Paul Industries is a US process equipment contractor for the Bahamas that designs, fabricates and commissions seawater desalination skids, chilled water and cooling plants, boiler and hot water systems, fuel and storage tanks, pump skids and water treatment for resorts, utilities, breweries, hospitals and Freeport industry, all built for the 60 Hz supply. The Bahamian grid runs at 60 Hz with three-phase service at 120/208 V and 277/480 V, so US-built motors, drives and panels suit it from the start, and Paul ships each system from the US East Coast to Nassau or Freeport with English documentation. Paul Industries is headquartered at 256 Shore Drive, Kilmarnock, Virginia, was formerly based in northern New Jersey and then Pennsylvania, and installs and commissions Bahamian systems or supervises their installation.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
Supply 60 Hz; 120/208 V or 277/480 V three-phase
Electrical code Canadian Electrical Code Part I
Building code Bahamas Building Code, 3rd edition (2003)
Main ports Nassau (Arawak Cay) and Freeport
VAT 10 percent since January 2022
Reviewed November 2026

What a US process equipment contractor for the Bahamas delivers under one contract

A US process equipment contractor for the Bahamas delivers the design, the fabricated equipment, the factory test, the crossing and the start-up of a process or utility system under one agreement, so a resort, utility or plant on New Providence or Grand Bahama deals with a single firm from drawing to handover. Paul Industries builds industrial water treatment and reverse osmosis trains, chilled water systems for hotel and hospital central plants, fabricated tanks for fuel, potable water and process liquids, pressure vessels and pump skids, and delivers each one with its drawings, test records and manuals.

Bahamian owners choose among three routes. Supply with installation supervision suits an owner whose own building contract is already under way; Paul directs setting, connection and testing. Design-build adds the plant room layout, utility connections and controls. Complete installation gives Paul the whole job from the quay at Arawak Cay or Freeport to the final performance run. Each route ends with one turnover file and one service contact. The international projects page lists the other countries where Paul delivers process systems.

Which Bahamian sites buy process and utility equipment?

Bahamian sites that buy process and utility equipment fall into five groups: resort and hotel central plants, water utilities and desalination, breweries and food plants, hospitals, and the industrial port area of Freeport on Grand Bahama. Each group depends on reliable water, cooling, hot water and fuel systems in a salt-laden, hurricane-exposed climate, which shapes material and enclosure choices as much as the process duty itself.

Bahamian islands, their sites and the systems Paul Industries builds for them
Island or areaSites (market facts)Systems Paul Industries builds
New Providence: Nassau and Cable BeachResort complexes such as Baha Mar, hospitals, government buildings, the Blue Hills and Windsor Field desalination plantsChilled water plants, reverse osmosis trains, hot water and laundry steam, fuel storage
Paradise IslandAtlantis and other resort propertiesCentral plant chillers, cooling towers, water treatment, pool and aquarium filtration support
New Providence: Clifton PierCommonwealth Brewery, power generationGlycol chillers, CIP skids, brewing water, boiler feed and fuel systems
Grand Bahama: FreeportBuckeye Bahamas Hub petroleum terminal, Grand Bahama Shipyard, Freeport Container Port, port area manufacturersTanks and piping, pump and transfer skids, compressed air, process cooling
Abaco, Eleuthera and ExumaResorts, marinas, island utilities and desalinationPackaged reverse osmosis, chilled water, fuel tank farms, generator cooling

Resort central plants on Paradise Island and Cable Beach

Resort central plants in the Bahamas run large chilled water loops, domestic hot water, laundry steam or hot water, pool and lagoon filtration, irrigation and fire water, often with their own reverse osmosis supply. Atlantis opened on Paradise Island in December 1998 and Baha Mar opened on Cable Beach in 2017 with about 2,300 rooms, and properties of that scale treat chillers, cooling towers and pumps as critical equipment. Paul Industries designs replacement chillers and towers, variable flow pumping, plate heat exchangers and water treatment for those plants, sized from the logged loads the engineering department provides.

