Paul Industries provides tank fabrication in New Hampshire, designing, building, delivering and installing aboveground and buried fuel storage, generator day tanks, stainless process and brewing tanks, chemical tanks and water storage for plants, hospitals, campuses and terminals. New Hampshire sorts tanks by what they hold: oil tanks fall under the NHDES rules in Env-Or 300 and Env-Or 400, volatile liquids under the air permit rules and the fire code, and food, process and water tanks under the codes their service brings. Paul Industries builds each tank to the standard its contents require and delivers it with the records NHDES, the fire official and the owner need.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
Aboveground oil rules Env-Or 300, above 660 gallons per system
Buried tank rules Env-Or 400, tanks over 110 gallons
New AST application At least 45 days before construction
Uncovered containment 110% of the largest tank
Snow loads Town values in ERDC/CRREL TR-02-6
Reviewed November 2026

What does tank fabrication in New Hampshire involve, and which rules apply?

Tank fabrication in New Hampshire involves choosing a design standard, a material and an installation route that fit the tank’s contents, size and location, because each kind of contents brings a different set of state rules. Oil in an aboveground system of more than 660 gallons, or in several systems holding more than 1,320 gallons together, falls under the NHDES aboveground storage tank program in Env-Or 300. A buried tank of more than 110 gallons holding a regulated substance falls under Env-Or 400 and RSA 146-C. A tall tank of volatile organic liquids can need an air permit, and every flammable or combustible liquid tank is located and spaced under the state fire code, which brings NFPA 30 with it.

Tanks for milk, yogurt bases, wort and beer, process water, buffers and cleaning chemicals sit outside the oil rules, and their design follows the service: sanitary standards for food, hygienic design for biologics, and corrosion resistance for chemicals. The table below sorts New Hampshire tanks by contents and the program that governs each.

Which New Hampshire program governs a tank, by contents and location
Contents and locationProgramMain requirementRecord the owner keeps
Oil above ground, over 660 gallons per systemEnv-Or 300 (NHDES)Registration, UL or API construction, secondary containment, overfill alarmRegistration, approval to operate, inspection logs, SPCC plan
Regulated substance below ground, over 110 gallonsEnv-Or 400 and RSA 146-C (NHDES)360-degree secondary containment on new facilities, leak monitoring, permit to operatePermit, test reports, operator designations
Vertical tank of volatile liquid, 40,000 gallons or moreEnv-A 607.01 (NHDES air)Temporary air permit before installation when vapor pressure reaches 1.52 psia at 60 degrees FAir permit and its conditions
Any flammable or combustible liquidState fire code (NFPA 1, with NFPA 30, 30A, 31 or 110)Location, spacing, venting and fire protectionFire official’s approval and permits
Dairy, brewing and food productSanitary design standards set by the buyer and food safety rulesCleanable stainless surfaces, drainable design, CIP coverageMaterial and finish records, weld logs
Process water, buffers and chemicalsBuilding and mechanical code; plant specificationMaterial compatibility, venting, seismic and wind anchorageDesign calculations, test record

NHDES AST regulations under Env-Or 300: registration, standards and markings

The NHDES AST regulations in Env-Or 300, readopted in October 2024, set what an aboveground oil tank must be built to, how it is registered and how it is marked. The owner registers every AST system at a covered facility on the NHDES AST registration form, and no covered facility may operate unregistered. Drum storage is registered by area rather than by drum. Oil in the rule’s sense is broad: motor fuels, heating oils, lubricating oils, insulating oils, used oil and petroleum-contaminated liquids all count.

Tanks installed since April 25, 1997 must be steel or another material the fire safety standards allow and must carry the manufacturer’s certification to the matching standard: UL 142 for shop-fabricated steel tanks, UL 142 with UL 2080 for fire resistant tanks, UL 2085 for protected tanks, UL 2245 for below-grade vaults, API 620 for field-erected low pressure tanks and API 650 for shop-fabricated and field-erected atmospheric tanks. A tank set on the ground needs a barrier between the steel and the soil that holds up to weather, soil and oil. Location and installation then follow NFPA 30A at service stations, NFPA 31 for on-premise heating oil, NFPA 110 for emergency generator fuel and NFPA 30 for everything else.

