Paul Industries provides tank fabrication in Wisconsin, designing, building and installing carbon steel storage tanks, stainless process tanks and fuel tanks for dairies, breweries, mills, food and chemical plants, data centers and utilities. Fuel, solvent and chemical tanks are built to the standards ATCP 93 recognizes, such as API 650, UL 142 and UL 2085, and planned through Wisconsin’s plan review, registration and inspection rules; sanitary tanks for milk, whey, wort and beer are built for cleanability and finish. The company is headquartered at 256 Shore Drive, Kilmarnock, Virginia, and builds tanks for sites from Kenosha to Superior.

Request a quote or call 201-450-8280

Headquarters 256 Shore Drive, Kilmarnock, Virginia
Tank rule ATCP 93, administered by DATCP
Registration Aboveground tanks of 5,000 gallons or more, within 15 business days of installation
Outdoor dikes 25 percent more capacity than NFPA 30 requires (ATCP 93.420)
Inspections API 653 for field-erected tanks, STI SP001 for shop-built tanks
Reviewed November 2026

What does tank fabrication in Wisconsin answer to?

Tank fabrication in Wisconsin answers to two families of rules depending on what the tank holds: chapter ATCP 93 for tanks storing flammable, combustible or federally listed hazardous liquids, and the food, beverage and pressure rules for process tanks. ATCP 93 is administered by the Department of Agriculture, Trade and Consumer Protection (DATCP), through its Bureau of Weights and Measures, and it took its present form when the chapter was created in November 2019. Flammable liquids are those with a flash point below 100 F; combustible liquids are those at or above it, split into Classes II, IIIA and IIIB under NFPA 30.

The chapter reaches further than new tanks. It applies to new facilities, to remodeling and alterations that are integral to storage, transfer or dispensing, and to a change that brings an existing facility into regulated service. Its groundwater protection and fire safety provisions, such as leak detection, secondary containment, corrosion protection and spill and overfill prevention, apply to existing tanks as well, whether or not anything is being changed. Paul Industries reads a tank project against those provisions at the start, because a replacement tank can pull the containment, piping and overfill devices around it into the same approval.

Process tanks follow a different path. A milk silo, whey tank, brewery fermenter or CIP tank holding water, food or beverage sits outside ATCP 93 unless it stores a regulated liquid, and becomes a pressure vessel under chapter SPS 341 only when it operates above 15 psig. Those tanks are governed by the plant’s food safety program and by sanitary design practice, and for a stainless steel tank, brewing or dairy service sets the finish, the welds and the cleaning design.

Plan review before a regulated tank is built

Plan review under ATCP 93.100 means written approval from DATCP or its authorized agent before construction of a new or additional tank or piping installation starts. The same approval is needed before a tank system changes from a non-regulated to a regulated substance, before corrosion protection or spill and overfill protection is added or modified, and before a tank is used for a substance that the department or fire department judges to be a significant hazard. The submittal includes the owner, the address, a project summary, a plot plan at a scale of at least one inch to 20 feet, and the fees and installation application.

Several common industrial cases are exempt. Aboveground tanks under 5,000 gallons storing Class IIIB liquids other than used oil need no plan review, nor does reconfiguring aboveground product piping that feeds a manufacturing, industrial or blending process. Aboveground tanks storing hazardous liquids that are neither flammable nor combustible are also exempt when a qualified engineer supervises their construction, though ATCP 93.350 still requires those tanks to be designed by a qualified engineer. Paul Industries prepares the drawings, calculations and data the submittal needs, so construction starts on an approved design.

Wisconsin tank registration, permits and installation credentials

Wisconsin tank registration under ATCP 93.140 applies to every new and existing tank that stores a regulated substance, with exemptions for aboveground tanks under 5,000 gallons, tank vehicles, portable and movable tanks on a property for less than 24 months, and tanks at EPA superfund sites. The owner registers a newly installed tank within 15 business days after installation is complete, on DATCP form TR-WM-118 for aboveground tanks. The note to the rule adds a financial reason: eligibility for Wisconsin’s petroleum cleanup fund is conditioned on prior registration.