The Bahamas water supply and reverse osmosis

The Bahamas water supply on New Providence depends on desalination: the Water and Sewerage Corporation buys water from plants such as Blue Hills, a seawater reverse osmosis plant in Nassau rated at 12 million US gallons a day since its 2012 expansion, and Windsor Field, producing since 1997. Asked how does Nassau Bahamas get its water, the short answer is seawater drawn from shallow wells in the limestone, pressed through reverse osmosis membranes with energy recovery devices, and the concentrate returned through deep disposal wells. Resorts and Family Island communities run smaller plants on the same principle. Paul builds reverse osmosis skids, cartridge and multimedia pretreatment, high-pressure pump sets, remineralization and chemical dosing, and storage tanks, and the high-purity water systems page explains the polishing steps that labs and hospitals add.

Breweries, food plants and hospitals

Commonwealth Brewery at Clifton Pier on New Providence, where Kalik has been brewed since 1988 in a venture with Heineken, is a working example of beverage processing in the islands; breweries of that kind run brewhouse steam, glycol cooling, CIP, CO2 handling and brewing water treatment, covered on Paul’s distilling and brewing page. Hospitals in Nassau and Freeport need chilled water, steam or hot water for sterilization and laundry, medical gas and treated water for dialysis and labs, described on the hospitals and healthcare page.

Freeport, the Hawksbill Creek Agreement and the Freeport Bahamas economy

The Freeport Bahamas economy rests on the Hawksbill Creek Agreement, signed on 4 August 1955, which created the Port Area on Grand Bahama under the Grand Bahama Port Authority and gave its licensees customs and tax concessions. People often call it the Freeport Bahamas free trade zone, and for an equipment buyer the key point is that a Port Authority licensee with bond status enters qualifying goods conditionally duty-free on the C-14 customs form, stating whether they are for company use or for manufacturing or assembly. The Port Area hosts the Buckeye Bahamas Hub petroleum terminal, formerly BORCO, with about 80 storage tanks, the Freeport Container Port, opened in 1997, and Grand Bahama Shipyard, a ship repair yard serving cruise ships.

The Grand Bahama Shipyard dry dock fleet grew when the floating dock East End, about 357 meters long and 70 meters wide, arrived in late 2025 as part of a redevelopment valued at about $600 million. Shipyards and petroleum terminals of that kind buy compressed air plants, ballast and fire water pumps, tank heating, fuel transfer skids, oily water separation and cooling water systems, the equipment Paul describes on its oil and gas page. Freeport sites also carry a reminder of hurricane exposure: the petroleum terminal closed for Hurricane Dorian in 2019, and Paul designs outdoor skids, tanks and electrical gear with that exposure in mind.

Bahamas voltage and frequency: a 60 Hz grid with US voltages

Bahamas voltage and frequency match US practice: the Utilities Regulation and Competition Authority’s power quality standard ES 10/2023 sets supply at 60 Hz, with 120 V and 120/240 V single-phase, 120/208 V three-phase and 277/480 V three-phase as the standard levels. For anyone asking what is the voltage in the Bahamas at an industrial site, the answer is one of those two three-phase systems, with steady-state voltage held within plus or minus 6 percent and phase imbalance within 3 percent under the same standard. The Bahamas Power and Light Company supplies New Providence and the Family Islands, while Grand Bahama Power Company serves Freeport under the Port Authority’s regulation, also at 60 Hz.

Is Bahamas 110 or 220? Neither label is exact: outlets carry 120 V, and 240 V comes from the split-phase service, the same arrangement as on the US mainland. The Bahamas voltage same as US practice means a 460 V motor, a 480 V drive and a 120 V control circuit built in the United States connect without conversion, so Paul spends its engineering effort on corrosion, wind, harmonics and generator backup instead of frequency changes.

