Paul Industries provides tank fabrication in Texas, designing, building, erecting and testing API 650 storage tanks, stainless process tanks and AWWA water tanks for refineries, terminals, chemical plants, food plants and utilities across the state. Texas now has two layers of tank regulation from the Texas Commission on Environmental Quality: the long-standing petroleum tank rules in 30 TAC Chapter 334, and the Aboveground Storage Vessel Safety Program that Senate Bill 900 created for refineries, petrochemical plants and bulk terminals. Paul Industries, headquartered at 256 Shore Drive in Kilmarnock, Virginia, builds each tank to the standard its contents and its location call for.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
Petroleum AST registration Within 30 days of first product (30 TAC 334.127)
Storage vessel program 21,000 gallons or more at refineries, chemical plants and terminals (Ch. 338)
Chapter 338 deadlines Register by September 1, 2027; certify existing vessels by 2037
Public water tanks AWWA design and an annual inspection (30 TAC 290)
Reviewed November 2026

Which Texas rules apply to a new tank?

The Texas rules that apply to a new tank depend on what it holds, how large it is and what kind of facility it sits in, so the regulatory answer is settled before the data sheet. Texas storage tank regulations are spread across three agencies and several chapters, and the table below sorts them. Diesel at a distribution yard, gasoline at a refinery, crude in the Permian Basin and potable water at a city plant each answer to a different set of rules, even if they look alike.

How Texas sorts aboveground tanks by contents and facility
Tank and settingTexas ruleKey requirement
Petroleum product tank over 1,100 gallons at a commercial or industrial site30 TAC Chapter 334, Subchapter FTCEQ registration within 30 days of first product; delivery only with a registration certificate
Storage vessel of 21,000 gallons or more at a refinery, petrochemical plant or bulk terminal30 TAC Chapter 338 (Senate Bill 900)Registration by September 1, 2027; performance standards incl. API 653, API 2350 and NFPA 30
VOC storage in ozone areas30 TAC 115.112Floating roof fittings and seals, or vapor control, by vapor pressure and size
Crude oil and condensate tanks at production sitesRailroad Commission of TexasOutside Chapter 334 Subchapter F; production tank standards such as API 12F
Potable water storage for a public water system30 TAC Chapter 290Covered, AWWA design and construction; inspected annually
Stainless process tanks inside a plantProduct rules (FDA, USDA, 3-A, ASME BPE) and the fire code adopted by the citySanitary design and documentation; flow-through process tanks are exempt from Subchapter F

TCEQ above ground storage tank regulations under Chapter 334

TCEQ above ground storage tank regulations in 30 TAC Chapter 334, Subchapter F, which most owners mean when they speak of Texas above ground storage tank regulations, cover containers made of nonearthen materials that hold petroleum products, including their associated piping, unless the rule exempts or excludes them. The program exists to protect groundwater and surface water, so its requirements center on registration, release reporting and corrective action rather than on how the tank is built.

The exclusions and exemptions decide most cases. Anything of 1,100 gallons or less is excluded, as are emergency spill containment, dilute mixtures that cannot fuel a vehicle or aircraft, and electrical transformers. Exemptions cover farm and residential motor fuel storage of 1,100 gallons or less, heating oil for use on the premises, flow-through process tanks, oil and gas production tanks regulated by the Railroad Commission, certain pipeline facilities, and everything located at or part of a petrochemical plant, a petroleum refinery, an electric generating facility or a bulk facility. That last exemption is why the Senate Bill 900 program was needed for the Gulf Coast storage terminals.

For tanks that are covered, TCEQ tank registration is due within 30 days of the date petroleum product is first placed in a new or replacement tank, under Rule 334.127, and a common carrier may not deliver product into a registered system without seeing a valid registration certificate. For the first 90 days after the first delivery into a new system, a temporary delivery authorization stands in, with the first bill of lading attached. Releases from an aboveground tank follow the same reporting, investigation and corrective action procedures as underground tanks. Paul Industries hands the owner the tank data the registration form asks for at turnover, so the TCEQ storage tank paperwork is ready before the first truck arrives.

