Paul Industries designs, installs, starts up and services data center cooling in Texas, from chilled water plants and dry cooler yards in Dallas-Fort Worth and San Antonio to heat rejection for campuses on the Gulf Coast and in West Texas. A Texas cooling plant answers to three forces at once: a climate that runs from humid Houston to arid El Paso, a state grid with its own rules for large loads, and winter freezes that most southern designs once ignored. Paul Industries supplies equipment, builds design-build plants and delivers complete installations, with the piping, controls integration and testing under one contract.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
Grid ERCOT carries about 90 percent of Texas electric load
Large-load threshold Above 75 MW at one site (SB 6, 2025)
Industrial power 6.12 cents/kWh against a US 8.13 (EIA, 2024)
Freeze benchmark DFW reached -2 F on February 16, 2021 (NWS)
Reviewed November 2026

What does data center cooling in Texas have to handle?

Data center cooling in Texas has to handle long, hot summers, a wide spread between humid and dry regions, occasional hard freezes, and an ERCOT grid that now writes rules specifically for large electric loads. Each of those shapes a different part of the plant: summer peaks size the chillers and heat rejection, humidity decides how much an evaporative system helps, freezes decide glycol and heat tracing, and the grid rules decide how the plant behaves when utility power is curtailed.

The national overview of cooling architectures, CRAH galleries, liquid cooling and closed loops sits on the national data center cooling systems page. What follows is the Texas layer: weather data for its main data center regions, the 2025 large-load law, water reporting, transmission peaks, storms and freezes, and how each one changes the equipment Paul Industries puts in the yard.

Two cooling climates: the arid west and the humid Gulf

Texas holds two very different cooling climates within one state, because West Texas air is hot and dry while the Gulf Coast is hot and humid, and the difference changes which heat rejection equipment earns its place. NOAA’s 1991 to 2020 July normals show similar daytime highs across the state, from 93 degrees Fahrenheit in Houston to 97 in Dallas and Austin, but the nights and the moisture differ: Houston averages a 77 degree July low with an annual afternoon relative humidity of 55 percent, while El Paso’s afternoon average is 27 percent.

July normals and humidity at Texas data center regions, and what they mean for heat rejection
RegionJuly normal high / low (NOAA 1991-2020)Annual afternoon humidityHeat rejection that tends to fit
Dallas-Fort Worth97 F / 78 F (Dallas)49 percentWater-cooled chillers with towers, or air-cooled chillers with free-cooling coils for winter hours
Houston and the upper Gulf Coast93 F / 77 F55 percentWater-cooled plants sized on a high design wet bulb; dehumidification for the white space
Austin and San Antonio97 F / 75 F (Austin); 95 F / 75 F (San Antonio)48 percent (San Antonio)Mixed plants: towers where water allows, dry coolers with trim chillers where water is short
Abilene, Midland and the Permian Basin96 F / 73 F34 percent (Midland)Dry coolers and adiabatic assist; closed loops that keep makeup water small
El Paso96 F / 73 F27 percentEvaporative assist works hard on dry afternoons; water supply decides how much of it to use
Amarillo and the Panhandle93 F / 66 F38 percentCooler nights add free-cooling hours; freeze protection matters more than anywhere else in the state

Dry air lowers the wet bulb temperature, which is the limit an evaporative device approaches, so a cooling tower or an adiabatic pad in Midland or El Paso produces colder water than the same equipment in Houston on a day with the same dry bulb reading. The catch in the west is water: every gallon an evaporative system saves in electricity comes out of a supply that West Texas counties watch closely. Along the Gulf the opposite holds. Towers are less effective on muggy afternoons, but water is easier to secure, and the bigger design problem is moisture in the white space and condensation on cold piping.

How dry coolers and economizers perform from El Paso to Houston

Dry coolers and waterside economizers perform best in Texas where nights are cool and air is dry, which favors the Panhandle and the high plains, and they deliver the fewest hours along the coast, where a warm, damp night holds the outdoor wet bulb close to the loop return temperature for months. The design question is never whether an economizer runs in Texas but how many hours a year it carries the full load, how many it carries part of the load, and what the chillers do the rest of the time.