Aboveground tanks need no DATCP permit to operate. That permit, under ATCP 93.145, is for underground tanks, including underground heating oil tanks that serve as backup fuel for gas-fired boilers. Underground tanks, underground piping and shop-built aboveground tank systems carry a different requirement under ATCP 93.240: their installation is provided or supervised by persons credentialed by DATCP, or carried out under the direct supervision of a registered professional engineer who is on site during the key installation and test activities. Cleaning and removal of shop-built aboveground tank systems falls under the same credential rule.

ATCP 93 steps for common tanks at Wisconsin plants
TankPlan reviewRegistrationInspection standard
Shop-built diesel tank for a standby generator, 5,000 gallons or moreRequiredWithin 15 business days of installationSTI SP001
Shop-built diesel day tank under 5,000 gallonsRequired for Class II dieselExempt below 5,000 gallonsSTI SP001
Field-erected API 650 tank for fuel, solvent or ethanolRequiredRequiredAPI 653: external and ultrasonic at 5 years, internal at 10
Lube or hydraulic oil tank under 5,000 gallons (Class IIIB)ExemptExemptSTI SP001 for shop-built steel
Caustic or acid tank on the CERCLA list, 1 percent or moreExempt if a qualified engineer supervises constructionRequired at 5,000 gallons or moreEngineer-designed under ATCP 93.350
Milk silo, wort or beer tank, CIP tankOutside ATCP 93Outside ATCP 93Food safety program; SPS 341 above 15 psig

Which standards can a Wisconsin storage tank be built to?

A Wisconsin storage tank for flammable or combustible liquids must be built and listed or labeled to one of the design standards that NFPA 30 section 21.4.2 recognizes, or to another standard or design the department approves, under ATCP 93.250. The recognized list includes API 650 for welded field-erected tanks, API 12B, 12D and 12F for production tanks, and UL 58, UL 80, UL 142, UL 1316, UL 1746, UL 2080 and UL 2085, and DATCP has also approved UL SU 2258. A tank custom-built for a specific purpose can instead be supported by a statement from a qualified engineer whose competency matches that purpose.

Every newly built tank also carries permanent exterior marking with the name of the manufacturer or the party responsible for construction, the year built, the standard it was built to and the minimum rate of any required emergency venting. Tanks built for underground use may not be placed aboveground, Class IIIB tanks of 5,000 gallons or more must be listed or acceptable to the department, and foundations must prevent uneven settling. Paul Industries builds to the standard the service needs, marks the tank to the rule and delivers the listing or engineer’s statement with the turnover file.

Tanks in Wisconsin built for hazardous substances on the federal CERCLA list, at concentrations of 1 percent or more, are designed and constructed under the supervision of a qualified engineer under ATCP 93.350, because those rules exist to keep the liquids out of the state’s groundwater. Paul Industries carries that engineering into the material selection, the nozzle and venting design and the containment.

Secondary containment and Wisconsin’s larger outdoor dikes

Secondary containment for Wisconsin aboveground tanks follows NFPA 30 section 22.11 with one notable state change: a dike system open to the weather must hold 25 percent more than the capacity NFPA 30 requires, under ATCP 93.420. Rain and snowmelt collect in an open dike, and the extra volume keeps that water from eating into the space reserved for a tank failure. Dikes built of steel or of poured or precast concrete must have every crack, seam and joint sealed liquid-tight, and concrete dikes follow ACI 350.2R as well.

New dikes with earthen or masonry walls or floors are lined with a synthetic material of permeability no faster than 10 to the minus 6 centimeters per second for the stored liquid. An engineered clay liner meeting that permeability for at least 35 years is allowed for tanks with double bottoms and interstitial monitoring and for certain single-bottom designs. Tanks storing Class IIIB liquids other than used oil, outside a dike shared with lighter liquids, are outside this section, though the federal spill prevention rules in 40 CFR 112 may still apply.

