Virginia operations include its South Charleston site and tenant operations at Institute on a site owned and operated by Altivia, and the former DuPont works at Belle now hosts several producers, among them Chemours and Kureha. Multi-tenant sites mean shared pipe racks, shared utilities and boundaries between owners that run through the middle of a header, so every new line starts with agreeing whose system it ties into and whose procedures govern the work. Sanitary and batch-change piping for these plants is covered on the sanitary process piping in West Virginia page, and integrity work on old equipment on the passivation services in West Virginia page.

Ohio River plants from Wheeling to Parkersburg and Huntington

Ohio River chemical plants handle some of the most demanding fluids in the state. Westlake’s Natrium plant at Proctor in Marshall County makes chlorine, caustic soda and derivatives, and the former Bayer site at New Martinsville, now Covestro, was built in 1954 to make toluene diisocyanate. Plants along this stretch draw cooling water from the river and sit on floodplain ground, so pipe supports, drains and buried crossings are designed with high water in mind as well as process conditions.

Martinsburg, Morgantown and the north central cities

The Eastern Panhandle brings a different kind of piping. Procter and Gamble broke ground on its $500 million Tabler Station plant in Berkeley County in September 2015, a site of more than a million square feet on 458 acres that began making product in February 2018. Consumer products plants of that kind run liquid raw material, product transfer, hot water and compressed air lines at high speed with frequent changeovers. Around Morgantown, Fairmont and Clarksburg the work leans toward research buildings, laboratory utilities and gas compression, often inside occupied buildings where mechanical code and process code meet in the same ceiling.

Which code governs process piping in West Virginia?

ASME B31.3 Process Piping governs most process piping in West Virginia plants, with ASME B31.1 for boiler external piping and power plant steam, and ASME B31.8 with the federal pipeline safety rules in 49 CFR Part 192 for gas gathering and transmission lines outside the plant fence. The owner, usually through its engineer of record, assigns the code and the fluid service category to each line, and the material, examination and test follow from that assignment.

Gas processing plants put the code boundary in sharp relief. Inlet piping arrives from a gathering system built to B31.8, the plant itself is commonly designed to B31.3, and residue gas leaves through a meter station into a transmission line built to B31.8 again. Drawing that boundary on the isometrics before fabrication matters, because the two codes treat design factors, examination and testing differently, and an inspector reviewing records later will look for the code each weld was made to.

Common West Virginia plant lines, their governing code and their test
LineWhere it appearsGoverning codeTypical test before service
Inlet and residue gas inside a processing plantNorth central gas plantsASME B31.3 Normal fluid service, High Pressure where the owner designates itHydrostatic at 1.5 times design pressure, adjusted for temperature
Ethane, propane and NGL productGas plant liquids sections, product pipelinesASME B31.3 with low-temperature toughness rulesHydrostatic where the line can be dried; pneumatic at 1.1 times design pressure under a written plan
Chlorine and causticOhio River chlor-alkali plantsASME B31.3 Category M where toxicity requires itHydrostatic or pneumatic, then a sensitive leak test and full drying for dry chlorine
Solvents and chemical intermediatesKanawha Valley sitesASME B31.3 Normal or Category M fluid serviceHydrostatic, with weld examination to the chosen category
Boiler external piping and high-pressure steamEvery plant with a steam boiler above 15 psiASME B31.1, with the boiler under the state boiler ruleHydrostatic to B31.1
Plant and instrument air, nitrogenStatewideASME B31.3 Normal or Category D fluid servicePneumatic or hydrostatic, plus leak test

Where West Virginia state law touches a piping job

West Virginia state law reaches process piping through five channels: the steam boiler rule, the Aboveground Storage Tank Act, air permits from the Department of Environmental Protection, the Contractor Licensing Act and the State Building Code where a county or municipality enforces it. None of them replaces B31.3 inside the plant, but each can change the schedule, the paperwork or the people who review the work.

Steam lines and the West Virginia boiler rule

Steam boilers above 15 psi in West Virginia fall under W. Va. Code 21-3-7, and the Division of Labor enforces them through rule 42 CSR 3 with yearly inspection, a permit to operate and a permit to install requested at least 15 days before a new boiler goes in. The rule adopts the National Board Inspection Code for installation, inspection and repairs. For a piping job that means boiler external piping is built to B31.1 and coordinated with the boiler’s inspection, while downstream headers and process steam follow the code the owner assigns. Boiler work itself is covered on the boiler repair in West Virginia page.