Bahamian electrical and building requirements set against US practice
ItemTypical US designWhat a Bahamian site needs
Frequency60 Hz60 Hz under URCA ES 10/2023
Three-phase voltage208 or 480 V120/208 V or 277/480 V, confirmed at the site transformer
HarmonicsIEEE 519 by owner choiceVoltage distortion limits drawn from IEEE 519-2022 in the URCA standard
Wiring rulesNFPA 70Canadian Electrical Code Part I, with Ministry of Works approval before connection
Buildings and structuresIBC and ASCE 7Bahamas Building Code, third edition, or the Port Authority code in Freeport
Workplace safetyOSHAHealth and Safety at Work Act 2002, Department of Labour inspectors

Nassau Bahamas voltage, harmonics and generator backup

Nassau Bahamas voltage at a hotel or hospital switchboard is normally 277/480 V for chillers and large pumps and 120/208 V for lighting and small loads, and the URCA standard caps the voltage distortion a customer’s equipment may push back into the network. Paul specifies drives with line reactors or harmonic filters where a chiller plant has several large variable frequency drives, and it designs transfer switching and load sequencing so a central plant restarts cleanly on standby generators after an outage.

Bahamas electricity voltage and the Canadian Electrical Code

Bahamas electricity voltage is American, while the wiring rules follow the Canadian Electrical Code Part I, which the Bahamas adopted as its electrical code. Before the Bahamas Power and Light Company connects a new or upgraded commercial service, the Ministry of Works reviews and stamps the electrical permit specification, and the owner presents the Electrical Installation Approval Certificate and the occupancy certificate. Paul delivers single-line diagrams, panel schedules, nameplate data and test results in the form the Ministry’s inspectors review, with panels and components carrying the listings the code calls for.

The Bahamas building code and the other rules for plant equipment

The Bahamas building code that governs most plant rooms, equipment pads and outdoor structures is the Bahamas Building Code, Third Edition, published in 2003 under the Buildings Regulations Act. What building code does the Bahamas use for new work in 2026? The answer stays the 2003 edition, with its amendments: the Cabinet decision of 30 September 2025 approved only the public works portions of the draft Bahamas building code 4th edition and ordered the 2003 amendments consolidated into one reprint.

The Bahamas building code 3rd edition sets design loads, permits and inspections; a building permit is needed for new construction, additions and alterations, and building, plumbing, electrical and mechanical inspectors check the work before the occupancy certificate is issued. The Bahamas building code wind speed for a site comes from the code and the owner’s structural engineer, and Paul designs tank anchorage, cooling tower supports, rooftop chiller frames and pipe racks to those loads. On Grand Bahama, the Grand Bahama building code is the Port Authority’s Building and Sanitary Code, which adopts the national code within the Port Area.

Workplace safety falls under the Health and Safety at Work Act 2002, enforced by inspectors appointed through the Minister of Labour. Boilers, receivers and pressure vessels arrive with their ASME data reports, hydrostatic test records and relief valve settings, the records an inspector and the owner’s insurer review. The Bahamas Bureau of Standards and Quality, set up under the Standards Act of 2006, publishes national standards and handles legal metrology, so flow meters and scales used in trade carry calibration records that Paul supplies with the equipment.

Freight shipping to Bahamas ports from the US East Coast

Freight shipping to Bahamas ports from the US East Coast is one of the shortest ocean legs Paul arranges: Port Everglades lists direct Nassau services with a one-day transit, and sailings to Freeport run from the same South Florida gateways. Container shipping to Nassau Bahamas lands at the Nassau Container Port on Arawak Cay, run by APD Limited with a 28-foot draft, while shipping to Freeport Bahamas uses the Freeport Container Port on Grand Bahama. Family Island sites take a second leg by mail boat, barge or landing craft from Nassau.

Island deliveries shape the design as much as the schedule. A landing craft ramp, a dock crane or a narrow settlement road sets the heaviest lift and the widest load that reach a resort on Exuma or a utility plant on Eleuthera, so Paul splits large systems into modules that match the smallest link in that chain, with bolted flanges and plug-in cable sets between them. Each module carries its own lifting points, center of gravity mark and weight, and the reassembly drawings ship in the crate with the equipment.

Shipping to Bahamas from US ports starts with the equipment’s size. Shipping to Bahamas from Florida, through Port Everglades, Miami or Jacksonville, gives the most frequent departures, and shipping to Bahamas from Miami suits container cargo timed to a resort shutdown window. Cargo shipping to Bahamas for oversized items such as cooling tower sections, large tanks and vessel shells moves on flat racks or as breakbulk, and Paul designs skids to fit a 40-foot high cube box, about 12 meters long, 2.35 meters wide and 2.69 meters high inside, wherever the process allows. Shipping to Nassau Bahamas through Arawak Cay ends with a road move through the city, so Paul plans module weights and heights against the route to the plant room.