Markings complete the picture. Each tank shows its product, and every tank other than an unconnected drum also shows the NFPA hazard symbol, the tank number from the registration and the safe fill volume or height that matches the high level alarm, in letters at least 2 inches high in a contrasting color. Paul Industries applies those markings before delivery so the tank arrives matching the registration it will carry.

Aboveground storage tank requirements in Env-Or 300 and what fabrication delivers
RequirementRuleWhat the tank arrives with
Construction standardEnv-Or 305.01UL 142, UL 2085 or API 650 label or documentation matched to the tank type
MarkingsEnv-Or 305.03Product name, NFPA hazard symbol, registration tank number and safe fill height, 2 inch letters
Secondary containmentEnv-Or 305.07 and 305.08Double wall tank or a dike, curb or pad sized to the rule
Overfill protectionEnv-Or 305.11Level gauge plus an independent audible and visible high level alarm
Interstitial and release monitoringEnv-Or 305.12 and 305.14Monitoring ports and sensors on double wall tanks and piping
Corrosion protectionEnv-Or 305.06Coatings and corrosion protection for tank and piping surfaces as the rule specifies
PipingEnv-Or 305.04 and 305.09Piping to API 2610 and NFPA 30, with secondary containment where the rule calls for it

Aboveground storage tank requirements: containment, overfill alarms and the 45-day application

Containment and overfill protection are the parts of Env-Or 300 that shape a new tank’s footprint. Secondary containment must keep a spill from permeating more than one foot into the soil in 72 hours or reaching groundwater or surface water before cleanup. Covered containment holds the full volume of the largest tank inside it, and uncovered containment, which collects rain and snowmelt, holds 110 percent. Dikes are built to NFPA 30, and a tank inside a building can rely on the room itself when the floor is concrete or another impervious material without drains or openings and the installation meets NFPA 30 or NFPA 31.

Every system also needs a gauge the delivery driver can read before the transfer begins and a high level alarm, separate from that gauge, that both sounds and shows. The alarm trips at 90 percent of capacity on tanks of 12,000 gallons or less, and at 3 percent below the calculated maximum safe fill height on larger tanks. Small systems of 660 gallons or less can use a vent whistle under specific conditions.

The paperwork starts well before the steel. At least 45 days before constructing or installing a new or replacement AST system over 660 gallons, the owner submits the NHDES application with complete plans and specifications sealed on every page by a New Hampshire professional engineer, plus a spill prevention control and countermeasure plan. An approval to construct is valid for one year, with a one-year extension available. New tanks may not be built in the floodway of a special flood hazard area. An installation supervisor holding International Code Council credentials for AST installation and retrofitting oversees the work and writes a report with every pressure test result, and NHDES inspects the system before oil is introduced and grants approval to operate once the installation matches the approved plans. Paul Industries prepares the tank data, drawings and test records the engineer’s package and the supervisor’s report draw on.

How often do tanks need to be inspected under the NHDES aboveground storage tank program?

Under the NHDES aboveground storage tank program, the owner inspects every AST system at least monthly, and larger tanks also receive detailed interior inspections on a schedule set by age and contents. The monthly exterior inspection looks for leaks, surface wetting, blistering, corrosion, cracks, distorted chimes, settlement, damaged insulation and failing supports, and checks every visible part of the high level alarm and leak detection system; the owner records and signs each one.

Tanks of 5,100 gallons or more receive a detailed interior inspection by an inspector holding the AST inspection credential the rule names. For a tank whose shell touches the ground, the first interior inspection comes at 10 years of age; for a tank entirely off the ground, on a cradle or rack, at 20 years. After that, gasoline tanks are inspected at least every 5 years and tanks holding other motor fuels, heating oils and fuel oils at least once every 10 calendar years. That answers how often do tanks need to be inspected in New Hampshire for oil service, and the related question of how often do tanks need to be tested is answered by the leak detection and integrity tests the rules attach to each system type.