The Senate Bill 900 program: Chapter 338 for refinery, chemical and terminal tanks

The Aboveground Storage Vessel Safety Program in 30 TAC Chapter 338 applies to storage vessels of 21,000 gallons (500 barrels) or more, made of nonearthen materials and holding a regulated substance, at petrochemical plants, petroleum refineries and bulk storage terminals, including end-of-line pipeline terminals, refinery terminals and for-hire rail or barge terminals. The rules took effect August 24, 2023, after the Legislature passed Senate Bill 900 in 2021.

The program has its own exclusions: production and gathering vessels, stormwater and wastewater collection systems, flow-through process tanks including pressure and process vessels and oil-water separators, tanks operated above 0.5 psig, heated tanks, movable intermediate bulk containers, tanks holding FDA-regulated products, liquefied petroleum tanks and tanks regulated by the federal Pipeline and Hazardous Materials Safety Administration. Everything else in scope is held to incorporated standards and a registration and certification schedule.

Chapter 338 performance standards and dates
RequirementExisting vessels (in service by September 1, 2027)New vessels (in service after September 1, 2027)
Process safety elementsParts of 40 CFR Part 68, including hazard review, mechanical integrity, management of change and pre-startup reviewSame
Spill preventionParts of 40 CFR Part 112, including SPCC and facility response plan sectionsSame
Inspection and repairAPI 653 shell, bottom and foundation evaluation, inspection frequency, internal and external inspection, reconstruction and repair sectionsSame
Overfill preventionAPI 2350 sections 4 and 5 for vessels at 0.5 psig or lessSame
Fire protectionNFPA 30 section 22.8, or API RP 2001Same
Design and constructionOriginal code of constructionAPI 650, thirteenth edition
Location and spacingExisting layoutNFPA 30 section 22.4
RegistrationBy September 1, 2027Within 30 days after start of operation
Compliance certificationStatus report by September 1, 2027; certify at next out-of-service maintenance, no later than September 1, 2037Within 30 days after start of operation
RecertificationEvery 10 yearsEvery 10 years

Retrofits needed to meet the existing-vessel standards are made during the next out-of-service maintenance, unless TCEQ approves in writing that a modification is technically infeasible. For owners, that turns every scheduled tank outage between now and 2037 into a compliance opportunity: overfill prevention upgrades, bottom and shell repairs to API 653, foundation evaluation and fire protection changes can all be planned into the same downtime.

What Chapter 338 means for a tank ordered today

A storage tank ordered today for a Texas refinery, petrochemical plant or terminal will likely start service near or after September 1, 2027, so the safest basis is to build it to the new-vessel standards from the outset. That means API 650 construction, NFPA 30 section 22.4 spacing and location, an overfill prevention system laid out to API 2350, and fire protection to NFPA 30 section 22.8 or API RP 2001, with registration and certification both due within 30 days after start of operation.

In practice the data sheet carries more than shell courses and roof type. Paul Industries asks for the stored products and their vapor pressures, the fill and withdrawal rates that set the overfill levels, the foam or water spray design basis, the spacing to neighboring tanks and property lines, and the API 653 inspection access the owner wants built in. The tank’s turnover package then lists the standard behind each feature, which is what an owner needs to certify compliance within 30 days of starting operation.

VOC storage controls in Texas ozone areas

VOC storage tanks in parts of Texas also answer to 30 TAC 115.112, which sets control requirements in the Houston-Galveston-Brazoria, Beaumont-Port Arthur and El Paso areas and in counties including Nueces, Bexar and Travis. Unless a tank can hold enough working pressure to prevent vapor loss, it must meet the rule’s control tables, typically through an internal or external floating roof or a vapor recovery system.