Shipping to Bahamas from US factories in the Northeast or Virginia uses rail or truck to a Florida port, then the short crossing. Every crate uses ISPM 15 heat-treated wood and carries marks that match the packing list, and quotations use Incoterms 2020 terms such as FCA at the US port or DAP at the site.

Bahamas customs duty rates, VAT and import regulations

Bahamas customs duty rates are set by tariff heading in the national tariff, so the duty on a chiller, a pump skid and a steel tank can differ on the same shipment. The Bahamas customs duty rates 2026 importers apply are those in force on the date of entry, after the budget amendments of each year, and the Bahamas customs duty list by heading is the reference the importer’s customs agent uses. On top of duty, the Bahamas import tax most buyers meet is value added tax at 10 percent, the rate since January 2022.

Bahamas import regulations require a commercial invoice, a bill of lading or air waybill, a packing list and a declaration of value, and Paul lists every component by heading with weights and values so the entry is clean. Bahamas import duty rates and any Bahamas customs duty exemption depend on the importer’s status and the approvals its project holds; in Freeport, for example, a Port Authority licensee with bond status enters goods on the C-14 form within five days of discharge. Paul matches crate marks and invoices to the approval the buyer holds, so the Bahamas import duty treatment on the entry matches the project’s concession.

How a Bahamian project with Paul Industries runs

Paul Industries runs a Bahamian project in nine stages, and the first two settle the site voltage, the governing code, the customs status and the hurricane loads before any steel is cut. Each stage and its deliverable appear below.

Stages of a process equipment project for a site in the Bahamas
StageActivityDeliverable to the owner
1. ScopeDuty, site voltage (120/208 or 277/480 V), island, concession status, wind loadsScope statement listing governing codes
2. DesignFlow diagrams, equipment sizing, Canadian Electrical Code panel design, corrosion specificationApproved drawings and data sheets
3. BuildWelding, fitting, wiring and calibration in the United StatesMaterial certificates, weld maps, calibration sheets
4. Factory testHydrostatic, functional and control tests at 60 HzSigned test report and open items list
5. ExportCrating, sailing from Florida to Nassau or Freeport, customs entryInvoice, packing list, bill of lading, value declaration
6. Site workPaul sets, connects and wires the equipment or supervises that workInstallation records and marked-up drawings
7. Start-upFlushing, membrane loading, refrigerant charge, boiler firing, loop tuningStart-up report and test data
8. AcceptancePerformance run, Ministry of Works inspection documentsAcceptance certificate and inspection package
9. HandoverOperator training, spares, maintenance plan before hurricane seasonEnglish manuals and as-built package

After handover Paul keeps the systems it supplied running with service visits, spare parts, membrane replacement, coil and tower repair and controls updates. Spare parts lists carry part numbers and lead times, and maintenance plans place cooling tower inspections, anchorage checks and generator transfer tests ahead of June, when the Atlantic hurricane season opens.

Who builds process systems for plants in the Bahamas?

Paul Industries builds process systems for plants in the Bahamas: reverse osmosis and water treatment for utilities, resorts and Family Island communities, chilled water plants and cooling towers for hotels and hospitals in Nassau and on Paradise Island, brewing and food plant utilities at Clifton Pier, and tanks, pump skids, compressed air and fuel systems for the Freeport port area. Paul engineers every system for the 60 Hz supply and the site voltage, builds to ASME and the Canadian Electrical Code, and installs and commissions the work or supervises its installation, under one contract with one turnover file. Paul’s Jamaica page covers a Caribbean neighbor where the same delivery model meets a 50 Hz grid.

What sets the delivered cost of equipment for a Bahamian site?

The delivered cost of equipment for a Bahamian site depends on five items beyond the equipment itself: corrosion protection, freight and the island leg, customs charges, documentation, and the installation route. Paul prices each item as a separate line in US dollars.