Warmer loop temperatures change that arithmetic. A plant built for a chilled water supply in the high 60s, or a liquid cooling loop running warmer still, can reject heat through dry coolers for far more of the year than a plant designed around 44 degree water. Paul Industries runs the bin calculation for the actual site with the owner’s chosen supply and return temperatures, and sizes the trim chillers for the summer hours the dry coolers cannot cover. For halls moving to direct-to-chip racks, the loop side of that design is covered on data center liquid cooling in Texas.

Why do Texas data centers need freeze protection?

Texas data centers need freeze protection because the February 2021 winter storm showed that a hard freeze can reach every part of the state for days at a time: Dallas-Fort Worth dropped to minus 2 degrees Fahrenheit on February 16, 2021, and Waco set a record of 205 consecutive hours below freezing, according to the National Weather Service. Equipment designed for a southern climate, with water-filled coils, uninsulated tower makeup lines and condenser loops with no glycol, split pipes and coils across the state that week.

A Texas cooling plant built today is designed on the assumption that a multi-day freeze arrives with grid stress on top of it. That changes both the equipment list and the controls sequence, because the plant may be riding on generators at the moment it most needs heat tracing and basin heaters.

Freeze protection choices for a Texas data center cooling plant
ExposureProtectionWhat to check at commissioning
Dry cooler and air-cooled chiller coilsPropylene or ethylene glycol at a concentration matched to the site’s design low, or isolation and drain-down for idle unitsGlycol concentration by refractometer; drain valves and vents reachable in winter conditions
Cooling tower basins and makeup linesBasin heaters, heat-traced and insulated makeup and drain piping, indoor sumps where the layout allowsHeat trace circuits on generator-backed panels; low-temperature alarms reporting to the building system
Exposed chilled water and condenser pipingInsulation with jacketing, heat tracing on dead legs and instrument lines, minimum-flow recirculationTrace continuity and alarm points; recirculation sequence tested with chillers off
Fire protection and domestic water in the yardHeated enclosures, dry or preaction design where the code permitsEnclosure heaters on standby power
Controls and instrumentsHeated enclosures for transmitters and actuators; fail positions chosen for freezing conditionsValve fail positions verified on loss of power

Data centers and Texas power grid rules after SB 6

Data centers and Texas power grid planning changed with Senate Bill 6 of 2025, which defines a large load as an interconnection above 75 megawatts at a single site, requires those customers to disclose on-site backup generation that can serve at least half of their demand, and lets ERCOT direct that generation to run, or the load to curtail, during grid emergencies. For loads interconnected after December 31, 2025 at transmission voltage, the law also requires the ability to curtail during firm load shed, and it created an ERCOT reliability service that procures demand reductions from large loads with at least 24 hours of notice.

The Public Utility Commission of Texas adopted its large-load interconnection rule in Project 58481 on September 18, 2026, with a flat $100,000 study fee. ERCOT reports that most of the large loads asking to connect are data centers, and the queue runs to hundreds of gigawatts, so the cooling plant on a new Texas campus is designed knowing that the site may be asked to leave the grid on purpose.

What SB 6 and the PUCT large-load rule mean for a Texas cooling plant
ProvisionWhat the law or rule saysEffect on the cooling design
Large-load thresholdInterconnections above 75 MW at one site, unless the PUCT sets a lower figureCampus phasing decides when the site crosses the threshold; cooling load counts toward it
Backup generation disclosureOn-site generation able to serve at least half the site’s demand must be reported to the utility and ERCOTGenerators sized for cooling as well as IT load, with restart sequences matched to their capacity
Directed deploymentERCOT may direct a large load to run its backup generation or curtail after market services are usedTransfers to on-site power become planned events that the plant rehearses
Curtailment during firm load shedTransmission-voltage loads connected after December 31, 2025 need the ability to curtailThermal storage or loop volume bridges the chiller restart; pumps stay on uninterruptible power
Demand reduction serviceERCOT procures reductions from loads of 75 MW or more, with at least 24 hours of noticePre-cooling and storage charging can be scheduled ahead of a called event
Study feeAt least $100,000 under the statute; the September 2026 PUCT rule set a flat $100,000Cooling load estimates go into the interconnection request early, so they need to be realistic

For cooling, that means the transfer from utility power to on-site generation is a planned event rather than a rare failure. Chillers have to restart quickly on generator power, pumps have to keep flow through the transfer, and thermal storage or a large chilled water volume has to bridge the minutes between. Paul Industries designs restart sequences that stagger compressor starts to suit the generator plant, specifies pumps and controls on uninterruptible power where the IT load cannot tolerate a flow interruption, and tests the full transfer under load before handover. The testing side of that work is described on data center commissioning in Texas.