Containment design is where tank projects in Wisconsin most often grow after the tank is ordered. Paul Industries sizes the dike, its drain valve and its liner at the same time as the tank, and where space is short, offers double-wall or UL 2085 protected tanks that carry integral containment.

How the tank fabrication process runs for a Wisconsin order

The tank fabrication process for a Wisconsin order starts with the service and the standard, then moves through design, material, fabrication, testing, delivery and installation, with the ATCP 93 approvals running alongside for regulated tanks. Size decides the first fork. Tanks small enough to ship by road are built complete and set on prepared foundations; larger API 650 tanks are erected on the foundation from rolled plate, with bottom, shell and roof welded and examined in the field.

Shop-built and field-erected tanks for Wisconsin sites
FactorShop-built tankField-erected tank
Typical standardsUL 142, UL 2085, sanitary process designsAPI 650 for storage; custom designs for large process tanks
Regulated installationCredentialed installer or on-site registered engineer under ATCP 93.240Plan review, registration and API 653 inspection schedule
Schedule driverFabrication and shipping slotFoundation curing, plate delivery and weather for field welding
Winter workBuilt indoors; delivery and setting in any seasonEnclosures and heat for welding and coating; foundation pours timed around frost
Periodic inspectionSTI SP001 monthly and annual owner checks plus formal inspectionsMonthly in-service checks; external and ultrasonic at 5 years; internal at 10
Best fitGenerator fuel, day tanks, chemical and process tanksBulk fuel, ethanol, water and large process storage

Wisconsin cold changes the field side. Outdoor sites are designed for winter temperatures of minus 10 F in the southeast and minus 25 F in the north under the state energy code, which bears on material toughness for the shell and on how foundations are built below frost. Field welding and coating in winter need heated enclosures, so carbon steel tank, Wisconsin winter projects are often split, with foundations poured in autumn and erection in spring. Paul Industries plans that split into the schedule from the start.

Stainless tanks for Wisconsin dairy, cheese and brewing plants

Stainless tanks in Wisconsin serve the dairy industry first: the state has nearly 1,200 cheesemakers holding state licenses, producing more than 600 types and styles of cheese, according to DATCP, and every plant needs silos, balance tanks, whey tanks, brine tanks and CIP tanks. Those tanks are built in 304 or 316L stainless with polished product-contact surfaces, sloped bottoms that drain fully, spray devices placed for full coverage, and manways, vents and agitators designed to be cleaned in place.

Breweries and distilleries add fermenters, bright tanks, hot liquor and cold liquor tanks, and spirit receivers. Fermenters and bright tanks that hold beer at 140 F or less can be built without the ASME code under SPS 341.45, but they still carry identification and relief devices, and spirit storage brings flammable liquid rules into play. When plants compare Wisconsin stainless steel tank manufacturers, the details that separate the bids are weld finish inside the tank, the drainability of outlets, the cleaning validation behind the spray design and the passivation after fabrication, covered on passivation services in Wisconsin. The cleaning side is described on the dairy processing and distilling and brewing pages.

The stainless steel tank lifespan in dairy and brewing service runs to decades when chloride exposure, cleaning chemistry and weld quality are controlled, and a tank that fails early usually shows pitting at welds or under deposits. Paul Industries builds with full-penetration welds ground to the specified finish, passivates after fabrication and documents the finish, so the plant has a baseline for later inspections.

Material and finish choices by Wisconsin tank service
ServiceUsual materialFinish or liningWhat drives the choice
Raw milk silo and balance tank304 stainlessPolished product contact, sloped and drainable bottomDaily CIP, insulation for outdoor silos, agitation
Cheese brine and acid whey316L stainless or higher alloyPolished, passivated after fabricationChloride and acid attack at welds and crevices
Fermenter and bright tank304 stainlessPolished interior, glycol jacketsCooling duty, CO2 venting, cleaning coverage
Spirit receiver at a distillery304 or 316L stainlessPolished interior; grounded and ventedFlammable liquid rules, emergency venting and containment
Diesel base tank or day tankCarbon steel, double wallCoated exterior, UL listingATCP 93 plan review, overfill and interstitial leak detection
Water and fire water storageCarbon steel or stainlessInterior coating on carbon steelVolume, freeze protection and heating in winter
Caustic and acid bulk storageCarbon steel, stainless or lined steel by chemical and temperatureLining or coating where the chemistry needs itEngineer-designed under ATCP 93.350 for listed substances