  • Corrosion protection. Coated coils, stainless or hot-dip galvanized frames, sealed enclosures and marine-grade fasteners cost more than inland specifications and last far longer in salt air.
  • Freight. The Florida crossing is short; flat racks, cranes at Arawak Cay or Freeport and a second leg to Abaco, Eleuthera or Exuma add cost.
  • Customs charges. Duty by heading and VAT at 10 percent apply unless a project or Port Area concession changes them.
  • Documentation. Ministry of Works electrical packages, ASME data reports and validation protocols for hospital or lab systems are priced as defined deliverables.
  • Site work. Work inside an occupied resort or hospital, phased around guests or patients, sets the installation figure; supervision lowers it.

Paul Industries for Bahamian resorts, utilities and Freeport plants

Paul Industries designs, fabricates and tests 60 Hz water, cooling, steam, fuel and process systems for sites across the Bahamas, ships them to Nassau or Freeport, and installs and commissions them or supervises installation, with electrical, pressure equipment and acceptance records in one English turnover package. Paul delivers the same scope for plants in Puerto Rico and on the US mainland. Send the duty, the island and site, the transformer voltage and the target date, and Paul replies with a route, a schedule and a price in US dollars. Request a quote to start a Bahamian project.

Standards referenced: URCA ES 10/2023 Standard for Power Quality and Reliability in Electric Power Systems · Electricity Act 2024 · Canadian Electrical Code Part I (CSA C22.1) · Bahamas Building Code, Third Edition 2003, and the Buildings Regulations Act · Grand Bahama Port Authority Building and Sanitary Code · Health and Safety at Work Act 2002 · Standards Act 2006 (Bahamas Bureau of Standards and Quality) · Hawksbill Creek Agreement 1955 · ASME Boiler and Pressure Vessel Code Sections I and VIII · ASME B31.1 and B31.3 · IEEE 519-2022 · Incoterms 2020 · ISPM 15

Frequently asked questions

Is Bahamas voltage same as US equipment ratings?

Bahamian supply uses the same voltages and the same 60 Hz frequency as the US mainland: 120/240 V single-phase, and 120/208 V or 277/480 V three-phase under the URCA power quality standard. Paul Industries confirms the site transformer voltage during design and builds motors, drives and panels to match it, so equipment connects without converters.

Which three-phase supply does a Nassau hotel plant room use?

Large hotel and resort plant rooms in Nassau and on Cable Beach normally take 277/480 V three-phase for chillers, pumps and cooling tower fans, with 120/208 V for lighting and small loads. Paul Industries designs the motor control centers and drives for the voltage on the transformer nameplate and adds harmonic mitigation where several large drives share one service.

Who builds reverse osmosis skids for resorts in Exuma and Eleuthera?

Paul Industries designs and fabricates packaged seawater and brackish reverse osmosis skids for resorts and island communities in Exuma, Eleuthera and Abaco, with pretreatment, high-pressure pumps, energy recovery, remineralization, dosing and storage tanks. Each skid is factory tested at 60 Hz, shipped through Nassau, and installed and started up by Paul or under its supervision.

What does a Paradise Island resort need when replacing a central plant chiller?

A chiller replacement at a Paradise Island resort needs logged cooling loads, the rigging route into the plant room, the 480 V service capacity, and a plan to keep guest areas cool during the change. Paul Industries sizes the new machine, plans temporary cooling where needed, ships the chiller to Nassau, and sets, connects and commissions it.

Does a Freeport licensee pay duty on process equipment from the United States?

A Grand Bahama Port Authority licensee with bond status enters qualifying goods conditionally duty-free on the C-14 customs form, stating whether they are for company use or for manufacturing or assembly, within five days of discharge. Paul Industries prepares invoices, packing lists and crate marks that match the licensee’s details so the Freeport entry goes through cleanly.

Which equipment do shipyards and terminals in Freeport order from US builders?

Shipyards and petroleum terminals in Freeport order compressed air plants, fire water and ballast pumps, fuel transfer and blending skids, tank heating, oily water separators and cooling water systems. Paul Industries fabricates that equipment to ASME and the owner’s standards, protects it for salt air, and ships it to the Freeport Container Port.