Tank connections under the Aboveground Storage Tank Act

The Aboveground Storage Tank Act, W. Va. Code 22-30, was passed in 2014 after a chemical leak from a tank farm on the Elk River contaminated the Charleston area’s drinking water source in January of that year. The Act defines a regulated tank as one holding more than 1,320 gallons, and the definition includes all ancillary pipes and dispensing systems up to the first point of isolation, meaning the nearest valve, pump, dispenser or piece of equipment where flow can be shut off. Piping from a regulated tank to its first valve is therefore part of the tank in the eyes of the law, and changes there belong in the tank’s records. Tank work is covered on the tank fabrication in West Virginia page.

When does a piping change need a WV DEP air permit?

A piping change needs a West Virginia DEP air permit when it is part of constructing, modifying or relocating a stationary source whose emissions reach the thresholds in the Division of Air Quality’s rule 45 CSR 13. Pipe itself rarely emits, but a new reactor feed, a vent header, a flare connection or a new tank can change what a unit releases, and the application has to identify and quantify hazardous air pollutants with supporting calculations. Paul Industries builds the piping schedule around the permit status the owner confirms, so field work on a new emission point lines up with the permit and pipe that sits outside the permit can proceed.

Process piping vs plumbing under the Contractor Licensing Act

The West Virginia Contractor Licensing Act, W. Va. Code 30-42, defines a contractor as anyone undertaking work costing $25,000 or more on commercial projects, or $5,000 or more on residential work, and it sets out separate classifications. A piping contractor in the statute’s words installs process, power plant, air, oil, gasoline, chemical or other piping, while a plumbing contractor installs plumbing piping, fixtures and venting and, by the same definition, gas piping, chilled water piping for refrigeration and comfort cooling, heating hot water piping and standpipes. Process piping vs plumbing in West Virginia is therefore a question of classification as well as code, and a plant project that mixes both kinds of lines is scoped with that split in mind.

The State Building Code inside an industrial building

West Virginia’s State Building Code, rule 87 CSR 4 of the State Fire Commission, adopts the 2018 International Building, Mechanical, Plumbing and Fuel Gas Codes and the 2020 National Electrical Code. A county or municipality that adopts the code is responsible for enforcing it, so permit and inspection practice varies across the state. Process piping inside an industrial building generally answers to the owner’s engineering and B31.3, while plumbing, fuel gas and comfort systems in the same building go through the jurisdiction’s permit process where one exists.

West Virginia rules that can sit around a process piping job
RuleWho administers itWhat it reachesEffect on the piping job
W. Va. Code 21-3-7 and 42 CSR 3Division of LaborSteam boilers above 15 psi and their repairsBoiler external piping coordinated with the boiler inspection
W. Va. Code 22-30, Aboveground Storage Tank ActDepartment of Environmental ProtectionTanks over 1,320 gallons and piping to the first point of isolationTank-side piping changes recorded with the tank
45 CSR 13 air permitsDEP Division of Air QualityNew, modified and relocated stationary sourcesField work on new emission points timed to the permit
W. Va. Code 30-42, Contractor Licensing ActWest Virginia Contractor Licensing BoardCommercial work of $25,000 or morePiping and plumbing classifications defined separately
87 CSR 4, State Building CodeState Fire Commission, enforced by adopting counties and citiesBuilding, mechanical, plumbing and fuel gas workPermits for building-side systems where the code is enforced
29 CFR 1910.119 process safety managementFederal OSHA, Charleston Area OfficeProcesses above threshold quantities of listed chemicalsManagement of change and pre-startup safety review

Materials for gas liquids, chlorine and caustic service

Material selection for West Virginia plant piping turns on three hard services that the state concentrates: natural gas liquids, chlorine and caustic soda. Each one punishes a wrong choice in a different way, so the piping specification for these lines deserves more attention than the drawing.