The rule reaches the details of floating roof design: openings in the roof must project below the liquid surface or carry a cover, seal or lid kept closed except in use, vacuum breaker vents stay closed except when the roof lands or floats off its legs, rim vents open only at those times or at the manufacturer’s setting, and roof drains that empty into the stored liquid need a slotted membrane cover over at least 90 percent of the opening. Paul Industries designs roof fittings, seals and drains to that rule for tanks in those areas, and coordinates any new tank with the owner’s air permit, since the Houston area has been in severe ozone nonattainment since November 2022.

Tank fabrication across Texas regions

Tank fabrication across Texas follows the state’s industrial geography: very large petroleum and chemical storage on the coast, production tanks in the oil fields, stainless process tanks at food, beverage and pharmaceutical plants, and water storage for growing cities and plants everywhere.

Storage tanks, Houston and the Ship Channel

Terminals and plants in Pasadena, Galena Park, Deer Park, Baytown and Channelview hold dense tank farms, and much of that storage falls under Chapter 338 and the Houston-Galveston-Brazoria VOC rules at once. For tank fabrication, Houston owners also plan around hurricane season, because a nearly empty tank under construction is vulnerable to wind and flood buoyancy.

Beaumont, Port Arthur, Corpus Christi and Freeport

Texas holds about one-third of US crude refining capacity, and the refineries, chemical plants and export terminals at the Sabine-Neches waterway, Corpus Christi Bay and Freeport add crude, product, intermediate and chemical storage, often in coastal soils that call for careful foundation design and settlement monitoring.

Water storage tank, Texas cities and plants

Potable water storage for Texas public water systems must be covered and designed, fabricated, erected, tested and disinfected to current AWWA standards under 30 TAC 290.43, which for welded steel means AWWA D100. Every ground, elevated and pressure tank in a public system is inspected annually, and pressure tanks with an inspection port get an interior inspection every five years. Plants build fire water, raw water and process water tanks to the same AWWA designs.

Stainless process tanks in North and Central Texas

Food, beverage, dairy and pharmaceutical plants in Dallas-Fort Worth, Sherman, Austin, San Antonio and the Rio Grande Valley use stainless mix, hold and CIP tanks built to 3-A or ASME BPE practice, which fall outside the petroleum tank rules as flow-through process tanks.

Permian Basin and the oil fields

Production tanks at oil and gas leases in the Permian Basin and the Eagle Ford are regulated by the Railroad Commission rather than TCEQ’s Subchapter F, and shop-welded production tanks are commonly built to API 12F, while larger field-erected tanks at gathering and crude terminals follow API 650.

Overfill prevention and fire protection designed in

Overfill prevention and fire protection are the two Chapter 338 standards that most change how a new storage vessel is built, because both need nozzles, instruments, piping and platforms that are cheaper to include at fabrication than to retrofit. API 2350 sets the levels of concern for a vessel, from the maximum working level to the high-high and critical high levels, and calls for an overfill prevention system matched to how the facility is attended and how product arrives, whether by pipeline, ship, barge, rail or truck.

For the fabricator, that translates into level instrument nozzles and stilling wells placed where the readings represent the liquid level, independent high-level switch connections, gauging hatches and, on floating roof units, clearances that let the roof move through its full stroke without striking instruments. Fire protection to NFPA 30 section 22.8, or to API RP 2001 in refinery practice, adds foam chambers or rim seal foam pourers, foam dams on floating roofs, cooling water rings where the design calls for them and the supports for all of it. Paul Industries lays these out with the owner’s fire protection and instrument engineers at the drawing stage, so the shell openings are cut and reinforced before the plates are rolled.

Coastal foundations, wind and hurricane season

Coastal foundations and hurricane season shape every storage project from Brownsville to Orange. Expansive clays and soft coastal soils settle under a full hydrotest load, so ringwall or slab foundations are designed from the owner’s geotechnical report and settlement is measured at set points during the first fill, giving the baseline that API 653 inspections later compare against.

Wind and flood govern the empty condition. A vessel under construction, or one drawn down for maintenance, is light enough for wind to buckle an unstiffened shell and for flood water to float it off its foundation, which is why API 650 wind girders, anchorage checks and storm procedures that call for ballasting with water ahead of a hurricane belong in the design basis for coastal sites. Paul Industries plans erection sequences with intermediate stiffening and a storm plan for any work open between June and November.