How does the Ministry of Works approve a new electrical service for a plant?

The Ministry of Works reviews and stamps the electrical permit specification, inspects the installation, and issues the Electrical Installation Approval Certificate that Bahamas Power and Light asks for before it connects. Paul Industries supplies single-line diagrams, load calculations, panel schedules and test results for that review, prepared to the Canadian Electrical Code that the Bahamas adopted.

Which building code applies to equipment pads and towers in Freeport?

Inside the Port Area, the Grand Bahama Port Authority’s Building and Sanitary Code applies, and it adopts the Bahamas Building Code. Elsewhere, the Bahamas Building Code third edition of 2003 and the Buildings Regulations Act govern. Paul Industries designs pads, tower supports and tank anchorage to the wind loads the owner’s structural engineer sets under those codes.

What is the transit time for shipping to Bahamas ports from South Florida?

Port Everglades lists direct Nassau services with a one-day crossing, and Freeport sailings run from the same South Florida ports. Port handling, customs entry and the road move to the site come on top, and Family Island deliveries add a mail boat or barge leg from Nassau. Paul Industries books the sailing and plans module sizes around those steps.

How is VAT charged on imported equipment in the Bahamas?

Value added tax in the Bahamas has been 10 percent since January 2022, down from 12 percent, and it applies to imports along with customs duty set by tariff heading. Project concessions or a Port Area licence change that treatment. Paul Industries itemizes every shipment by heading and value so the importer’s customs agent calculates duty and VAT accurately.

How should a hospital in Nassau plan a chilled water upgrade?

A hospital in Nassau planning a chilled water upgrade starts with the cooling load, the redundancy the clinical areas need, the generator capacity and a phasing plan that keeps operating rooms and wards conditioned. Paul Industries designs the plant with N+1 chillers and pumps where required, builds the skids, and installs them in phases around patient care.

How do hurricanes change the design of outdoor process equipment in the Bahamas?

Outdoor equipment in the Bahamas must resist hurricane winds, flying debris and storm surge, as Hurricane Dorian showed on Grand Bahama and Abaco in 2019. Paul Industries designs anchorage, tower supports and skid frames to the code wind loads, raises electrical gear above flood levels, and adds restart sequences so a plant returns to service after an outage.

Which materials hold up best on skids exposed to salt air in the Bahamas?

Skids exposed to salt air in the Bahamas last longest with stainless steel or hot-dip galvanized frames, coated or copper-nickel heat exchanger coils, stainless fasteners, sealed NEMA 4X enclosures and UV-stable cable. Paul Industries writes those choices into the specification and documents coating systems and dry film thickness in the turnover file.

Can a Bahamian owner witness the factory acceptance test?

Engineers and owners from Bahamian resorts, utilities and plants are welcome at Paul Industries factory acceptance tests in person or by live video. The short flight from Nassau or Freeport to the US East Coast makes attendance easy, and the signed test report and open items list go into the turnover package before the equipment sails.

Does the Bahamas use metric or imperial units on drawings?

Paul Industries draws Bahamian projects in the units the owner’s engineering standard sets, US customary or metric, and adds dual dimensions where a site mixes both. Manuals, alarm texts, nameplates and training material are in English, the official language of the Bahamas, so operators and inspectors read the same documents.

What service support follows equipment installed in the Bahamas?

Paul Industries services Bahamian systems after handover with planned visits, spare parts lists, membrane and filter replacement, cooling tower and coil repair, and controls updates. Maintenance plans place anchorage checks, tower inspections and generator transfer tests ahead of each hurricane season, and every visit is recorded in the same file as the original turnover package.

What information produces a firm price for a project in the Bahamas?

A firm price for a Bahamian project comes from the process duty, the island and site, the transformer voltage, any project or Port Area concession, the outdoor exposure, and the target completion date. Paul Industries returns a proposal with the route, the schedule and a US dollar price, with freight, customs charges and installation shown as separate lines.

Planning water, cooling or process equipment for a site in the Bahamas?

Send Paul Industries the duty, the island, the transformer voltage and your target date, and the reply sets out the sailing, the build schedule and a working budget. Call 201-450-8280 or request a quote.