Outdoor silos in Wisconsin also need insulation and cladding that hold up through a minus 15 F or minus 20 F design winter, with heat on outlet valves and instrument connections so product and cleaning solutions keep flowing. Paul Industries designs the jacket, insulation and cladding with the silo, and places sample valves, level and temperature connections where operators can reach them from a heated room. Where an existing silo or process vessel is being replaced, Paul works from the existing nozzle positions so new connections line up with the plant’s piping and the changeover fits a single cleaning window.

Generator fuel and day tanks under Wisconsin fuel tank regulations

Wisconsin fuel tank regulations treat a diesel tank for a standby generator as an ATCP 93 tank for a Class II combustible liquid, so the base tank or day tank needs plan review and, at 5,000 gallons or more, registration. Hospitals, data centers, water utilities and campuses use UL 142 double-wall base tanks or UL 2085 protected tanks for that service, sized to the required run time and fitted with overfill prevention, leak detection in the interstice and vents sized to the marked emergency venting rate.

Data center campuses in southeast Wisconsin carry fuel for long generator runs, which makes tank count, containment and fill access as important as tank size. Paul Industries builds and installs base tanks, day tanks, transfer pumps and the fuel piping between them, and coordinates the fill, vent and overfill arrangement with the plan review drawings. The fuel piping side connects to process piping in Wisconsin.

How often are aboveground tanks inspected under ATCP 93?

Aboveground tanks in Wisconsin are inspected on a schedule set by how they were built, under ATCP 93.440. Field-erected metallic tanks within the scope of API 653 have a first in-service inspection within one month of initial service and then monthly, a first external inspection and a first ultrasonic thickness inspection at five years, and a first internal inspection at ten years, with later intervals set by API 653. Shop-built metallic tanks follow STI SP001, which sets monthly and annual owner checks plus periodic formal inspections.

The agency that performs an API 653 inspection reports it on DATCP’s summary form TR-WM-119 and gives the owner both the summary and the full report, and the owner keeps the summary on site for inspection within 30 days of receiving it. A tank converted from unregulated to regulated service must have every inspection in the table that has not yet occurred completed before the regulated substance goes in. Paul Industries builds tanks with inspection access in mind, including nozzle and manway placement for internal entry, and repairs, alters and reconstructs existing tanks to API 653 when an inspection calls for it.

Existing Wisconsin storage often needs work short of replacement. Bottoms thinned by underside corrosion, shell courses with pitting near the floor, roofs with failed seals and nozzles that leak at their reinforcing pads are all repaired under API 653 with the inspector’s findings as the scope. ATCP 93 also has its own sections for a change in service between regulated and non-regulated substances, for seldom-used and temporarily out of service systems and for closure, and each triggers steps such as a tank-system site assessment before the work proceeds. Paul Industries plans repairs, changes of service and replacements against those sections, so the owner’s records stay continuous from the first registration to the last inspection.

How much does tank fabrication in Wisconsin cost?

The cost of tank fabrication in Wisconsin depends on volume, material, the construction standard, wall thickness, roof type, nozzles and internals, finish for sanitary service, insulation and heating, containment, foundation and access for delivery or erection. A UL 142 carbon steel tank and a polished 316L silo of the same volume differ several times in price, and a field-erected API 650 tank adds foundation and erection costs that a shop-built tank avoids.

Wisconsin items enter the budget as well: plan review fees and drawings, the larger outdoor dike volume, linings for earthen containment, winter enclosures for field work and the first API 653 or STI SP001 inspection plan. Paul Industries gives a budget range from comparable tanks once the service, volume and site are known, then a firm price with drawings. Request a quote with the stored liquid, volume, dimensions limits and site plan.

Who fabricates tanks in Wisconsin?