Inspection timing for New Hampshire oil storage tanks
TankExterior inspectionFirst interior inspectionInterior inspection after that
AST under 5,100 gallonsMonthly, logged and signedAs findings requireAs findings require
AST 5,100 gallons or more, shell on the ground, gasolineMonthlyAt 10 yearsAt least every 5 years
AST 5,100 gallons or more, shell on the ground, other fuels and heating oilMonthlyAt 10 yearsAt least every 10 calendar years
AST 5,100 gallons or more, entirely off the groundMonthlyAt 20 yearsEvery 5 or 10 years by contents
Insulated tank or insulated pipingMonthly, across the insulation surfacePer the insulated tank rulePer the insulated tank rule

Inspections turn into aboveground storage tank repair work when they find bottom corrosion, shell pitting, settlement or failed coatings. Paul Industries repairs bottoms, shell sections, nozzles, roofs and containment, replaces alarms and gauges, and documents each repair for the inspection record, with industrial tank cleaning ahead of entry where the tank has to be emptied and opened.

NH underground storage tank regulations: Env-Or 400 for buried tanks

The NH underground storage tank regulations in Env-Or 400 apply to any facility where a buried tank of more than 110 gallons stores a regulated substance, and NHDES is the agency answering who regulates underground storage tanks in the state under RSA 146-C. As for what underground storage tanks are regulated, the rule excludes tanks used solely to heat a residential building, facilities where every tank holds 1,100 gallons or less of heating oil for on-premise heating, systems with less than 10 percent of their volume below ground, and tanks in an underground room or vault that sit fully above the floor and can be inspected on every side.

A new NH UST facility gets tanks with 360-degree secondary containment and monitored interstitial space, access ports that need no excavation, double-wall underground piping, liquid-tight sumps with sensors at the low point, and a steel or fiberglass wear plate of at least 144 square inches under each opening. Each tank carries a permanent label with its design standard, year of manufacture, dimensions and capacity. Plans go to NHDES with an engineer’s seal, and construction waits until the sooner of 90 days after a complete application or the department’s approval. No facility operates without an NHDES underground storage tank permit to operate, which names the facility’s class A and class B operators.

The size of underground fuel storage tanks matters to an owner deciding between buried and aboveground storage: a heating oil tank of 1,100 gallons or less for on-premise heating falls outside Env-Or 400, while a larger buried tank carries permits, testing and operator duties for its whole life. Many New Hampshire owners replacing a buried tank move the storage above ground, into an NH AST that is easier to inspect and repair. Paul Industries designs both routes and prices them side by side.

Volatile liquids, air permits and fire code spacing

Volatile liquids add an air permit to tank fabrication in New Hampshire when the tank is large and the vapor pressure is high. Env-A 607.01 requires a temporary permit before installing an aboveground vertical tank of 40,000 gallons or more that holds volatile organic compounds with a true vapor pressure of 1.52 pounds per square inch absolute or more at 60 degrees F. Gasoline and many solvents cross that line; diesel and heating oil do not. Below the size threshold, the fire code still governs the tank’s location, spacing, venting and fire protection through NFPA 30.

The state fire code adopts the 2024 editions of NFPA 1 and NFPA 101 by reference, and the standards those codes cite come with them, so a flammable liquid tank is spaced from property lines, buildings and other tanks under NFPA 30’s tables and fitted with normal and emergency venting sized for its contents. Generator fuel at hospitals, data rooms and campuses falls under NFPA 110 as well as Env-Or 300 when the system holds more than 660 gallons. Paul Industries sizes vents, emergency relief and containment with the fire official’s review in mind, and builds day tanks with the overfill and return arrangements generator suppliers specify.

Stainless process tanks for New Hampshire dairy, brewing and biologics plants

Stainless process tanks in New Hampshire serve dairy and yogurt production, craft brewing and distilling, biologics and specialty chemicals, and each service sets its own finish and cleaning demands. In Londonderry, Stonyfield’s yogurt plant, owned by Lactalis since 2017, added 17,000 square feet for a pouch line in a $7 million expansion announced in 2023, and dairy plants of that kind run silos, cultured product tanks and CIP tanks built in 304 or 316 stainless with sanitary welds and fittings. Breweries across the state run fermenters, brite tanks and hot liquor tanks; at the Pease Tradeport in Portsmouth, biologics manufacturing runs buffer, media and pure water tanks with hygienic finishes and full documentation.