Storage and process vessels Paul Industries builds for Texas owners, by standard
TypeTypical standardWhere it is used in Texas
Field-erected atmospheric storageAPI 650, with API 653 for repairs and reconstructionRefinery, chemical and terminal storage on the coast; crude terminals in West Texas
Shop-built atmospheric storageAPI 650 Annex JPlant storage, additive and chemical storage where road limits allow
Low-pressure storageAPI 620Refrigerated and low-pressure products above the API 650 pressure range
Production tanksAPI 12FOil and gas leases in the Permian Basin and Eagle Ford
Potable and fire water storageAWWA D100Public water systems, plant fire water and raw water
Sanitary process vessels3-A or ASME BPE practiceFood, dairy, beverage and pharmaceutical plants

Shop-built tanks, field erection and the Texas schedule

Shop-built tanks arrive complete and tested, and Texas road permits for oversize loads usually set the practical limit on diameter, while larger tanks are erected in the field course by course on a prepared foundation. The choice drives the schedule: a shop tank’s time is mostly fabrication, while a field tank’s time is mostly site work, which on the Gulf Coast competes with summer heat, afternoon storms and hurricane season.

Hydrostatic testing of a field-erected unit also needs a water source and a discharge plan, which in parts of Texas means arranging water early and treating it before disposal. Shell-to-bottom welds and annular plates are checked again after the test, because those are the joints most sensitive to settlement.

Repairing and altering Texas tanks under API 653

Repairs and alterations to Texas storage tanks follow API 653, which Chapter 338 incorporates for vessels in its scope and which most owners use for the rest of their tank population. Shell evaluation, bottom evaluation and foundation evaluation come first, then the repair plan: door sheets and shell course replacement, new bottoms or bottom overlays with leak detection, nozzle additions, roof replacement or conversion from a fixed roof to an internal floating roof.

Planning these repairs around Chapter 338 makes sense for owners with vessels in its scope. A bottom replacement is the natural moment to add a release prevention barrier and leak detection, a roof replacement the moment to convert a fixed-roof unit holding volatile product to an internal floating roof that meets the VOC rules, and a shell repair the moment to add the level instrument and foam nozzles that the overfill and fire protection standards call for. Doing those in one outage avoids opening the same vessel twice before the 2037 certification deadline.

Reconstruction, where a tank is dismantled and rebuilt at a new location, has its own API 653 design section and is treated as close to new construction. Paul Industries fabricates replacement plates, nozzle assemblies and roofs, makes the welded repairs and returns the tank with a record set the owner’s API 653 inspector can accept. Welding procedures for this work are covered on industrial welding services in Texas, and cleaning before entry on the industrial tank cleaning page.

Aboveground storage tank secondary containment requirements in Texas

Aboveground storage tank secondary containment requirements in Texas come mostly from the federal SPCC rule in 40 CFR Part 112, which Chapter 338 also incorporates. For bulk storage at onshore facilities, Section 112.8 requires containment sized for the entire capacity of the largest single container plus enough freeboard for precipitation, with dikes and drainage built so that rainwater can be inspected before release.

The fire code adopted by the city or county adds spacing, impounding and drainage requirements drawn from NFPA 30 or the International Fire Code. Paul Industries designs dike walls, double-wall tanks for smaller fuel storage and drainage valves to those rules, and generator fuel systems for critical facilities are covered on data center mechanical contractors in Texas.

What does tank fabrication in Texas cost?

The cost of tank fabrication in Texas is set by capacity and dimensions, material, shell and bottom thickness, roof type, nozzles and internals, coatings, foundation and containment work, and the testing and inspection plan, so a price comes from the data sheet rather than a cost per gallon. Stainless and alloy tanks, internal floating roofs, overfill systems and foam fire protection all add cost to an otherwise simple carbon steel tank.

Paul Industries offers a budget range from comparable tanks once the basic data is known, then a firm price after the design is fixed. Supply-only shop tanks, design-build packages with foundations and piping, and complete installation including erection and hydrotest are priced the same way.