Natural gas liquids can chill a line far below ambient when pressure drops across a valve or during blowdown, because the liquid flashes and cools the pipe. B31.3 sets low-temperature toughness rules for that case, so carbon steel in liquids service is chosen and impact tested for the lowest temperature the line can reach, and stainless steel goes where the temperature falls further. Dry chlorine is handled in carbon steel built to the Chlorine Institute’s Pamphlet 6, with every trace of moisture removed before startup, because wet chlorine attacks carbon steel quickly; titanium, which resists wet chlorine, ignites in dry chlorine, so the two services never share a material. Hot, concentrated caustic causes stress corrosion cracking in carbon steel, so lines above the temperature and concentration limits in the owner’s specification are stress relieved after welding or built in nickel alloys.

Pipe fabrication, West Virginia spools and modules

Pipe fabrication West Virginia projects move off site keeps hot work and weld examination away from operating units. Paul Industries cuts, fits, welds, examines and hydrotests spools under controlled conditions, labels them to the isometrics and ships them in the order the field team will set them, so the plant sees bolt-up, final welds and the system test rather than weeks of fabrication. Pipe rack modules with steel, pipe, cable tray and insulation already fitted suit gas plant expansions, where repeated trains and long rack runs make a module design pay back.

Mountain terrain affects delivery as much as fabrication. Many north central gas plants sit on ridgetop pads reached by narrow, steep roads, so module sizes are set by what a truck can carry around the last few switchbacks as much as by what a crane can lift. Survey of the access route belongs at the start of design, before module splits are fixed.

Testing through a West Virginia winter

Pressure testing in West Virginia winters needs a plan for freezing, because ridgetop and valley plants alike see hard frosts and the mountain counties stay below freezing for long stretches. A hydrotest at 1.5 times design pressure is the default under B31.3, but water left in a low point or a valve body freezes and splits it. Paul Industries heats test water, drains and blows lines dry promptly, and where any trace of water would harm the service, as in dry chlorine or NGL service, uses a pneumatic test at 1.1 times design pressure under a written safety plan with exclusion zones and staged pressurization.

How are tie-ins made at a running West Virginia plant?

Tie-ins at a running West Virginia plant are made either during a planned outage, with isolation, draining and purging under the plant’s procedures, or hot, by welding a fitting onto a pressurized line and cutting into it with a hot tap machine. Hot tapping follows API RP 2201, with wall thickness measured, flow confirmed and the weld procedure qualified for welding on a line in service.

At plants covered by OSHA process safety management, a piping change runs through management of change before work starts and a pre-startup safety review before chemicals are introduced. West Virginia has no OSHA state plan for private employers, so federal OSHA, through its Charleston Area Office, enforces those rules at private plants across the state. Paul Industries prepares the piping portion of the change package: updated isometrics and line list, the material and weld records, and the test results the review team signs against.

How much does process piping in West Virginia cost?

Process piping in West Virginia is priced on fluid service, material, pipe size, weld count, examination level, access and outage constraints, more than on footage. A Category M chlorine line in carbon steel with full examination costs several times a compressed air header of the same size, and on industrial piping West Virginia gas plants need, a ridgetop tie-in during a one-day window costs more than the same welds made in a fabrication bay.

State requirements add identifiable costs: a 45 CSR 13 air permit application carries a minimum fee of $1,000 under the DEP’s fee rule, before engineering time to prepare it, and a regulated tank change adds inspection and record updates under the storage tank law. Industrial electricity in West Virginia averaged 7.81 cents per kilowatt-hour in 2024, against a United States average of 8.13, which matters when comparing heat tracing, pumping and compression options over the life of a system. Paul Industries prices from a line list or P&IDs, offers a budget range from comparable scope early, and fixes the price once the specification and tie-in points are defined.

Who installs process piping in West Virginia?

Paul Industries installs process piping in West Virginia, carrying each job from design and material procurement through fabrication, installation, examination, testing and turnover under one contract. Its headquarters is 256 Shore Drive in Kilmarnock, Virginia; the company was formerly based in northern New Jersey, then Pennsylvania, and today builds plant piping throughout West Virginia, across all 50 states and at plants abroad. Plants with sites in more than one state find the same approach on the process piping in Virginia page for the headquarters state and on the process piping in Pennsylvania and process piping in Maryland pages, with the wider region on the Mid-Atlantic page.