Paul Industries builds those tanks with drainable bottoms, spray devices placed for full CIP coverage, polished or pickled surfaces matched to the product, jackets for heating or cooling and nozzles laid out for the plant’s piping. The welds that touch product are made and inspected to the finish the buyer specifies, and the tanks connect to sanitary process piping in New Hampshire, with passivation services in New Hampshire restoring the stainless surface after field welding.

Tank fabrication, New Hampshire snow loads and cold: designing outdoor tanks

Designing an outdoor tank for New Hampshire starts with snow, because ground snow loads change sharply with elevation and from town to town. New Hampshire’s building code is the 2024 IBC, whose design loads come from ASCE 7-22, and the state’s designers also have ERDC/CRREL TR-02-6, Ground Snow Loads for New Hampshire, developed by the Army’s Cold Regions Research and Engineering Laboratory in Hanover with the Structural Engineers of New Hampshire. It tabulates ground snow loads by town up to limiting elevations, with case studies needed above them, and the roof of a tank, its platforms and its ladders carry that load plus drifting.

Wind and seismic loads set the anchorage of tall, light tanks, which can slide or overturn when empty. Cold weather sets everything else: water legs, level instruments and drains need heat tracing and insulation; vents need frost protection so they cannot ice shut and pull a vacuum; and carbon steel shells in the North Country need materials suited to winters well below zero degrees F. Paul Industries designs roofs, anchorage, venting and insulation for the specific town and elevation of each site.

Shop-built or field-erected: sizing a tank for New Hampshire sites

Shop-built or field-erected is the first construction decision on any large New Hampshire tank, and road transport usually makes it. A shop-built tank is fabricated, tested and coated complete, then trucked to site and set on its foundation in a single lift, which keeps welding out of an operating plant; its diameter and length are limited by what can move on state highways under permit. Above that size, an API 650 tank is field-erected on its foundation from rolled plates, with welding, examination and testing done on site. That split explains common aboveground storage tank sizes: shop-built units of a few thousand to tens of thousands of gallons, and field-erected tanks for larger fuel, water and process storage.

Field erection in New Hampshire adds weather planning. Plate welding and coating need temperature and humidity windows, so large builds are scheduled for spring through fall, with tenting and preheat for work that runs into the cold months. Paul Industries handles steel tank fabrication both ways and chooses the route from the site’s access, the tank size and the plant’s tolerance for work inside its fence. Among water tank fabricators, Paul Industries also builds fire water, process water and thermal storage tanks to the plant’s specification.

What does tank fabrication cost in New Hampshire?

Tank fabrication cost in New Hampshire depends on capacity, material and thickness, single or double wall construction, the governing standard, nozzles and internals, finish, coatings, insulation, foundations, containment, delivery and the permit and engineering work the contents bring. A UL 142 double wall generator tank is a compact, repeatable product; a jacketed 316L process tank with a polished interior and sanitary fittings, or a field-erected API 650 tank with a dike and fire protection, carries far more engineering and labor. Buried tanks add excavation, backfill, monitoring and the Env-Or 400 permit; aboveground oil tanks add the 45-day application, the engineer’s sealed plans, the SPCC plan and the alarms.

Paul Industries prices tank work with the tank, foundation, containment, piping, controls and documentation listed separately, offers a budget range from comparable scope early, and confirms a firm price once contents, size and location are fixed. Paul Industries supplies a tank on its own, designs and builds a complete storage system, or installs it end to end.

Who fabricates tanks in New Hampshire?

Paul Industries fabricates and installs fuel, process, chemical and water tanks for plants, hospitals, campuses and terminals across New Hampshire. Paul Industries, an East Coast contractor with headquarters at 256 Shore Drive in Kilmarnock, Virginia, and formerly based in northern New Jersey and then Pennsylvania, accepts tank projects throughout New Hampshire, in every one of the 50 states and for plants abroad through its international projects. New Hampshire tanks built by Paul Industries arrive matched to their NHDES, fire code and process requirements.