Who fabricates and erects tanks for Texas plants and terminals?

Paul Industries fabricates and erects tanks for Texas plants and terminals, from API 650 storage and API 12F production tanks to stainless process tanks and AWWA water tanks, and installs the piping, ladders, platforms, foundations and containment around them. Of the tank manufacturers Texas owners compare, the deciding questions are the same: which standard the tank is built to, how the regulatory paperwork is handled and what records arrive at turnover, and Paul Industries answers all three in its proposal.

Tank work usually connects to other scope: pressurized storage on pressure vessel fabrication in Texas and the transfer lines on process piping in Texas. The national tank fabrication page explains tank types, materials and fabrication steps in more depth.

Tank work from Paul Industries in Texas

An East Coast contractor with a Kilmarnock, Virginia headquarters at 256 Shore Drive, and formerly based in northern New Jersey and later Pennsylvania, Paul Industries builds storage and process vessels for owners across Texas and the rest of the country. Its headquarters-state page is tank fabrication in Virginia, and owners with Southeast sites can compare tank fabrication in Florida. For everything else Paul Industries builds statewide, start at Texas; for neighboring states along the water, see Gulf Coast.

For tank fabrication in Texas, Paul Industries designs to the right code, builds and erects the tank, tests it, delivers the records TCEQ registration and certification need, and repairs and alters tanks already in service. To start, send the contents, capacity, location and required date, and request a quote.

Standards referenced: API 650 · API 620 · API 653 · API 12F · API 2350 · API RP 2001 · NFPA 30 · AWWA D100 · ASME BPE · 40 CFR Part 112 (SPCC) · 40 CFR Part 68 · 30 TAC Chapter 334 Subchapter F · 30 TAC Chapter 338 · 30 TAC 115.112 · 30 TAC Chapter 290

Frequently asked questions

Who builds tanks for terminals in Pasadena, Galena Park and Deer Park?

Paul Industries builds and erects API 650 storage tanks for terminals and plants in Pasadena, Galena Park, Deer Park, Channelview and Baytown, and repairs existing tanks under API 653. Most tanks there fall under the Chapter 338 storage vessel program and the Houston-area VOC rules, so floating roof fittings, overfill prevention and fire protection are designed in from the start.

Does Paul Industries fabricate tanks for Corpus Christi and Ingleside terminals?

Yes. Paul Industries fabricates and erects crude, product and chemical storage tanks for terminals and plants in Corpus Christi, Ingleside and the Coastal Bend. Nueces and San Patricio counties have their own VOC storage requirements, and coastal soils and salt air shape the foundation design and coating systems on every tank.

Who builds stainless process tanks for Dallas-Fort Worth and Central Texas food plants?

Paul Industries builds jacketed and unjacketed stainless mix, hold and CIP tanks for food, beverage, dairy and pharmaceutical plants in Dallas-Fort Worth, Sherman, Austin and San Antonio. These are built to 3-A or ASME BPE practice with polished product-contact surfaces, sanitary nozzles and drainable bottoms, and ship with material and finish records.

Does Paul Industries build tanks for Midland and Odessa operators?

Yes. Paul Industries builds production, gathering and terminal tanks for operators in Midland, Odessa and across the Permian Basin. Lease production tanks fall under the Railroad Commission rather than TCEQ’s petroleum tank registration, and shop-welded units are commonly built to API 12F, while large crude terminal tanks are field-erected to API 650.

When is TCEQ tank registration due for a new aboveground tank?

For a petroleum tank covered by Chapter 334 Subchapter F, registration is due within 30 days after product is first placed in the tank. A temporary delivery authorization lets carriers deliver for the first 90 days. Under Chapter 338, existing storage vessels register by September 1, 2027, and new ones within 30 days after operation begins.

Do tanks at a refinery or chemical plant register under Chapter 334?