Paul Industries fabricates tanks for Wisconsin plants and facilities: shop-built UL 142 and UL 2085 tanks, field-erected API 650 storage tanks, stainless silos and process tanks, brewery and distillery tanks, chemical tanks and water storage. The work covers design, fabrication, coating or passivation, foundations and containment coordination, delivery and setting or field erection, piping, instrumentation, testing and startup, with supply-only, design-build and complete installation routes.

Buyers comparing tank manufacturers in Wisconsin usually weigh three questions: whether the tank will pass plan review the first time, whether its containment and piping are part of the price, and whether the sanitary or coating finish is documented. Paul Industries answers them under one contract, with tanks that need ASME construction covered on pressure vessel fabrication in Wisconsin and field welding on industrial welding services in Wisconsin. The national service is described on tank fabrication.

Storage and process tanks from Paul Industries for Wisconsin

From its headquarters at 256 Shore Drive, Kilmarnock, Virginia, Paul Industries, an East Coast contractor formerly based in northern New Jersey, then Pennsylvania, designs, builds and installs tanks for sites across Wisconsin, across all 50 states and at plants abroad. The headquarters state’s tank rules are set out on tank fabrication in Virginia and a Northeast comparison on tank fabrication in Pennsylvania; the state’s wider industrial picture is on the Wisconsin and Midwest pages, and startup records on validation and commissioning in Wisconsin. Send the stored liquid, volume, standard, finish, site plan and schedule. Call 201-450-8280 or request a quote.

Standards referenced: Wisconsin Administrative Code ch. ATCP 93, Flammable, Combustible and Hazardous Liquids · NFPA 30 Flammable and Combustible Liquids Code · API 650 Welded Tanks for Oil Storage · API 653 Tank Inspection, Repair, Alteration and Reconstruction · UL 142 Steel Aboveground Tanks · UL 2085 Protected Aboveground Tanks · STI SP001 Standard for the Inspection of Aboveground Storage Tanks · ACI 350.2R concrete containment · Wisconsin Administrative Code ch. SPS 341

Frequently asked questions

Who handles tank fabrication, Wisconsin dairies and breweries included?

Paul Industries handles tank fabrication for Wisconsin dairies, cheese and whey plants, breweries and distilleries, building stainless silos, balance tanks, whey and brine tanks, fermenters, bright tanks and CIP tanks with polished product-contact surfaces and drainable designs. Tanks are delivered, set, piped and started up under one contract. Send the product, volume, finish and room dimensions for a budget price.

Who builds tanks for Milwaukee, Waukesha and Kenosha plants?

Paul Industries builds storage and process tanks for plants and campuses in Milwaukee, Waukesha, Racine, Kenosha and the rest of Southeast Wisconsin, including generator fuel tanks for hospitals and data centers, chemical tanks and stainless process tanks. Regulated tanks go through ATCP 93 plan review before construction, and outdoor equipment there is built for the county’s minus 10 F design winter.

Does Paul Industries build tanks for Green Bay, the Fox Valley and central Wisconsin?

Yes. Paul Industries builds tanks for paper mills, food plants and manufacturers in Green Bay, Appleton, Oshkosh, Wausau, Stevens Point and Marshfield, including chemical storage, water and process tanks and fuel tanks. Field-erected tanks in central and northern Wisconsin are scheduled around foundation work before frost and erection in warmer months, with enclosures where winter welding cannot wait.

What should buyers ask tank manufacturers, Wisconsin or out of state?

Ask which standard the tank is built and listed to, whether the drawings will support ATCP 93 plan review, how containment, venting and overfill prevention are handled, what finish and passivation records come with a stainless tank, and who sets and pipes it. Paul Industries answers all of those in the quote and carries the tank from design through installation and startup.

What separates tank fabrication companies on a Wisconsin bid?

Bids for Wisconsin tanks differ most in what they leave out: plan review drawings, the larger outdoor dike ATCP 93 requires, linings, foundations, piping, overfill and leak detection devices, and the first inspection plan. A low tank price can hide those costs. Paul Industries prices the tank with its containment, installation and documentation, so the comparison is complete.