How much water do data centers in Texas use for cooling?

How much water data centers in Texas use for cooling comes down mostly to how the heat leaves the site: an evaporative tower plant consumes water continuously through evaporation and blowdown, while a closed-loop plant with dry coolers consumes very little after its initial fill, at the cost of more electricity on hot afternoons. The state is now asking for that number. On September 14, 2026 the governor directed the Texas Water Development Board to enforce water-use reporting by major users, including data centers, and a week later he directed the Texas Commission on Environmental Quality to halt permits sought by data center projects until ERCOT and Water Development Board audits are complete.

A water budget for a Texas campus starts with the site’s source and its drought rules. Many West Texas and Hill Country sites favor designs with little or no evaporation, while Gulf Coast sites with reliable surface water or reclaimed water supply still choose towers for their efficiency. Paul Industries prices both paths for the owner: the tower plant with its makeup, blowdown treatment and drought contingency, and the dry plant with its larger electrical demand and trim chillers, so the choice rests on the site’s water and power rather than habit.

Data center cooling without water in West Texas

Data center cooling without water in the evaporative sense is practical in West Texas when the loop runs warm enough. Data centers in West Texas, from Abilene to the Permian Basin and El Paso, see dry air that lets adiabatic pads cut peak power on the hottest afternoons with modest water use, while dry coolers do the work for most of the year. The trade is a larger yard, more fans and a bigger electrical service, all of which Paul Industries lays out against the site plan before equipment is ordered.

Summer peaks, transmission charges and chiller staging

Summer peaks matter twice for a Texas data center cooling plant, because ERCOT’s highest-demand afternoons are also the hottest hours for heat rejection, and transmission costs inside ERCOT are allocated by each customer’s load during the four highest 15-minute system peaks, one in each month from June through September. The Public Utility Commission is reviewing that four-peak method, but while it applies, every kilowatt the cooling plant draws during those intervals carries into the following year’s transmission charges.

A data hall cannot shed IT load to chase a peak, but the cooling plant can shift some of its own draw. Chilled water storage charged overnight, chiller sequencing that holds the most efficient machines on line through the late afternoon, and condenser water reset matched to the tower’s capability all reduce cooling demand during the peak window. Paul Industries reviews the plant’s trend data against the summer peak intervals and recommends the controls and storage changes that pay back under the owner’s actual tariff.

Keeping a hall cool through a Gulf Coast storm

Keeping a Houston-area data hall cool through a Gulf Coast storm depends on how long the site can run its cooling plant without utility power, water deliveries or staff movement, because a hurricane outage there can last days. After Hurricane Beryl in July 2024, CenterPoint Energy reported 2.26 million customers affected, and restoration across the Houston region took the better part of a week and longer in places.

A storm-ready plant has generator capacity for the full cooling load as well as the IT load, enough fuel and makeup water storage for the planned autonomy, tower and dry cooler anchorage designed to the site’s wind loads, and yard equipment set above the flood elevation. Paul Industries reviews those points with the owner before hurricane season: generator coverage of chillers, pumps and tower fans, makeup water storage hours, and the order in which the plant restarts after a transfer. The same review covers what happens to a data center cooling failure during the storm itself, including which halls ride through on stored chilled water and which shed load first.

Data center cooling by Texas region

Data center cooling across Texas differs by region in climate, grid and water, so a plant layout proven in one market rarely transfers unchanged to another.