The same work runs across New England, including tank fabrication in Massachusetts and tank fabrication in Connecticut, and in the headquarters state through tank fabrication in Virginia. The national tank fabrication page covers tank types and design in depth, and the New Hampshire page covers the state’s industries and codes. Tanks that operate under pressure are built as vessels through pressure vessel fabrication in New Hampshire, and they connect to the plant through process piping in New Hampshire and industrial welding services in New Hampshire.

Tank fabrication from Paul Industries for New Hampshire sites

Paul Industries designs, fabricates, delivers, sets and connects aboveground and buried fuel tanks, generator day tanks, stainless process and brewing tanks, chemical tanks and water storage for New Hampshire sites, with the construction standard, markings, containment, alarms, test records and installation reports the state rules require handled as one job. Send the contents, capacity, location and site photos, and request a quote for the tank.

Standards referenced: N.H. Admin. Code Env-Or 300, Aboveground Petroleum Storage Facilities · N.H. Admin. Code Env-Or 400, Underground Storage Tank Facilities · RSA 146-A and RSA 146-C · 40 CFR 280 and 40 CFR 112 (SPCC) · UL 142, UL 2080, UL 2085 and UL 2245 · API 650, API 620 and API 2610 · NFPA 30, NFPA 30A, NFPA 31 and NFPA 110 · N.H. Admin. Code Env-A 607.01 (air permits) · New Hampshire State Fire Code (NFPA 1 and NFPA 101, 2024 editions) · New Hampshire State Building Code, RSA 155-A (2024 IBC with ASCE 7-22 loads) · ERDC/CRREL TR-02-6, Ground Snow Loads for New Hampshire

Frequently asked questions

Who builds dairy and food tanks for plants in Londonderry, Salem and the I-93 corridor?

Paul Industries builds stainless silos, cultured product tanks, CIP tanks and jacketed process tanks for dairy and food plants in Londonderry, Salem, Hooksett and along the I-93 corridor. Those tanks are built with sanitary welds, drainable bottoms and spray coverage for cleaning, and Paul Industries installs and connects them during planned production breaks.

Does Paul Industries handle tank fabrication, NH Seacoast terminals and biologics plants included?

Paul Industries handles tank fabrication for the Seacoast, including fuel storage around Portsmouth and Newington and buffer, media and pure water tanks for biologics tenants at the Pease Tradeport. Fuel tanks follow Env-Or 300 and NFPA 30, while biologics tanks follow hygienic design and documentation practice. Call 201-450-8280 with the contents and capacity.

Can Paul Industries build generator fuel tanks for hospitals in Manchester, Nashua and Concord?

Paul Industries builds and installs UL 142 and UL 2085 generator fuel tanks and day tanks for hospitals, data rooms and public buildings in Manchester, Nashua and Concord. Systems over 660 gallons fall under Env-Or 300 and NFPA 110, so the tanks arrive with markings, alarms and containment ready for the NHDES application and inspection.

Does Paul Industries supply tanks to breweries and manufacturers in Keene and the Monadnock region?

Paul Industries supplies fermenters, brite tanks, hot liquor tanks, chemical tanks and process water storage to breweries and manufacturers in Keene, Peterborough, Jaffrey and the rest of the Monadnock region. Each tank is built to the plant’s finish and cleaning requirements and set and connected by Paul Industries.

Who fabricates tanks for paper, biomass and manufacturing sites around Berlin and Gorham?

Paul Industries fabricates water, chemical, fuel and process tanks for mills, biomass plants and manufacturers in Berlin, Gorham and across the North Country. Outdoor tanks there are designed for heavy snow on roofs and platforms, high-elevation snow loads, frost-protected vents and materials suited to deep winter cold.

What underground storage tanks are regulated in New Hampshire, and which are excluded?

Env-Or 400 covers any facility where a buried tank of more than 110 gallons stores a regulated substance. It excludes tanks that heat a residential building, facilities where every tank holds 1,100 gallons or less of heating oil for on-premise heating, systems with less than 10 percent of their volume below ground, and fully visible tanks in an underground room or vault.