Does a Wisconsin aboveground tank need a permit to operate?

Aboveground tanks are exempt from the DATCP permit to operate under ATCP 93.145; that permit is for underground tanks. Aboveground tanks of 5,000 gallons or more storing regulated substances are registered with DATCP within 15 business days of installation, and new installations need plan review and written approval before construction starts.

When does a Wisconsin tank need plan review?

Plan review and written approval are needed before construction of any new or additional regulated tank or piping, before changing a tank from non-regulated to regulated service, and before adding or changing corrosion protection or spill and overfill protection. Exemptions include aboveground tanks under 5,000 gallons storing Class IIIB liquids other than used oil and aboveground piping changes feeding a manufacturing process.

How much containment does an outdoor tank need in Wisconsin?

Outdoor dikes follow NFPA 30 section 22.11, but ATCP 93.420 requires a dike open to the weather to hold 25 percent more than the NFPA 30 capacity, to allow for rain and snow. Steel and concrete dikes are sealed liquid-tight, and new earthen or masonry dikes are lined to a permeability of 10 to the minus 6 centimeters per second or slower.

Which construction standards does ATCP 93 accept for a fuel tank?

ATCP 93.250 accepts the standards NFPA 30 section 21.4.2 recognizes, including API 650, UL 142, UL 2080 and UL 2085, plus UL SU 2258 and other designs DATCP approves. A custom tank can be accepted on a qualified engineer’s statement. Every new tank is marked with its builder, year, standard and minimum emergency venting rate.

Are API 653 inspections required on every Wisconsin storage tank?

API 653 applies to field-erected metallic aboveground tanks within its scope, with first external and ultrasonic inspections at five years and a first internal at ten years after initial service. Shop-built metallic tanks follow STI SP001 instead. Inspection summaries for API 653 work go on DATCP form TR-WM-119 and are kept on site.

Do milk silos and brewery tanks fall under ATCP 93?

Tanks storing milk, whey, wort, beer, water or other food products sit outside ATCP 93, which covers flammable, combustible and listed hazardous liquids. They are governed by the plant’s food safety program and sanitary design practice, and by SPS 341 if they operate above 15 psig. Spirit storage at a distillery is different, because high-proof ethanol is a flammable liquid.

What is the stainless steel tank lifespan in Wisconsin dairy service?

A well-built 304 or 316L tank in dairy service lasts for decades when cleaning chemistry, chloride exposure and temperatures stay within design limits and welds are finished and passivated properly. Early failures usually start as pitting at welds, gaskets or deposits. Regular inspection of welds and spray coverage, and repassivation after repairs, extend service life.

Can an underground tank be dug up and reused aboveground in Wisconsin?

ATCP 93.400 prohibits using a tank designed and built for underground use as an aboveground tank. A plant replacing an underground tank with an aboveground one needs a tank listed for aboveground service, such as UL 142 or UL 2085, with plan review, registration where the size requires it and the matching containment. Paul Industries supplies and installs the replacement.

Who may install a shop-built fuel tank in Wisconsin?

ATCP 93.240 requires the installation of underground tanks, underground piping and shop-built aboveground tank systems to be provided or supervised by persons credentialed by DATCP, or carried out under the direct supervision of a registered professional engineer who is on site for the key installation and test activities. Cleaning and removal of shop-built aboveground systems follow the same rule.

How long does a field-erected tank take for a Wisconsin site?

The schedule depends on plan review, plate delivery, foundation work and the season. Foundations are poured before frost or after thaw, and field welding and coating in winter need heated enclosures, so many Wisconsin projects pour in autumn and erect in spring. Paul Industries sets the sequence and dates in the proposal once the site and size are known.

What information starts a tank quote for a Wisconsin site?

Send the stored liquid and its flash point, volume, preferred dimensions, construction standard, material and finish, nozzle list, heating, insulation and agitation needs, containment arrangement, site plan and delivery access, and the required date. Photos of the existing tank help on replacements. Paul Industries prices the tank and its installation from that package, with drawings to follow on award.