Data center cooling: Dallas-Fort Worth and North Texas

Data center cooling Dallas-Fort Worth owners specify most often is a water-cooled or air-cooled chilled water plant with free-cooling capability for winter, serving CRAH galleries or fan walls and, increasingly, coolant distribution units for liquid-cooled rows. North Texas summers are hot with warm nights, so chillers carry full lift through July and August, while winters bring enough cool hours to make economizers worthwhile and enough hard freezes to make glycol or drain-down a requirement. Sites from Garland and Plano to Fort Worth, Midlothian and Red Oak connect through Oncor and other ERCOT utilities.

Data center cooling: Houston and the Gulf Coast

Data center cooling Houston campuses rely on is shaped by humidity and storms: water-cooled plants sized for a high design wet bulb, dehumidification for the white space, insulation and vapor barriers on every cold pipe, and yard equipment protected from wind and flood. Sites in Houston, Katy, the Energy Corridor and toward Freeport and Beaumont plan their cooling around the hurricane season as much as the summer peak.

Austin, Taylor and San Antonio

Central Texas sites in Austin, Round Rock, Taylor and San Antonio see Dallas-like summer highs with somewhat drier air, and their water supply varies sharply by provider and drought stage. Many choose hybrid plants with towers for efficiency and dry coolers as a hedge when water restrictions tighten. Austin Energy and CPS Energy serve their cities as municipal utilities inside ERCOT, so interconnection and curtailment arrangements run through them.

El Paso and the Panhandle

El Paso, along with much of the Panhandle and East Texas, lies outside ERCOT, so the SB 6 curtailment rules written for the ERCOT grid apply differently there. The cooling design still responds to the same physics: El Paso’s dry air rewards evaporative assist where water allows, and Amarillo’s cool nights reward economizers but demand the strongest freeze protection in the state.

Texas data center cooling regulations and codes

Texas data center cooling regulations come from city building codes rather than a statewide commercial code, from the energy code that Texas law sets for commercial construction, from environmental permits for generators and water, and now from the ERCOT and PUCT rules for large loads. The Health and Safety Code makes the International Energy Conservation Code the energy code for commercial construction and lets cities adopt editions and amendments, so the version that governs an economizer or a fan power limit depends on where the hall is permitted.

Chilled water and condenser piping follows ASME B31.9, or B31.3 when the owner’s specification calls for process piping rules, refrigeration machinery rooms follow ASHRAE 15 through the adopted mechanical code, and ASHRAE 90.4 sets an energy standard specific to data centers that many owners write into their design criteria. Paul Industries builds to the code edition adopted by the city or county that issues the permit and records the pressure tests, flushing and startup data that inspectors and owners ask for.

What do data center cooling costs look like in Texas?

Data center cooling costs in Texas fall into two parts: the installed cost of the plant, driven by capacity, redundancy, heat rejection type and freeze and storm protection, and the operating cost, driven by electricity and, for evaporative plants, water and treatment. Texas power is cheaper than the national average for industrial customers, 6.12 cents per kilowatt-hour against 8.13 nationally in 2024 (EIA), which lengthens the payback on efficiency upgrades but does not remove it on plants that run every hour of the year.

As an illustration, a cooling plant drawing an average of 1,500 kilowatts all year uses about 13.1 million kilowatt-hours; at the 2024 Texas industrial average that is roughly $804,000, against about $1,068,000 at the national average. The figures are an example with stated assumptions, before demand and transmission charges. Paul Industries prices the installed plant from the owner’s load, redundancy and site conditions, starting with a budget figure drawn from similar plants and moving to a fixed price when the drawings and equipment schedule settle, with the operating cost of each option shown beside it.

Who builds data center cooling plants in Texas?

Paul Industries builds data center cooling plants in Texas, installing chillers, dry coolers, cooling towers, pumps, chilled water and condenser water piping, coolant distribution units and the controls connections that tie them together, for new campuses, expansions and retrofits across the state. Paul Industries is an East Coast contractor with its headquarters at 256 Shore Drive, Kilmarnock, Virginia (it was formerly based in northern New Jersey, then Pennsylvania), and it takes cooling work at Texas data centers, across all 50 states and abroad through its international projects.

Owners who compare data center cooling contractors in Texas look at whether one contract covers the yard, the piping and the hall. With Paul Industries it does: the chiller plant on chiller repair in Texas for existing machines, the piping systems on process piping in Texas, and the full mechanical package on data center mechanical contractor in Texas. Paul Industries also builds cooling plants in other states with their own conditions, including its headquarters state on data center cooling in Virginia and the humid, storm-exposed sites on data center cooling in Florida.