Among the mechanical contractors in West Virginia and the piping contractors West Virginia owners compare, the practical test is the record set: weld maps tied to welder identities, procedure qualifications under ASME Section IX, examination reports, material certificates and signed test records. Paul Industries hands those over for every line, and welding detail is set out on the industrial welding services in West Virginia page.

Process piping from Paul Industries across West Virginia

Paul Industries designs, fabricates, supplies, installs, tests, starts up, services and repairs process piping in West Virginia for gas processing, chemical, chlor-alkali, metals and consumer products plants, from the Kanawha Valley and the Ohio River to the gas fields and the Eastern Panhandle. More on the state sits on the West Virginia page and on chemical plant work under chemical manufacturing. Send a line list, piping specification and outage dates, call 201-450-8280 or request a quote.

Standards referenced: ASME B31.3 Process Piping · ASME B31.1 Power Piping · ASME B31.8 Gas Transmission and Distribution Piping Systems · ASME Boiler and Pressure Vessel Code Section IX · API 570 · API RP 2201 · Chlorine Institute Pamphlet 6 · 49 CFR Part 192 · OSHA 29 CFR 1910.119 process safety management · W. Va. Code 22-30 (Aboveground Storage Tank Act) · W. Va. Code 30-42 (West Virginia Contractor Licensing Act) · W. Va. Code 21-3-7 and 42 CSR 3 (high-pressure steam boilers) · 45 CSR 13 (WV DEP air permits) · 87 CSR 4 (West Virginia State Building Code)

Frequently asked questions

Who installs process piping at Marcellus gas processing plants in north central West Virginia?

Paul Industries installs inlet, residue gas, NGL product, condensate and glycol piping at gas processing plants across Doddridge, Harrison, Wetzel and Marshall counties. Expansion work is planned around running trains: tie-ins to shared headers and flare systems are scheduled for plant outages or made as hot taps, and spools arrive prefabricated, examined and tested so field time goes into setting and final welds.

Does Paul Industries take process piping work in South Charleston, Institute and Belle?

Yes. Paul Industries takes process and utility piping work at chemical sites throughout the Kanawha Valley, including the multi-tenant sites at South Charleston, Institute and Belle. Each job starts by fixing the ownership boundary on shared racks and headers and agreeing whose permit-to-work and isolation procedures apply, so the records end up with the owner of each line.

Who builds piping at Ohio River chemical and chlor-alkali plants from Wheeling to Parkersburg?

Paul Industries builds chlorine, caustic, hydrogen, brine, steam and cooling water piping at Ohio River plants in the Northern Panhandle, Marshall and Wetzel counties and down to Parkersburg and Huntington. Toxic lines are fabricated to Category M requirements where the owner assigns them, dried and leak tested before chemical is introduced, and supported with the river’s flood levels in mind.

Does Paul Industries pipe manufacturing plants in Martinsburg and the Eastern Panhandle?

Yes. Paul Industries pipes consumer products, food, packaging and distribution plants in Berkeley and Jefferson counties, including liquid raw material and product transfer lines, purified water, hot water, steam and compressed air. Work in high-speed plants is staged around planned changeovers and line stops, with off-site fabrication keeping in-plant hot work short.

What is industrial process piping at a West Virginia gas processing plant?

Industrial process piping at a gas processing plant is the pipe inside the fence that carries gas and liquids between equipment: inlet separators, dehydration, cryogenic expanders, fractionation columns, compressors, storage and product meters. It is commonly built to ASME B31.3, with materials picked for pressure, temperature and the cold that liquids produce when they flash, and it ends where gathering and transmission pipelines under B31.8 begin.

Where does plant piping end and a gas pipeline begin at a West Virginia processing plant?

The boundary is set by the owner and the pipeline operator, usually at an inlet or outlet isolation valve or meter station. Upstream and downstream of it, gathering and transmission lines follow ASME B31.8 and the federal pipeline safety rules in 49 CFR Part 192; inside it, plant piping follows B31.3. Paul Industries marks that boundary on the isometrics so every weld carries the right procedure, examination and test record.

Does the West Virginia Aboveground Storage Tank Act cover the piping connected to a tank?

Yes, up to a point. The Act defines a regulated tank as a device holding more than 1,320 gallons and includes all ancillary pipes and dispensing systems up to the first point of isolation, which is the nearest valve, pump, dispenser or equipment where flow can be shut off. Piping changes inside that boundary are treated as part of the tank and go into its records.