Tanks located at or part of a petroleum refinery, petrochemical plant, electric generating facility or bulk facility are exempt from Chapter 334 Subchapter F. Those of 21,000 gallons or more at refineries, petrochemical plants and bulk terminals now fall under the Chapter 338 storage vessel program instead, with its own registration and certification schedule.

Does Chapter 338 apply to heated or pressurized tanks?

Heated tanks and tanks operated above 0.5 psig are excluded from the Chapter 338 definition of a storage vessel, as are flow-through process tanks, pressure vessels and oil-water separators. Other rules still reach them, including the owner’s process safety program, the fire code and, for pressure vessels, the ASME Code.

Can a fuel distributor fill a new Texas tank before it is registered?

For the first 90 days after product is first delivered into a new or replacement system, a common carrier can accept a TCEQ temporary delivery authorization, with the first bill of lading attached, in place of the registration certificate. After that, deliveries need a valid, current registration certificate on site.

Are generator diesel tanks of 1,100 gallons or less regulated by TCEQ?

Tanks of 1,100 gallons or less are excluded from Chapter 334 Subchapter F, so a small generator base tank is not registered there. The federal SPCC rule can still apply to the facility’s total oil storage, and the fire code adopted by the city sets spacing, venting and containment for the tank.

What standards does a Texas public water storage tank follow?

Under 30 TAC 290.43, potable water storage for a public water system must be covered and designed, fabricated, erected, tested and disinfected to current AWWA standards, which for welded steel tanks is AWWA D100. Rule 290.46 requires an annual inspection of every ground, elevated and pressure tank, covering vents, hatches, coatings and watertightness.

Does a floating roof tank in Houston need special fittings?

Yes. Under 30 TAC 115.112, floating roof openings in the Houston-Galveston-Brazoria area must project below the liquid or carry a closed cover, seal or lid; vacuum breaker and rim vents stay closed except when the roof lands or floats; and roof drains that empty into the product need a slotted membrane cover over at least 90 percent of the opening.

Who regulates oil field tanks in Texas?

Tanks used in exploring for, developing or producing oil, gas or geothermal resources are regulated by the Railroad Commission of Texas and are exempt from TCEQ’s petroleum tank registration. Those production tanks are also outside Chapter 338. Air authorizations for their emissions still come through TCEQ.

How is a tank bottom replaced under API 653?

The tank is emptied, cleaned and gas freed, the old bottom is cut out or overlaid, the foundation is evaluated and repaired, and the new bottom is welded, vacuum box tested and joined to the shell under API 653 rules. Many owners add a release prevention barrier and leak detection at the same time. A hydrotest follows where API 653 requires it.

What aboveground storage tank secondary containment requirements apply to a Texas fuel tank?

Facilities subject to the SPCC rule provide containment for the entire capacity of the largest single container plus freeboard for rain, and the city fire code adds impounding, spacing and drainage rules from NFPA 30 or the International Fire Code. Double-wall tanks meet containment on many smaller fuel tanks.

Can an existing Texas tank be moved to a new site?

Yes, under API 653 reconstruction rules, which treat a dismantled and rebuilt tank close to new construction, with design checks, weld procedures, examination and a hydrotest. A petroleum tank covered by Chapter 334 is registered at its new location, and one entering service at a Chapter 338 facility after September 1, 2027 needs its compliance certification within 30 days.

What drives the price of a stainless process tank for a Texas plant?

Volume, alloy, surface finish, jackets and insulation, agitator supports, nozzle count, CIP spray devices, load cells and documentation set the price. A polished, jacketed BPE tank with full documentation costs considerably more than a plain storage tank of the same size. Paul Industries prices from the data sheet and a general arrangement sketch.

Which drawings and data start a Texas tank quote?

Send the stored product and its vapor pressure and temperature, capacity or dimensions, design code, roof type, nozzle list, site location and facility type, foundation or soil data, coating requirements and the required in-service date. Paul Industries returns a budget range and the open questions before a firm price.

Planning a new, replacement or relocated tank in Texas?

Send the contents, capacity, location, facility type and required date. Call 201-450-8280 or request a quote.