Texas data center cooling from Paul Industries

Paul Industries designs, supplies, installs, starts up and services data center cooling in Texas, from a single trim chiller to a campus plant with dry cooler yards, thermal storage and liquid cooling loops. To price a project, send the IT load per hall, rack density, the cooling architecture or basis of design, site location and water source, and the redundancy target. Call 201-450-8280 or request a quote. For the wider picture, the Texas overview gathers every Texas service page, and the Gulf Coast page covers the neighboring coastal states.

Standards referenced: ASHRAE Thermal Guidelines for Data Processing Environments · ASHRAE 90.4 · International Energy Conservation Code (Texas Health and Safety Code 388.003) · Texas SB 6 (2025), Utilities Code 37.0561 and 39.170 · PUCT large-load interconnection rule, Project 58481 · ERCOT Nodal Protocols · ASME B31.9 · ASME B31.3 · ASHRAE 15

Frequently asked questions

Who provides cooling for data centers in Dallas-Fort Worth, Garland and Midlothian?

Paul Industries provides cooling for data centers across Dallas-Fort Worth, including Garland, Plano, Richardson, Fort Worth, Midlothian and Red Oak. North Texas plants need full chiller capacity through hot July nights and freeze protection for winters that reached minus 2 degrees Fahrenheit at DFW in February 2021. Paul Industries installs chillers, dry coolers, towers, pumps and piping, and tests the plant through a utility-to-generator transfer before handover.

Does Paul Industries install data center cooling in Houston, Katy and the Gulf Coast?

Yes. Paul Industries builds, starts up and maintains data center cooling plants in Houston, Katy, the Energy Corridor, Pasadena, Baytown and south toward Freeport. Gulf Coast plants are sized for high humidity, insulated against condensation on every cold pipe, and laid out for hurricane season, with generator coverage for chillers and pumps, makeup water storage and yard equipment set above the flood elevation.

Which contractor cools data halls in Austin, Round Rock, Taylor and San Antonio?

Paul Industries designs and installs cooling for data halls in Austin, Round Rock, Taylor, San Marcos and San Antonio. Central Texas owners often choose hybrid plants, with cooling towers for efficiency and dry coolers as a hedge against drought restrictions, and interconnection arrangements run through municipal utilities such as Austin Energy and CPS Energy as well as the ERCOT wires companies.

Who provides cooling for data centers in Abilene, Midland and the rest of West Texas?

Paul Industries provides cooling for data centers in Abilene, Midland, Odessa, Lubbock, El Paso and the Panhandle. West Texas air is dry, so adiabatic assist and dry coolers do well, but water supply decides how much evaporation a site can afford. Paul Industries lays out closed-loop plants with dry coolers and trim chillers where water is scarce, and evaporative plants where supply allows.

Why so many data centers in Texas, and what does it mean for cooling design?

Developers point to land, a grid with large generation additions, and industrial power below the national average: 6.12 cents per kilowatt-hour in Texas against 8.13 nationally in 2024 (EIA). For cooling, the growth means plants are built at a scale where freeze protection, curtailment behavior under SB 6 and water reporting are design inputs from the first drawing, not details added at the end.

Are data centers water cooled in Texas, or do they rely on air?

Both approaches are common. Many Texas campuses use chilled water plants, either water-cooled with towers or air-cooled with dry coolers, feeding air handlers or fan walls in the hall. Newer high-density rows add liquid loops to the chips through coolant distribution units. Whether the heat leaves the site through evaporation or through dry coils is the bigger Texas decision, because it sets both water use and summer electrical demand.

What does SB 6 require of a data center that wants to connect to ERCOT?

Senate Bill 6 of 2025 applies to interconnections above 75 megawatts at one site. It requires disclosure of other substantially similar interconnection requests in Texas, a study fee of at least $100,000, disclosure of backup generation able to serve at least half the site’s demand, and, for loads connected after December 31, 2025 at transmission voltage, the ability to curtail during firm load shed.

How does ERCOT curtailment affect a cooling plant's controls?