What is a piping contractor under West Virginia law?

W. Va. Code 30-42-3 defines a piping contractor as a person whose principal business is installing process, power plant, air, oil, gasoline, chemical or other kinds of piping. The Contractor Licensing Act applies to commercial work costing $25,000 or more. Paul Industries scopes plant piping against those definitions so the classification of each part of the work is clear at bid stage.

Where is the West Virginia plumbing contractors license line on a plant project?

The statute’s plumbing contractor definition covers plumbing piping, fixtures and venting and also lists gas piping, chilled water piping for refrigeration and comfort cooling, heating hot water piping and standpipes. Process lines carrying chemicals, gas liquids or plant air sit under the piping contractor definition instead. On a plant project mixing building and process systems, the scope split follows those two definitions.

What does the DEP need when a piping change adds a new emission point?

Under 45 CSR 13 the Division of Air Quality needs an application describing the new or modified source, with hazardous air pollutant emissions identified and quantified and supporting calculations attached, measured against the rule’s thresholds. The application fee starts at $1,000 under the DEP’s fee rule. Paul Industries supplies the piping and equipment details the owner’s permit engineer needs and sequences field work to the permit status.

Are steam lines at a West Virginia plant covered by the state boiler rule?

The state boiler rule, 42 CSR 3, covers steam boilers above 15 psi and adopts the National Board Inspection Code for their installation, inspection and repair. Boiler external piping, from the boiler to its stop valves, is built to ASME B31.1 and coordinated with the boiler’s inspection. Steam headers and process steam further downstream follow B31.1 or B31.3 as the owner specifies.

Does West Virginia still have prevailing wage on public piping projects?

West Virginia repealed its state prevailing wage law in 2016, so state-funded projects no longer carry state wage determinations. Federally funded construction, such as work at federal laboratories or projects with federal grants, still carries Davis-Bacon wage rates. Paul Industries prices public work to the wage terms in the contract documents.

Who enforces process safety management at West Virginia chemical plants?

Federal OSHA enforces process safety management at private plants in West Virginia through its Charleston Area Office, because the state has no OSHA state plan for private employers. For a piping change at a covered process, that means management of change before work, mechanical integrity records for the new pipe and a pre-startup safety review before chemicals are introduced.

How are NGL and propane lines tested in a West Virginia mountain winter?

Liquids lines are often tested pneumatically at 1.1 times design pressure, because water left in them would freeze in winter and contaminate the product in any season. The test runs under a written safety plan with exclusion zones and staged pressure holds. Where a hydrotest is required, heated water, prompt draining and drying with dry air or nitrogen keep the line from freezing.

What materials suit chlorine and caustic piping at an Ohio River chlor-alkali plant?

Dry chlorine is carried in carbon steel to the Chlorine Institute’s Pamphlet 6, dried thoroughly before startup, because moisture turns it corrosive. Wet chlorine needs materials such as titanium or lined pipe, and titanium is kept out of dry chlorine because it ignites there. Hot, concentrated caustic calls for stress relieved carbon steel or nickel alloys to resist stress corrosion cracking.

Which delivery routes does Paul Industries offer for West Virginia piping work?

Paul Industries offers supply-only fabricated spools and rack modules, examined, tested and labeled to the isometrics; design-build packages that start from a process description and finish with issued drawings and a tested system; and complete installation from survey through turnover. Many West Virginia plants use spools for planned maintenance and complete installation for expansions.

What records does a West Virginia plant receive at piping turnover?

The turnover package holds the as-built isometrics and line list, material test reports, welding procedure and welder qualification records under ASME Section IX, weld maps, examination reports, pressure test records with gauge calibration, and any tank or boiler records the change touched. For process safety management sites it also includes the documents the pre-startup safety review needs.

What should a West Virginia plant send to get process piping priced?

Send P&IDs or a line list, the piping specification and fluid service categories, tie-in locations with photos, outage or turnaround dates, and site rules for hot work and access. For gas plants, add the access route to the pad and any module size limits. Paul Industries returns a budget range first and a firm price once scope is fixed.

Adding or replacing process lines at a West Virginia plant?

Send a line list or P&IDs, the piping specification, tie-in locations and your outage dates. Call 201-450-8280 or request a quote.