How far ahead must an NHDES application be filed for a new aboveground oil tank?

Env-Or 307.01 requires the application at least 45 days before constructing or installing a new or replacement AST system of more than 660 gallons. It includes the application form, complete plans and specifications sealed on every page by a New Hampshire professional engineer, and an SPCC plan. The approval to construct then stays valid for one year.

Does an indoor fuel tank in a New Hampshire boiler room need a dike?

Env-Or 305.08 lets a tank inside a building use the room as its containment when the installation meets NFPA 30 or NFPA 31, the floor under the tank and its piping is concrete or another impervious material, and the floor has no drains, cracks or openings that would let oil escape. Paul Industries checks those conditions before choosing single or double wall construction.

When does a New Hampshire oil tank need a high level alarm?

Env-Or 305.11 requires every covered AST system to have a gauge visible to the delivery operator and an independent high level alarm that is both audible and visible. The alarm trips at 90 percent of capacity on tanks of 12,000 gallons or less and 3 percent below the maximum safe fill height on larger tanks. Systems of 660 gallons or less can use a vent alarm under set conditions.

What must the label on a new NH UST show?

Env-Or 405.01 requires a permanent label, such as a stencil or engraved plate, giving the standard the tank was built to, the year of manufacture, and its dimensions and capacity. New facility tanks also need 360-degree secondary containment and wear plates of at least 144 square inches under each opening. Paul Industries delivers buried tanks with those features in place.

Who supervises the installation of a new aboveground oil tank in New Hampshire?

Env-Or 307.09 requires installation of an AST system or component to be supervised by an individual holding International Code Council credentials for AST installation and retrofitting. That supervisor writes a report describing the oversight and listing every pressure test result, and NHDES grants approval to operate only after receiving it and confirming the work matches the approved plans.

Does a large gasoline or solvent tank in New Hampshire need an air permit?

Env-A 607.01 requires a temporary air permit before installing an aboveground vertical tank of 40,000 gallons or more holding volatile organic compounds with a true vapor pressure of 1.52 psia or more at 60 degrees F. Gasoline and many solvents meet that vapor pressure. Paul Industries designs floating roofs, vapor controls and venting to the permit’s conditions.

Can a new tank be installed in a New Hampshire flood zone?

Env-Or 307.10 bars new AST systems from the floodway portion of the special flood hazard area. Outside the floodway but within a flood zone, the tank is anchored against buoyancy and its vents and fill points are raised above the design flood level. Paul Industries checks the flood maps for each site before laying out the tank and its containment.

What does the safe fill height marked on a New Hampshire tank mean?

The safe fill height or volume marked on the tank is the level at which the high level alarm activates, in the same units as the tank gauge, so a delivery driver can compare the gauge reading with the marking. Env-Or 305.03 requires it in letters at least 2 inches high along with the NFPA hazard symbol and the registration tank number.

What snow load should an outdoor tank roof in New Hampshire carry?

The roof load starts from the town’s ground snow load, found in ERDC/CRREL TR-02-6 for most New Hampshire towns up to a limiting elevation, with a case study above it, then converted to a roof load under ASCE 7-22 through the 2024 IBC. Platforms and walkways on the tank carry snow as well. Paul Industries designs the roof to the specific site.

Should a New Hampshire owner replace a buried oil tank with an aboveground one?

Moving storage above ground trades the Env-Or 400 permit, monitoring and operator duties for Env-Or 300’s registration, containment, alarms and monthly inspections, with every surface visible. Space, setbacks under NFPA 30, snow and freeze protection and site appearance decide the answer. Paul Industries prices both designs side by side, including removal of the old tank.

What information goes into a New Hampshire tank quote?

Send the contents, required capacity, preferred material, operating temperature, indoor or outdoor location, site photos, nozzle and instrument needs, finish and cleaning requirements, and any existing registration or permit. For fuel systems, add the generator or burner demand. Paul Industries returns a budget range and the permit steps the tank will need.

Adding or replacing a tank at a New Hampshire site?

Send the contents, capacity, location, site photos and any existing NHDES registration or permit. Call 201-450-8280 or request a quote.