A site that can be told to leave the grid needs a cooling plant that restarts reliably on its own generation. Paul Industries sequences chiller restarts to the generator plant’s capacity, keeps pumps and controls on uninterruptible power where flow cannot stop, sizes chilled water storage or loop volume to bridge the restart, and proves the sequence in an integrated transfer test under load before the hall goes live.

Does a Texas data center need glycol in its cooling loops?

Any loop with coils or piping exposed to outdoor air needs freeze protection somewhere in Texas, and glycol is the usual answer for dry coolers and air-cooled chillers. The concentration is chosen from the site’s design low and burst protection needs, then checked at commissioning. Indoor chilled water loops usually stay on treated water, with heat tracing and insulation on any section that passes through unheated space.

What did the February 2021 freeze teach Texas cooling designers?

The storm showed that a southern plant can face days below freezing while the grid is also short of power. ERCOT shed up to 20,000 megawatts of firm load, and many cooling systems lost coils and pipes to freezing. Designs now put heat tracing, basin heaters and controls on generator-backed circuits and choose valve fail positions that leave water moving or drained when power drops.

How much water does a Texas data center cooling tower use?

A tower consumes water through evaporation, drift and blowdown, and the evaporation part scales with the heat rejected, so a large campus running towers uses far more water than one on dry coolers. The exact figure depends on the heat load, the cycles of concentration the water chemistry allows and the hours the towers run. Paul Industries calculates it for the specific site and source water when comparing tower and dry cooler plants.

What did the September 2026 Texas directives change for data center water and permits?

On September 14, 2026 the governor directed the Texas Water Development Board to enforce water-use reporting by major users, including data centers. On September 21 he directed the Texas Commission on Environmental Quality to halt permits sought by data center projects until the ERCOT and Water Development Board audits are complete. Cooling plant water use is part of what owners now document and report.

How do the four summer coincident peaks affect a data center cooling plant?

Inside ERCOT, transmission costs are allocated by each customer’s load in the four highest 15-minute system peaks, one in each month from June through September. The cooling plant cannot drop IT load, but chilled water storage, chiller sequencing and condenser water reset reduce its own draw during those afternoons. The PUCT is reviewing the method, so Paul Industries checks the current tariff before recommending storage.

What hurricane protections does a Houston data center cooling yard need?

The yard needs chillers, dry coolers and towers anchored for the site’s design wind speed, equipment and electrical gear set above the flood elevation, generator capacity for the whole cooling load, and fuel and makeup water storage for the planned hours of autonomy. Restart order after a power transfer is written down and tested, so the plant comes back the same way every time.

Is an air-cooled chiller plant a good fit for a Texas data center?

Air-cooled plants suit sites where water is scarce or uncertain, which covers much of West and Central Texas, and they avoid tower chemistry and blowdown. They draw more power on hot afternoons and need larger yards. Paired with free-cooling coils and a warm loop temperature, an air-cooled plant in North Texas or the Panhandle runs many winter hours with compressors off.

Can Paul Industries add cooling capacity to a Texas data hall that is already running?

Yes. Paul Industries adds chillers, pumps and coolant distribution units to operating Texas halls through hot taps, valved tie-in points and staged outages planned under a written method of procedure. Redundancy is confirmed before each step, temporary cooling is connected where margin is thin, and the new capacity is tested under load before the old equipment is changed.

Does Paul Industries supply cooling equipment for a Texas project without installing it?

Yes. Paul Industries supplies chillers, dry coolers, pumps, coolant distribution units, valves and prefabricated pipe spools for Texas projects on a supply-only basis, and offers design-build and complete installation for owners who want the whole plant under one contract. Each route includes submittals, factory test records where the equipment has them, and startup support documentation.

What should a Texas owner send to price a data center cooling plant?

Send the IT load per hall and the phasing, rack densities and any liquid cooling plans, the basis of design or preferred heat rejection type, the site address and water source, the redundancy target, and the utility serving the site. Paul Industries answers with a budget number based on similar Texas plants, then a fixed price when drawings and the equipment schedule are complete.

Planning a data center cooling plant in Texas?

Send the IT load per hall, rack density, site location, water source and redundancy target. Call 201-450-8280 or request a quote.